CN215331696U - Simple stair for construction site - Google Patents
Simple stair for construction site Download PDFInfo
- Publication number
- CN215331696U CN215331696U CN202121285179.1U CN202121285179U CN215331696U CN 215331696 U CN215331696 U CN 215331696U CN 202121285179 U CN202121285179 U CN 202121285179U CN 215331696 U CN215331696 U CN 215331696U
- Authority
- CN
- China
- Prior art keywords
- pedal
- stair
- connecting hoop
- supporting beam
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model relates to a simple stair for a construction site, and belongs to the technical field of building construction tools. The pedal device mainly comprises support beams, a connecting hoop, pedals and short shafts, wherein the connecting hoop is uniformly and fixedly arranged on the support beams, the two support beams are arranged in parallel, and two ends of each pedal are respectively arranged in the connecting hoop through the short shafts; the pedal angle can be adjusted, the pedal angle can be adjusted as required when the stair climbing device is used, the level of the pedal is kept, personnel getting on and off between two working platforms with different height differences can be met, the requirement that people with various height differences pass through the stair is met, a temporary bridge floor does not need to be built, the workload of the personnel is reduced, occupied lifting equipment is avoided, and the working efficiency is improved.
Description
Technical Field
The utility model belongs to the technical field of building construction tools, and particularly relates to a simple stair for a construction site.
Background
In the building construction process, the place that has the discrepancy in elevation (but the discrepancy in elevation is not big) is more, for example foundation ditch, barricade, irrigation canals and ditches etc. and is more arduous when personnel about needs, simultaneously, when need cross two table surface (for example between irrigation canals and ditches or two adjacent buildings) of the same discrepancy in elevation, often need to detour or build interim bridge floor, and is consuming time hard, if adopt lifting means, inefficiency and equipment is occupied, seriously hinders work efficiency's improvement.
Disclosure of Invention
In order to overcome the problems in the background art, the utility model provides a simple stair for a construction site; the pedal angle can be adjusted, the pedal angle can be adjusted as required when the stair climbing device is used, the level of the pedal is kept, personnel getting on and off between two working platforms with different height differences can be met, the requirement that people with various height differences pass through the stair is met, a temporary bridge floor does not need to be built, the workload of the personnel is reduced, occupied lifting equipment is avoided, and the working efficiency is improved.
In order to realize the purpose, the utility model is realized by the following technical scheme: the utility model provides a job site is with simple and easy stair mainly includes a supporting beam, connects staple bolt, footboard, minor axis, the even fixed mounting of connection staple bolt on a supporting beam, two supporting beam parallel arrangement, install in connecting the staple bolt through the minor axis respectively at the footboard both ends.
The supporting beam and the short shaft are steel pipes for building construction, and the connecting hoop is a steel pipe connecting fastener for building construction.
The pedal is formed by welding steel bars for building construction.
The two ends of the supporting beam are hinged with anti-skid supporting seats, and anti-skid rubber pads are arranged on the bottom surfaces of the anti-skid supporting seats; the inner side of the connecting hoop is provided with an anti-slip liner.
The utility model has the beneficial effects that:
the pedal angle can be adjusted as required during use, the pedal level is kept, personnel getting on and off between two working platforms with different height differences or the same height can be met, one stair meets the requirement of passing people of various height differences, a temporary bridge floor does not need to be built, the workload of the personnel is reduced, the occupied lifting equipment is avoided, and the working efficiency is improved.
Drawings
FIG. 1 is a perspective view of the present invention showing the use of the differential height station.
Fig. 2 is a perspective view illustrating a working position without height difference in the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings to facilitate understanding of the skilled person.
The utility model discloses a simple stair for a construction site, which mainly comprises support beams 1, a connecting hoop 2, pedals 3 and short shafts 4, wherein the connecting hoop 2 is uniformly and fixedly arranged on the support beams 1, the two support beams 1 are arranged in parallel, and two ends of each pedal 3 are respectively arranged in the connecting hoop 2 through the short shafts 4; the 3 angles of footboard can be adjusted, can adjust the footboard angle as required when using, keep the footboard level, can satisfy personnel between two table surface of different altitude differences or co-altitude from top to bottom, realize that a stair satisfies various altitude differences and cross people's requirement, need not to build interim bridge floor, reduce staff's work load, avoid hoisting equipment to be occupied, are favorable to work efficiency's improvement.
The supporting beam 1 and the short shaft 4 are steel pipes for building construction, and the connecting hoop 2 is a steel pipe connecting fastener for building construction; the pedal 3 is formed by welding steel bars for building construction; the preparation is finished by using local materials, so that the cost is saved.
The anti-skid supporting device is characterized in that anti-skid supporting seats 5 are hinged to two ends of the supporting beam 1, anti-skid rubber pads are arranged on the bottom surfaces of the anti-skid supporting seats 5, and the bottom surfaces of the anti-skid supporting seats 5 can form stable supporting by the bottom surfaces or the whole surfaces all the time in the use process; the inner side of the connecting hoop 2 is provided with an anti-slip liner, so that the pedal 3 can be prevented from rotating in the using process, and the safety is ensured.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the utility model, and that, although the utility model has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the utility model as defined by the appended claims.
Claims (5)
1. The utility model provides a job site is with simple and easy stair which characterized in that: the simple and easy stair for job site include supporting beam (1), connect staple bolt (2), footboard (3), minor axis (4), the even fixed mounting of connection staple bolt (2) on supporting beam (1), two supporting beam (1) parallel arrangement, install in connecting staple bolt (2) through minor axis (4) respectively at footboard (3) both ends.
2. The stairway for construction sites as claimed in claim 1, wherein: the supporting beam (1) and the short shaft (4) are steel pipes for building construction, and the connecting hoop (2) is a steel pipe connecting fastener for building construction.
3. The stairwell for construction sites as claimed in claim 1 or 2, wherein: the pedal (3) is formed by welding steel bars for building construction.
4. The stairway for construction sites as claimed in claim 3, wherein: the anti-skidding support structure is characterized in that two ends of the support beam (1) are hinged with anti-skidding support seats (5), and anti-skidding rubber pads are arranged on the bottom surfaces of the anti-skidding support seats (5).
5. The stairway as claimed in any one of claims 1, 2 and 4, wherein: the inner side of the connecting hoop (2) is provided with an anti-skid gasket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121285179.1U CN215331696U (en) | 2021-06-09 | 2021-06-09 | Simple stair for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121285179.1U CN215331696U (en) | 2021-06-09 | 2021-06-09 | Simple stair for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215331696U true CN215331696U (en) | 2021-12-28 |
Family
ID=79556645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121285179.1U Active CN215331696U (en) | 2021-06-09 | 2021-06-09 | Simple stair for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215331696U (en) |
-
2021
- 2021-06-09 CN CN202121285179.1U patent/CN215331696U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9783939B2 (en) | Articulating work platform support system, work platform system, and methods of use thereof | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN104583510A (en) | A lift truck operated stacking formwork table system and a method of operation thereof | |
CN111985020B (en) | Automobile crane walking and lifting load calculating system and calculating method | |
CN107178203A (en) | A kind of planar dimension and adjustable for height operating platform | |
CN111472353A (en) | Reverse construction method steel pipe upright pile construction casing device and construction method thereof | |
CN215331696U (en) | Simple stair for construction site | |
CN108331429A (en) | A kind of tubulose highrise steel structure installation method | |
CN202215006U (en) | Tool-type fixed ladder for construction | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN211775082U (en) | Jig frame for large-span pipe truss | |
CN208347279U (en) | A kind of building faces side structural column construction protecting rack | |
JP2745004B2 (en) | Steel construction method | |
CN217352084U (en) | Municipal construction is with crossing integral passway | |
CN221143715U (en) | Temporary stair operation platform for assembled building construction | |
CN216949441U (en) | Steel ladder stand for assembly type building stairwell | |
CN220847158U (en) | Template side personnel construction platform | |
CN216587831U (en) | Elevator shaft protection platform for construction | |
CN218970751U (en) | Large-span steel truss gallery deflection control temporary buttress device | |
CN212836620U (en) | Concrete pouring platform | |
CN220908941U (en) | Adjustable assembled safety stair | |
CN216949181U (en) | Convenient installation and disassembly double-race stair | |
CN215564745U (en) | Lattice type assembled ladder way | |
CN213837426U (en) | Steel stair that is used for workman to go up and down operation before prefabricated stair do not install | |
CN210483133U (en) | Novel ladder cage structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |