CN215364454U - Ship lock engineering water delivery valve overhauls uses auxiliary fixtures - Google Patents

Ship lock engineering water delivery valve overhauls uses auxiliary fixtures Download PDF

Info

Publication number
CN215364454U
CN215364454U CN202121803232.2U CN202121803232U CN215364454U CN 215364454 U CN215364454 U CN 215364454U CN 202121803232 U CN202121803232 U CN 202121803232U CN 215364454 U CN215364454 U CN 215364454U
Authority
CN
China
Prior art keywords
cross beam
water delivery
fixedly arranged
handle rod
foot handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121803232.2U
Other languages
Chinese (zh)
Inventor
朱立新
刘宇
周友志
贾宝良
严俊
胡佳琦
诸惠红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No2 Engineering Co ltd Of Cccc Third Harbor Engineering Co ltd
Original Assignee
No2 Engineering Co ltd Of Cccc Third Harbor Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No2 Engineering Co ltd Of Cccc Third Harbor Engineering Co ltd filed Critical No2 Engineering Co ltd Of Cccc Third Harbor Engineering Co ltd
Priority to CN202121803232.2U priority Critical patent/CN215364454U/en
Application granted granted Critical
Publication of CN215364454U publication Critical patent/CN215364454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an auxiliary tool for overhauling a water delivery valve of ship lock engineering, which comprises an upright post base plate, wherein H-shaped steel is fixedly arranged at the top of the upright post base plate, a plurality of pin bolt holes are respectively formed in two sides of the joint of the upright post base plate and the H-shaped steel, main beams are respectively fixedly arranged at the corners of the top of the H-shaped steel, a cross beam is fixedly arranged among the four main beams, a single-foot handle rod is fixedly arranged in the middle of the top end of the cross beam, which is close to one side of the back surface of the cross beam, two tons of lifting lugs are fixedly arranged at the bottom of the single-foot handle rod, ten tons of lifting lugs are fixedly arranged in the middle of the bottom end of the cross beam, and three stabilizing rods are fixedly arranged in the middle of the single-foot handle rod. And meanwhile, the maintenance of the water delivery gate is finished under the condition that the normal operation of the ship lock is not influenced.

Description

Ship lock engineering water delivery valve overhauls uses auxiliary fixtures
Technical Field
The utility model relates to the technical field of maintenance of ship lock water delivery valves, in particular to an auxiliary tool for maintenance of a ship lock engineering water delivery valve.
Background
Among the ship lock engineering, the water delivery valve generally is located work gate synchronous, is located the lock head position, because lock head position bank side sets up the afforestation more, and the slabstone is mated formation or sets up command center etc. to the maintenance of water delivery gate, its has following defect: the maintenance gate is put down during maintenance and can lead to the lock to shut down a navigation, destroys the afforestation easily during maintenance and mats formation and increases the manual work and overhauls the degree of difficulty.
Disclosure of Invention
The utility model aims to provide an auxiliary tool for overhauling a water delivery valve of a ship lock engineering, which aims to solve the problems that the ship lock is stopped when an overhauling gate is put down during overhauling, greening is easy to damage during overhauling, paving is easy to increase manual operation overhauling difficulty, and the problems are solved.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a ship lock engineering water delivery valve overhauls and uses auxiliary fixtures, includes the stand bottom plate, the top fixed mounting of stand bottom plate has H shaped steel, a plurality of column foot bolt hole has all been seted up with the both sides of H shaped steel junction to the stand bottom plate, the equal fixed mounting in corner at H shaped steel top has a girder, four fixed mounting has the crossbeam between the girder, the middle part fixed mounting that the crossbeam top is close to crossbeam back one side has single foot handle pole, the bottom fixed mounting of single foot handle pole has two tons of lugs, the middle part fixed mounting of crossbeam bottom has ten tons of lugs, the positive middle part of single foot handle pole and the equal fixed mounting in middle part at the single foot handle pole back have chain block, the middle part fixed mounting of single foot handle pole has three stabilizer bar.
As a preferred technical scheme of the utility model, the connection parts of the four main beams and the cross beam are fixedly provided with parallel connection.
As a preferable technical scheme of the utility model, the bottoms of the two stabilizer bars are respectively and fixedly connected with two ends of the top of the cross beam, which are close to one side of the back surface of the cross beam.
As a preferred technical scheme of the utility model, a plurality of main beam stiffening plates are fixedly arranged in the middle of each of the four main beams.
As a preferred technical scheme of the utility model, a plurality of single-foot handle rod stiffening plates are fixedly arranged at the joint of the single-foot handle rod and the two-ton lifting lug.
Compared with the prior art, the utility model has the beneficial effects that: through two tons of lugs on the single-foot handlebar pole and ten tons of lugs on the cross beam, the greening and the accurate hoisting of paving are avoided, the success rate and the quality of oil cylinder replacement can be effectively guaranteed, and meanwhile, the maintenance of the water delivery gate is completed under the condition that the normal operation of the ship lock is not influenced.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a top view of a beam of the present invention;
FIG. 4 is a comparison of a ten ton shackle and a two ton shackle of the present invention;
FIG. 5 is a top view of the column base plate of the present invention;
FIG. 6 is a construction flow chart of the present invention.
In the figure: 1. a main beam stiffener; 2. the single-foot handle rod is used for reinforcing the plate; 3. ten tons of lifting lugs; 4. two tons of lifting lugs; 5. a cross beam; 6. a main beam; 7. a column base plate; 8. a single-foot handle bar; 9. parallel connection; 10. a stabilizer bar; 11. a chain block; 12. a column base bolt hole; 13. h-shaped steel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the utility model provides an auxiliary tool for overhauling a water delivery valve in ship lock engineering, which comprises an upright post bottom plate 7, wherein the top of the upright post bottom plate 7 is fixedly provided with H-shaped steel 13, two sides of the joint of the upright post bottom plate 7 and the H-shaped steel 13 are respectively provided with a plurality of column foot bolt holes 12, corners of the top of the H-shaped steel 13 are respectively fixedly provided with a main beam 6, a cross beam 5 is fixedly arranged among the four main beams 6, the middle part of the top end of the cross beam 5, which is close to one side of the back surface of the cross beam 5, is fixedly provided with a single-foot handle rod 8, the bottom of the single-foot handle rod 8 is fixedly provided with two tons of lifting lugs 4, the middle part of the bottom end of the cross beam 5 is fixedly provided with ten tons of lifting lugs 3, the middle parts of the front surface of the single-foot handle rod 8 and the back surface of the single-foot handle rod 8 are respectively fixedly provided with a chain block 11, the middle parts of the three stabilizing rods 10 are fixedly provided, and a user marks an X-Y axis on the upright post bottom plate 7, the X-Y axis of H shaped steel 13 aligns with the X-Y axis of stand bottom plate 7 mark, check the axis alignment correct back, install four girders 6 on H shaped steel 13, the spot location of inspection column base bolt hole 12 after column base bolt hole 12 punches on stand bottom plate 7 and accomplishes, the main effect of single-foot barre 8 is that the installation and demolish the trouble hydro-cylinder to and use when demolising and installing the frame, the effect of the cantilever on the single-foot barre 8 is for the sufficient operating space of chain block 11 in the process of lifting by crane.
Preferably, the connection parts of the four main beams 6 and the cross beam 5 are fixedly provided with parallel links 9, and the stability of the connection of the main beams 6 and the cross beam 5 is increased by the installation of the parallel links 9.
Preferably, the bottom of two of the stabilizer bars 10 is respectively fixedly connected with the two ends of the top of the cross beam 5 close to the back side of the cross beam 5, wherein the two stabilizer bars 10 are in contact with the cross beam 5, the other stabilizer bar 10 is in contact with the ground, and the three stabilizer bars 10 are in a stable triangle shape, so that the stability of the single-foot handle bar 8 is increased.
Preferably, a plurality of main beam stiffening plates 1 are fixedly mounted in the middle of each of the four main beams 6, the size of each main beam stiffening plate 1 is-8 × 96 × 276mm, the number of the main beam stiffening plates 1 is twenty-eight, and the support performance of the main beams 6 is improved by arranging the main beam stiffening plates 1.
Preferably, a plurality of single-foot handle rod stiffening plates 2 are fixedly installed at the joints of the single-foot handle rods 8 and the two-ton lifting lugs 4, the size of each single-foot handle rod stiffening plate 2 is 8 × 46 × 182mm, the number of the single-foot handle rod stiffening plates is eight, and the stability of the connection of the two-ton lifting lugs 4 and the single-foot handle rods 8 is increased.
When the auxiliary tool is used in concrete, the utility model relates to an auxiliary tool for overhauling a water delivery valve of ship lock engineering, a user marks an X-Y axis on a stand column bottom plate 7, the X-Y axis of H-shaped steel 13 is aligned with the X-Y axis marked on the stand column bottom plate 7, after the axes are checked to be aligned correctly, four main beams 6 are installed on the H-shaped steel 13, a central point position of a column base bolt hole 12 is checked after a column base bolt hole 12 on the stand column bottom plate 7 is punched, a single-foot handle rod 8 is mainly used for installing and removing a fault oil cylinder, and the auxiliary tool is used when a rack is removed and installed, a cantilever on the single-foot handle rod 8 is used for providing enough operating space for a chain block 11 in the hoisting process, the user fixes the single-foot handle rod between a ten-ton lifting lug 3 and two-ton lifting lugs 4 by a hemp rope, and fixes the head of a piston of the oil cylinder so as to prevent the oil cylinder from freely falling to cause secondary damage to a cylinder body due to the non-pressure after the hydraulic oil cylinder removes a hydraulic oil pipe, the user demolishs oil pipe, demolish the shaft cap bolt of hydro-cylinder piston ejector pin axle with the spanner, the back is all demolishd to the construction bolt of unilateral shaft cap, manual removal round pin axle cap, the chain of pulling chain block 11, the lifting hook of handle chain block 11 descends to frame upper portion position, ten tons of electric block are hung to ten tons of lugs 3 under interim crossbeam 5, whether the lifting hook insurance card of inspection has all closed after electric block hangs on ten tons of lugs 3, guarantee the security of overhauing.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (5)

1. The utility model provides a ship lock engineering water delivery valve overhauls uses auxiliary fixtures, includes stand bottom plate (7), its characterized in that: the top of the upright post bottom plate (7) is fixedly provided with H-shaped steel (13), both sides of the joint of the upright post bottom plate (7) and the H-shaped steel (13) are respectively provided with a plurality of column base bolt holes (12), the corners of the top of the H-shaped steel (13) are fixedly provided with main beams (6), cross beams (5) are fixedly arranged among the four main beams (6), a single-foot handle rod (8) is fixedly arranged in the middle of one side of the top end of the cross beam (5) close to the back of the cross beam (5), two tons of lifting lugs (4) are fixedly arranged at the bottom of the single-foot handle bar (8), the middle part of the bottom end of the cross beam (5) is fixedly provided with ten tons of lifting lugs (3), the middle part of the front surface of the single-foot handle rod (8) and the middle part of the back surface of the single-foot handle rod (8) are both fixedly provided with a chain block (11), the middle part of the single-foot handle rod (8) is fixedly provided with three stabilizer bars (10).
2. The ship lock engineering water delivery valve overhauls and uses auxiliary fixtures of claim 1, characterized in that: and the joints of the four main beams (6) and the cross beam (5) are fixedly provided with parallel connectors (9).
3. The ship lock engineering water delivery valve overhauls and uses auxiliary fixtures of claim 1, characterized in that: the bottom parts of the two stabilizer bars (10) are respectively and fixedly connected with the two ends of the top part of the cross beam (5) close to one side of the back surface of the cross beam (5).
4. The ship lock engineering water delivery valve overhauls and uses auxiliary fixtures of claim 1, characterized in that: the middle parts of the four main beams (6) are fixedly provided with a plurality of main beam stiffening plates (1).
5. The ship lock engineering water delivery valve overhauls and uses auxiliary fixtures of claim 1, characterized in that: and a plurality of single-foot handle rod stiffening plates (2) are fixedly arranged at the joint of the single-foot handle rod (8) and the two-ton lifting lug (4).
CN202121803232.2U 2021-08-04 2021-08-04 Ship lock engineering water delivery valve overhauls uses auxiliary fixtures Expired - Fee Related CN215364454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121803232.2U CN215364454U (en) 2021-08-04 2021-08-04 Ship lock engineering water delivery valve overhauls uses auxiliary fixtures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121803232.2U CN215364454U (en) 2021-08-04 2021-08-04 Ship lock engineering water delivery valve overhauls uses auxiliary fixtures

Publications (1)

Publication Number Publication Date
CN215364454U true CN215364454U (en) 2021-12-31

Family

ID=79615077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121803232.2U Expired - Fee Related CN215364454U (en) 2021-08-04 2021-08-04 Ship lock engineering water delivery valve overhauls uses auxiliary fixtures

Country Status (1)

Country Link
CN (1) CN215364454U (en)

Similar Documents

Publication Publication Date Title
CN1843883A (en) Wind-proofing anchoring device for large-scaled crane in dock apron
CN215364454U (en) Ship lock engineering water delivery valve overhauls uses auxiliary fixtures
CN212714951U (en) A template for cantilever type shore protection barricade
CN201110804Y (en) Multifunctional experimental bench
CN111794227A (en) Anti-pulling hoop type anchor rod static pressure pile device and construction method
CN216042984U (en) Collapse-prevention steel pipe tower with stable base
CN212611998U (en) Strutting arrangement is used in municipal administration bridge construction
CN212128878U (en) Cylindrical pier capping beam construction bracket based on pin rod method
CN110820518B (en) Machining and hoisting method for steel arch bridge suspender
CN204524596U (en) A kind of dismountable self-locking overhead welding operating platform
CN210238297U (en) Detaching device for bent cap support
CN2770895Y (en) Movable dieframe for storing large-sized dies
CN112049017A (en) Bailey frame integral frame falling device for cast-in-place box girder and construction process
CN209381056U (en) Wind-force tower planar plate members assist turnover device
CN208502273U (en) It is a kind of for without bearing large space Steel Truss Beam hoisting frame
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN214423362U (en) 800 ton super-tonnage anchor rod static pressure pile frame
CN110374006A (en) A kind of construction method for removing space opposite sex large-tonnage steel beam bracket
CN204751886U (en) Batch reinforcing bar lifting device frame
CN201960322U (en) Retreater of crank dowel pin on oil pumping unit
CN216030564U (en) Portable dismounting device of bank bridge hoist tapered end hydro-cylinder
CN215798145U (en) Movable support for hook head pulley block of crane
CN215798266U (en) Wall formula guardrail template installation and disassembly tools
CN219710235U (en) Construction platform for underwater bored pile
CN219194178U (en) Lifting appliance for lifting steel plate superposed beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211231

CF01 Termination of patent right due to non-payment of annual fee