CN215311078U - Energy-saving dust device for building site - Google Patents

Energy-saving dust device for building site Download PDF

Info

Publication number
CN215311078U
CN215311078U CN202023188579.9U CN202023188579U CN215311078U CN 215311078 U CN215311078 U CN 215311078U CN 202023188579 U CN202023188579 U CN 202023188579U CN 215311078 U CN215311078 U CN 215311078U
Authority
CN
China
Prior art keywords
fixedly arranged
energy
cavity
shell
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023188579.9U
Other languages
Chinese (zh)
Inventor
李飞燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinfeng Fengshen Industrial Design Co ltd
Original Assignee
Xinfeng Fengshen Industrial Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinfeng Fengshen Industrial Design Co ltd filed Critical Xinfeng Fengshen Industrial Design Co ltd
Priority to CN202023188579.9U priority Critical patent/CN215311078U/en
Application granted granted Critical
Publication of CN215311078U publication Critical patent/CN215311078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Nozzles (AREA)

Abstract

The utility model provides an energy-saving dust settling device for a construction site. The energy-saving dust settling device for the construction site comprises a shell; the supporting column is fixedly arranged at the top of the shell; a sliding post slidably mounted on the support post; the first chamber is arranged on the sliding column; the water pump is fixedly arranged at the top of the shell; the water inlet pipe is fixedly arranged on a water inlet of the water pump, and one end of the water inlet pipe extends into the shell; and the water outlet pipe is fixedly arranged on a water outlet of the water pump, and one end of the water outlet pipe is communicated with the first cavity in a sealing manner. The energy-saving dust settling device for the construction site has the advantages of convenience in use, high efficiency, strong flexibility, uniform spraying and resource saving.

Description

Energy-saving dust device for building site
Technical Field
The utility model relates to the technical field of building equipment, in particular to an energy-saving dust settling device for a building site.
Background
In the building construction process, dust pollution is one of main pollution sources, dust is a main source of ground surface dust, the dust affects the environment and simultaneously causes harm to human bodies, and dust is generally sprayed on a building site in a manual mode.
However, the traditional manual spraying dust fall process wastes time and labor, the efficiency is low, the flexibility is low, the spraying is uneven, and water resources are wasted.
Therefore, it is necessary to provide a new energy-saving dust falling device for construction sites to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model solves the technical problem of providing the energy-saving dust-settling device for the construction site, which has the advantages of convenient use, high efficiency, strong flexibility, uniform spraying and resource saving.
In order to solve the technical problem, the utility model provides an energy-saving dust-settling device for a construction site, which comprises: a housing; the supporting column is fixedly arranged at the top of the shell; a sliding post slidably mounted on the support post; the first chamber is arranged on the sliding column; the water pump is fixedly arranged at the top of the shell; the water inlet pipe is fixedly arranged on a water inlet of the water pump, and one end of the water inlet pipe extends into the shell; the water outlet pipe is fixedly arranged on a water outlet of the water pump, and one end of the water outlet pipe is hermetically communicated with the first cavity; the connecting pipe is hermetically and rotatably arranged on the inner wall of the top of the first cavity, and the top end of the connecting pipe extends out of the first cavity; the blades are symmetrically and fixedly arranged on the connecting pipe; the spray head is fixedly arranged at the top end of the connecting pipe and communicated with the connecting pipe; the second chamber is arranged on the supporting column; the threaded rod is rotatably installed on the inner wall of the top of the second cavity, and the top end of the threaded rod extends out of the second cavity and is in threaded connection with the sliding column; and the four universal wheels are symmetrically and fixedly arranged at the bottom of the shell.
Preferably, the bottom fixed mounting of threaded rod has first bevel gear, rotate on the support column and install the dwang, the one end of dwang extends to in the second cavity and fixed mounting has second bevel gear, first bevel gear and second bevel gear meshing.
Preferably, the bottom of the sliding column is provided with a sliding groove, and the supporting column is connected with the inner wall of the sliding groove in a sliding manner.
Preferably, a water pipe is fixedly installed on the shell and is communicated with the shell in a sealing mode.
Preferably, a plurality of nozzles are symmetrically and fixedly installed on the spray head and communicated with the spray head.
Preferably, a push rod is fixedly mounted on the housing.
Compared with the prior art, the energy-saving dust-settling device for the construction site has the following beneficial effects:
the utility model provides an energy-saving dust settling device for a construction site, wherein a sliding column is slidably arranged on a supporting column, a threaded rod is rotatably arranged on the inner wall of the top of a second cavity, the top end of the threaded rod extends out of the second cavity and is in threaded connection with the sliding column, so that the height can be adjusted conveniently, the dust settling range is increased, a water pump is fixedly arranged on the top of a shell, a water outlet pipe is fixedly arranged on a water outlet of the water pump, one end of the water outlet pipe is in sealed communication with the first cavity, a connecting pipe is rotatably arranged on the inner wall of the top of the first cavity in a sealed manner, the top end of the connecting pipe extends out of the first cavity, a plurality of blades are symmetrically and fixedly arranged on the connecting pipe, a spray head is fixedly arranged on the top end of the connecting pipe, and the spray head is communicated with the connecting pipe, under rivers impact to the blade, can drive the connecting pipe and rotate, can rotate and spray, be convenient for spray evenly, increase simultaneously and spray the scope, improve dust fall efficiency, save the water resource.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of an energy-saving dust settling device for a construction site, provided by the utility model;
FIG. 2 is a schematic top cross-sectional view of a second chamber of the present invention.
Reference numbers in the figures: 1. a housing; 2. a support pillar; 3. a sliding post; 4. a first chamber; 5. a water pump; 6. a water inlet pipe; 7. a water outlet pipe; 8. a connecting pipe; 9. a blade; 10. a spray head; 11. a second chamber; 12. a threaded rod; 13. a universal wheel; 14. a first bevel gear; 15. rotating the rod; 16. a second bevel gear.
Detailed Description
The utility model is further described with reference to the following figures and embodiments.
Referring to fig. 1 and 2 in combination, the energy-saving dust settling device for the construction site includes: a housing 1; the supporting column 2 is fixedly arranged at the top of the shell 1; the sliding column 3 is arranged on the supporting column 2 in a sliding mode; a first chamber 4, wherein the first chamber 4 is arranged on the sliding column 3; the water pump 5 is fixedly arranged at the top of the shell 1; the water inlet pipe 6 is fixedly arranged on a water inlet of the water pump 5, and one end of the water inlet pipe 6 extends into the shell 1; the water outlet pipe 7 is fixedly arranged on a water outlet of the water pump 5, and one end of the water outlet pipe 7 is hermetically communicated with the first cavity 4; the connecting pipe 8 is hermetically and rotatably arranged on the inner wall of the top of the first chamber 4, and the top end of the connecting pipe 8 extends out of the first chamber 4; the blades 9 are symmetrically and fixedly arranged on the connecting pipe 8; the spray head 10 is fixedly arranged at the top end of the connecting pipe 8, and the spray head 10 is communicated with the connecting pipe 8; the second chamber 11 is formed in the supporting column 2, and the second chamber 11 is formed in the supporting column 2; the threaded rod 12 is rotatably installed on the inner wall of the top of the second chamber 11, and the top end of the threaded rod 12 extends out of the second chamber 11 and is in threaded connection with the sliding column 3; four universal wheels 13, four universal wheels 13 symmetry fixed mounting are in the bottom of casing 1.
The bottom fixed mounting of threaded rod 12 has first bevel gear 14, rotate on the support column 2 and install dwang 15, the one end of dwang 15 extends to in the second cavity 11 and fixed mounting has second bevel gear 16, first bevel gear 14 and the meshing of second bevel gear 16.
The bottom of the sliding column 3 is provided with a sliding groove, and the supporting column 2 is connected with the inner wall of the sliding groove in a sliding mode.
And a water delivery pipe is fixedly arranged on the shell 1 and is communicated with the shell 1 in a sealing way.
A plurality of nozzles are symmetrically and fixedly installed on the spray head 10, and the nozzles are communicated with the spray head 10.
A push rod is fixedly arranged on the shell 1.
The working principle of the energy-saving dust-settling device for the construction site provided by the utility model is as follows:
when in use, the device is convenient to drive to move under the action of the four universal wheels 13; the rotating rod 15 is screwed to drive the second bevel gear 16 to rotate, the second bevel gear 16 drives the first bevel gear 14 to rotate, the first bevel gear 14 drives the threaded rod 12 to rotate, and the threaded rod 12 can drive the sliding column 3 to vertically move, so that the height can be adjusted conveniently, and the dust fall range is enlarged; start-up water pump 5 can carry water to first cavity 4 in through inlet tube 6 and outlet pipe 7, water passes through in connecting pipe 8 gets into shower nozzle 10, there is forty-five degrees contained angles in outlet pipe 7 and the inner wall of first cavity 4, under rivers impact to blade 9, can drive connecting pipe 8 and rotate, connecting pipe 8 drives shower nozzle 10 and rotates, can rotate and spray, be convenient for spray evenly, increase simultaneously and spray the scope, improve dust fall efficiency, save the water resource.
Compared with the prior art, the energy-saving dust-settling device for the construction site has the following beneficial effects:
the utility model provides an energy-saving dust settling device for a construction site, wherein a sliding column 3 is slidably installed on a supporting column 2, a threaded rod 12 is rotatably installed on the inner wall of the top of a second cavity 11, the top end of the threaded rod 12 extends out of the second cavity 11 and is in threaded connection with the sliding column 3, so that the height can be adjusted conveniently, the dust settling range can be increased, a water pump 5 is fixedly installed at the top of a shell 1, a water outlet pipe 7 is fixedly installed on a water outlet of the water pump 5, one end of the water outlet pipe 7 is in sealed communication with a first cavity 4, a connecting pipe 8 is rotatably installed on the inner wall of the top of the first cavity 4 in a sealed manner, the top end of the connecting pipe 8 extends out of the first cavity 4, a plurality of blades 9 are symmetrically and fixedly installed on the connecting pipe 8, and a spray head 10 is fixedly installed at the top end of the connecting pipe 8, and shower nozzle 10 with connecting pipe 8 is linked together, under the impact of rivers to blade 9, can drive connecting pipe 8 and rotate, can rotate and spray, is convenient for spray evenly, increases simultaneously and sprays the scope, improves dust fall efficiency, saves the water resource.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (6)

1. The utility model provides an energy-saving dust device for building site, its characterized in that includes:
a housing;
the supporting column is fixedly arranged at the top of the shell;
a sliding post slidably mounted on the support post;
the first chamber is arranged on the sliding column;
the water pump is fixedly arranged at the top of the shell;
the water inlet pipe is fixedly arranged on a water inlet of the water pump, and one end of the water inlet pipe extends into the shell;
the water outlet pipe is fixedly arranged on a water outlet of the water pump, and one end of the water outlet pipe is hermetically communicated with the first cavity;
the connecting pipe is hermetically and rotatably arranged on the inner wall of the top of the first cavity, and the top end of the connecting pipe extends out of the first cavity;
the blades are symmetrically and fixedly arranged on the connecting pipe;
the spray head is fixedly arranged at the top end of the connecting pipe and communicated with the connecting pipe;
the second chamber is arranged on the supporting column;
the threaded rod is rotatably installed on the inner wall of the top of the second cavity, and the top end of the threaded rod extends out of the second cavity and is in threaded connection with the sliding column;
and the four universal wheels are symmetrically and fixedly arranged at the bottom of the shell.
2. The energy-saving dust device for building site of claim 1, characterized in that, the bottom fixed mounting of threaded rod has first bevel gear, rotate on the support column and install the dwang, the one end of dwang extends to in the second cavity and fixed mounting has second bevel gear, first bevel gear and second bevel gear meshing.
3. The energy-saving dust falling device for the construction site as claimed in claim 1, wherein a sliding groove is formed at the bottom of the sliding column, and the supporting column is slidably connected with the inner wall of the sliding groove.
4. The energy-saving dust falling device for the construction site as claimed in claim 1, wherein a water pipe is fixedly installed on the housing, and the water pipe is communicated with the housing in a sealing manner.
5. The energy-saving dust falling device for the construction site as claimed in claim 1, wherein a plurality of nozzles are symmetrically and fixedly mounted on the nozzle, and the nozzles are communicated with the nozzle.
6. The energy-saving dust falling device for the construction site as claimed in claim 1, wherein a push rod is fixedly mounted on the housing.
CN202023188579.9U 2020-12-26 2020-12-26 Energy-saving dust device for building site Expired - Fee Related CN215311078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023188579.9U CN215311078U (en) 2020-12-26 2020-12-26 Energy-saving dust device for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023188579.9U CN215311078U (en) 2020-12-26 2020-12-26 Energy-saving dust device for building site

Publications (1)

Publication Number Publication Date
CN215311078U true CN215311078U (en) 2021-12-28

Family

ID=79570494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023188579.9U Expired - Fee Related CN215311078U (en) 2020-12-26 2020-12-26 Energy-saving dust device for building site

Country Status (1)

Country Link
CN (1) CN215311078U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114570169A (en) * 2022-05-09 2022-06-03 山东神驰化工集团有限公司 Ammonia water loading ammonia recovery system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114570169A (en) * 2022-05-09 2022-06-03 山东神驰化工集团有限公司 Ammonia water loading ammonia recovery system
CN114570169B (en) * 2022-05-09 2022-07-08 山东神驰化工集团有限公司 Ammonia water loading ammonia recovery system

Similar Documents

Publication Publication Date Title
CN215311078U (en) Energy-saving dust device for building site
CN212068168U (en) Dust device for construction
CN216604562U (en) Dust device for building engineering
CN111794166A (en) Dust fall machine for hydraulic engineering construction site
CN212524254U (en) Concrete breaker with dust fall effect
CN215196079U (en) Environment-friendly building construction dust device
CN214883350U (en) Civil engineering is with on-spot dust collector
CN215996074U (en) Dust device for civil construction
CN213023058U (en) Multi-functional fixed point ware of herbicide field drug effect test
CN213404417U (en) Vegetation watering environment-friendly watering device for municipal works
CN212660764U (en) Water-saving irrigation equipment for rice
CN214082031U (en) Concrete maintenance is with watering device convenient to evenly sprinkle
CN212983744U (en) Road construction is with watering dust device
CN213556051U (en) Dust device is used at water conservancy job site
CN212017199U (en) Municipal construction dust fall environment-friendly device
CN221710773U (en) Irrigation device for hydraulic engineering
CN216358910U (en) Energy-saving air environment dust device
CN214680799U (en) Spraying dust device that job site used
CN218358184U (en) Dust fall ware is used in construction
CN211660280U (en) Sprayer rotating nozzle device
CN213558970U (en) Integration pump station belt cleaning device
CN219559124U (en) Cement production dust device
CN221524126U (en) Paint spraying machine for green building waterproof construction
CN221689580U (en) Municipal landscape garden irrigation device
CN212911129U (en) Greening device for municipal garden

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211228