CN215334859U CN202120057356.4U CN202120057356U CN215334859U CN 215334859 U CN215334859 U CN 215334859U CN 202120057356 U CN202120057356 U CN 202120057356U CN 215334859 U CN215334859 U CN 215334859U
Authority
CN
China
Prior art keywords
channel
pipeline
steel
section steel
jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120057356.4U
Other languages
Chinese (zh)
Inventor
张彦龙
张媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group electromechanical installation Co.,Ltd.
China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Equipment Installation Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, Equipment Installation Co Ltd of China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN202120057356.4U priority Critical patent/CN215334859U/en
Application granted granted Critical
Publication of CN215334859U publication Critical patent/CN215334859U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline hanger, which comprises channel steel and a hanger rod; the channel-section steel is the level setting, the jib is vertical form and connects at the both ends of channel-section steel, and the bottom of jib passes the through-hole of seting up on the channel-section steel and is in the same place with two nut thread connection, and the channel-section steel upper surface is equipped with U type pipe strap, wooden support and pipeline. The utility model has the beneficial effects that: the pipeline is the card through the wooden block and puts the settlement with U type pipe strap, and U type pipe strap is fixed connection through the lower fixation nut and the channel-section steel that the bottom is connected, ensure that the pipeline can firmly be motionless, and then reach standard with guaranteeing construction convenience and precision, the bottom of jib is fixed connection through two nuts and channel-section steel, the angle steel is passed on the top of jib, and through last fixation nut and angle steel fixed connection, can hang up through the pipeline that the jib will settle on the channel-section steel, in order to ensure when horizontal pipeline installation, support at turn and the yielding position of atress department.

Description

Pipeline hanger
Technical Field
The utility model relates to a hanging bracket, in particular to a pipeline hanging bracket, and belongs to the technical field of pipeline construction.
Background
During horizontal pipeline installation, need add at turn and atress department yielding position and establish the support in order to play support fixed action, consequently need use the pipeline gallows in pipeline construction process, the selection of a pipeline gallows will consider the pipeline and lay the structural condition in space, intraductal flowing medium kind, pipeline weight, pipeline interface atress, pipeline heat insulation etc. factor, rationally select fixed bolster, sliding support and gallows, based on this, this application proposes a pipeline gallows.
SUMMERY OF THE UTILITY MODEL
The present invention has been made to solve the above problems, and an object of the present invention is to provide a pipe hanger.
The utility model realizes the purpose through the following technical scheme: a pipeline hanger comprises a channel steel and a hanger rod; the U-shaped channel is horizontally arranged, the suspension rod is vertically connected to two ends of the U-shaped channel, the bottom end of the suspension rod penetrates through a through hole formed in the U-shaped channel to be in threaded connection with a double nut, and a U-shaped pipe clamp, a wooden support and a pipeline are arranged on the upper surface of the U-shaped channel;
the pipeline is arranged on the channel steel in a side-by-side mode, a wooden support wraps the outer side of the pipeline, the U-shaped pipe clamp is placed on the outer side of the wooden support, and the bottom end of the U-shaped pipe clamp penetrates through a through hole formed in the channel steel and is connected with the lower fixing nut in a threaded mode.
As a still further scheme of the utility model: the pipeline is clamped and arranged with the U-shaped pipe clamp through the wooden support, and the U-shaped pipe clamp is fixedly connected with the channel steel through a lower fixing nut connected with the bottom end of the U-shaped pipe clamp.
As a still further scheme of the utility model: the bottom of jib is fixed connection through two nuts and channel-section steel, the angle steel is passed on the top of jib to through last fixation nut and angle steel fixed connection.
As a still further scheme of the utility model: the bottom end of the suspender penetrates through the joint of the channel steel and the double nuts and is sleeved with a gasket.
As a still further scheme of the utility model: the steel plate is welded on the outer side edge of the angle steel, and the steel plate is fixedly connected with the floor slab or the support beam through the fixing screws.
The utility model has the beneficial effects that: the pipeline hanger is reasonable in design, a pipeline is clamped and placed with a U-shaped pipe clamp through a wooden support, the U-shaped pipe clamp is fixedly connected with a channel steel through a lower fixing nut connected with the bottom end of the U-shaped pipe clamp, the pipeline can be firmly fixed, construction convenience and standard precision are guaranteed, the bottom end of a suspender is fixedly connected with the channel steel through two nuts, the top end of the suspender penetrates through an angle steel and is fixedly connected with the angle steel through an upper fixing nut, the pipeline arranged on the channel steel can be lifted through the suspender, support is guaranteed at the position where the pipeline is easy to deform at a turning position and a stress position during horizontal pipeline installation, a gasket is sleeved at the position where the top end of the suspender penetrates through the connecting part of the angle steel and the lower fixing nut, the gasket is sleeved at the position where the bottom end of the suspender penetrates through the connecting part of the channel steel and the two nuts, loosening of a nut to be prevented from being screwed, structural firmness of the pipeline hanger is guaranteed, and a steel plate is welded on the outer side of the angle steel plate, and the steel plate is fixedly connected with the floor slab or the support beam through the fixing screw, so that the pipeline bracket can be installed at a position specified by design and cannot move randomly.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the upper end connection structure of the hanger bar of the present invention;
fig. 3 is a schematic view of a connection structure of a hanger bar and a channel steel.
In the figure: 1. channel-section steel, 2, jib, 3, U type pipe strap, 4, wooden block, 5, pipeline, 6, lower fixation nut, 7, double nut, 8, gasket, 9, angle steel, 10, go up fixation nut, 11, steel sheet and 12, set screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, a pipe hanger includes a channel steel 1 and a hanger rod 2; the steel channel 1 is horizontally arranged, the suspender 2 is vertically connected to two ends of the steel channel 1, the bottom end of the suspender 2 penetrates through a through hole formed in the steel channel 1 and is in threaded connection with a double nut 7, and a U-shaped pipe clamp 3, a wooden support 4 and a pipeline 5 are arranged on the upper surface of the steel channel 1;
further, in the embodiment of the utility model, the pipeline 5 is arranged on the channel steel 1 side by side, the outer side of the pipeline 5 is wrapped by the wooden support 4, the U-shaped pipe clamp 3 is clamped on the outer side of the wooden support 4, and the bottom end of the U-shaped pipe clamp 3 penetrates through a through hole formed in the channel steel 1 and is in threaded connection with the lower fixing nut 6.
Further, in the embodiment of the utility model, the pipeline 5 is clamped and placed with the U-shaped pipe clamp 3 through the wooden support 4, and the U-shaped pipe clamp 3 is fixedly connected with the channel steel 1 through the lower fixing nut 6 connected with the bottom end of the U-shaped pipe clamp 3, so that the pipeline 5 can be firmly fixed, and further, the construction convenience and the accuracy standard can be guaranteed.
Furthermore, in the embodiment of the utility model, the bottom end of the suspender 2 is fixedly connected with the channel steel 1 through a double nut 7, the top end of the suspender 2 passes through the angle steel 9 and is fixedly connected with the angle steel 9 through an upper fixing nut 10, and the pipeline 5 arranged on the channel steel 1 can be hoisted through the suspender 2, so as to ensure that the easy-deformation part at the turning and stressed part is supported when the horizontal pipeline is installed.
Furthermore, in the embodiment of the utility model, the gasket 8 is sleeved at the bottom end of the suspender 2 penetrating through the joint of the channel steel 1 and the double nuts 7, so that the loosening of the tightened nuts is avoided, and the structural firmness of the pipeline hanger is ensured.
Furthermore, in the embodiment of the present invention, a steel plate 11 is welded to the outer side edge of the angle steel 9, and the steel plate 11 is fixedly connected to a floor or a support beam by a fixing screw 12, so that the pipe bracket can be installed at a position specified by design without any movement.
The working principle is as follows: when using this pipeline gallows, at first pass through-hole and two nuts 7 threaded connection that 1 both ends of channel-section steel were seted up with jib 2, and pass fixed connection angle steel 9 on floor or corbel with the top of jib 2, and use last fixation nut 10 to fix it, realize the fixed mounting of this pipeline gallows, then put pipeline 5 in U type pipe strap 3 through the wooden block 4 card, and pass the through-hole of seting up on channel- section steel 1 and 6 threaded connection of lower fixation nut with the bottom of U type pipe strap 3, realize the hoist and mount to pipeline 5.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A pipeline hanger comprises a channel steel (1) and a hanger rod (2); the method is characterized in that: the steel channel (1) is horizontally arranged, the suspender (2) is vertically connected to two ends of the steel channel (1), the bottom end of the suspender (2) penetrates through a through hole formed in the steel channel (1) and is in threaded connection with a double nut (7), and a U-shaped pipe clamp (3), a wooden support (4) and a pipeline (5) are arranged on the upper surface of the steel channel (1);
pipeline (5) are and form installing on channel-section steel (1) side by side, just the outside parcel of pipeline (5) has wooden block (4), U type pipe strap (3) card is put in the outside of wooden block (4), just the bottom of U type pipe strap (3) is passed the through-hole of seting up on channel-section steel (1) and is in the same place with fixation nut (6) threaded connection down.
2. A pipeline hanger as claimed in claim 1, wherein: pipeline (5) are the card through wooden block (4) and U type pipe strap (3) and put the arrangement, just U type pipe strap (3) are fixed connection through lower fixation nut (6) that the bottom is connected and channel-section steel (1).
3. A pipeline hanger as claimed in claim 1, wherein: the bottom of jib (2) is fixed connection through two nuts (7) and channel-section steel (1), angle steel (9) are passed on the top of jib (2) to through last fixation nut (10) and angle steel (9) fixed connection.
4. A pipe hanger as claimed in claim 3, wherein: the bottom end of the suspender (2) penetrates through the joint of the channel steel (1) and the double nuts (7) and is sleeved with a gasket (8).
5. A pipe hanger as claimed in claim 3, wherein: the outer side edge of the angle steel (9) is welded with a steel plate (11), and the steel plate (11) is fixedly connected with a floor slab or a support beam through a fixing screw (12).
CN202120057356.4U 2021-01-11 2021-01-11 Pipeline hanger Active CN215334859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120057356.4U CN215334859U (en) 2021-01-11 2021-01-11 Pipeline hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120057356.4U CN215334859U (en) 2021-01-11 2021-01-11 Pipeline hanger

Publications (1)

Publication Number Publication Date
CN215334859U true CN215334859U (en) 2021-12-28

Family

ID=79571870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120057356.4U Active CN215334859U (en) 2021-01-11 2021-01-11 Pipeline hanger

Country Status (1)

Country Link
CN (1) CN215334859U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114370529A (en) * 2022-01-07 2022-04-19 中铁建设集团机电安装有限公司 Installation process of air conditioner water pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114370529A (en) * 2022-01-07 2022-04-19 中铁建设集团机电安装有限公司 Installation process of air conditioner water pipe
CN114370529B (en) * 2022-01-07 2023-07-11 中铁建设集团机电安装有限公司 Mounting technology of air conditioner water pipe

Similar Documents

Publication Publication Date Title
CN215334859U (en) Pipeline hanger
CN204385984U (en) Back of the body bolt suspension member group formula shaped steel keel stone curtain wall
CN201215876Y (en) Assistant hanging rack for mounting top rack of electric pole
CN209744005U (en) Hanging type vibration damping mounting structure of total heat exchanger
CN210151984U (en) Be used for building antidetonation a gallows structure
CN215981218U (en) Pipeline installation gallows under L shaped steel roof beam
CN203653194U (en) L-shaped gantry mounting rack
CN209087561U (en) On-load tap-changer of transformer bracket
CN219973852U (en) Firm strutting arrangement of reinforcement hanging flower basket fore-stock
CN210594878U (en) Be used for cable testing bridge hoist and mount mounting structure
CN217108521U (en) Pipeline hanging device
CN218216477U (en) Communication room wiring rack easy to assemble and disassemble
CN206159765U (en) Adjustable mounting bracket
CN218714958U (en) Large-scale safe hanging basket for constructional engineering construction
CN200994170Y (en) Integrated support
CN216810885U (en) Abnormal shape non-standard hanging flower basket construction mounting structure
CN220467308U (en) Building panel beating lifts by crane anchor clamps
CN110040618A (en) A kind of wall-mounted equipment mounting tool
CN217934969U (en) Large-span bridge support device
CN217282782U (en) Flexible photovoltaic support of stable in structure type
CN215626237U (en) Hanging crane rail mounting mechanism for net rack roof
CN219827983U (en) Pipeline support and hanger
CN213685570U (en) Pipeline assembling support
CN214402694U (en) Single-tube longitudinal anti-seismic support
CN213587857U (en) A show device is suspended in midair to design picture for building planning design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100043 room 901-2, 20 Shijingshan Road, Shijingshan District, Beijing

Patentee after: China Railway Construction Group electromechanical installation Co.,Ltd.

Patentee after: China Railway Construction Group Co., Ltd

Address before: 100043 room 901-2, 20 Shijingshan Road, Shijingshan District, Beijing

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP EQUIPMENT CO.,LTD.