CN215357016U - Comprehensive pipe rack information construction management and control operation platform - Google Patents

Comprehensive pipe rack information construction management and control operation platform Download PDF

Info

Publication number
CN215357016U
CN215357016U CN202121831196.0U CN202121831196U CN215357016U CN 215357016 U CN215357016 U CN 215357016U CN 202121831196 U CN202121831196 U CN 202121831196U CN 215357016 U CN215357016 U CN 215357016U
Authority
CN
China
Prior art keywords
operation platform
plate
support column
utility
supporting column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121831196.0U
Other languages
Chinese (zh)
Inventor
王士龙
张华勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Haidel Technology Co ltd
Original Assignee
Tianjin Haidel Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Haidel Technology Co ltd filed Critical Tianjin Haidel Technology Co ltd
Priority to CN202121831196.0U priority Critical patent/CN215357016U/en
Application granted granted Critical
Publication of CN215357016U publication Critical patent/CN215357016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an information construction management and control operation platform for a comprehensive pipe gallery, which comprises an operation platform, wherein a pipe bracket is fixedly connected to the middle part of the upper surface of the operation platform through a telescopic rod, a first support column and a second support column are respectively arranged on two sides of the bottom end of the operation platform, bottom plates are fixedly arranged at the bottom ends of the first support column and the second support column, a moving wheel is arranged at the bottom end of each bottom plate, a lifting plate is arranged between the first support column and the second support column, the lifting plate penetrates through the middle of the first support column and the second support column through a lifting assembly, and a fixing assembly is arranged below the lifting plate. The pipeline at the lower end is clamped through the fixing assembly, so that stable transportation is facilitated; the lifting assembly drives the fixing assembly and the pipeline to integrally move up and down so as to meet the requirements of different pipelines on construction heights and facilitate use; after the piping lane construction, rotate the crank for two montants move dorsad in the spout, make things convenient for this operation platform quick dismantlement from the piping lane to come out, improved the efficiency of construction.

Description

Comprehensive pipe rack information construction management and control operation platform
Technical Field
The utility model relates to the technical field of pipe gallery construction, in particular to an information construction management and control operation platform for a comprehensive pipe gallery.
Background
Along with the wide use of piping lane, people's concern is aroused gradually to piping lane interior piping erection problem, and piping lane interior piping erection position is diversified, and the pipe connection of being inconvenient for is narrow and small in piping lane space, need set up different operation platform during the pipe connection of different positions, co-altitude, has both increased the pipe connection degree of difficulty and has increased workman's work load.
To this end, chinese patent with publication number CN 206580511U discloses a multifunctional construction operation platform for pipe gallery, which includes a supporting bottom frame, an operation platform, a jacking bracket, a pipe jacking device arranged on the jacking bracket, a hand-operated platform lifting device arranged between the supporting bottom frame and the operation platform, and a pipe lifting device arranged in the supporting bottom frame.
Although the patent realizes the simultaneous installation of the upper and lower pipelines to a certain extent, the installation efficiency is improved, and the cost is effectively reduced; and after the construction, the unable quick dismantlement of following the piping lane of device influences work efficiency. Therefore, an operation platform for managing and controlling the information construction of the comprehensive pipe rack is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an information construction management and control operation platform for a comprehensive pipe rack, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a management and control operating platform for information construction of a comprehensive pipe gallery comprises an operating platform, wherein a pipe bracket is fixedly connected to the middle of the upper surface of the operating platform through a telescopic rod, a first supporting column and a second supporting column are arranged on two sides of the bottom end of the operating platform respectively, a toothed rail is arranged on the right side of the first supporting column, and a jack is arranged on the front side of the second supporting column;
a bottom plate is fixedly arranged at the bottom ends of the first support column and the second support column, a moving wheel is arranged at the bottom end of the bottom plate, a lifting plate is arranged between the first support column and the second support column, and a sliding groove is formed in the lifting plate;
the lifter plate runs through lifting unit first support column with in the middle of the second support column, just the lifter plate below is equipped with fixed subassembly.
Preferably, the lifting assembly comprises a first moving plate and a second moving plate, a first slot is formed in the first moving plate, a second slot is formed in the second moving plate, and the first supporting column and the second supporting column penetrate through the first slot and the second slot respectively.
Preferably, a gear is arranged in the first slot, the gear is meshed with the rack, one end of the gear is fixedly connected with the output end of the motor, and a bolt penetrates through the front end of the second slot and is inserted into any one of the inserting holes.
Preferably, the fixed component comprises two vertical rods and a screw rod, the top ends of the two vertical rods are provided with sliding blocks, the sliding blocks are connected in the sliding grooves in a sliding and clamping mode, the screw rod penetrates through the two vertical rods, and the middle portion of the screw rod is provided with a box body.
Preferably, the bottom end of the vertical rod is connected with a drag rod through a connecting plate, the drag rod is internally connected with an extrusion plate through a spring in a penetrating manner, and the drag rod and the extrusion plate are both of arc-shaped structures.
Preferably, a crank is arranged on the front side of the box in a penetrating mode, a driving wheel is arranged on the crank in a penetrating mode and located in the box, driven wheels are meshed with the two sides of the driving wheel, and the driven wheels fixedly penetrate through the screw.
Compared with the prior art, the utility model has the beneficial effects that:
1. the lower end of the pipeline is clamped by the fixing assembly, so that stable transportation is facilitated, welding at the optimal angle is facilitated, accurate welding is achieved, welding seam forming is facilitated, and the operation intensity of workers is reduced;
2. the lifting plate is driven to lift through the lifting assembly, so that the fixing assembly and the pipeline are driven to integrally move up and down, the requirements of different pipelines on construction heights are met, and the use is convenient;
3. after the piping lane construction, rotate the crank for two montants move dorsad in the spout, make things convenient for this operation platform quick dismantlement from the piping lane to come out, improved the efficiency of construction.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged structural view of the structure at A in FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the internal structure of the case according to the present invention;
FIG. 4 is a partial structural view of the fixing assembly of the present invention.
In the figure: the device comprises a base plate 1, a moving wheel 101, a first supporting column 2, a toothed rail 201, a second supporting column 3, a jack 301, a lifting plate 4, a sliding chute 401, a lifting assembly 5, a first moving plate 501, a first slot 5011, a second moving plate 502, a second slot 5021, a bolt 5022, a gear 503, a motor 6, an operating table 7, an expansion rod 8, a pipe bracket 801, a fixed assembly 9, a vertical rod 901, a sliding block 9011, a screw 902, a connecting plate 903, a supporting rod 904, a squeezing plate 905, a spring 906, a box 10, a crank 11, a driving wheel 1101 and a driven wheel 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", "front", "rear", "left", "right", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in fig. 1, are only used for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or structure referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be taken as limiting the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides an information-based construction management and control operation platform of utility tunnel, includes operation panel 7, and 8 fixedly connected with conduit saddle 801 of telescopic link are passed through at 7 upper surface middle parts of operation panel, and the upper end pipeline supports through conduit saddle 801, and 7 bottom both sides of operation panel are equipped with first support column 2 and second support column 3 respectively, can support operation panel 7 through first support column 2 and second support column 3.
First support column 2 and 3 bottom of second support column are all fixed and are equipped with bottom plate 1, and 1 bottom of bottom plate is equipped with and removes wheel 101, and this operation platform of being convenient for removes to suitable position, is equipped with lifter plate 4 in the middle of first support column 2 and the 3 second support columns, and lifter plate 4 runs through in the middle of first support column 2 and the 3 second support columns through lifting unit 5, and lifter plate 4 below is equipped with fixed subassembly 9, carries out the centre gripping to the lower extreme pipeline through fixed subassembly 9.
The lifting assembly 5 comprises a first moving plate 501 and a second moving plate 502, a first slot 5011 is formed in the first moving plate 501, a second slot 5021 is formed in the second moving plate 502, and a first supporting column 2 and a second supporting column 3 respectively penetrate through the first slot 5011 and the second slot 5021.
The rack 201 is arranged on the right side of the first support column 2, the gear 503 is arranged in the first slot 5011, the gear 503 is meshed with the rack 201, one end of the gear 503 is fixedly connected with the output end of the motor 6, the gear 503 is driven to rotate by the motor 6, the first moving plate 501 is driven to move on the first support column 2, and the lifting plate 4 and the second moving plate 502 are driven to move together.
Jacks 301 are arranged on the front side of the second supporting column 3, a bolt 5022 penetrates through the front end of the second slot 5021, and the bolt 5022 is inserted into any one jack 301 to lock the movement of the lifting plate 4.
Seted up spout 401 on lifter plate 4, fixed subassembly 9 includes two montants 901 and screw rod 902, two montant 901 tops all are equipped with slider 9011, slider 9011 slip joint is in spout 401, screw rod 902 runs through two montants 901, montant 901 bottom is connected with drawbar 904 through connecting plate 903, drawbar 904 is inside to have stripper plate 905 through the through connection of spring 906, stripper plate 905 on the drawbar 904 through the lower extreme carries out the centre gripping to the lower extreme pipeline, elasticity through spring 906, the clamp that makes the pipeline more stable is got in stripper plate 905, be convenient for stable transportation, drawbar 904 and stripper plate 905 are the arc structure.
The middle of the screw 902 is provided with a box 10, the front side of the box 10 is provided with a crank 11 in a penetrating manner, the crank 11 is provided with a driving wheel 1101 in a penetrating manner, the driving wheel 1101 is located in the box 10, both sides of the driving wheel 1101 are respectively engaged with a driven wheel 12, the driven wheel 12 is fixedly penetrated through the screw 902, the crank 11 is rotated, the driving wheel 1101 drives the driven wheel 12 to rotate, and then the two vertical rods 901 move oppositely or oppositely.
The working principle is as follows: when the pipe joint is used, an upper end pipeline is supported through the pipe bracket 801, the bolt 5022 is firstly pulled out from one jack 301, the crank 11 is rotated, the driving wheel 1101 drives the driven wheel 12 to rotate, so that the two vertical rods 901 move in the same direction on the screw 902, the lower end pipeline is clamped through the extrusion plate 905 on the lower end drag rod 904, the pipeline is clamped in the extrusion plate 905 more stably through the elasticity of the spring 906, stable transportation is facilitated, welding at the optimal angle is facilitated, accurate welding is facilitated, welding seam forming is facilitated, and the operation intensity of workers is reduced;
then drive gear 503 through motor 6 and rotate, drive first movable plate 501 and remove on first support column 2, and then drive lifter plate 4 and second movable plate 502 and remove together, and then drive fixed subassembly 9 and lower extreme pipeline wholly reciprocate to satisfy the construction height demand of different pipelines, facilitate the use, then insert bolt 5022 in the jack 301 that corresponds with it, lock the removal of lifter plate 4.
After the piping lane construction, rotate crank 11, action wheel 1101 drives from the rotation of driving wheel 12 for two montants 901 move dorsad along screw 902 in spout 401, make things convenient for this operation platform quick dismantlement from the piping lane to come out, improved the efficiency of construction.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a utility tunnel information ization construction management and control operation platform, includes operation panel (7), its characterized in that: a pipe support (801) is fixedly connected to the middle of the upper surface of the operating platform (7) through a telescopic rod (8), a first supporting column (2) and a second supporting column (3) are respectively arranged on two sides of the bottom end of the operating platform (7), a rack (201) is arranged on the right side of the first supporting column (2), and a jack (301) is arranged on the front side of the second supporting column (3);
a bottom plate (1) is fixedly arranged at the bottom ends of the first supporting column (2) and the second supporting column (3), a moving wheel (101) is arranged at the bottom end of the bottom plate (1), a lifting plate (4) is arranged between the first supporting column (2) and the second supporting column (3), and a sliding groove (401) is formed in the lifting plate (4);
lifter plate (4) run through lifting unit (5) first support column (2) with in the middle of second support column (3), just lifter plate (4) below is equipped with fixed subassembly (9).
2. The utility model provides an operation platform is managed and control in information-based construction of utility tunnel according to claim 1, its characterized in that: the lifting assembly (5) comprises a first moving plate (501) and a second moving plate (502), a first slot (5011) is formed in the first moving plate (501), a second slot (5021) is formed in the second moving plate (502), and the first supporting column (2) and the second supporting column (3) penetrate through the first slot (5011) and the second slot (5021) respectively.
3. The utility model provides a utility tunnel information-based construction management and control operation platform of claim 2, its characterized in that: the gear (503) is arranged inside the first slot (5011), the gear (503) is meshed with the rack (201), one end of the gear (503) is fixedly connected with the output end of the motor (6), a bolt (5022) penetrates through the front end of the second slot (5021), and the bolt (5022) is inserted into any one of the jacks (301).
4. The utility model provides an operation platform is managed and control in information-based construction of utility tunnel according to claim 1, its characterized in that: the fixed component (9) comprises two vertical rods (901) and a screw rod (902), wherein the top ends of the two vertical rods (901) are respectively provided with a sliding block (9011), the sliding blocks (9011) are clamped in the sliding grooves (401) in a sliding mode, the screw rod (902) penetrates through the two vertical rods (901), and the middle of the screw rod is provided with a box body (10).
5. The utility model provides a utility tunnel information-based construction management and control operation platform of claim 4, its characterized in that: the bottom end of the vertical rod (901) is connected with a drag rod (904) through a connecting plate (903), the interior of the drag rod (904) is connected with an extrusion plate (905) through a spring (906), and the drag rod (904) and the extrusion plate (905) are both arc-shaped structures.
6. The utility model provides a utility tunnel information-based construction management and control operation platform of claim 4, its characterized in that: the utility model discloses a box, including box (10), box (10) front side run through and be equipped with crank (11), run through on crank (11) and be equipped with action wheel (1101), action wheel (1101) are located in box (10), just action wheel (1101) both sides all mesh there is driven wheel (12), driven wheel (12) are fixed to run through on screw rod (902).
CN202121831196.0U 2021-08-06 2021-08-06 Comprehensive pipe rack information construction management and control operation platform Active CN215357016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121831196.0U CN215357016U (en) 2021-08-06 2021-08-06 Comprehensive pipe rack information construction management and control operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121831196.0U CN215357016U (en) 2021-08-06 2021-08-06 Comprehensive pipe rack information construction management and control operation platform

Publications (1)

Publication Number Publication Date
CN215357016U true CN215357016U (en) 2021-12-31

Family

ID=79616034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121831196.0U Active CN215357016U (en) 2021-08-06 2021-08-06 Comprehensive pipe rack information construction management and control operation platform

Country Status (1)

Country Link
CN (1) CN215357016U (en)

Similar Documents

Publication Publication Date Title
CN211256683U (en) Bracket for bridge construction
CN214880034U (en) But highway bridge construction cyclic utilization's support bracket
CN215357016U (en) Comprehensive pipe rack information construction management and control operation platform
CN212507281U (en) Building platform lifting mechanism
CN104724635A (en) Train door disassembling and assembling mechanism
CN218623500U (en) Building construction bearing structure
CN111115538A (en) Multifunctional crane pipe moving device
CN115609214A (en) Breast board assembling and welding table for breast board type semi-trailer
CN215622197U (en) Movable pipeline combined trolley
CN211662007U (en) Maintenance device for repairing engineering machine
CN210134655U (en) Steel reinforcement framework forming system
CN103896050A (en) Automatic turnover mechanism
CN113735029A (en) Auxiliary lifting device for mounting multifunctional overhead pipeline
CN113664082A (en) Convenient aluminum pipe bending device
CN216730284U (en) Positioning device for welding steel members
CN219100877U (en) Stable lifting device for automobile lifting platform
CN112186655A (en) Crimping device for manufacturing large-section lead
CN111633797A (en) Prefabricated plate napping device
CN212385661U (en) Prefabricated plate napping device
CN114682985B (en) Opposite-opening positioning device suitable for welding large-diameter steel pipes
CN213978645U (en) Clamping device of prefabricated concrete component of assembly type building
CN217297214U (en) Multifunctional overhead working truck for electrified construction
CN219864238U (en) Reinforcing and connecting device for building structure
CN214558750U (en) Rectangular beam turnover mechanism
CN203048016U (en) Groove-shaped slideway of full automatic propelling device