CN215367260U - Foundation engineering pile driving device - Google Patents

Foundation engineering pile driving device Download PDF

Info

Publication number
CN215367260U
CN215367260U CN202121663467.6U CN202121663467U CN215367260U CN 215367260 U CN215367260 U CN 215367260U CN 202121663467 U CN202121663467 U CN 202121663467U CN 215367260 U CN215367260 U CN 215367260U
Authority
CN
China
Prior art keywords
deflector
plate
concave plate
balancing weight
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121663467.6U
Other languages
Chinese (zh)
Inventor
于鸿浩
窦玉涛
李思军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Haozhi Construction Engineering Co ltd
Original Assignee
Anhui Haozhi Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Haozhi Construction Engineering Co ltd filed Critical Anhui Haozhi Construction Engineering Co ltd
Priority to CN202121663467.6U priority Critical patent/CN215367260U/en
Application granted granted Critical
Publication of CN215367260U publication Critical patent/CN215367260U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of pile, a ground engineering pile device is disclosed, including base and the concave plate of fixed mounting on the base, bilateral symmetry is provided with two screw rods on the inner wall at concave plate top, install the deflector that is the level setting in the concave plate, and set up two through-holes with screw rod looks adaptation on the deflector, equal threaded connection has two nuts on the outer wall of every screw rod, and two nuts offset with the upper and lower two walls of deflector respectively, the center of deflector runs through the guiding hole of seting up with balancing weight looks adaptation, equal symmetry is provided with two slide rails on the inner wall of concave plate left and right sides, two spouts with slide rail looks adaptation are all seted up to the left and right sides of deflector. The hoist engine passes through wire rope and drives the balancing weight downstream, under the mutually supporting of deflector, slide rail, screw rod and nut, leads to the balancing weight of downstream ground, avoids producing the dislocation between balancing weight and ground stake, leads to ground stake installation slope.

Description

Foundation engineering pile driving device
Technical Field
The application relates to the technical field of piling, more specifically relates to a foundation engineering pile driver equipment.
Background
Piling refers to driving piles into the ground to make the building foundation firm.
Chinese patent with application number CN202021591826.7 provides a ground engineering pile driver, the on-line screen storage device comprises a base, the hoist engine, the mount, deflector and balancing weight, the bottom four corners of base is fixed with four group's auto-lock universal wheels through the bolt symmetry, there is the hoist engine right half on base surface through the bolt fastening, the welded surface of base is fixed with the mount, sliding connection has the deflector between two sets of risers of mount, threaded hole has been seted up to the bottom of deflector, the screw hole female connection of deflector bottom has the balancing weight, another group of screw hole has been seted up on the surface of deflector, the screw hole female connection on deflector surface has solid fixed ring.
Through above-mentioned technical scheme, drive the balancing weight through the hoist engine and carry out the pile operation, avoided artifical pile, the pile efficiency and the quality of not only improving have reduced workman's intensity of labour simultaneously, nevertheless strike the ground pile through the balancing weight, produce the dislocation easily between balancing weight and ground pile, lead to ground pile installation slope.
SUMMERY OF THE UTILITY MODEL
In order to solve and strike the ground stake through the balancing weight, produce the dislocation easily between balancing weight and ground stake, lead to the problem of ground stake installation slope, this application provides a ground foundation engineering pile device.
The application provides a foundation engineering pile driver equipment adopts following technical scheme:
the utility model provides a foundation engineering pile device, includes base and the concave plate of fixed mounting on the base, bilateral symmetry is provided with two screw rods on the inner wall at concave plate top, install the deflector that is the level setting in the concave plate, and set up two through-holes with screw rod looks adaptation on the deflector, every equal threaded connection has two nuts on the outer wall of screw rod, and two nuts offset with the upper and lower two walls of deflector respectively, the guiding hole of offering with balancing weight looks adaptation is run through at the center of deflector, equal symmetry is provided with two slide rails on the inner wall of the concave plate left and right sides, two spouts with slide rail looks adaptation are all seted up to the left and right sides of deflector.
Furthermore, a box body is detachably mounted at the top of the concave plate, a winch is fixedly mounted in the box body, and the winch is fixedly connected with the balancing weight through a steel wire rope.
Furthermore, the center of base has run through and has seted up the rectangular hole, the bottom welding of base has rectangular frame, the through-hole has been seted up to four corners on the base.
Through above-mentioned technical scheme, set up rectangular frame for mutually perpendicular between base and the soil.
Further, the downside that just is located the deflector in the notch plate is provided with the drainage plate, the left side of notch plate is run through and is seted up the mud outlet with drainage plate matched with, run through on the drainage plate and set up the inclined hole with balancing weight looks adaptation.
Through above-mentioned technical scheme, set up the inclined hole, be convenient for lead the balancing weight.
Further, a notch is formed in the drainage plate, the notch penetrates through the right wall of the concave plate along the length direction of the drainage plate, the baffle is installed in the notch in a sliding mode, the right side fixedly connected with limiting plate of the baffle is provided with a handle in a welding mode, and the limiting plate is provided with a handle in a welding mode.
Through above-mentioned technical scheme, set up the baffle, the drainage plate of being convenient for carries out the drainage to earth.
Further, be provided with on the base and be located the left receiver of notch plate, and contradict each other between receiver and the notch plate.
Through above-mentioned technical scheme, set up the receiver, be convenient for collect earth.
To sum up, the application comprises the following beneficial technical effects:
(1) the winch drives the balancing weight to move downwards through the steel wire rope, and the balancing weight moving downwards is guided under the mutual matching of the guide plate, the slide rail, the screw and the nut, so that the situation that the balancing weight and a ground pile are staggered to cause the installation and inclination of the ground pile is avoided;
(2) the inclined hole of baffle on to the drainage plate carries out the shutoff for the earth of balancing weight bottom adhesion falls on the drainage plate, and in earth got into the containing box through the mud outlet that concave plate left side was seted up, realizes clearing up the earth of balancing weight bottom, has reduced the probability that produces the dislocation when colliding between balancing weight and ground stake.
Drawings
FIG. 1 is a first schematic diagram of an axial measurement configuration of the present application;
FIG. 2 is a second schematic diagram of an axial structure according to the present application;
fig. 3 is a schematic cross-sectional structure of the present application.
The reference numbers in the figures illustrate:
1. a base; 101. a rectangular hole; 102. a through hole; 2. a concave plate; 201. a sludge outlet; 3. a screw; 4. a guide plate; 5. a nut; 6. a slide rail; 7. a box body; 8. a winch; 9. a rectangular frame; 10. a drainage plate; 11. a baffle plate; 12. a limiting plate; 13. a handle; 14. an accommodating box.
Detailed Description
The technical solution in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application; it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all embodiments, and all other embodiments obtained by those of ordinary skill in the art without any inventive work based on the embodiments in the present application belong to the protection scope of the present application.
In the description of the present application, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present application. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present application, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "sleeved/connected," "connected," and the like are to be construed broadly, e.g., "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
Example (b):
the present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses ground engineering pile device, including base 1 and the concave plate 2 of fixed mounting on base 1, bilateral symmetry is provided with two screw rods 3 on the inner wall at concave plate 2 top, install deflector 4 that is the level setting in the concave plate 2, and set up two through-holes 102 with 3 looks adaptations of screw rod on the deflector 4, equal threaded connection has two nuts 5 on every screw rod 3's the outer wall, and two nuts 5 offset with two upper and lower walls of deflector 4 respectively, the guiding hole of seting up with balancing weight looks adaptation is run through at the center of deflector 4, equal symmetry is provided with two slide rails 6 on the inner wall of the concave plate 2 left and right sides, two spouts with 6 looks adaptations of slide rail are all seted up to the left and right sides of deflector 4. More specifically, under the mutual cooperation of the guide plate 4, the slide rail 6, the screw rod 3 and the nut 5, the counterweight block is guided.
Box 7 is installed to the top detachably of concave plate 2, fixed mounting has hoist engine 8 in box 7, hoist engine 8 passes through wire rope and balancing weight fixed connection, base 1's center runs through and has seted up rectangular hole 101, base 1's bottom welding has rectangular frame 9, through-hole 102 has been seted up in the last four corners of base 1, the downside that just is located deflector 4 in the concave plate 2 is provided with drainage plate 10, the left side of concave plate 2 runs through and sets up the mud outlet 201 with drainage plate 10 matched with, run through the inclined hole of seting up with balancing weight looks adaptation on the drainage plate 10. More specifically, the earth of balancing weight bottom adhesion drops on drainage plate 10, and earth gets into in the receiver 14 through the mud outlet 201 that the concave plate 2 left side was seted up.
Set up the notch in the drainage plate 10, and the notch wears to establish 2 right walls of concave plate along the length direction of drainage plate 10, installs baffle 11 in the notch slidable, and the right side fixedly connected with limiting plate 12 of baffle 11, and the welding has handle 13 on the limiting plate 12, is provided with on the base 1 to be located 2 left receivers of concave plate 14, and contradicts each other between receiver 14 and the concave plate 2. More specifically, install baffle 11 in the notch, baffle 11 blocks up the inclined hole on the drainage plate 10 for the earth of balancing weight bottom adhesion drops on drainage plate 10.
The implementation principle of the foundation engineering pile driving device of the embodiment of the application is as follows: the device is placed on the ground needing to be piled, foundation bolts are arranged in through holes 102 at four corners on a base 1, the device is fixedly connected with the ground, a winch 8 is started, the winch 8 drives a balancing weight to move downwards through a steel wire rope, the balancing weight moving downwards is guided under the mutual matching of a guide plate 4, a slide rail 6, a screw rod 3 and a nut 5, the dislocation between the balancing weight and the ground pile is avoided, the ground pile is installed and inclined, the winch 8 drives the balancing weight to move upwards through the steel wire rope, a limiting plate 12 and a baffle plate 11 are driven through a handle 13, the baffle plate 11 is installed in a groove, the baffle plate 11 blocks an inclined hole in a drainage plate 10, so that soil adhered to the bottom of the balancing weight drops on the drainage plate 10, and enters a storage box 14 through a soil outlet 201 formed in the left side of a concave plate 2, and the soil at the bottom of the balancing weight is cleaned, the probability of dislocation generated when the balancing weight collides with the ground pile is reduced.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. The utility model provides a foundation engineering pile driver equipment which characterized in that: including base (1) and the concave plate (2) of fixed mounting on base (1), bilateral symmetry is provided with two screw rods (3) on the inner wall at concave plate (2) top, install deflector (4) that are the level setting in concave plate (2), and set up on deflector (4) two through-hole (102) with screw rod (3) looks adaptation, every equal threaded connection has two nuts (5) on the outer wall of screw rod (3), and two nuts (5) offset with the upper and lower two walls of deflector (4) respectively, the guiding hole of seting up with balancing weight looks adaptation is run through at the center of deflector (4), equal symmetry is provided with two slide rails (6) on the inner wall of concave plate (2) left and right sides, two spouts with slide rail (6) looks adaptation are all seted up to the left and right sides of deflector (4).
2. A foundation engineering pile driving device according to claim 1, characterized in that: the top of the concave plate (2) is detachably provided with a box body (7), a winch (8) is fixedly arranged in the box body (7), and the winch (8) is fixedly connected with the balancing weight through a steel wire rope.
3. A foundation engineering pile driving device according to claim 1, characterized in that: the center of the base (1) is penetrated and provided with a rectangular hole (101), the bottom of the base (1) is welded with a rectangular frame (9), and four corners of the base (1) are provided with through holes (102).
4. A foundation engineering pile driving device according to claim 1, characterized in that: the novel drainage plate is characterized in that a drainage plate (10) is arranged on the lower side of the guide plate (4) in the concave plate (2), a mud outlet (201) matched with the drainage plate (10) is formed in the left side of the concave plate (2) in a penetrating mode, and an inclined hole matched with the balancing weight is formed in the drainage plate (10) in a penetrating mode.
5. A foundation engineering pile driving device according to claim 4, characterized in that: set up the notch in drainage plate (10), and the notch wears to establish concave plate (2) right wall along the length direction of drainage plate (10), install baffle (11) slidable in the notch, the right side fixedly connected with limiting plate (12) of baffle (11), and the welding has handle (13) on limiting plate (12).
6. A foundation engineering pile driving device according to claim 1, characterized in that: the storage box (14) located on the left side of the concave plate (2) is arranged on the base (1), and the storage box (14) and the concave plate (2) are mutually abutted.
CN202121663467.6U 2021-07-21 2021-07-21 Foundation engineering pile driving device Expired - Fee Related CN215367260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121663467.6U CN215367260U (en) 2021-07-21 2021-07-21 Foundation engineering pile driving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121663467.6U CN215367260U (en) 2021-07-21 2021-07-21 Foundation engineering pile driving device

Publications (1)

Publication Number Publication Date
CN215367260U true CN215367260U (en) 2021-12-31

Family

ID=79610702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121663467.6U Expired - Fee Related CN215367260U (en) 2021-07-21 2021-07-21 Foundation engineering pile driving device

Country Status (1)

Country Link
CN (1) CN215367260U (en)

Similar Documents

Publication Publication Date Title
CN111021355B (en) Hoisting type cast-in-place pile head cutting device
CN109406199B (en) Vault concrete on-site sampling detection device and detection method
CN215367260U (en) Foundation engineering pile driving device
CN211006604U (en) Offshore wind turbine generator system positioning support guide frame
CN108707908B (en) Adjustable installation device of offshore wind turbine foundation sacrificial anode block and J-shaped tube
CN218911367U (en) Wall brushing device
CN203475433U (en) Noiseless pile pressing device for steel sheet piles
CN220705613U (en) Rectangular deep hole drilling machine adapting to soil stratum and provided with synchronous horizontal cantilever
CN113049305A (en) Water sample collector auxiliary assembly
CN217629922U (en) Automatic concrete vibrating equipment
CN111320053A (en) Passenger liner elevator guide rail combination supporting device and passenger liner elevator guide rail system comprising same
CN218347326U (en) Anchor rope construction drilling machine mobile device
CN113775465A (en) Large tidal current energy power generation device and assembly platform thereof
CN215485963U (en) Drilling and pouring fender post construction equipment
CN220781403U (en) High-efficiency wall brushing device for underground continuous wall
CN216130120U (en) Pile driver frame for construction of CFG pile in tidal flat area
CN113186918B (en) Piling equipment for constructional engineering
CN213563654U (en) Novel simple slotting device
CN217896442U (en) Inspection device structure for highway engineering construction
CN211872959U (en) Surface tamping device for building
CN220599753U (en) Stone collecting and slag discharging system of anti-slide pile drilling machine
CN213978955U (en) Firm formula reinforcing means based on building engineering uses
CN217059772U (en) Bearing capacity detection device for construction detection
CN218206038U (en) Assembled impurity collection bin of galvanized steel structure
CN220599760U (en) Stone-collecting crushing device of anti-slide pile drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211231

CF01 Termination of patent right due to non-payment of annual fee