CN215258192U - Overhead heat supply pipeline support - Google Patents

Overhead heat supply pipeline support Download PDF

Info

Publication number
CN215258192U
CN215258192U CN202121815364.7U CN202121815364U CN215258192U CN 215258192 U CN215258192 U CN 215258192U CN 202121815364 U CN202121815364 U CN 202121815364U CN 215258192 U CN215258192 U CN 215258192U
Authority
CN
China
Prior art keywords
support
heat supply
supply pipeline
supporting plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121815364.7U
Other languages
Chinese (zh)
Inventor
张臻臻
孙德珍
谷恒贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Aoxiang Power Engineering Design Consulting Co ltd
Original Assignee
Shandong Aoxiang Power Engineering Design Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Aoxiang Power Engineering Design Consulting Co ltd filed Critical Shandong Aoxiang Power Engineering Design Consulting Co ltd
Priority to CN202121815364.7U priority Critical patent/CN215258192U/en
Application granted granted Critical
Publication of CN215258192U publication Critical patent/CN215258192U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

An overhead heat supply pipeline support is characterized by comprising a base plate, a fixed main support and an upper movable support; the substrate is a plane plate; the fixing main bracket is arranged on the base plate, and the top of the fixing main bracket is provided with a planar upper panel; the upper movable support comprises a supporting plate and a heat supply pipeline support fixed on the supporting plate; the supporting plate can be arranged on the upper panel of the fixed main support in a sliding mode, and at least one arc-shaped supporting plate which is matched with the outer surface of the heat supply pipeline is arranged at the upper end of the heat supply pipeline support. When this support mainly used old district heating network reforms transform, the preparation of bungalow roof or bicycle shed top heating pipeline support, it can not cause original building waterproof layer to destroy, and is favorable to shortening construction cycle, and occupation space area is little, uses in a flexible way.

Description

Overhead heat supply pipeline support
Technical Field
The utility model relates to a heat supply pipeline technical transformation technical field specifically is an aerial heat supply pipeline support.
Background
In recent years, under the big background of vigorously advocating "energy conservation and environmental protection" in China, centralized heating gradually becomes the main mode of heating in cities and towns in China, and centralized heating has the advantages of energy conservation, environmental pollution reduction, good heating effect, high heating stability, high automation degree and the like. But for old districts, especially the districts heated in the eighties and ninety years of the last century, the problems of pipeline aging, leakage, valve corrosion, unreasonable pipe diameter design, lagged control means, poor heating effect and the like are more prominent. Since 2008, the nation has gradually promoted the old community heat supply pipe network reconstruction work, and the old pipe network reconstruction is carried out by the successive policy and fund support of each place.
The drawing data such as old district building, structure are incomplete, pipeline construction lacks the wholeness planning, so still adopt built on stilts mode of laying after most heat supply pipeline reforms transform. Wherein, partial overhead pipeline often lays in bungalow roof or bicycle shed top, and the building is waterproof accomplished, and does not have corresponding civil engineering drawing data, often adopts to destroy the building waterproof layer in the work progress and directly adopts bolt fixed bolster, short steel pipe support pipeline that punches, or directly places heat supply pipeline in the bungalow top. The scheme can cause heat preservation damage of the heat supply pipeline or dislocation of the pipeline during operation, and the operation safety cannot be ensured.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a pair of built on stilts heat supply pipeline support, when the heat supply pipe network of mainly used old district was reformed transform, the preparation of bungalow roof or bicycle shed top heat supply pipeline support, it can not cause original building waterproof layer to destroy, and is favorable to shortening construction cycle, and occupation space area is little, uses in a flexible way.
The utility model provides a technical scheme that its technical problem adopted is: an overhead heat supply pipeline support is characterized by comprising a base plate, a fixed main support and an upper movable support;
the substrate is a plane plate;
the fixing main bracket is arranged on the base plate, and the top of the fixing main bracket is provided with a planar upper panel;
the upper movable support comprises a supporting plate and a heat supply pipeline support fixed on the supporting plate; the supporting plate can be arranged on the upper panel of the fixed main support in a sliding mode, and at least one arc-shaped supporting plate which is matched with the outer surface of the heat supply pipeline is arranged at the upper end of the heat supply pipeline support.
As the overhead heat supply pipeline bracket of the utility model, the fixed main bracket comprises a rectangular frame supporting surface formed by connecting at least four side frames; wherein two opposite frames in the four frames are provided with hinged positions at the middle positions.
Further, the method comprises the following steps: reinforcing rods are arranged between the supporting legs for fixing the main support and the four frames of the rectangular frame.
Further, the method comprises the following steps: the reinforcing rods are fixedly connected with lugs fixed on the frame and the supporting legs through connecting pieces.
As a further technical solution of the present invention: the two heat supply pipeline supports on the upper movable support are symmetrically distributed along the center line of the supporting plate.
Further: hanging rings for hoisting are arranged on the front side, the rear side or the left side and the right side of the fixed main support.
The utility model has the advantages that:
1) the manufacturing process is simple, the construction period is short, the occupied space area is small, and the use is flexible;
2) the steel structure model is adopted, so that the structural strength is high, the stability is good, and the realization is convenient;
3) an antifriction structure polytetrafluoroethylene plate is arranged between the pipeline support and the bracket, so that the horizontal thrust of the bracket can be reduced;
4) the support structure is independent of the original building, and the waterproof layer of the original building cannot be damaged;
5) the width of the steel plate 2 can be changed according to requirements, and the pipeline expansion can be realized without changing a lower bracket.
6) The support structure can be reused after the pipeline is abandoned.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
FIG. 2 is a top view of FIG. 1;
fig. 3 is a top view of a second embodiment of the present invention;
the figure is as follows: the heat supply device comprises a base plate 1, a fixed main support 2, a frame 21, a hinged position 22, support legs 23, a reinforcing rod 24, lugs 25, lifting rings 26, an upper panel 27, an upper movable support 3, a supporting plate 31, a heat supply pipeline support 32, an arc-shaped supporting plate 33 and a heat supply pipeline 4.
Detailed Description
The invention is further explained below with reference to the drawings and examples:
the first embodiment is as follows: the support for the overhead heating pipeline shown in fig. 1 and 2 comprises a base plate 1, a fixed main support 2 and an upper movable support 3. The substrate 1 is a plane plate; in this embodiment, a steel plate is used as the substrate.
A fixed main support 2 is arranged on a base plate 1, and the upper surface of the fixed main support forms a plane or is positioned in the same plane. In this embodiment, the fixing main support 2 includes a support surface of a rectangular frame formed by connecting at least four side frames 21; two opposite frames of the four frames are provided with a hinging position 22 at the middle position.
Reinforcing rods 24 are arranged between the supporting legs 23 of the main fixing bracket 2 and the four side frames 21 of the rectangular frame. The reinforcing rods 24 are fixedly connected with lugs 25 fixed on the frame and the supporting legs through connecting pieces. During manufacturing, the frame 21 and the supporting legs 23 for fixing the main support can be made of angle steel. The size of the base plate 1 is selected according to the pipe diameter of the heat supply pipeline 4 and the load, and the height of the supporting legs is at least 100mm higher than that of the parapet wall of the building.
The upper movable support 3 comprises a supporting plate 31 and a heat supply pipeline support 32 fixed on the supporting plate; the supporting plate 31 is slidably disposed on the fixing main bracket 2, specifically, on the rectangular frame supporting surface formed by the four frames 21 of the fixing main bracket 2. In this embodiment, the supporting plate 31 is made of a teflon plate. The upper end of the heat supply pipeline bracket 32 is provided with an arc-shaped supporting plate 33 which is adaptive to the outer surface of the heat supply pipeline 4.
In this embodiment, hanging rings 26 for hanging are provided on the front and rear sides or the left and right sides of the main fixing bracket 2.
During the use, when reforming transform pipe support as old district heat supply, base plate 1 places on bungalow roof or bicycle shed top, and fixed position back, together fixed with the landing leg of fixed main support, can be the welding also can be other connecting piece fixed connection. Finally, the polytetrafluoroethylene plate is laid on the upper panel 27, during construction, the heat supply pipeline support 32 can slide on the upper panel 27 through the polytetrafluoroethylene plate, the position of the heat supply pipeline support 32 is adjusted to adapt to the position of the heat supply pipeline, and the pipeline support 32 is welded and fixed with the heat supply pipeline 4 after being in the appropriate position.
Example two: as shown in fig. 3, two heat supply pipeline brackets 32 are arranged on the upper movable bracket 3, and are symmetrically distributed along the center line of the supporting plate 31. The rest is the same as the first embodiment, and is not described again. This embodiment utilizes the dual bracing, more is favorable to supporting heat supply pipeline's stability, avoids the single bracing to cause inside stress concentration.
In addition, as a further improvement of this embodiment: set up the second heat supply pipeline support into detachable support, can select to use a heat supply pipeline support or two heat supply pipeline supports in the application scene of difference, use more in a flexible way.
The structure, proportion, size, etc. that the drawings of the present invention show are all only used for cooperating with the content that the specification reveals to the personage who is familiar with this technique understands and reads, and not used for limiting the limit condition that the present invention can be implemented, so do not have the essential meaning in the technology, and the modification of any structure, the change of proportion relation or the adjustment of size, under not influencing the efficiency that the present invention can produce and the mesh that can reach, all should still fall in the scope that the technical content that the present invention discloses can cover. Meanwhile, the terms "upper", "lower", "front", "rear", "middle", and the like used in the present specification are for the sake of clarity only, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof are also considered to be the scope of the present invention without substantial changes in the technical content.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. The present invention can be modified in many ways without departing from the spirit and scope of the present invention, and those skilled in the art can modify or change the embodiments described above without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (6)

1. An overhead heat supply pipeline support is characterized by comprising a base plate, a fixed main support and an upper movable support;
the substrate is a plane plate;
the fixing main bracket is arranged on the base plate, and the top of the fixing main bracket is provided with a planar upper panel;
the upper movable support comprises a supporting plate and a heat supply pipeline support fixed on the supporting plate; the supporting plate can be arranged on the upper panel of the fixed main support in a sliding mode, and at least one arc-shaped supporting plate which is matched with the outer surface of the heat supply pipeline is arranged at the upper end of the heat supply pipeline support.
2. An overhead heating pipe support according to claim 1, wherein: the fixing main bracket comprises a supporting surface of a rectangular frame formed by connecting at least four side frames; wherein two opposite frames in the four frames are provided with hinged positions at the middle positions.
3. An overhead heating pipe support according to claim 2, wherein: reinforcing rods are arranged between the supporting legs for fixing the main support and the four frames of the rectangular frame.
4. An overhead heating pipe support according to claim 3, wherein: the reinforcing rods are fixedly connected with lugs fixed on the frame and the supporting legs through connecting pieces.
5. An overhead heating pipe support according to any one of claims 1 to 4, wherein: the two heat supply pipeline supports on the upper movable support are symmetrically distributed along the center line of the supporting plate.
6. An overhead heating pipeline support according to claim 5, wherein: hanging rings for hoisting are arranged on the front side, the rear side or the left side and the right side of the fixed main support.
CN202121815364.7U 2021-08-05 2021-08-05 Overhead heat supply pipeline support Active CN215258192U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121815364.7U CN215258192U (en) 2021-08-05 2021-08-05 Overhead heat supply pipeline support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121815364.7U CN215258192U (en) 2021-08-05 2021-08-05 Overhead heat supply pipeline support

Publications (1)

Publication Number Publication Date
CN215258192U true CN215258192U (en) 2021-12-21

Family

ID=79496922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121815364.7U Active CN215258192U (en) 2021-08-05 2021-08-05 Overhead heat supply pipeline support

Country Status (1)

Country Link
CN (1) CN215258192U (en)

Similar Documents

Publication Publication Date Title
CN206952450U (en) Weld positioning tool
CN206519915U (en) A kind of support and fixing equipment for wind electricity blade
CN215258192U (en) Overhead heat supply pipeline support
CN213296831U (en) Steel bar truss building carrier plate with supporting seat
CN201634347U (en) Ultra-large tower crane and lower support assembly thereof
CN209958161U (en) Linear adjusting equipment of track beam
CN216475557U (en) Assembled structure beam column node connection structure
CN102815603B (en) Nuclear power plant ring crane corbel and manufacturing method thereof
CN109339105A (en) A kind of side's arch piping lane erection support and piping lane system and piping lane system installation method
CN206110793U (en) Do not take framework of ground area
CN202787309U (en) Transformer foundation
CN213234262U (en) Aluminum alloy template supports fixing device
CN215108683U (en) Wind tower assembly safety tool
CN210563435U (en) Slope supporting device for top rising of inclined heavy-load steel net rack
CN203770852U (en) Multi-deck integrated pipe frame structure
CN207724281U (en) Engineering pipe fitting rack that is a kind of easy to remove and adjusting
CN202864698U (en) Ring-lifted corbel of nuclear power plant
CN206689586U (en) Solar energy increasing material manufacturing engineering truck
CN202220438U (en) Diving platform steel formwork support system
CN207255534U (en) A kind of special steel part welder of high intensity
CN206360349U (en) A kind of bracing means of concrete structure templates for expansion joints
CN213509670U (en) Lifting mechanism for lifting top steel platform in limited space
CN216400012U (en) Aerated concrete pulling-free support rod steam-curing bottom plate
CN215967193U (en) Portable roller way supporting device
CN220857584U (en) Temporary erection device for residential area electric wires in urban updating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Yongji Dun'an Thermal Power Co.,Ltd.

Assignor: SHANDONG AOXIANG POWER ENGINEERING DESIGN CONSULTING Co.,Ltd.

Contract record no.: X2023980036333

Denomination of utility model: An overhead heating pipeline support

Granted publication date: 20211221

License type: Common License

Record date: 20230612