CN215289992U - River course is repaiied and is prevented river course flood prevention device for engineering - Google Patents

River course is repaiied and is prevented river course flood prevention device for engineering Download PDF

Info

Publication number
CN215289992U
CN215289992U CN202121100753.1U CN202121100753U CN215289992U CN 215289992 U CN215289992 U CN 215289992U CN 202121100753 U CN202121100753 U CN 202121100753U CN 215289992 U CN215289992 U CN 215289992U
Authority
CN
China
Prior art keywords
gate
winch
fixedly connected
support
river channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121100753.1U
Other languages
Chinese (zh)
Inventor
程鸿生
田小梅
王春鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121100753.1U priority Critical patent/CN215289992U/en
Application granted granted Critical
Publication of CN215289992U publication Critical patent/CN215289992U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a river course is repaiied and is prevented river course flood prevention device for engineering relates to the river course and repaiies and prevent engineering technical field. The utility model discloses a gate pier and storage mud box, gate pier pass through mounting groove fixedly connected with fixed rail, and the up end of gate pier has the second hoist engine through first leg joint, and the up end of gate pier has the third hoist engine through second leg joint, and the inboard bottom sliding connection of gate pier has storage mud box. The utility model discloses a second hoist engine and third hoist engine have been set up, can drive and store up the mud box and go up and down, salvage silt, the influence of silt to the gate drainage has been avoided, it can change the angle through the effect of second hoist engine and third hoist engine to store up the mud box simultaneously, make to store up the mud box and also can play the effect of interception silt, the filter has been set up, make the junction between gate and the fixed rail can not receive the interference of silt and floater, the lift of the gate of being convenient for, the smoothness nature and the timeliness of gate lift have been improved, greatly reduced the potential safety hazard.

Description

River course is repaiied and is prevented river course flood prevention device for engineering
Technical Field
The utility model belongs to the technical field of the river course is repaiied and is prevented engineering, especially relate to a river course is repaiied and is prevented river course flood prevention device for engineering.
Background
In the river course is repaiied and is prevented engineering, in order to deal with the flood season flood rise, consequently the designer all can reserve the flood control passageway when building for the river course possesses stronger flood control ability, has guaranteed the security in river course low reaches, and the flood control passageway also is the important component part in river course simultaneously, and at present, in the river course is repaiied and is prevented engineering, in order to deal with the flood control, need use the river course device of controlling flood, but it still has following drawback in the in-service use:
1. in the using process of the conventional river channel flood prevention device for the river channel repair and prevention project, water flow can drive sludge at the bottom of a river channel to the front of a gate, and the sludge in front of the gate is excessively accumulated along with the increase of time, so that adverse effects on flood prevention are caused, the drainage of the gate is not facilitated, and meanwhile, workers are not convenient to clean the sludge;
2. current river course is repaiied and is prevented for engineering river course flood prevention device when using, floater or silt in the river course can influence the lift of gate for the gate lift is obstructed, when the flood discharge, has the gate to open the problem of slowly or can't open, has big potential safety hazard.
Therefore, the existing river channel flood prevention device for the river channel repair and prevention project cannot meet the requirements in actual use, so that an improved technology is urgently needed in the market to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a river course is repaiied and is prevented river course flood prevention device for engineering, through having set up second hoist engine, third hoist engine, storage mud box and filter, it is too much to have solved the silt accumulation before the current gate, causes unfavorable influence to the flood prevention, is unfavorable for the drainage of gate, and floater or silt in the river course can influence the lift of gate for the obstructed problem of gate lift.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a river course is repaiied and is prevented river course flood prevention device for engineering, include the gate pier and store up the mud box, the gate pier passes through the fixed rail of mounting groove fixedly connected with, the up end of gate pier has the second hoist engine through first leg joint, the up end of gate pier has the third hoist engine through the second leg joint, and the second hoist engine is located the front portion of third hoist engine, the inboard bottom sliding connection of gate pier has the mud box of storage, wherein, the gate pier has the filter through slot sliding connection, store up the fixed knot of the equal fixedly connected with in front portion and the rear portion of inside bottom of mud box, the anterior fixed knot of mud box of storage is connected with first stay cord, the fixed knot at mud box rear portion of storage is connected with the second stay cord.
Further, slot and mounting groove have been seted up to the inboard of gate pier up end, and the slot is located the front end of mounting groove, one side sliding connection of filter can fix the one end of filter in the slot through the slot, can install the fixed rail through the mounting groove.
Further, the fixed rail is connected in the mounting groove in a sliding manner, the inner side of the fixed rail is connected with a gate in a sliding manner, the top end of the fixed rail is fixedly connected with a top plate, the upper end surface of the top plate is fixedly connected with a first winch, the movable end of the first winch is connected with one end of a rope, the rope penetrates through the top plate, the top end of the gate is fixedly connected with a pulley piece, the outer ring of the pulley piece is connected with a rope, the other end of the rope is fixedly connected with the bottom end of the top plate, the two sides of the front surface of the gate are fixedly connected with limit rails, the limit rails correspond to the slots one by one, one end of the filter plate, which is far away from the slots, is connected in the limit rails in a sliding way, can install the gate through the fixed rail, can twine the rope through first hoist engine, can drive the gate through rope and pulley spare and rise, can assist fixedly through spacing rail to the other end of filter.
Further, the bottom fixed connection of second hoist engine is on first support, the bottom fixed connection of first support is on the gate pier, first support is located the front portion of second support, the expansion end of second hoist engine is connected with first stay cord, first stay cord runs through first support, can install the second hoist engine through first support, can drive the front end that stores up the mud box through first stay cord and go up and down.
Further, the bottom fixed connection of third hoist engine is on the second support, the bottom fixed connection of second support is on the gate pier, the expansion end of third hoist engine is connected with the second stay cord, the second stay cord runs through the second support, can install the third hoist engine through the second support, and the rear end that can drive the mud storage box of second stay cord is done and is gone up and down.
Further, the back of storing up the mud box nevertheless does not connect with the gate contact, the infiltration hole has been seted up to the inside bottom of storing up the mud box, the draw-in groove has been seted up on the right side of storing up the mud box up end, the internal connection of draw-in groove has the baffle, the both ends and the draw-in groove sliding connection of baffle, the bottom of baffle and the up end butt of storing up the mud box can discharge the inside water of storing up the mud box through the infiltration hole, can install the baffle through the draw-in groove, can clear up the inside of storing up the mud box through taking out the baffle.
The utility model discloses following beneficial effect has:
1. the utility model discloses a second hoist engine and third hoist engine have been set up, can drive and store up the mud box and go up and down, can salvage the silt of the river course bottom before the gate through storing up the mud box, and the staff's of being convenient for clearance has avoided the influence of silt to the gate drainage, stores up the effect change angle that the mud box can pass through second hoist engine and third hoist engine simultaneously for store up the effect that the mud box also can play interception silt.
2. The utility model discloses a filter has been set up for the junction between gate and the fixed rail can not receive the interference of silt and floater, and the smoothness nature and the promptness of gate lift have been improved in the lift of the gate of being convenient for, greatly reduced the potential safety hazard.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a connection structure diagram of a second winch and a third winch of the present invention and a mud storage box;
FIG. 3 is a view showing the connection structure of the filter plate with the gate pier and the gate according to the present invention;
fig. 4 is an enlarged structural view of a portion a in fig. 2 according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a gate pier; 11. a slot; 12. a filter plate; 13. mounting grooves; 2. a fixed rail; 21. a gate; 22. a top plate; 23. a first winch; 24. a rope; 25. a pulley member; 26. a limit rail; 3. a second hoist; 31. a first bracket; 32. a first pull cord; 4. a third hoist; 41. a second bracket; 42. a second pull cord; 5. a mud storage box; 51. a fixing buckle; 52. a water seepage hole; 53. a card slot; 54. and a baffle plate.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Please refer to fig. 1-4, the utility model relates to a river course flood prevention device for river course maintenance and protection engineering, including gate pier 1 and storage mud box 5, gate pier 1 is connected with fixed rail 2 through mounting groove 13 fixedly connected with, and the up end of gate pier 1 is connected with second hoist engine 3 through first support 31, and the up end of gate pier 1 is connected with third hoist engine 4 through second support 41, and second hoist engine 3 is located the front portion of third hoist engine 4, and the inboard bottom sliding connection of gate pier 1 has storage mud box 5.
As shown in fig. 1-4, the bottom end of the second winch 3 is fixedly connected to the first support 31, the bottom end of the first support 31 is fixedly connected to the gate pier 1, the first support 31 is located at the front of the second support 41, the movable end of the second winch 3 is connected to the first pull rope 32, the first pull rope 32 penetrates through the first support 31, the bottom end of the third winch 4 is fixedly connected to the second support 41, the bottom end of the second support 41 is fixedly connected to the gate pier 1, the movable end of the third winch 4 is connected to the second pull rope 42, the second pull rope 42 penetrates through the second support 41, the back of the mud storage box 5 is in contact with the gate 21 but not connected to the gate, the bottom end inside the mud storage box 5 is provided with a water seepage hole 52, the front part and the rear part of the bottom end inside the mud storage box 5 are both fixedly connected to the fixing buckles 51, the fixing buckle 51 at the front part of the mud storage box 5 is connected to the first pull rope 32, the fixing buckle 51 at the rear part of the mud storage box 5 is connected to the second pull rope 42, the right side of the upper end face of the sludge storage box 5 is provided with a clamping groove 53, the inside of the clamping groove 53 is connected with a baffle plate 54, two ends of the baffle plate 54 are in sliding connection with the clamping groove 53, the bottom end of the baffle plate 54 is abutted against the upper end face of the sludge storage box 5, in the process of normal use, the sludge storage box 5 is positioned at the bottom end of a river channel, sludge can be taken to the bottom end of the river channel at the inner side of the gate pier 1 along with the flow of water in the river channel, the sludge falls into the sludge storage box 5 and is collected, when the sludge is cleaned, a worker can control and start the second winch 3 on the first support 31 and the third winch 4 on the second support 41, the second winch 3 and the third winch 4 work to drive the first pull rope 32 and the second pull rope 42 to rise, the sludge storage box 5 is driven to rise under the action of the fixing buckle 51, the sludge storage box 5 rises to bring the sludge collected by the sludge storage box 5 to the water surface, and when the sludge storage box 5 rises to the top end of the gate pier 1, store up the water among the mud box 5 and can trickle out under the effect of infiltration hole 52, then the staff can take baffle 54 out from draw-in groove 53, then clear up the silt that stores up among the mud box 5 again, the trouble of staff has been reduced, after the clearance, work through second hoist engine 3 and third hoist engine 4 drives first stay cord 32 and second stay cord 42 and will store up mud box 5 and descend the bottom in river course, and the staff can be through controlling second hoist engine 3 and third hoist engine 4 to first stay cord 32 and the winding speed of second stay cord 42, make the angle of storing up mud box 5 and river course bottom change, make and store up mud box 5 also can play the effect of intercepting silt.
Wherein, as shown in fig. 1 and fig. 3, the gate pier 1 is slidably connected with a filter plate 12 through an insertion slot 11, the inner side of the upper end surface of the gate pier 1 is provided with the insertion slot 11 and an installation slot 13, the fixed rail 2 can be fixedly installed through the installation slot 13, the insertion slot 11 is positioned at the front end of the installation slot 13, one side of the filter plate 12 is slidably connected in the insertion slot 11, the fixed rail 2 is slidably connected in the installation slot 13, the inner side of the fixed rail 2 is slidably connected with a gate 21, the top end of the fixed rail 2 is fixedly connected with a top plate 22, the upper end surface of the top plate 22 is fixedly connected with a first winch 23, the movable end of the first winch 23 is connected with one end of a rope 24, the rope 24 penetrates through the top plate 22, the top end of the gate 21 is fixedly connected with a pulley piece 25, the outer ring of the pulley piece 25 is connected with the rope 24, the other end of the rope 24 is fixedly connected at the bottom end of the top plate 22, both sides of the front surface of the gate 21 are fixedly connected with limit rails 26, the limiting rails 26 correspond to the slots 11 one by one, one end of the filter plate 12, which is far away from the slots 11, is slidably connected into the limiting rails 26, the filter plate 12 is inserted into the slots 11 by a worker, in the process, the other end of the filter plate 12 also slides in the limiting rails 26 until the bottom end of the filter plate 12 is positioned at the bottom end of a river channel, and then installation can be completed, under the action of the filter plate 12, the joint of the gate 21 and the fixed rail 2 cannot be influenced by floating objects and sludge, the opening of the gate 21 is facilitated, when the gate 21 is opened in advance, the worker controls and starts the first winch 23 on the top plate 22, the first winch 23 works to drive the rope 24 to wind, under the action of the pulley piece 25, the gate 21 rises, the two sides of the gate 21 slide in the fixed rail 2, the limiting rails 26 are separated from the filter plate 12, and the filter plate 12 can continue to be fixedly installed under the action of the slots 11, without affecting the use of the filter plate 12 and the shutter 21.
One specific application of this embodiment is: in daily use, a worker installs the filter plate 12 in the slot 11, and copies and fixes the other end of the filter plate 12 through the limit rail 26, the sludge storage box 5 is positioned at the bottom end of the river channel through the second winch 3 and the third winch 4, sludge falls into the sludge storage box 5 under the action of water flow in the river channel, when the sludge needs to be cleaned, the worker controls and starts the second winch 3 and the third winch 4 to lift the sludge storage box 5 to the top end of the gate pier 1, then the baffle 54 is taken down to clean the sludge in the sludge storage box 5, after the cleaning is completed, the sludge storage box 5 is positioned at the bottom end of the river channel through the second winch 3 and the third winch 4, and the worker can change the angle between the sludge storage box 5 and the bottom end of the river channel by controlling the winding speed of the first pull rope 32 and the second pull rope 42 through the second winch 3 and the third winch 4, for example, make third hoist engine 4 twine second stay cord 42, second hoist engine 3 does not operate, can make the rear end of storing up mud box 5 lift up, store up the angle increase of mud box 5 and river course bottom for store up mud box 5 and also can play the interception effect to silt, when torrential rain carries out the flood discharge, through the start-up of controlling first hoist engine 23, with the gate 21 drive rise to can carry out the drainage.
The above is only the preferred embodiment of the present invention, and the present invention is not limited thereto, any technical solutions recorded in the foregoing embodiments are modified, and some technical features thereof are replaced with equivalent ones, and any modification, equivalent replacement, and improvement made thereby all belong to the protection scope of the present invention.

Claims (6)

1. The utility model provides a river course is repaiied and is prevented river course flood prevention device for engineering, includes gate pier (1) and stores up mud box (5), its characterized in that: the gate pier (1) is fixedly connected with a fixed rail (2) through a mounting groove (13), the upper end face of the gate pier (1) is connected with a second winch (3) through a first support (31), the upper end face of the gate pier (1) is connected with a third winch (4) through a second support (41), the second winch (3) is located at the front part of the third winch (4), and the bottom end of the inner side of the gate pier (1) is connected with a mud storage box (5) in a sliding mode;
wherein, pier (1) has filter (12) through slot (11) sliding connection, store up the anterior of the inside bottom of mud box (5) and the equal fixedly connected with in rear portion and detain (51), store up the anterior fixed knot (51) of mud box (5) and be connected with first stay cord (32), it is connected with second stay cord (42) to store up the fixed knot (51) at mud box (5) rear portion.
2. The river channel flood prevention device for the river channel repair and prevention project according to claim 1, wherein a slot (11) and a mounting groove (13) are formed in the inner side of the upper end face of the gate pier (1), the slot (11) is located at the front end of the mounting groove (13), and one side of the filter plate (12) is slidably connected into the slot (11).
3. The river channel flood prevention device for the river channel repair and prevention project according to claim 1, wherein the fixed rail (2) is slidably connected in a mounting groove (13), the inner side of the fixed rail (2) is slidably connected with a gate (21), the top end of the fixed rail (2) is fixedly connected with a top plate (22), the upper end face of the top plate (22) is fixedly connected with a first winch (23), the movable end of the first winch (23) is connected with one end of a rope (24), the rope (24) penetrates through the top plate (22), the top end of the gate (21) is fixedly connected with a pulley piece (25), the outer ring of the pulley piece (25) is connected with the rope (24), the other end of the rope (24) is fixedly connected at the bottom end of the top plate (22), and both sides of the front face of the gate (21) are fixedly connected with limit rails (26), the limiting rails (26) are in one-to-one correspondence with the slots (11), and one ends, far away from the slots (11), of the filter plates (12) are connected in the limiting rails (26) in a sliding mode.
4. The river channel flood prevention device for the river channel repair and prevention project according to claim 1, wherein the bottom end of the second winch (3) is fixedly connected to a first support (31), the bottom end of the first support (31) is fixedly connected to a gate pier (1), the first support (31) is located in the front of a second support (41), the movable end of the second winch (3) is connected with a first pull rope (32), and the first pull rope (32) penetrates through the first support (31).
5. The river channel flood prevention device for the river channel repair and prevention project according to claim 1, wherein the bottom end of the third winch (4) is fixedly connected to the second support (41), the bottom end of the second support (41) is fixedly connected to the gate pier (1), the movable end of the third winch (4) is connected with a second pull rope (42), and the second pull rope (42) penetrates through the second support (41).
6. The river channel flood prevention device for the river channel repair and prevention project, according to claim 1, is characterized in that the back face of the mud storage box (5) is in contact with the gate (21) but not connected, a water seepage hole (52) is formed in the bottom end of the inside of the mud storage box (5), a clamping groove (53) is formed in the right side of the upper end face of the mud storage box (5), a baffle (54) is connected inside the clamping groove (53), two ends of the baffle (54) are slidably connected with the clamping groove (53), and the bottom end of the baffle (54) is abutted to the upper end face of the mud storage box (5).
CN202121100753.1U 2021-05-21 2021-05-21 River course is repaiied and is prevented river course flood prevention device for engineering Expired - Fee Related CN215289992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121100753.1U CN215289992U (en) 2021-05-21 2021-05-21 River course is repaiied and is prevented river course flood prevention device for engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121100753.1U CN215289992U (en) 2021-05-21 2021-05-21 River course is repaiied and is prevented river course flood prevention device for engineering

Publications (1)

Publication Number Publication Date
CN215289992U true CN215289992U (en) 2021-12-24

Family

ID=79541676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121100753.1U Expired - Fee Related CN215289992U (en) 2021-05-21 2021-05-21 River course is repaiied and is prevented river course flood prevention device for engineering

Country Status (1)

Country Link
CN (1) CN215289992U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323668A (en) * 2022-08-20 2022-11-11 常熟市宏业印染有限公司 Automatic printing and dyeing production line with high cleanliness

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323668A (en) * 2022-08-20 2022-11-11 常熟市宏业印染有限公司 Automatic printing and dyeing production line with high cleanliness
CN115323668B (en) * 2022-08-20 2023-08-29 常熟市宏业印染有限公司 Automatic printing and dyeing assembly line with high cleanliness

Similar Documents

Publication Publication Date Title
CN215289992U (en) River course is repaiied and is prevented river course flood prevention device for engineering
CN112411462B (en) Hydraulic engineering is pressure water tank for drainage station
CN107185801A (en) A kind of handstone impurity removing equipment poured into a mould for Bridge guardrail
CN211113550U (en) A slidingtype protective structure for water conservancy dam
JP2017025610A (en) Water channel gate device and installation method therefor
CN113550278A (en) River course sluice with debris clearance structure
CN211717512U (en) River course velocity of flow, water level automatic monitoring device
CN214798712U (en) Cable distribution box
CN212103956U (en) Low-water-head dam fishway with ecological flow discharging function
CN2030209U (en) Folding multi-hinged-steel gate
CN212294563U (en) Dam filter equipment for water conservancy and hydropower
CN109555090B (en) Ecological flow discharge facility for pumped storage power station and implementation method
CN214887613U (en) Automatic water drainage controller for preventing pump burning
CN212114669U (en) Monitoring device for dam safety integrated management
CN218712701U (en) Water stopping device
CN220364952U (en) Gate frame fixing mechanism for sluice construction
CN216428184U (en) Water sluicegate headstock gear
CN221855444U (en) Small-sized water conservancy gate
CN219586684U (en) Water conservancy water and electricity flood discharge gate
CN218466468U (en) Intercepting device for water conservancy ditch construction
CN220202591U (en) Water conservancy prevention of seepage sealing device
CN116180683B (en) Gate operation device
CN221155592U (en) A drainage sediment removal and collection device for car washer
CN218436925U (en) Waterproof drainage mechanism of hydraulic engineering construction
CN115949028B (en) Flood control dike for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211224

CF01 Termination of patent right due to non-payment of annual fee