CN215277704U - High-temperature cooling equipment for grinding balls - Google Patents
High-temperature cooling equipment for grinding balls Download PDFInfo
- Publication number
- CN215277704U CN215277704U CN202121244882.8U CN202121244882U CN215277704U CN 215277704 U CN215277704 U CN 215277704U CN 202121244882 U CN202121244882 U CN 202121244882U CN 215277704 U CN215277704 U CN 215277704U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- cooling
- box body
- cover
- cooling box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Grinding-Machine Dressing And Accessory Apparatuses (AREA)
Abstract
The utility model relates to the technical field of grinding ball cooling, and discloses a high-temperature grinding ball cooling device, which comprises a cooling box body, the left side of the cooling box body is fixedly connected with a hydraulic push rod, the top end of the hydraulic push rod is fixedly connected with a bracket, the top of the bracket is fixedly connected with a main water tank, the front of the main water tank is fixedly connected with a delivery pump, the bottom of the bracket is fixedly connected with a cover, the inner side of the cover is fixedly connected with two spray headers, the inner side of the cover is fixedly connected with a flow guide ring, the inner side of the cover is fixedly connected with a connecting rod, the bottom of the connecting rod is fixedly connected with a basket, the left side of the cooling box body is fixedly connected with a cooling pipe, the left end fixedly connected with fan of cooling tube, the inboard fixedly connected with metal mesh board of cooling tube, the left side fixedly connected with water storage box of cooling box. The grinding ball high-temperature cooling equipment has a good cooling effect, and effectively reduces the waste of water vapor.
Description
Technical Field
The utility model relates to a ball cooling technology field specifically is a ball high temperature cooling arrangement.
Background
In the field of mining industry, ore grinding is an important component of mineral separation operation, grinding balls are ball stones which are widely used as ore grinding media, during ore grinding, ores and the grinding balls are arranged in a barrel of a grinding machine, and the barrel drives the grinding balls to generate complex impact, grinding and shearing effects on the ores during rotation, so that the ores are finally ground.
The cooling effect of the cooling equipment for the high-temperature grinding balls produced by most of the existing grinding ball production lines is poor, a large amount of water vapor can be generated during cooling, water resource waste is caused, the grinding balls are not easy to cool and take, and inconvenience in use is caused, so that the grinding ball high-temperature cooling equipment is provided to solve the problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a ball high temperature cooling arrangement possesses that the cooling effect is good, and effectively reduces advantages such as the waste of vapor, has solved general cooling arrangement cooling effect not good, and the big problem of water waste.
(II) technical scheme
For realizing that above-mentioned cooling effect is good, and effectively reduce the purpose of the waste of vapor, the utility model provides a following technical scheme: a grinding ball high-temperature cooling device comprises a cooling box body, wherein a hydraulic push rod is fixedly connected to the left side of the cooling box body, a support is fixedly connected to the top end of the hydraulic push rod, a main water tank is fixedly connected to the top of the support, a conveying pump is fixedly connected to the front side of the main water tank, a cover is fixedly connected to the bottom of the support, two spray headers are fixedly connected to the inner side of the cover, a guide ring is fixedly connected to the inner side of the cover, a connecting rod is fixedly connected to the inner side of the cover, a basket is fixedly connected to the bottom of the connecting rod, a cooling pipe is fixedly connected to the left side of the cooling box body, a fan is fixedly connected to the left end of the cooling pipe, a metal mesh plate is fixedly connected to the inner side of the cooling pipe, a water storage tank is fixedly connected to the left side of the cooling box body, a communication hole is formed in the bottom of the cooling pipe, a communication pipe is fixedly connected to the bottom of the communication hole, the bottom of the delivery pump is fixedly connected with a shunt tube.
Preferably, the cover is in a semicircular shell shape, the inner diameter of the cover is equal to that of the cooling box body, and the deflector ring is in a circular ring shape.
Preferably, the support is L-shaped, the cooling pipe is communicated with the cooling box body, and the basket is located on the inner side of the cooling box body.
Preferably, the bottom end of the communicating pipe is fixedly connected with the water storage tank, and the communicating pipe is communicated with the water storage tank.
Preferably, the number of the metal mesh plates is at least six, and the bottom of the cooling box body is fixedly connected with a drainage valve.
Preferably, the shunt pipe is fixedly connected with the two spray headers, the bottom of the cover is tightly attached to the cooling box body, and the guide ring is inserted into the cooling box body.
(III) advantageous effects
Compared with the prior art, the utility model provides a ball high temperature cooling arrangement possesses following beneficial effect:
the high-temperature grinding ball cooling equipment has the advantages that high-temperature grinding balls are placed on the inner side of a net basket, a support, a cover, a connecting rod and the net basket are lowered by a hydraulic push rod, the cover is attached to the top of a cooling box body, the net basket enters the inner side of the cooling box body, the grinding balls are cooled by spraying of a spray head in the lowering process, the net basket enters the cooling box body, cooling water is also accumulated in the cooling box body to carry out secondary cooling on the net basket, water vapor generated by a water body rises to the cover to be gradually condensed and then falls down along a guide ring, partial water vapor is blown by a fan to be absorbed into a cooling pipe, the water vapor passes through a metal screen plate on the inner side of the cooling pipe to be condensed and then enters a water storage box to be accumulated through communication holes and communication pipes, a large amount of water resources are prevented from being wasted, resources are saved, the net basket is lifted upwards by the hydraulic push rod, the grinding balls are convenient to take out, and the high-temperature grinding ball cooling equipment has good cooling effect, and effectively reduces the waste of water vapor.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of part A of the structure of FIG. 1;
fig. 3 is a bottom view of the structure flow guiding ring of the present invention.
In the figure: 1 cooling box body, 2 hydraulic push rods, 3 supports, 4 main water tanks, 5 delivery pumps, 6 covers, 7 spray headers, 8 diversion rings, 9 connecting rods, 10 baskets, 11 cooling pipes, 12 fans, 13 metal mesh plates, 14 water storage tanks, 15 communicating holes, 16 communicating pipes and 17 diversion pipes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a high temperature cooling device for grinding balls comprises a cooling box 1, a drain valve is fixedly connected to the bottom of the cooling box 1, a hydraulic push rod 2 is fixedly connected to the left side of the cooling box 1, a support 3 is fixedly connected to the top end of the hydraulic push rod 2, the support 3 is in an L shape, a main water tank 4 is fixedly connected to the top of the support 3, a delivery pump 5 is fixedly connected to the front of the main water tank 4, a cover 6 is fixedly connected to the bottom of the support 3, the cover 6 is in a semi-circular shell shape, the inner diameter of the cover 6 is equal to the inner diameter of the cooling box 1, the bottom of the cover 6 is tightly attached to the cooling box 1, two spray heads 7 are fixedly connected to the inner side of the cover 6, a deflector ring 8 is fixedly connected to the inner side of the cover 6, the deflector ring 8 is inserted into the cooling box 1, the deflector ring 8 is in a circular ring shape, a connecting rod 9 is fixedly connected to the inner side of the cover 6, the bottom of the connecting rod 9 is fixedly connected with a basket 10, the basket 10 is positioned on the inner side of the cooling box body 1, the left side of the cooling box body 1 is fixedly connected with a cooling pipe 11, the cooling pipe 11 is communicated with the cooling box body 1, the left end of the cooling pipe 11 is fixedly connected with a fan 12, the model of the fan 12 can be HL32A, the inner side of the cooling pipe 11 is fixedly connected with a metal mesh plate 13, the number of the mesh plates 13 is at least six, the left side of the cooling box body 1 is fixedly connected with a water storage box 14, the bottom of the cooling pipe 11 is provided with a communication hole 15, the bottom of the communication hole 15 is fixedly connected with a communication pipe 16, the bottom of the communication pipe 16 is fixedly connected with the water storage box 14, the communication pipe 16 is communicated with the water storage box 14, the bottom of the delivery pump 5 is fixedly connected with a shunt pipe 17, the shunt pipe 17 is fixedly connected with two spray headers 7, a high-temperature grinding ball is placed on the inner side of the basket 10, and the support 3, the hydraulic push rod 2, The cover 6, the connecting rod 9 and the net basket 10 descend together, so that the cover 6 is attached to the top of the cooling box body 1, the net basket 10 enters the inner side of the cooling box body 1, in the descending process, the spray head 7 sprays water to cool grinding balls, the net basket 10 enters the cooling box body 1, cooling water is also accumulated in the cooling box body 1, the net basket 10 is cooled for the second time, water vapor generated by a water body rises to the cover 6 and is gradually condensed, then falls down along the flow guide ring 8, partial water vapor is blown and absorbed into the cooling pipe 11 by the fan 12, and is condensed by the metal net plate 13 on the inner side of the cooling pipe 11 and then enters the water storage box 14 through the communication hole 15 and the communication pipe 16 to be accumulated, so that a large amount of water resource waste is prevented, resources are saved, the net basket 10 is lifted upwards through the hydraulic push rod 2, and the grinding balls are convenient to take out.
When in use, high-temperature grinding balls are placed on the inner side of the basket 10, the support 3, the cover 6, the connecting rod 9 and the basket 10 are descended together by the hydraulic push rod 2, the cover 6 is attached to the top of the cooling box body 1, the basket 10 enters the inner side of the cooling box body 1, the grinding balls are cooled by spraying of the spray head 7 in the descending process, the basket 10 enters the cooling box body 1, cooling water is also accumulated in the cooling box body 1 to carry out secondary cooling on the basket 10, water vapor generated by a water body rises to the cover 6 to be gradually condensed and then falls down along the guide ring 8, part of the water vapor is blown and absorbed into the cooling pipe 11 by the fan 12, is condensed by the metal mesh plate 13 on the inner side of the cooling pipe 11 and then enters the water storage box 14 through the communicating hole 15 and the communicating pipe 16 to be accumulated, so that a large amount of water resources are prevented from being wasted, resources are saved, and the basket 10 is lifted upwards by the hydraulic push rod 2, the grinding ball is convenient to take out.
In conclusion, in the high-temperature grinding ball cooling equipment, high-temperature grinding balls are placed on the inner side of a basket 10, a hydraulic push rod 2 descends the support 3, the cover 6, the connecting rod 9 and the basket 10 together, the cover 6 is attached to the top of a cooling box body 1, the basket 10 enters the inner side of the cooling box body 1, in the descending process, a spray head 7 sprays water to cool the grinding balls, the basket 10 enters the cooling box body 1, cooling water is also accumulated in the cooling box body 1 to cool the basket 10 for the second time, water vapor generated by a water body rises to the cover 6 to be gradually condensed and then falls down along a flow guide ring 8, part of the water vapor is blown and absorbed into a cooling pipe 11 by a fan 12, is condensed by a metal screen 13 on the inner side of the cooling pipe 11 and then enters a water storage tank 14 through a communication hole 15 and a communication pipe 16 to be accumulated, so that a large amount of water resources are prevented from being wasted, the resources are saved, the basket 10 is lifted upwards by the hydraulic push rod 2, the grinding ball high-temperature cooling equipment is convenient to take out the grinding ball, has good cooling effect, effectively reduces the waste of water vapor, and solves the problems that the cooling effect of common cooling equipment is not good and the water resource waste is large.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a ball high temperature cooling arrangement, includes cooling box (1), its characterized in that: the left side of the cooling box body (1) is fixedly connected with a hydraulic push rod (2), the top end of the hydraulic push rod (2) is fixedly connected with a support (3), the top of the support (3) is fixedly connected with a main water tank (4), the front of the main water tank (4) is fixedly connected with a delivery pump (5), the bottom of the support (3) is fixedly connected with a cover (6), the inner side of the cover (6) is fixedly connected with two spray headers (7), the inner side of the cover (6) is fixedly connected with a flow guide ring (8), the inner side of the cover (6) is fixedly connected with a connecting rod (9), the bottom of the connecting rod (9) is fixedly connected with a net basket (10), the left side of the cooling box body (1) is fixedly connected with a cooling pipe (11), the left end of the cooling pipe (11) is fixedly connected with a fan (12), and the inner side of the cooling pipe (11) is fixedly connected with a metal net plate (13), the left side fixedly connected with water storage box (14) of cooling box (1), intercommunicating pore (15) have been seted up to the bottom of cooling tube (11), the bottom fixedly connected with communicating pipe (16) of intercommunicating pore (15), the bottom fixedly connected with shunt tubes (17) of delivery pump (5).
2. A high temperature cooling apparatus for grinding balls according to claim 1, characterized in that: the cover (6) is in a semicircular shell shape, the inner diameter of the cover (6) is equal to that of the cooling box body (1), and the guide ring (8) is in a circular ring shape.
3. A high temperature cooling apparatus for grinding balls according to claim 1, characterized in that: the support (3) is L-shaped, the cooling pipe (11) is communicated with the cooling box body (1), and the basket (10) is located on the inner side of the cooling box body (1).
4. A high temperature cooling apparatus for grinding balls according to claim 1, characterized in that: the bottom end of the communicating pipe (16) is fixedly connected with the water storage tank (14), and the communicating pipe (16) is communicated with the water storage tank (14).
5. A high temperature cooling apparatus for grinding balls according to claim 1, characterized in that: the number of the metal mesh plates (13) is at least six, and the bottom of the cooling box body (1) is fixedly connected with a drainage valve.
6. A high temperature cooling apparatus for grinding balls according to claim 1, characterized in that: the shunt pipe (17) is fixedly connected with the two spray headers (7), the bottom of the cover (6) is tightly attached to the cooling box body (1), and the flow guide ring (8) is inserted into the cooling box body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121244882.8U CN215277704U (en) | 2021-06-04 | 2021-06-04 | High-temperature cooling equipment for grinding balls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121244882.8U CN215277704U (en) | 2021-06-04 | 2021-06-04 | High-temperature cooling equipment for grinding balls |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215277704U true CN215277704U (en) | 2021-12-24 |
Family
ID=79514195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121244882.8U Expired - Fee Related CN215277704U (en) | 2021-06-04 | 2021-06-04 | High-temperature cooling equipment for grinding balls |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215277704U (en) |
-
2021
- 2021-06-04 CN CN202121244882.8U patent/CN215277704U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205324379U (en) | Aluminium prduct process uses high -efficient cooling device | |
CN205241743U (en) | High -efficient thermal treatment guenching unit | |
CN215277704U (en) | High-temperature cooling equipment for grinding balls | |
CN107318254A (en) | Rack water cooling system | |
CN211248191U (en) | Water cooling equipment for casting sand | |
CN207272544U (en) | A kind of Efficient numerical control machine tool shell automatic welding positioning tool | |
CN205635825U (en) | Aluminum alloy welded joint's micro -arc oxidation corrosion resistant protector | |
CN103993142B (en) | Heat treatment quenching device | |
CN209796376U (en) | Storage tank with spraying device | |
CN207915101U (en) | A kind of cutting fluid control device | |
CN210220597U (en) | Workpiece drying device for oil immersion machine | |
CN208964987U (en) | The heat treatment tooling of nuclear power safety injection tank end socket | |
CN107151768A (en) | One kind is used for the post-job workpiece cooling device of galvanizing | |
CN219169729U (en) | Steel pipe cutting machine prevents structure that splashes | |
CN214792632U (en) | Cooling water circulation device of cooling tower | |
CN206241770U (en) | A kind of cooling device of numerical control machining center | |
CN211601620U (en) | Industrial cooling tower | |
CN216935378U (en) | Tetrahydrofuran tail gas recovery device | |
CN214274069U (en) | Tower type water jet vacuum unit | |
CN212019824U (en) | Water cooling device for manganese steel welding | |
CN210711739U (en) | Galvanized steel pipe passivation production line | |
CN210933855U (en) | Vertical chemical rectification tower | |
CN209050502U (en) | A kind of water cooling plant for automobile parts processing | |
CN210754907U (en) | Sinker forging device | |
CN211261902U (en) | Circulating water cooling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211224 |