CN215329186U - Civil engineering concrete conveying equipment for paving - Google Patents

Civil engineering concrete conveying equipment for paving Download PDF

Info

Publication number
CN215329186U
CN215329186U CN202121026668.5U CN202121026668U CN215329186U CN 215329186 U CN215329186 U CN 215329186U CN 202121026668 U CN202121026668 U CN 202121026668U CN 215329186 U CN215329186 U CN 215329186U
Authority
CN
China
Prior art keywords
fixedly connected
box
driving roller
conveying
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121026668.5U
Other languages
Chinese (zh)
Inventor
刘复德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongan Xinda Jinghui Group Co ltd
Original Assignee
Zhongan Xinda Beijing Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongan Xinda Beijing Construction Co ltd filed Critical Zhongan Xinda Beijing Construction Co ltd
Priority to CN202121026668.5U priority Critical patent/CN215329186U/en
Application granted granted Critical
Publication of CN215329186U publication Critical patent/CN215329186U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model discloses concrete conveying equipment for civil engineering paving, which comprises a conveying box, wherein a conveying device is movably and alternately connected between a left box wall and a right box wall in the conveying box, the upper part of the left box wall and the upper part of the right box wall in the conveying box are fixedly connected with a connecting plate, a discharge hole is formed in the left part of the upper end of the connecting plate, two groups of supporting rods and supporting columns are fixedly connected to the left part of a lower box wall in the conveying box and the right part of the lower box wall in the conveying box respectively, the upper ends of the two groups of supporting rods and the upper ends of the two groups of supporting columns are fixedly connected with a vibrating device, a material guiding frame is fixedly connected between the vibrating devices, a vibrating motor is fixedly connected to the middle part of the lower end of the material guiding frame, and a material guiding mechanism is fixedly connected to the lower part of the right end of the conveying box. According to the concrete conveying equipment for the civil engineering paving, the vibration device is arranged, so that concrete is quickly led out of the material guide frame, and resource waste caused by drying of the concrete in the material guide frame is avoided.

Description

Civil engineering concrete conveying equipment for paving
Technical Field
The utility model relates to the field of civil engineering paving, in particular to concrete conveying equipment for civil engineering paving.
Background
The common concrete is artificial stone which is prepared by taking cement as a main cementing material, mixing water, sand, stones and chemical additives and mineral admixtures as necessary according to a proper proportion, uniformly stirring, densely forming, curing and hardening, and is mainly divided into two stages and states, namely a plastic state before setting and hardening, namely fresh concrete or a concrete mixture; in civil engineering, the most widely used is common concrete, cement is used as cementing material, sand and stone are used as aggregate, and cement concrete is prepared by adding water and mixing.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide concrete conveying equipment for civil engineering paving, which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides a civil engineering concrete conveying equipment for pavement, includes the delivery box, delivery box upper end right part fixedly connected with feed inlet, the activity interlude jointly is connected with conveyor between left tank wall and the right tank wall in the delivery box, the common fixedly connected with connecting plate on left tank wall upper portion and the right tank wall upper portion in the delivery box, open on the left part of connecting plate upper end has the discharge gate, two sets of bracing pieces of fixedly connected with and support column of tank wall right part respectively down in the delivery box, and two sets of bracing pieces and two sets of equal fixedly connected with vibrator in support column upper end, common fixedly connected with guide frame between the vibrator, the equal fixedly connected with vibrating motor in guide frame lower extreme middle part, open at delivery box right-hand member middle part has the wearing groove, delivery box right-hand member lower part fixedly connected with guide mechanism.
Preferably, conveyor includes first driving roller and second driving roller, the equal fixedly connected with tight pulley of first driving roller and second driving roller right-hand member, and cup jointed the belt jointly between two sets of tight pulleys, first driving roller and second driving roller right part interlude altogether and are connected with the connection box, connection box right-hand member rear portion fixedly connected with rotates the motor, it is in the same place with first driving roller fixed connection to rotate the motor output, first driving roller and second driving roller link together with transport case activity interlude.
Preferably, the vibrator includes the connecting block, connecting block upper end middle part fixedly connected with spring, spring upper end fixedly connected with supporting shoe, the equal fixedly connected with reinforcing plate in supporting shoe upper end left part and upper end right part, and the common fixedly connected with backup pad in two sets of reinforcing plate rear ends, the connecting block respectively with bracing piece and support column fixed connection together.
Preferably, the material guiding mechanism comprises a material guiding box, a material guiding plate is fixedly connected to the left portion of the inner lower box wall of the material guiding box, a transmission port is fixedly connected to the right portion of the lower end of the material guiding box, and the left end of the material guiding box is fixedly connected with the lower portion of the right end of the transmission box.
Preferably, the right part of the guide frame penetrates through the through groove and is positioned above the guide mechanism.
Preferably, the right parts of the first transmission roller and the second transmission roller penetrate through the upper part of the right box wall in the conveying box and are movably and alternately connected with the connecting frame, and the left end of the connecting frame is fixedly connected with the upper part of the right end of the conveying box.
Compared with the prior art, the utility model has the following beneficial effects:
in the utility model
1. By starting the rotating motor, the output end of the rotating motor drives the first transmission roller to rotate, so that the fixed wheel rotates, the fixed wheel drives the belt to rotate, the other group of fixed wheels sleeved with the belt rotates, the other group of fixed wheels drives the second transmission roller to rotate, and the first transmission roller and the second transmission roller rotate in the conveying box, so that concrete at the upper end of the connecting plate is uniformly guided into the material guide frame through the discharge port, the concrete is uniformly discharged, and the concrete paving quality is improved;
2. through starting vibrating motor, make vibrating motor drive the vibrations of guide frame, through the vibrations of guide frame, make the backup pad vibrations, make the backup pad pass through the reinforcing plate and drive the supporting shoe vibrations, make the spring produce vibrations to strengthen the vibrations of guide frame, make the concrete in the guide frame lead-in to the guide incasement fast, improved the unloading speed of concrete, can avoid the concrete to glue simultaneously and cause the wasting of resources in the guide frame.
Drawings
FIG. 1 is a schematic view showing the overall construction of a concrete transporting apparatus for civil engineering pavement according to the present invention;
FIG. 2 is a schematic view showing the overall structure of a conveying device of the concrete conveying equipment for civil engineering paving of the present invention;
FIG. 3 is a schematic view showing the overall structure of a vibration device of the concrete conveying equipment for civil engineering paving according to the present invention;
fig. 4 is a top view of the whole structure of a material guiding mechanism of the concrete conveying equipment for civil engineering paving of the utility model.
In the figure: 1. a delivery box; 2. a feed inlet; 3. a conveying device; 4. a connecting plate; 5. a discharge port; 6. a support bar; 7. a support pillar; 8. a vibration device; 9. a material guiding mechanism; 10. a material guiding frame; 11. penetrating a groove; 12. a vibration motor; 31. a first drive roller; 32. a second driving roller; 33. a fixed wheel; 34. a belt; 35. a connecting frame; 36. rotating the motor; 81. connecting blocks; 82. a spring; 83. a support block; 84. a reinforcing plate; 85. a support plate; 91. a material guiding box; 92. a material guide plate; 93. a transfer port.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in figures 1-4, a concrete conveying device for civil engineering paving comprises a conveying box 1, a feed inlet 2 is fixedly connected at the right part of the upper end of the conveying box 1, a conveying device 3 is movably inserted and connected between the left box wall and the right box wall in the conveying box 1, a connecting plate 4 is fixedly connected at the upper part of the left box wall and the upper part of the right box wall in the conveying box 1, a discharge outlet 5 is arranged at the left part of the upper end of the connecting plate 4, two groups of supporting rods 6 and supporting columns 7 are respectively and fixedly connected at the left part of the lower box wall and the right part of the lower box wall in the conveying box 1, and two sets of bracing pieces 6 and the equal fixedly connected with vibrator 8 in two sets of support column 7 upper ends, common fixedly connected with guide frame 10 between vibrator 8, the equal fixedly connected with vibrating motor 12 in guide frame 10 lower extreme middle part, open at the right-hand member middle part of transport case 1 has wearing groove 11, transport case 1 right-hand member lower part fixedly connected with guide mechanism 9.
The conveying device 3 comprises a first driving roller 31 and a second driving roller 32, and the first driving roller 31 and the second driving roller 32 are arranged, so that concrete is conveyed orderly, fixed wheels 33 are fixedly connected to the right ends of the first driving roller 31 and the second driving roller 32, a belt 34 is sleeved between the two groups of fixed wheels 33, a connecting frame 35 is penetratingly connected to the right parts of the first driving roller 31 and the second driving roller 32, a rotating motor 36 is fixedly connected to the rear part of the right end of the connecting frame 35, the output end of the rotating motor 36 is fixedly connected with the first driving roller 31, and the first driving roller 31 and the second driving roller 32 are movably penetratingly connected with the conveying box 1; the vibration device 8 comprises a connecting block 81, a spring 82 is fixedly connected to the middle of the upper end of the connecting block 81, the vibration effect brought by the vibration motor 12 is enhanced by arranging the spring 82, a supporting block 83 is fixedly connected to the upper end of the spring 82, reinforcing plates 84 are fixedly connected to the left portion and the right portion of the upper end of the supporting block 83, supporting plates 85 are fixedly connected to the rear ends of the two groups of reinforcing plates 84 together, the supporting plates 85 are arranged to support the material guide frame 10, and the connecting block 81 is fixedly connected with the supporting rod 6 and the supporting column 7 respectively; the material guiding mechanism 9 comprises a material guiding box 91, the left part of the inner lower box wall of the material guiding box 91 is fixedly connected with a material guiding plate 92, the right part of the lower end of the material guiding box 91 is fixedly connected with a transmission port 93, the transmission port 93 can transmit concrete out by arranging the transmission port 93, and the left end of the material guiding box 91 is fixedly connected with the lower part of the right end of the conveying box 1; the right part of the material guiding frame 10 penetrates through the through groove 11 and is positioned above the material guiding mechanism 9, so that concrete in the material guiding frame 10 can be guided into the material guiding mechanism 9; the right parts of the first driving roller 31 and the second driving roller 32 penetrate through the upper part of the right box wall in the conveying box 1 and are movably and alternately connected with the connecting frame 35, and the left end of the connecting frame 35 is fixedly connected with the upper part of the right end of the conveying box 1.
It should be noted that, the concrete conveying equipment for civil engineering paving of the utility model is characterized in that the upper end of a connecting plate 4 which is guided into a conveying box 1 through a feed inlet 2 is rotated by starting a rotating motor 36, the output end of the rotating motor 36 drives a first driving roller 31 fixedly connected with the rotating motor to rotate, a fixed wheel 33 fixedly connected with the first driving roller 31 is rotated by the rotation of the first driving roller 31, the fixed wheel 33 drives a belt 34 to rotate, another group of fixed wheels 33 sleeved with the belt 34 rotates, another group of fixed wheels 33 drives a second driving roller 32 fixedly connected with the fixed wheels to rotate, the first driving roller 31 and the second driving roller 32 rotate in the conveying box 1, the concrete at the upper end of the connecting plate 4 is uniformly guided into a material guiding frame 10 through a discharge outlet 5 by the rotation of the first driving roller 31 and the second driving roller 32, and the vibration motor 12 is started, the vibration motor 12 is enabled to drive the material guiding frame 10 fixedly connected with the vibration motor to vibrate, the vibration motor 10 is enabled to drive the supporting plate 85 fixedly connected with the vibration motor to vibrate, the supporting plate 85 is enabled to drive the supporting block 83 fixedly connected with the reinforcing plate 84 to vibrate through the reinforcing plate 84, the spring 82 fixedly connected with the supporting block 83 vibrates, concrete in the material guiding frame 10 is enabled to be rapidly led into the material guiding box 91, the concrete is led into the transmission port 93 fixedly connected with the material guiding box 91 through the material guiding plate 92 fixedly connected with the material guiding box 91, and the concrete is led out through the transmission port 93.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a civil engineering is concrete conveying equipment for road paving, includes delivery box (1), its characterized in that: the feeding device is characterized in that a feeding port (2) is fixedly connected to the right part of the upper end of the conveying box (1), a conveying device (3) is movably and alternately connected between the left box wall and the right box wall in the conveying box (1), a connecting plate (4) is fixedly connected to the upper part of the left box wall and the upper part of the right box wall in the conveying box (1), a discharging port (5) is formed in the left part of the upper end of the connecting plate (4), two groups of supporting rods (6) and supporting columns (7) are fixedly connected to the left part and the right part of the lower box wall in the conveying box (1), a vibrating device (8) is fixedly connected to the upper ends of the two groups of supporting rods (6) and the two groups of supporting columns (7), a material guiding frame (10) is fixedly connected between the vibrating devices (8) together, a vibrating motor (12) is fixedly connected to the middle part of the lower end of the material guiding frame (10), and a penetrating groove (11) is formed in the middle part of the right end of the conveying box (1), the lower part of the right end of the conveying box (1) is fixedly connected with a material guide mechanism (9).
2. A civil engineering paving concrete delivery apparatus as claimed in claim 1, wherein: conveyor (3) are including first driving roller (31) and second driving roller (32), first driving roller (31) and the equal fixedly connected with tight pulley (33) of second driving roller (32) right-hand member, and cup jointed belt (34) between two sets of tight pulley (33) jointly, first driving roller (31) and second driving roller (32) right part are interlude and are connected with connection frame (35) jointly, connection frame (35) right-hand member rear portion fixedly connected with rotates motor (36), it is in the same place to rotate motor (36) output and first driving roller (31) fixed connection, first driving roller (31) and second driving roller (32) are interlude with transport case (1) swing joint together.
3. A civil engineering paving concrete delivery apparatus as claimed in claim 1, wherein: the vibration device (8) comprises a connecting block (81), a spring (82) is fixedly connected to the middle of the upper end of the connecting block (81), a supporting block (83) is fixedly connected to the upper end of the spring (82), the left end of the upper end of the supporting block (83) is fixedly connected with a reinforcing plate (84) with the right end of the upper end, a supporting plate (85) is fixedly connected to the rear ends of the two groups of reinforcing plates (84) jointly, and the connecting block (81) is fixedly connected with a supporting rod (6) and a supporting column (7) respectively.
4. A civil engineering paving concrete delivery apparatus as claimed in claim 1, wherein: guide mechanism (9) are including leading workbin (91), lower case wall left part fixedly connected with stock guide (92) in leading workbin (91), lead workbin (91) lower extreme right part fixedly connected with transmission mouth (93), lead workbin (91) left end and carry case (1) right-hand member lower part fixed connection together.
5. A civil engineering paving concrete delivery apparatus as claimed in claim 1, wherein: the right part of the material guide frame (10) penetrates through the through groove (11) and is positioned above the material guide mechanism (9).
6. A civil engineering paving concrete delivery apparatus as claimed in claim 2, wherein: the right parts of the first transmission roller (31) and the second transmission roller (32) penetrate through the upper part of the right box wall in the conveying box (1) and are movably and alternately connected with the connecting frame (35), and the left end of the connecting frame (35) is fixedly connected with the upper part of the right end of the conveying box (1).
CN202121026668.5U 2021-05-14 2021-05-14 Civil engineering concrete conveying equipment for paving Active CN215329186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121026668.5U CN215329186U (en) 2021-05-14 2021-05-14 Civil engineering concrete conveying equipment for paving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121026668.5U CN215329186U (en) 2021-05-14 2021-05-14 Civil engineering concrete conveying equipment for paving

Publications (1)

Publication Number Publication Date
CN215329186U true CN215329186U (en) 2021-12-28

Family

ID=79546310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121026668.5U Active CN215329186U (en) 2021-05-14 2021-05-14 Civil engineering concrete conveying equipment for paving

Country Status (1)

Country Link
CN (1) CN215329186U (en)

Similar Documents

Publication Publication Date Title
CN208100708U (en) A kind of small-size concrete prefabricated components automatic distributing vibration device
CN215329186U (en) Civil engineering concrete conveying equipment for paving
CN212820160U (en) Waste concrete purification device
CN108515621B (en) Concrete stirring device and construction process thereof
CN115464762A (en) Small-size prefab processing distributing device
CN215969430U (en) Cement mortar mixer for road construction
CN210336408U (en) Special mixer of fibre concrete
CN212919892U (en) Even cement manufacture of compounding is with compounding device
CN210552101U (en) Concrete mixing device for building engineering
CN207206752U (en) A kind of portable concrete agitating device
CN217072892U (en) Avoid concrete of jam to go out feed bin
CN213166176U (en) Concrete mixing assembly line device
CN216031589U (en) Cement pole preparation is with mud material filling external fixation vibrator
CN116945368B (en) Cement stabilized macadam basic unit vibration mixing device
CN215150383U (en) Pouring equipment for manufacturing concrete square pile
CN215661078U (en) A dispensing equipment for concrete production
CN212978796U (en) Concrete batching system
CN114934431B (en) Crack repair equipment for cement concrete pavement maintenance
CN217670151U (en) Material level and feeding linkage device for concrete processing powder
CN217476239U (en) Concrete raw material integration mixing device
CN217734878U (en) Concrete placement device for building engineering construction
CN217226090U (en) Machine-made sand concrete proportioning device
CN214026376U (en) Grit material feeding unit of concrete production
CN219882843U (en) Building aggregate mechanism sand ratio feeding device
CN214144771U (en) Reinforced concrete molding pouring mechanism for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 102300 room cz0704, 51 Sanjiadian East Street, Mentougou District, Beijing

Patentee after: Zhongan Xinda Jinghui Group Co.,Ltd.

Address before: 102300 room cz0704, 51 Sanjiadian East Street, Mentougou District, Beijing

Patentee before: Zhongan Xinda (Beijing) Construction Co.,Ltd.