CN215396137U - CFG stake pile head cutting mount - Google Patents

CFG stake pile head cutting mount Download PDF

Info

Publication number
CN215396137U
CN215396137U CN202121728012.8U CN202121728012U CN215396137U CN 215396137 U CN215396137 U CN 215396137U CN 202121728012 U CN202121728012 U CN 202121728012U CN 215396137 U CN215396137 U CN 215396137U
Authority
CN
China
Prior art keywords
iron
pile head
sleeve
assembly
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121728012.8U
Other languages
Chinese (zh)
Inventor
位放
刘恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121728012.8U priority Critical patent/CN215396137U/en
Application granted granted Critical
Publication of CN215396137U publication Critical patent/CN215396137U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a CFG pile head cutting and fixing frame which comprises a hoop assembly movably arranged on a pile head, wherein a plurality of fastener sleeves are movably arranged on the hoop assembly, iron cones distributed along the vertical direction and iron rods along the horizontal direction are movably arranged in the fastener sleeves, the iron cones move downwards along the vertical direction to push the iron rods to move towards the axis of the hoop assembly, and springs for resetting the iron rods are arranged in the fastener sleeves. The utility model provides a pile head cutting fixing frame, can clear away the pile head that has already cut, the staple bolt sub-assembly is fixed the pile head of lower part, the interior indisputable awl of fastener sleeve is pushed the horizontal iron borer hard along vertical direction to make the pile head prized; meanwhile, the spring in the clamping piece sleeve can reset the iron drill rod, so that the iron drill rod is convenient to use next time. And the hoop assembly can be provided with a plurality of fastener sleeves.

Description

CFG stake pile head cutting mount
Technical Field
The utility model relates to a CFG pile head cutting fixing frame.
Background
In the road construction process, in order to make the road more stable and durable, often carry out a foundation's reinforcement to the road through the CFG pile body and make the foundation of road can not be destroyed because of conventional soil is not hard up, the CFG pile body is cement fly ash gravel pile, mix cement by rubble, stone bits, sand, fly ash and add water and mix, variable strength stake that has certain intensity of making with various pile-forming machinery, CFG stake composite foundation passes through the mattress pad layer and is connected with the basis, no matter the stake end falls in general soil layer or hard soil layer, all the time can guarantee that stake soil participates in work. Because the strength and modulus of the pile body are larger than those of the soil between the piles, the stress of the pile top is larger than the surface stress of the soil between the piles under the action of load. The piles can transmit the borne load to a deeper soil layer and correspondingly increase the load borne by soil among the piles. Therefore, the bearing capacity of the composite foundation is improved and the deformation is reduced due to the action of the piles, so that the piles and the soil share the load.
And reserving part of CFG pile bodies to be exposed on the ground in the casting process of the CFG pile bodies, uniformly cutting the CFG pile bodies exposed on the ground to enable each CFG pile to reach a uniform height, and then reinforcing the foundation on the basis of the CFG. After the CFG pile body is cut, partial adhesion exists, the CFG pile body which is cut needs to be manually removed, the conventional removal is carried out by placing an iron cone in a cutting gap and then knocking the iron cone by a hammer, so that the cut CFG pile part is separated from the CFG pile in the foundation, and the plane cut by the CFG pile is trimmed.
Because of the quantity of CFG stake is more, places the required work load of iron awl and increase through the manual work, and the iron awl can rock, the scheduling situation drops at the in-process of strikeing, needs the manual work to place the iron awl in the cutting gap once more, and the space between each CFG stake is limited, and the iron hammer strikes the in-process and can't execute the exhibition completely, has increased the later stage engineering time.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a CFG pile head cutting and fixing frame, which can change horizontal knocking into vertical knocking on a cut CFG pile so as to enlarge a knocking space, is additionally provided with a clamping piece sleeve, can quantitatively increase a cutting seam needing to be knocked, is additionally provided with a spring in the clamping piece sleeve, can reset an iron chisel and is greatly convenient for clearing an exposed part of a CFG pile body.
In order to achieve the above purpose, the utility model provides the following technical scheme: the utility model provides a CFG stake pile head cutting mount, includes the staple bolt sub-assembly of movable mounting on the pile head, movable mounting has a plurality of fastener sleeve pipes on the staple bolt sub-assembly, the inside movable mounting of fastener sleeve pipe has the iron awl of distributing along vertical direction and the iron bar along the horizontal direction, the iron awl along vertical direction remove down, in order to push away the iron bar to staple bolt sub-assembly axle center removes, the fastener is intraductal to be provided with so that the spring that the iron bar resets and use.
Preferably, the fastener sleeve pipe includes vertical sleeve pipe of iron, joint frame and joint block rubber, joint frame fixed mounting is in fastener sheathed tube one end, the outer wall fixed mounting of vertical sleeve pipe one side has horizontal sleeve pipe, the iron borer is located in the horizontal sleeve pipe, the iron awl is located the inside of the vertical sheathed tube of iron, the joint block rubber is installed to the inner wall of joint frame one side.
As preferred, the iron cone is the round platform structure, and goes up the end radius and be less than the radius of going to the bottom, and the last end of round platform structure is located the vertical sleeve intraductal inclined plane that is, the top fixed mounting of joint frame has the slip table, and the slip table is located the vertical sleeve intraductally, the slip table is the inclined plane towards the terminal surface of horizontal sleeve pipe one end: the inclined plane of iron awl is tangent with the inclined plane of slip table to make the iron awl support to push away the iron borer removes along the shaft diameter direction.
Preferably, a lantern ring is fixedly installed on the outer wall of the iron chisel, and one end of the spring is fixed on the lantern ring.
Preferably, the hoop assembly comprises an iron hoop, an anti-falling rubber pad and a matching plate, the anti-falling rubber pad is fixedly mounted on the inner wall of one side of each of the two adjacent iron hoops, and the matching plates are welded at two ends of each of the two iron hoops respectively.
In the technical scheme, the CFG pile head cutting fixing frame provided by the utility model has the following beneficial effects: when the CFG pile head that needs passed the cutting is clear away, overlap two the device cooperation in the latter half of CFG pile head, and install the fastener sleeve pipe additional on the hoop sub-assembly as required, then fix the device through nut cover group, place the iron awl in the fastener sleeve pipe again, then strike the iron awl, the iron awl makes the crowded iron borer that pushes away of power of vertical direction because of the effect of slip table, the iron borer perk pile head, dismantle the device this moment, the iron borer makes the iron borer reset under the effect of spring, then handle the pile head that knocks off.
Drawings
In order to more clearly illustrate the embodiments of the present application or technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings can be obtained by those skilled in the art according to the drawings.
Fig. 1 is a schematic view of an exploded structure of a cutting fixture according to an embodiment of the present invention;
FIG. 2 is a schematic view of a cartridge sleeve structure provided in an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a hoop assembly according to an embodiment of the present invention;
fig. 4 is a schematic structural view of the cutting fixture according to the embodiment of the present invention.
Description of reference numerals:
1. a card member sleeve; 2. a hoop assembly; 3. an iron cone; 4. a sliding table; 5. a collar; 6. a spring; 7. a nut sleeve set; 8. an iron chisel; 11. a vertical sleeve; 12. a clamping frame; 13. clamping a rubber block; 14. a horizontal sleeve; 21. an iron hoop; 22. an anti-drop rubber pad; 23. and (4) matching the plates.
Detailed Description
In order to make the technical solutions of the present invention better understood, those skilled in the art will now describe the present invention in further detail with reference to the accompanying drawings.
As shown in fig. 1-4, a CFG pile head cutting fixing frame comprises a hoop assembly 2 movably mounted on a pile head, a plurality of fastener sleeves 1 are movably mounted on the hoop assembly 2, iron cones 3 distributed in the vertical direction and iron rods 8 distributed in the horizontal direction are movably mounted inside the fastener sleeves 1, the iron cones 3 move downwards in the vertical direction to push the iron rods 8 to move towards the axis of the hoop assembly 2, and springs 6 for resetting the iron rods 8 are arranged in the fastener sleeves 1. When the CFG pile head that needs cut was clear away, overlap two the device cooperation in the latter half of CFG pile head, and install fastener sleeve pipe 1 additional as required on staple bolt sub-assembly 2, then fix the device through nut suit 7, place iron awl 3 in fastener sleeve pipe 1 again, then strike iron awl 3, iron awl 3 makes 3 crowded push away iron borer 8 of iron awl because of the effect of slip table 4, the cutting seam that iron borer 8 inserted the pile head perks, when dismantling the device, iron borer 8 makes iron borer 8 reset under the effect of spring 6, then handle the pile head that knocks.
As shown in the figures, as a further technical solution provided by the present invention, a clamping frame 12 is included in the clamping member sleeve 1, a clamping rubber block 13 is installed on an inner wall of one side of the clamping frame 12, the clamping rubber block 13 is used for preventing the clamping member sleeve 1 from slipping off from the hoop assembly 2, the clamping frame 12 is fixedly installed at one end of the vertical sleeve 11, the horizontal sleeve 14 is installed on an outer wall of one side of the vertical sleeve 11, and the iron brazing filler metal 8 is movably arranged in the horizontal sleeve 14.
Furthermore, for the clamping piece sleeve 1, the sliding table 4 is fixed at the top end of the clamping frame 12 and is placed in the vertical sleeve 11, one end of the sliding table 4 is an inclined surface and faces one end of the horizontal sleeve 14, wherein the iron cone 3 is in a circular table structure, the radius of the upper bottom is smaller than that of the lower bottom, the lower bottom of the circular table structure is positioned in the vertical sleeve 11, the upper bottom of the iron cone 3 is an inclined surface, the inclined surface of the upper bottom of the iron cone 3 is in tangential fit with the inclined surface of the sliding table 4, the iron cone 3 acts downwards on the inclined surface of the sliding table 4 to enable the iron cone 3 to extrude the iron drill 8,
further, the iron rod 8 is movably arranged in the horizontal sleeve 14, the lantern ring 5 is fixedly installed on the outer wall of the iron rod 8, the spring 6 is arranged on the iron rod 8, one end of the spring 6 is fixed on the lantern ring 5, the other end of the spring is fixed on the horizontal sleeve 14, the spring 6 pulls to enable the iron rod 8 to reset, and the iron rod 8 is fixed in the horizontal sleeve 14 so as to be used next time.
Further, staple bolt sub-assembly 2 is including hoop 21, anticreep rubber pad 22 and cooperation board 23, anticreep rubber pad 22 fixed mounting on the inner wall of two adjacent one sides of hoop 21, and anticreep rubber pad 22 is used for cooperating joint rubber piece 13 to fix fastener sleeve pipe 1, and cooperation board 23 welds in the both ends of hoop 21, and pile head cutting mount generally is two, fixes the pile head through the mode of embracing, and connects through cooperation board 23.
The working principle is as follows: when driving the CFG pile head, overlap the lower extreme in the CFG pile head with two the device cooperations, install certain quantity's fastener sleeve pipe 1 additional on staple bolt sub-assembly 2 according to the quantity of strikeing the seam, joint block rubber 13 on the joint frame 12 prevents fastener sleeve pipe 1 slippage with the cooperation of staple bolt sub-assembly 2, rethread nut suit 7 is fixed the device, place iron awl 3 in fastener sleeve pipe 1, iron awl 3 slides with 4 tangents of slip table, through strikeing iron awl 3, 3 lapse of iron awl and through 4 crowded push iron borer 8 of slip table, the cutting seam that iron borer 8 atress inserted the pile head carries out pile head atress sled to open, iron borer 8 makes iron borer 8 reset under the effect of spring 6.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the utility model. Accordingly, the drawings and description are illustrative in nature and should not be construed as limiting the scope of the utility model.

Claims (5)

1. The utility model provides a CFG stake pile head cutting mount, its characterized in that, includes staple bolt sub-assembly (2) of movable mounting on the pile head, movable mounting has a plurality of fastener sleeve pipes (1) on staple bolt sub-assembly (2), inside movable mounting of fastener sleeve pipe (1) has iron awl (3) and iron borer (8) along the horizontal direction that distribute along vertical direction, iron awl (3) move down along vertical direction, push away with crowded iron borer (8) to staple bolt sub-assembly (2) axle center removes, be provided with in fastener sleeve pipe (1) so that spring (6) that iron borer (8) reset usefulness.
2. A CFG pile head cutting and fixing frame according to claim 1, wherein the clamping sleeve (1) comprises a vertical sleeve (11), a clamping frame (12) and a clamping rubber block (13), the clamping frame (12) is fixedly installed at one end of the clamping sleeve (1), a horizontal sleeve (14) is fixedly installed on the outer wall of one side of the vertical sleeve (11), the iron rod (8) is located in the horizontal sleeve (14), the iron cone (3) is located inside the vertical sleeve (11), and the clamping rubber block (13) is installed on the inner wall of one side of the clamping frame (12).
3. The CFG pile head cutting and fixing frame of claim 2, characterized in that the iron cone (3) is a circular truncated cone structure, the radius of the upper bottom is smaller than the radius of the lower bottom, the upper bottom of the circular truncated cone structure is positioned in the vertical sleeve (11) and is an inclined plane, the top fixed mounting of the clamping frame (12) is provided with the sliding table (4), the sliding table (4) is positioned in the vertical sleeve (11), and the end face of the sliding table (4) facing one end of the horizontal sleeve (14) is an inclined plane:
the inclined plane of iron awl (3) is tangent with the inclined plane of slip table (4) to make iron awl (3) support and push away iron borer (8) move along the shaft diameter direction.
4. A CFG pile head cutting and fixing frame according to claim 1, characterized in that a collar (5) is fixedly installed on the outer wall of the iron drill (8), and one end of the spring (6) is fixed on the collar (5).
5. The CFG pile head cutting and fixing frame as claimed in claim 1, wherein the hoop assembly (2) comprises iron hoops (21), anti-falling rubber pads (22) and matching plates (23), the anti-falling rubber pads (22) are fixedly installed on the inner walls of the adjacent sides of the two iron hoops (21), and the matching plates (23) are welded to the two ends of each iron hoop (21).
CN202121728012.8U 2021-07-27 2021-07-27 CFG stake pile head cutting mount Expired - Fee Related CN215396137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121728012.8U CN215396137U (en) 2021-07-27 2021-07-27 CFG stake pile head cutting mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121728012.8U CN215396137U (en) 2021-07-27 2021-07-27 CFG stake pile head cutting mount

Publications (1)

Publication Number Publication Date
CN215396137U true CN215396137U (en) 2022-01-04

Family

ID=79653518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121728012.8U Expired - Fee Related CN215396137U (en) 2021-07-27 2021-07-27 CFG stake pile head cutting mount

Country Status (1)

Country Link
CN (1) CN215396137U (en)

Similar Documents

Publication Publication Date Title
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN201148614Y (en) Gas assist vibration punching stone column construction equipment
CN215396137U (en) CFG stake pile head cutting mount
CN210066493U (en) Hoop mold for trestle hanging mold construction
CN206495520U (en) A kind of intensive steel muscle portion position concrete auxiliary tamping equipment
CN109057503B (en) Construction convenience's high strength concrete pole
CN110616705A (en) Wedge type pile head with pile side bearing force and pile forming construction method
CN200949234Y (en) Hole picking shovel
CN104005411A (en) Tubular pile construction method and pile tube structure of tubular pile
CN212026256U (en) Guide platform for building
CN201148617Y (en) Wrapping opening-shaped pile tip
CN213143044U (en) Shallow pile broken pile reinforcing structure for cast-in-place pile
CN209816835U (en) Club-footed pile for building immersed tube
CN113417277A (en) Tamping tool and tamping equipment
CN103866763B (en) Method for making pile by performing pile pressure irrigation through immersed tube and special device and application
CN110670576A (en) Building foundation reinforcing device and method
CN215925983U (en) Pile bottom mud jacking cement slurry collecting device
CN220394516U (en) Composite carrier rammed prestressed pipe pile
CN204510218U (en) A kind of simple and easy pile follower
RU2191235C1 (en) Method of reinforcement of building foundation and device for its embodiment
CN210049606U (en) Concrete placement is with simply chute that welds
CN210263950U (en) Thin-wall multi-opening pouring string barrel
CN220008175U (en) Precast slab hole mud jacking frock
CN221255441U (en) Building engineering pile
CN209907387U (en) Multipurpose dynamic compaction machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220104