CN215406096U - Supporting structure with matched smooth piles and T-shaped piles - Google Patents

Supporting structure with matched smooth piles and T-shaped piles Download PDF

Info

Publication number
CN215406096U
CN215406096U CN202121522063.5U CN202121522063U CN215406096U CN 215406096 U CN215406096 U CN 215406096U CN 202121522063 U CN202121522063 U CN 202121522063U CN 215406096 U CN215406096 U CN 215406096U
Authority
CN
China
Prior art keywords
piles
pile
parallel
shaped
diced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121522063.5U
Other languages
Chinese (zh)
Inventor
郑利祥
张武
邬志浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhuogong Building Materials Technology Co ltd
Original Assignee
Guangdong Zhuogong Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhuogong Building Materials Technology Co ltd filed Critical Guangdong Zhuogong Building Materials Technology Co ltd
Priority to CN202121522063.5U priority Critical patent/CN215406096U/en
Application granted granted Critical
Publication of CN215406096U publication Critical patent/CN215406096U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种顺桩和丁桩配合的支护结构,其特征是:包括多个顺桩及多个丁桩,多个顺桩和多个丁桩间隔排布,丁桩采用的是工字桩,丁桩的竖臂平行设置;顺桩的两侧面分别嵌在相邻的丁桩的两凹槽内,并分别与相邻的丁桩的竖臂相对的面接触。本实用新型结构简单,其可以替代圆形支护桩以及各类型式的钢板桩;本实用新型采用预制的工字桩进行施工,工字桩质量可靠有保证,施工节约工期,生产效率高,而且使得基坑支护施工非常方便,能节省原材料,构件化生产降低了支护施工时对环境污染。

Figure 202121522063

The utility model discloses a supporting structure which is matched with parallel piles and diced piles, which is characterized in that the supporting structure comprises a plurality of parallel piles and a plurality of diced piles, a plurality of parallel piles and a plurality of diced piles are arranged at intervals, and the diced piles adopt It is an I-shaped pile, and the vertical arms of the d-pillars are arranged in parallel; the two sides of the parallel piles are respectively embedded in the two grooves of the adjacent d-pillars, and are respectively in contact with the opposite surfaces of the vertical arms of the adjacent d-pillars. The utility model has a simple structure, and can replace circular supporting piles and various types of steel sheet piles; the utility model adopts prefabricated I-shaped piles for construction, the quality of the I-shaped piles is reliable and guaranteed, the construction period is saved, and the production efficiency is high. Moreover, the foundation pit support construction is very convenient, raw materials can be saved, and the component-based production reduces the environmental pollution during the support construction.

Figure 202121522063

Description

Supporting structure with matched smooth piles and T-shaped piles
Technical Field
The utility model belongs to the technical field of foundation pit supporting equipment, and particularly relates to a supporting structure with matched straight piles and T-shaped piles.
Background
The existing deep foundation pit support is mostly supported by adopting a mode of pouring slope protection piles and underground diaphragm walls, all the modes are that reinforcing cages are processed on site, and then the slope protection piles and the underground diaphragm walls are poured on site. The existing deep foundation pit support can also adopt a steel sheet pile inserting mode to carry out support, such as inserting SMW, Larsen steel sheet piles and the like, but the steel piles have small rigidity and large deformation in the excavation process of the foundation pit, and the construction quality of the foundation pit is difficult to ensure.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model provides the support with the matched smooth piles and the T-shaped piles, which has the advantages of simple structure, low cost, convenient construction operation of foundation pit support construction, small environmental pollution during support construction, construction efficiency improvement and foundation pit construction quality guarantee.
The technical scheme adopted by the utility model is as follows: a supporting structure with matched cis-piles and T-piles comprises a plurality of cis-piles and a plurality of T-piles, wherein the cis-piles and the T-piles are arranged at intervals, the T-piles are H-shaped piles, and vertical arms of the T-piles are arranged in parallel; two side surfaces of the following piles are respectively embedded in the two grooves of the adjacent T-shaped piles and are respectively contacted with the surfaces opposite to the vertical arms of the adjacent T-shaped piles.
In the supporting structure with the matched cis-shaped piles and T-shaped piles, the cis-shaped piles are H-shaped piles, and vertical arms of the cis-shaped piles are perpendicular to vertical arms of the T-shaped piles; the two cross arms of the following pile are respectively embedded in the two grooves of the adjacent T-shaped piles, and the side surfaces of the two cross arms of the following pile, which are opposite to each other, are respectively contacted with the surfaces, opposite to the vertical arms, of the two adjacent T-shaped piles.
In the supporting structure matched with the cis-shaped piles and the T-shaped piles, the cis-shaped piles are hollow piles with polygonal sections.
In the supporting structure with the matched cis-shaped piles and the cis-shaped piles, the cis-shaped piles and the cis-shaped piles respectively comprise I-shaped concrete pile bodies and reinforcement cages arranged in the concrete pile bodies; the concrete pile body is made of concrete, and the strength grade of the concrete is C60.
In the supporting structure matched with the cis-arranged piles and the T-shaped piles, the length of the T-shaped piles is 9000-18000 mm, the length of the cis-arranged piles is 3000-9000 mm, and the cis-arranged piles penetrate into the bottom surface of the foundation pit by 1 m.
Compared with the prior art, the utility model has the beneficial effects that: the utility model has simple structure, and can replace circular support piles and various types of steel sheet piles; the utility model adopts the prefabricated I-shaped pile for construction, the quality of the I-shaped pile is reliable and guaranteed, the construction period is saved, the production efficiency is high, the foundation pit supporting construction is very convenient, the raw materials can be saved, and the environmental pollution during the supporting construction is reduced by means of component production.
Drawings
FIG. 1 is a structural view of embodiment 1 of the present invention.
Fig. 2 is a structural view of embodiment 2 of the present invention.
Detailed Description
The utility model is further described below with reference to the accompanying drawings and examples.
Example 1
As shown in fig. 1, the utility model comprises a plurality of T-shaped piles 1 and a plurality of cis-shaped piles 2, wherein the T-shaped piles 1 and the cis-shaped piles 2 are alternately arranged; the vertical arms of the T-shaped piles 1 are arranged in parallel, the vertical arm of the following pile 2 is perpendicular to the vertical arm of the T-shaped pile 1, two cross arms of the following pile 2 are embedded in the grooves corresponding to the two adjacent T-shaped piles 1 respectively, and the side faces, opposite to each other, of the cross arms of the following pile 2 are tightly attached to the faces, opposite to the vertical arms, of the two adjacent T-shaped piles 1 respectively. The T-shaped pile 1 and the straight pile 2 both comprise I-shaped concrete pile bodies and reinforcement cages arranged in the concrete pile bodies; the concrete pile body is made of concrete, and the strength grade of the concrete is C60.
The utility model adopts a supporting structure with alternately arranged along-pile and butyl piles, and aims to replace the existing section steel supporting pile and part of circular slope protection piles with smaller diameters, the size of the prefabricated along-pile 2 is 120-60mm (the first number represents the height of a cross section, the second number represents the width of the cross section, the third number represents the thickness of a cross section web, and the fourth number represents the thickness of a flange), 800-480 mm or 1000-600-200-mm-wall-1 is 9000-18000 mm, the along-pile 2 is 3000-pile 2 is 1m, and the soil-wall-bottom-wall.
Example 2
As shown in fig. 2, the utility model comprises a plurality of T-shaped piles 1 and a plurality of cis-shaped piles 2, wherein the T-shaped piles 1 are I-shaped piles, and the cis-shaped piles 2 are hollow piles with 12-edge interfaces. The T-shaped piles 1 and the cis-shaped piles 2 are alternately arranged, and vertical arms of the T-shaped piles 1 are arranged in parallel. Two side surfaces of the following piles 2 are respectively embedded in the two grooves of the adjacent T-shaped piles 1 and are respectively contacted with the opposite surfaces of the vertical arms of the adjacent T-shaped piles 1. The T-shaped piles 1 respectively comprise I-shaped concrete pile bodies and reinforcement cages arranged in the concrete pile bodies; the concrete pile body is made of concrete, and the strength grade of the concrete is C60. The cis-pile 2 comprises a concrete pile body and a reinforcement cage arranged in the concrete pile body, the concrete pile body is made of concrete, and the strength grade of the concrete is C60. The length of the T-shaped pile 1 is 9000-18000 mm, the length of the T-shaped pile 2 is 3000-9000 mm, the T-shaped pile 2 stretches into 1m of the bottom surface of the foundation pit, and the soil retaining condition is met.
According to the geological conditions and the design conditions of the foundation pit, the section sizes and the reinforcement arrangement conditions of the T-shaped piles 1 and the cis-shaped piles 2 are selected through calculation and comparison in multiple aspects such as flexural rigidity, area and weight. The T-shaped piles 1 and the cis-shaped piles 2 are produced in prefabricated part factories, the quality is guaranteed, the produced environmental pollution is less, after the T-shaped piles are produced and reach the standard strength, the T-shaped piles are firstly qualified and then transported to construction sites in batches after being qualified, and the construction on the site is carried out. During site construction, soil can be stirred by using stirring pile equipment (such as a triaxial stirring pile and TRD equipment), and the stirring pile is used as a hole site of a precast pile and also used as a waterproof curtain. During on-site construction, a static pressure machine and a hammering machine are used for constructing the T-shaped piles 1 and the cis-shaped piles 2, and soil squeezing effect is noticed during construction. The construction must be accurately positioned.
The web top of being connected with equipment during the construction adopts the steel sheet protection, avoids being pressed from both sides bad sheet pile by anchor clamps, with steel sheet protection web top back, with anchor clamps clip the steel sheet, carry out vertical butyl stake 1 of inserting and in the same direction as stake 2, guarantee butyl stake 1 and in the same direction as the vertical degree of stake 2, avoid producing extra moment of flexure until inserting the design elevation. And constructing a cis pile 2 and then constructing a T pile 1, so that the cis pile and the T pile form a whole with high bending rigidity, and the like, and performing the next working procedure cycle. And after the slope protection pile is constructed, performing crown beam construction, wherein the crown beam construction adopts a currently common method, and after the crown beam construction is finished, excavating soil inside a foundation pit, and constructing by adopting an inner support, an anchor rod, a cantilever and the like.

Claims (5)

1.一种顺桩和丁桩配合的支护结构,其特征是:包括多个顺桩及多个丁桩,多个顺桩和多个丁桩间隔排布,丁桩采用的是工字桩,丁桩的竖臂平行设置;顺桩的两侧面分别嵌在相邻的丁桩的两凹槽内,并分别与相邻的丁桩的竖臂相对的面接触。1. the supporting structure that a parallel pile and a small pile cooperate, it is characterized in that: comprise a plurality of parallel piles and a plurality of small piles, a plurality of parallel piles and a plurality of small piles are arranged at intervals, and what the small piles adopt is an I-shaped The vertical arms of the dicing piles are arranged in parallel; the two sides of the piling piles are respectively embedded in the two grooves of the adjacent dicing piles, and are respectively in contact with the opposite surfaces of the vertical arms of the adjacent dicing piles. 2.根据权利要求1所述的顺桩和丁桩配合的支护结构,其特征是:所述的顺桩采用的是工字桩,顺桩的竖臂垂直于丁桩的竖臂设置;顺桩的两横臂的分别嵌在相邻的丁桩的两凹槽内,顺桩的两横臂相背的侧面分别与相邻的两丁桩的竖臂相对的面接触。2. the supporting structure of the alignment pile according to claim 1 and the d-pillar cooperation, it is characterized in that: what the described aligning pile adopts is an I-shaped pile, and the vertical arm of the aligning pile is set perpendicular to the vertical arm of the d-pillar; The two transverse arms of the parallel piles are respectively embedded in the two grooves of the adjacent small piles, and the opposite sides of the two transverse arms of the parallel piles are respectively in contact with the opposite surfaces of the vertical arms of the adjacent two small piles. 3.根据权利要求1所述的顺桩和丁桩配合的支护结构,其特征是:所述的顺桩采用的是截面为多边形的空心桩。3 . The supporting structure of claim 1 , wherein the parallel pile is a hollow pile with a polygonal cross section. 4 . 4.根据权利要求2所述的顺桩和丁桩配合的支护结构,其特征是:丁桩和顺桩均包括工字形混凝土桩体及设置在混凝土桩体内的钢筋笼;混凝土桩体采用混凝土制成,混凝土的强度等级为C60。4. the supporting structure that the parallel piles and the diced piles cooperate according to claim 2, it is characterized in that: the diced piles and the diced piles all comprise the I-shaped concrete pile body and the reinforcement cage that is arranged in the concrete pile body; The concrete pile body adopts concrete The concrete has a strength class of C60. 5.根据权利要求1所述的顺桩和丁桩配合的支护结构,其特征是:丁桩长度为9000~18000mm,顺桩的长度为3000~9000mm,顺桩深入基坑底面1m。5. The supporting structure of the parallel pile and the diced pile according to claim 1, is characterized in that: the length of the diced pile is 9000~18000mm, the length of the lined pile is 3000~9000mm, and the parallel pile is 1m deep into the bottom surface of the foundation pit.
CN202121522063.5U 2021-07-06 2021-07-06 Supporting structure with matched smooth piles and T-shaped piles Expired - Fee Related CN215406096U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121522063.5U CN215406096U (en) 2021-07-06 2021-07-06 Supporting structure with matched smooth piles and T-shaped piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121522063.5U CN215406096U (en) 2021-07-06 2021-07-06 Supporting structure with matched smooth piles and T-shaped piles

Publications (1)

Publication Number Publication Date
CN215406096U true CN215406096U (en) 2022-01-04

Family

ID=79647128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121522063.5U Expired - Fee Related CN215406096U (en) 2021-07-06 2021-07-06 Supporting structure with matched smooth piles and T-shaped piles

Country Status (1)

Country Link
CN (1) CN215406096U (en)

Similar Documents

Publication Publication Date Title
CN108612110B (en) Combined type supporting construction method for deep foundation pit of subway station
CN113957878B (en) Construction method for revetment of prefabricated U-shaped sheet pile without cofferdam
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN101666085B (en) Prefabricated part composite cement soil wall and construction method thereof
CN215406096U (en) Supporting structure with matched smooth piles and T-shaped piles
CN115030200B (en) Integrated cofferdam structure for construction of offshore side underwater bridge foundation and construction method
CN105951863A (en) Construction device of active assembling type open caisson and construction method using same
CN217536985U (en) Foundation pit enclosure structure
CN216664085U (en) Prefabricated U template pile revetment construction guide frame of cofferdam exempts from
CN217710669U (en) Variable cross-section type steel reinforcement cage structure
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam
CN115772900B (en) A high-efficiency, self-stabilizing foundation pit support structure and construction method thereof
CN111719567A (en) A kind of steel structure foundation pit enclosure
CN114703868A (en) Anchor-pull support and foundation pit construction method by utilizing shallow foundation pit in large-height-difference pit
CN210134451U (en) Steel-pipe pile basis of aquatic tower crane
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
CN114263185A (en) Foundation pit support structure and construction method thereof
CN201826326U (en) Foundation of deep-excavation tower crane
CN215406038U (en) A prestressed special-shaped high-strength hollow support pile
CN219343228U (en) Double-row pile foundation pit supporting structure with web member beams arranged at rear part
CN214330696U (en) A structure for tunnel cable duct slope punishment
CN219710338U (en) Deep foundation pit supporting structure
CN220058078U (en) Pi-shaped section steel for retaining wall
CN215367385U (en) A cantilever retaining wall for trenchless construction
CN215669660U (en) But reuse's retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A kind of supporting structure combined with piles and spuds

Effective date of registration: 20230113

Granted publication date: 20220104

Pledgee: Bank of China Limited by Share Ltd. Foshan branch

Pledgor: Guangdong Zhuogong Building Materials Technology Co.,Ltd.

Registration number: Y2023980031260

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230413

Granted publication date: 20220104

Pledgee: Bank of China Limited by Share Ltd. Foshan branch

Pledgor: Guangdong Zhuogong Building Materials Technology Co.,Ltd.

Registration number: Y2023980031260

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220104