CN215291312U - Aluminum alloy climbing frame - Google Patents

Aluminum alloy climbing frame Download PDF

Info

Publication number
CN215291312U
CN215291312U CN202022890310.9U CN202022890310U CN215291312U CN 215291312 U CN215291312 U CN 215291312U CN 202022890310 U CN202022890310 U CN 202022890310U CN 215291312 U CN215291312 U CN 215291312U
Authority
CN
China
Prior art keywords
pole setting
fixedly connected
aluminum alloy
climbing frame
inner vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022890310.9U
Other languages
Chinese (zh)
Inventor
贺炳太
贺骁
李子康
王运波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dexin Innovation Industrial Co ltd
Original Assignee
Sichuan Dexin Innovation Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dexin Innovation Industrial Co ltd filed Critical Sichuan Dexin Innovation Industrial Co ltd
Priority to CN202022890310.9U priority Critical patent/CN215291312U/en
Application granted granted Critical
Publication of CN215291312U publication Critical patent/CN215291312U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an aluminum alloy climbing frame, including a set of outer pole setting and three hoisting device, hoisting device includes that interior pole setting one side is fixed to be set up in the lower piece that hangs of outer pole setting one side bottom, hang down one side fixedly connected with electric block of pole setting in keeping away from, the top fixed mounting that interior pole setting orientation hung one side down has the support, and the fixed tensioning ware that is provided with in one side of support, fixedly connected with chain between electric block and the tensioning ware, and the head and the tail both ends of chain pass through connecting piece fixed connection, and are a set of the equidistance is provided with seven boards of walking between the face in the looks of pole setting in outer pole setting and three, and seven bilateral symmetry of walking the board are provided with four group's bracing pieces, one side fixedly connected with outside grid of two sets of bracing pieces. This frame is climbed to aluminum alloy, the adjustable gap of walking between guidance tape and the concrete structure, convenient to use has still improved stability, and the workman of being convenient for carries out work, and the practicality is higher.

Description

Aluminum alloy climbing frame
Technical Field
The utility model belongs to the technical field of climb the frame, concretely relates to frame is climbed to aluminum alloy.
Background
The climbing frame is a working platform which is erected for ensuring each construction process to be carried out smoothly. The device is divided into an outer climbing frame and an inner climbing frame according to the erected positions; according to different materials, the bamboo climbing frame can be divided into a wood climbing frame, a bamboo climbing frame and a steel pipe climbing frame; the climbing frame is divided into a vertical rod type climbing frame, a bridge type climbing frame, a door type climbing frame, a suspension type climbing frame, a hanging type climbing frame, a cantilever type climbing frame and a climbing type climbing frame according to the structural form, along with the rapid development of the building industry, the attachment type lifting climbing frame and the attachment type lifting platform are gradually popularized, and the current all-steel climbing frame gradually occupies the market.
The prior all-steel climbing frame has more advantages than the traditional climbing frame, but still has defects; 1. the overall structure is heavy, is inconvenient for workers to build, and cannot adjust the gap between the walkway plate and the concrete structure; 2. present full steel is climbed and is not set up strutting arrangement for its stability is relatively poor, and the workman of being inconvenient for carries out work, and the practicality is relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an aluminum alloy climbs frame to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an aluminum alloy climbing frame comprises a group of outer vertical rods and three lifting devices;
the lifting device comprises a lower hanging piece, wherein one side of an inner vertical rod is fixedly arranged at the bottom end of one side of an outer vertical rod, one side of the lower hanging piece, which is far away from the inner vertical rod, is fixedly connected with an electric hoist, a support is fixedly arranged at the top end of one side, facing the lower hanging piece, of the inner vertical rod, a tensioner is fixedly arranged on one side of the support, a chain is fixedly connected between the electric hoist and the tensioner, and the head end and the tail end of the chain are fixedly connected through a connecting piece;
seven walkways are equidistantly arranged between the facing surfaces of one group of the outer vertical rods and the three inner vertical rods, four groups of supporting rods are symmetrically arranged on two sides of the seven walkways, one side of two groups of the supporting rods far away from the inner vertical rods is fixedly connected with an outer grid, two groups of triangular supports are equidistantly arranged between the facing surfaces of the adjacent group of the supporting rods, and horizontal trusses are fixedly arranged at the bottom ends of the facing surfaces of one group of the outer vertical rods and the three inner vertical rods;
three the equal equidistance in bottom that outer pole setting one side was kept away from to interior pole setting is provided with three strutting arrangement, strutting arrangement includes that fixed connection attaches wall support in interior pole setting one side, attach one side butt in the concrete structure of pole setting in the wall support is kept away from, and the top that attaches the wall support keeps away from one side of concrete structure and fixes and be provided with the rectangular plate, and the bilateral symmetry on rectangular plate top is provided with a set of otic placode, and is a set of the through-hole that supplies the fixed setting of pivot is seted up at the center of otic placode facies, and the activity is provided with the threaded rod on the outer fringe face of pivot, one side meshing that the pivot was kept away from to the outer fringe face of threaded rod has the threaded connection portion of fixed connection in interior pole setting.
Preferably, a set of fixedly connected with net frame between the top of outer pole setting facies, and equal equidistance is provided with three group C shaped steel between the facies of outer pole setting and interior pole setting, and fixedly connected with Z type between the adjacent a set of C shaped steel props.
Preferably, three one side symmetry that outer pole setting was kept away from to interior pole setting is provided with two sets of engaging lugs, and all sets up the logical groove that supplies the pavement to turn over board activity and set up between the face in opposite directions of two sets of engaging lugs.
Preferably, the outer edge surface of the chain is movably provided with an upper hanging piece, one side of the upper hanging piece facing the concrete structure is provided with a through groove for movably arranging a wall bolt, and one end of the wall bolt penetrating through the concrete structure is in threaded connection with a nut.
Preferably, three the fixed welding in top that interior pole setting kept away from outer pole setting one side has the enhancement diagonal draw bar, and the one end fixedly connected with mounting of interior pole setting is kept away from to the enhancement diagonal draw bar, and the other end welded fastening of mounting has the pre-buried steel pipe of installing in concrete structure.
The utility model discloses a technological effect and advantage: the aluminum alloy climbing frame has the advantages that due to the arrangement of the three inner vertical rods and the set of the walkway turning plates, gaps between the walkway plates and the concrete structure can be adjusted by breaking the walkway turning plates, and the use is convenient; benefit from nine strutting arrangement's setting, attach the wall support through nine and support this frame of climbing, improved stability, the workman of being convenient for carries out work, and the practicality is higher.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the lifting device of the present invention;
fig. 3 is a left side view of the present invention;
fig. 4 is an enlarged schematic view of the structure at a in fig. 3 according to the present invention.
In the figure: the device comprises an outer vertical rod 1, a lifting device 101, an inner vertical rod 2, a walkway plate 201, a lower hanging piece 3, an electric hoist 301, a support 4, a tensioner 401, a chain 5, a connecting piece 501, an upper hanging piece 502, a wall penetrating bolt 503, a support rod 6, an outer grid 601, a triangular support 7, a horizontal truss 701, a support device 8, a wall attaching support 9, a 901 concrete structure, a lug plate 10, a shaft pin 1001, a threaded rod 11, a threaded connection 1101, a screen frame 12, a Z-shaped support 13, a walkway turning plate 14, a pre-embedded steel pipe 15 and a reinforced diagonal draw bar 1501.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides an aluminum alloy climbing frame as shown in figures 1-4, which comprises a group of outer vertical rods 1 and three lifting devices 101;
the lifting device 101 comprises a lower hanging piece 3 fixedly arranged at the bottom end of one side of an outer vertical rod 1 at one side of an inner vertical rod 2, an electric hoist 301 is fixedly connected to one side of the lower hanging piece 3 far away from the inner vertical rod 2, a support 4 is fixedly arranged at the top end of one side of the inner vertical rod 2 facing the lower hanging piece 3, a tensioner 401 is fixedly arranged at one side of the support 4, a chain 5 is fixedly connected between the electric hoist 301 and the tensioner 401, and the head end and the tail end of the chain 5 are fixedly connected through a connecting piece 501;
specifically, the outer edge surfaces of the chains 5 are movably provided with upper hanging pieces 502, one side of each upper hanging piece 502, facing the concrete structure 901, is provided with a through groove for the wall bolt 503 to movably arrange, one end of the wall bolt 503, penetrating the concrete structure 901, is in threaded connection with a nut, the three electric hoists 301 are started to drive the three chains 5 to move, and the climbing frame is moved up and down through the three upper hanging pieces 502 fixedly installed on the three chains 5, so that the use is convenient.
A set of the equidistance is provided with seven and walks guidance tape 201 between the face in opposite directions of outer pole setting 1 and three interior pole settings 2, seven bilateral symmetry that walk guidance tape 201 are provided with four group's bracing pieces 6, four groups keep away from one side fixedly connected with outside grid 601 of two sets of bracing pieces 6 of interior pole setting 2 in the bracing piece 6, and the equidistance is provided with two sets of triangular supports 7 between the face in opposite directions of adjacent a set of bracing piece 6, and is a set of the bottom fixed mounting that outer pole setting 1 and three interior pole settings 2 face in opposite directions has horizontal truss 701, and seven walk guidance tape 201, four groups of bracing pieces 6, outside grid 601 and horizontal truss 701 and all adopt the aluminum alloy, and whole support body is lighter than traditional half steel climbing frame, all steel climbing frame, practices thrift cost of transportation, workman's installation more convenient.
The bottom ends of the three inner vertical rods 2 far away from the outer vertical rod 1 are all provided with three supporting devices 8 at equal intervals, the supporting device 8 comprises a wall-attached support 9 fixedly connected to one side of the inner vertical rod 2, one side of the wall-attached support 9 far away from the inner vertical rod 2 is abutted against the concrete structure 901, and one side of the top end of the wall-attached support 9, which is far away from the concrete structure 901, is fixedly provided with a rectangular plate, two sides of the top end of the rectangular plate are symmetrically provided with a group of ear plates 10, the center of the opposite surface of the group of ear plates 10 is provided with a through hole for fixing the shaft pin 1001, and the outer edge surface of the shaft pin 1001 is movably provided with a threaded rod 11, one side of the outer edge surface of the threaded rod 11 far away from the shaft pin 1001 is engaged with a threaded connecting part 1101 fixedly connected with the inner vertical rod 2, support this frame of climbing through nine attach wall supports 9, improved stability, the workman of being convenient for carries out work, and the practicality is higher.
Specifically, a set of fixedly connected with net frame 12 between the top of outer pole setting 1 looks to the face, and equal equidistance is provided with three group's C shaped steel between the face in opposite directions of outer pole setting 1 and interior pole setting 2, and fixedly connected with Z type props 13 between the adjacent a set of C shaped steel.
Specifically, two groups of engaging lugs are symmetrically arranged on one side, away from the outer vertical rod 1, of the three inner vertical rods 2, through grooves for the movable arrangement of the walkway turning plates 14 are formed between the opposite surfaces of the two groups of engaging lugs, and the gaps between the walkway plates 201 and the concrete structures 901 can be adjusted by moving the walkway turning plates 14 with hands, so that the use is convenient.
Specifically, three the top fixed welding that interior pole setting 2 kept away from outer pole setting 1 one side has reinforcing diagonal member 1501, and reinforcing diagonal member 1501 keeps away from the one end fixedly connected with mounting of interior pole setting 2, and the other end welded fastening of mounting has the pre-buried steel pipe 15 of installing in concrete structure 901, and three reinforcing diagonal members 1501 have improved stability through three mounting and three setting in the three pre-buried steel pipe 15 fixed connection in concrete structure 901.
The working principle of the aluminum alloy climbing frame is that during use, nine supporting devices 8 are fixedly installed on one side of three inner vertical rods 2, then a group of outer vertical rods 1, seven walkway plates 201, four groups of supporting rods 6 and outer grids 601 are sequentially installed, three groups of upper hanging pieces 502 fixedly arranged on chains 5 are fixedly installed in a wall body through three wall penetrating bolts 503, the nine supporting devices 8 are abutted to the wall body, and installation is completed. This frame is climbed to aluminum alloy, the adjustable gap of walking between guidance tape and the concrete structure, convenient to use has still improved stability, and the workman of being convenient for carries out work, and the practicality is higher.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (5)

1. An aluminum alloy climbing frame comprises a group of outer vertical rods (1) and three lifting devices (101);
the method is characterized in that: the lifting device (101) comprises a lower hanging piece (3) fixedly arranged at the bottom end of one side of an outer vertical rod (1) at one side of an inner vertical rod (2), an electric hoist (301) is fixedly connected to one side, away from the inner vertical rod (2), of the lower hanging piece (3), a support (4) is fixedly mounted at the top end of one side, facing the lower hanging piece (3), of the inner vertical rod (2), a tensioner (401) is fixedly arranged at one side of the support (4), a chain (5) is fixedly connected between the electric hoist (301) and the tensioner (401), and the head end and the tail end of the chain (5) are fixedly connected through a connecting piece (501);
seven walkway plates (201) are arranged between the opposite surfaces of one group of outer vertical rods (1) and three inner vertical rods (2) at equal intervals, four groups of supporting rods (6) are symmetrically arranged on two sides of the seven walkway plates (201), one side of two groups of supporting rods (6) far away from the inner vertical rods (2) in the four groups of supporting rods (6) is fixedly connected with an outer grid (601), two groups of triangular supports (7) are arranged between the opposite surfaces of the adjacent group of supporting rods (6) at equal intervals, and horizontal trusses (701) are fixedly arranged at the bottom ends of the opposite surfaces of one group of outer vertical rods (1) and three inner vertical rods (2);
three equal equidistance in bottom that outer pole setting (1) one side was kept away from in pole setting (2) is provided with three strutting arrangement (8), strutting arrangement (8) are including fixed connection in attaching wall support (9) of pole setting (2) one side, attach one side butt in concrete structure (901) that interior pole setting (2) were kept away from in wall support (9), and the top that attaches wall support (9) keeps away from one side of concrete structure (901) and fix and be provided with the rectangular plate, and the bilateral symmetry on rectangular plate top is provided with a set of otic placode (10), and is a set of the through-hole that supplies fixed setting of pivot (1001) is seted up at the center of otic placode (10) facies, and the activity is provided with threaded rod (11) on the outer fringe face of pivot (1001), one side meshing that pivot (1001) were kept away from to the outer fringe face of threaded rod (11) has threaded connection portion (1101) of fixed connection in interior pole setting (2).
2. The aluminum alloy climbing frame according to claim 1, characterized in that: a set of fixedly connected with net frame (12) between the top of outer pole setting (1) looks face, and equal equidistance is provided with three group's C shaped steel between the face of just outer pole setting (1) and interior pole setting (2) in opposite directions, and fixedly connected with Z type between the adjacent a set of C shaped steel props (13).
3. The aluminum alloy climbing frame according to claim 1, characterized in that: three one side symmetry that interior pole setting (2) kept away from outer pole setting (1) is provided with two sets of engaging lugs, and all sets up the logical groove that supplies the pavement to turn over board (14) activity setting between the relative face of two sets of engaging lugs.
4. The aluminum alloy climbing frame according to claim 1, characterized in that: the outer edge surface of the chain (5) is movably provided with an upper hanging piece (502), one side, facing the concrete structure (901), of the upper hanging piece (502) is provided with a through groove for the wall through bolt (503) to movably arrange, and one end, penetrating through the concrete structure (901), of the wall through bolt (503) is connected with a nut in a threaded mode.
5. The aluminum alloy climbing frame according to claim 1, characterized in that: the top end of one side of the inner vertical rod (2) far away from the outer vertical rod (1) is fixedly welded with a reinforced diagonal draw bar (1501), one end of the reinforced diagonal draw bar (1501) far away from the inner vertical rod (2) is fixedly connected with a fixing piece, and the other end of the fixing piece is fixedly welded with an embedded steel pipe (15) installed in the concrete structure (901).
CN202022890310.9U 2020-12-04 2020-12-04 Aluminum alloy climbing frame Active CN215291312U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022890310.9U CN215291312U (en) 2020-12-04 2020-12-04 Aluminum alloy climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022890310.9U CN215291312U (en) 2020-12-04 2020-12-04 Aluminum alloy climbing frame

Publications (1)

Publication Number Publication Date
CN215291312U true CN215291312U (en) 2021-12-24

Family

ID=79513128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022890310.9U Active CN215291312U (en) 2020-12-04 2020-12-04 Aluminum alloy climbing frame

Country Status (1)

Country Link
CN (1) CN215291312U (en)

Similar Documents

Publication Publication Date Title
CN113789948B (en) Large-span atrium side wall sliding rail hanging basket with roof and construction method thereof
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN215291312U (en) Aluminum alloy climbing frame
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN211173007U (en) Novel tripod of encorbelmenting
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN109944164B (en) Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN110886225A (en) Construction method of cable tower stay cable installation system
CN217000804U (en) Climb frame with stay cable formula prestressing force cantilever beam integrated configuration
JPH09195228A (en) Build-up trestle for bridge pier reinforcing work and its using method
CN210767838U (en) Large-section inclined column template construction structure for constructional engineering
CN110219416B (en) Precast concrete Y-shaped beam assembly and construction method thereof
CN210798994U (en) Concrete structure wall body unilateral template structure
CN214144633U (en) Upside-down hanging attached lifting scaffold
JP2004232366A (en) Suspended scaffolding
CN213329962U (en) Split type lifting scaffold
CN219710948U (en) Push-pull platform device for wall attachment position of climbing tower crane
CN221216936U (en) Wall-riding type installation hanging bracket of high-altitude hoisting equipment
CN214006508U (en) Wall-attached mounting and supporting device for climbing frame
CN219060833U (en) Oblique roofing hanging basket erects fixed establishment
CN221073407U (en) Movable simple hanging basket structure for building outer elevation construction
CN214531837U (en) Lifting system for aluminum alloy climbing frame
CN220847087U (en) Movable scaffold work platform suitable for bridge overhauls

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant