CN215338339U - Construction line weighs down for building - Google Patents

Construction line weighs down for building Download PDF

Info

Publication number
CN215338339U
CN215338339U CN202121430813.6U CN202121430813U CN215338339U CN 215338339 U CN215338339 U CN 215338339U CN 202121430813 U CN202121430813 U CN 202121430813U CN 215338339 U CN215338339 U CN 215338339U
Authority
CN
China
Prior art keywords
plates
cotton rope
construction line
base
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121430813.6U
Other languages
Chinese (zh)
Inventor
李沛怡
张通
康立朋
马晓晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121430813.6U priority Critical patent/CN215338339U/en
Application granted granted Critical
Publication of CN215338339U publication Critical patent/CN215338339U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of construction line pendants, in particular to a construction line pendant for buildings, which comprises a base, wherein two side plates which are distributed at intervals are fixedly arranged at the top of the base, a retractor is rotatably arranged between the two side plates, a rotary disc is rotatably arranged on the side plate positioned on one side, a rotary shaft of the rotary disc penetrates through the side plates and is fixedly connected with the retractor, supporting plates are fixedly arranged on the side plates, a guide pulley is arranged between the two supporting plates, shafts are fixedly arranged on two sides of the guide pulley, the end parts of the shafts are respectively rotatably arranged on the supporting plates, the construction line pendant also comprises a cotton rope, one end of the cotton rope is fixedly connected in the retractor, and the other end of the cotton rope is fixedly connected with a cone; place the base on the wall top, the manual carousel that rotates drives the coiler and rotates to release the cotton rope of roll-up on the coiler, the cotton rope is through guide pulley's guide effect, thereby makes the cone transfer, and according to the position of the altitude mixture control cone of wall, the reversible rotation carousel roll-up cotton rope, thereby it rises to drive the cone.

Description

Construction line weighs down for building
Technical Field
The utility model relates to the technical field of construction line pendants, in particular to a construction line pendant for a building.
Background
The plummet is also called a plumb bob, and is a conical object cast by metal (iron, steel, copper, etc.), mainly used for measuring the verticality of the object, and is commonly found in building engineering. The building engineering refers to an engineering entity formed by the construction of various building buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the building buildings, and the verticality is measured by a line weight so as to trim the wall flatness in time.
The existing line weight is simple in structure and single in function, the line weight cannot be quickly fixed to the upper end of a wall surface when in use, and the position of a plumb cannot be adjusted according to the height of the wall surface, so that the construction line weight for the building is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problem that the position of a plumb bob cannot be adjusted according to the height of a wall surface when a plumb bob is used in the prior art, and provides a construction plumb bob for a building.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the design is a construction line for building weighs down, the on-line screen storage device comprises a base, base top fixed mounting has two interval distribution's curb plate, two rotatable the installing coiler between the curb plate, be located one side rotatable the installing carousel on the curb plate, the pivot of carousel run through the curb plate and with coiler fixed connection, equal fixed mounting has the backup pad on the curb plate, two be equipped with guide pulley between the backup pad, the equal fixed mounting in guide pulley both sides has the axle, the axle head is rotatable the installing in the backup pad respectively, still includes the cotton rope, cotton rope one end fixed connection is in the coiler, cotton rope other end fixedly connected with cone.
Preferably, both ends of the top of the base are fixedly provided with the weighting blocks.
Preferably, the lower ends of the two support plates are provided with measuring mechanisms, and the measuring mechanisms on the two sides are distributed in a mirror image mode.
Preferably, the measuring mechanism comprises a screw and a plurality of ruler plates, the upper end of the screw is fixedly connected to the supporting plate, the screw penetrates through the plurality of ruler plates and is distributed at equal intervals from top to bottom, thread sleeves are arranged at the upper ends and the lower ends of the ruler plates, and the thread sleeves are connected to the screw in a threaded mode.
The construction line pendant for the building, provided by the utility model, has the beneficial effects that: place the base on the wall top, the manual carousel that rotates drives the coiler and rotates to release the cotton rope of roll-up on the coiler, the cotton rope is through guide pulley's guide effect, thereby makes the cone transfer, and according to the position of the altitude mixture control cone of wall, the reversible rotation carousel roll-up cotton rope, thereby it rises to drive the cone.
Drawings
Fig. 1 is a schematic working diagram of a construction plummet for building according to the present invention.
Fig. 2 is a schematic structural diagram of a construction plummet for building according to the present invention.
Fig. 3 is an enlarged schematic view of a straight ruler plate of the construction line drop for building according to the present invention.
Fig. 4 is an enlarged schematic view of a part of the construction plummet for building according to the present invention.
In the figure: base 1, weight 2, curb plate 3, coiler 4, carousel 5, backup pad 6, leading pulley 7, axle 8, cotton rope 9, centrum 10, cotton rope 9, cone 10, screw rod 11, ruler board 12, thread bush 13, wall 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, a construction line for building weighs down, including base 1, base 1 top fixed mounting has two interval distribution's curb plate 3, rotatable installation has coiler 4 between two curb plates 3, rotatable installation has carousel 5 on the curb plate 3 that is located one side, the pivot of carousel 5 runs through curb plate 3 and with coiler 4 fixed connection, equal fixed mounting has backup pad 6 on the curb plate 3, be equipped with guide pulley 7 between two backup pads 6, the equal fixed mounting in guide pulley 7 both sides has axle 8, axle 8 tip is rotatable installation respectively in backup pad 6, still include cotton rope 9, 9 one end fixed connection of cotton rope is in coiler 4, cotton rope 9 is through guide of guide pulley 7, 9 other end fixed connection of cotton rope has cone 10. When the device works, referring to a figure 1 in the attached drawing of the specification, a base 1 is placed at the top end of a wall surface, a rotary disc 5 is manually rotated to drive a retractor 4 to rotate, so that a rope 9 wound on the retractor 4 is released, the rope 9 passes through the guiding effect of a guide pulley 7, a cone 10 is lowered, the position of the cone 10 is adjusted according to the height of the wall surface 14, and the rope 9 can be wound by the rotary disc 5 in a reverse rotation mode, so that the cone 10 is driven to ascend.
The equal fixed mounting in base 1 top both ends has weight 2, and multiplicable base 1 places the stability in the wall upper end, and 6 lower extremes of two backup pads all are provided with measuring mechanism, and the measuring mechanism mirror image of both sides distributes. The measuring mechanism includes screw rod 11 and polylith ruler board 12, screw rod 11 upper end fixed connection is in backup pad 6, screw rod 11 runs through polylith ruler board 12, polylith ruler board 12 equidistance distributes from top to bottom, both ends all are equipped with thread bush 13 about the ruler board 12, the equal threaded connection of thread bush 13 is on screw rod 11, adjust the distribution of ruler board 12 earlier according to the height of wall, make polylith ruler board 12 distribute in the upper and middle position section of wall, thread bush 13 through ruler board 12 upper and lower both ends can fix ruler board 12, the thread bush 13 of rotation upper end makes it compress tightly ruler board 12, thereby through the distance between measurement cotton rope 9 and the wall, and observe whether ruler board 12 tip laminates perpendicularly on the wall, thereby judge the straightness that hangs down of wall.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (4)

1. The construction line pendant for the building is characterized by comprising a base (1), wherein two side plates (3) which are distributed at intervals are fixedly arranged at the top of the base (1), a coiler (4) is rotatably arranged between the two side plates (3), a turntable (5) is rotatably arranged on the side plate (3) positioned on one side, a rotating shaft of the rotating disc (5) penetrates through the side plate (3) and is fixedly connected with the retractor (4), supporting plates (6) are fixedly arranged on the side plates (3), a guide pulley (7) is arranged between the two supporting plates (6), shafts (8) are fixedly arranged on both sides of the guide pulley (7), the end parts of the shafts (8) are respectively rotatably arranged on the supporting plate (6), and the guide pulley further comprises a thread rope (9), one end of the wire rope (9) is fixedly connected in the retractor (4), and the other end of the wire rope (9) is fixedly connected with a cone (10).
2. The construction line drop for building according to claim 1, wherein the weighting block (2) is fixedly installed at both ends of the top of the base (1).
3. The construction plummet for building according to claim 1, wherein the lower ends of the two support plates (6) are provided with measuring mechanisms, and the measuring mechanisms on both sides are distributed in a mirror image manner.
4. The construction line weight for the building as claimed in claim 3, wherein the measuring mechanism comprises a screw rod (11) and a plurality of ruler plates (12), the upper end of the screw rod (11) is fixedly connected to the support plate (6), the screw rod (11) penetrates through the plurality of ruler plates (12), the plurality of ruler plates (12) are distributed at equal intervals from top to bottom, the upper end and the lower end of each ruler plate (12) are provided with threaded sleeves (13), and the threaded sleeves (13) are all in threaded connection with the screw rod (11).
CN202121430813.6U 2021-06-26 2021-06-26 Construction line weighs down for building Active CN215338339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121430813.6U CN215338339U (en) 2021-06-26 2021-06-26 Construction line weighs down for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121430813.6U CN215338339U (en) 2021-06-26 2021-06-26 Construction line weighs down for building

Publications (1)

Publication Number Publication Date
CN215338339U true CN215338339U (en) 2021-12-28

Family

ID=79561853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121430813.6U Active CN215338339U (en) 2021-06-26 2021-06-26 Construction line weighs down for building

Country Status (1)

Country Link
CN (1) CN215338339U (en)

Similar Documents

Publication Publication Date Title
CN213391274U (en) Adjusting device for construction and installation of steel structure steel column
CN217179704U (en) Underground water level observation device for hydrogeological exploration
CN215338339U (en) Construction line weighs down for building
CN215524630U (en) Perpendicularity measuring device for house construction project
CN209925903U (en) Level gauge capable of being suspended and placed for road construction
CN112684815A (en) Bridge rotation state intelligent control system
CN211740199U (en) Wall straightness detection device that hangs down for building engineering
CN113670256B (en) Foundation settlement monitoring system for building engineering
CN210486903U (en) Vertical measuring device for building construction
CN212807051U (en) Pile hole perpendicularity detection device
CN219390928U (en) Transmission line shaft tower slope detection device
CN216483080U (en) Vertical measuring device for mining
CN217980339U (en) Municipal house is with measuring hanging wire mechanism
CN220222963U (en) Civil engineering building pay-off
CN214879823U (en) Hydrology current surveying winch convenient to remove
CN219608027U (en) Detection device for perpendicularity of elevator steel structure hoistway
CN217358499U (en) Automatic perpendicularity capturing system for vertical prefabricated part
CN216246053U (en) Vertical construction measuring tool for box-type substation stand column
CN217974516U (en) Pipe jacking construction is with deep basal pit measuring device
CN216476279U (en) Gravity pendulum block attaches wall support with gravity detects function
CN115724348A (en) Special hoisting wireless signal director with distance measurement and straight measurement functions and distance measurement and straight measurement method
CN216558976U (en) High-rise building verticality measuring device
CN218841538U (en) Monitoring device for bridge hanging basket construction
CN114934684B (en) Intelligent adjustment method for assembly verticality of prefabricated vertical component of building structure
CN214333767U (en) Multifunctional measuring device for building engineering management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant