CN215252031U - Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper - Google Patents

Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper Download PDF

Info

Publication number
CN215252031U
CN215252031U CN202120578300.3U CN202120578300U CN215252031U CN 215252031 U CN215252031 U CN 215252031U CN 202120578300 U CN202120578300 U CN 202120578300U CN 215252031 U CN215252031 U CN 215252031U
Authority
CN
China
Prior art keywords
screw spike
handle
anchoring
sides
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120578300.3U
Other languages
Chinese (zh)
Inventor
吉品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhenning Semiconductor Research Institute Co Ltd
Original Assignee
Jiangsu Zhenning Semiconductor Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhenning Semiconductor Research Institute Co Ltd filed Critical Jiangsu Zhenning Semiconductor Research Institute Co Ltd
Priority to CN202120578300.3U priority Critical patent/CN215252031U/en
Application granted granted Critical
Publication of CN215252031U publication Critical patent/CN215252031U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a filling equipment especially relates to a railway sleeper wood screw spike anchor is with sulphur mortar filling equipment. The utility model aims at providing a reduce environmental pollution, improve construction quality's iron sleeper wood screw spike anchor is with sulphur mortar filling equipment. The technical scheme of the utility model is that: a sulfur mortar filling equipment for anchoring a wooden screw spike of an iron sleeper comprises: a support plate; the storage component is connected between the supporting plates in a sliding manner; the discharging component is connected to one side of the storage component. The utility model discloses a cooperation of case lid, box and first handle to reach the purpose of storing sulphur mortar.

Description

Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper
Technical Field
The utility model relates to a filling equipment especially relates to a railway sleeper wood screw spike anchor is with sulphur mortar filling equipment.
Background
At present, the railway sleeper screw spike has two anchoring modes, namely a reverse anchor and a positive anchor, wherein the reverse anchor is to turn the sleeper for many times to anchor in order to save the operation of plugging the bottom of a reserved hole of the sleeper, and the screw spike is positioned by adopting a simple iron bracket; the positive anchor does not need to move the sleeper, but needs to block the bottom of a reserved hole of the sleeper firstly, generally adopts sand, broken cloth and the like for blocking, after the anchoring material is poured, a screw track nail positioner is installed, a track nail is inserted into the anchoring material according to the positioning of the positioner, and after the anchoring material is condensed, the positioner is taken down.
The existing railway sleeper screw spike anchoring method is generally adopted for construction, and the anti-anchoring method is not suitable for being adopted due to the reasons that other normal-temperature anchoring materials are long in condensation time, slow in early strength increase, irreversible in hardening reaction and the like, so that sulfur mortar can be adopted as the anchoring material, but the existing method has the problems of great environmental pollution and difficulty in ensuring construction quality.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of large pollution and difficult guarantee of construction quality, the technical problems to be solved are as follows: provides sulfur mortar filling equipment for anchoring the wooden screw spike of the iron sleeper, which reduces the environmental pollution and improves the construction quality.
The technical scheme is as follows: a sulfur mortar filling equipment for anchoring a wooden screw spike of an iron sleeper comprises:
a support plate;
the storage component is connected between the supporting plates in a sliding manner;
the discharging component is connected to one side of the storage component.
Further, the storage assembly includes:
the box body is connected between the supporting plates in a sliding manner;
a box cover is arranged on one side of the box body;
the first handle is connected to box one side.
Further, the ejection of compact subassembly includes:
the device comprises a hopper, wherein two hoppers are connected to one side of a box body;
the guide cylinder is connected to one side of the funnel.
Further, still include the closing component, the closing component includes:
one side of one supporting plate is connected with two fixing plates;
one side of the fixed plate is connected with the connecting rod;
one side of each connecting rod is connected with a gyroscope cone, and the gyroscope cones are all contacted with the guide cylinders;
two positioning pins are connected to two sides inside the supporting plate;
first spring, all be connected with first spring between locating pin and the backup pad.
Further, still including the locating component, the locating component includes:
the two sides of the box body are both connected with a second handle;
the middle fixing block is internally provided with a transmission rod in a sliding way, and the transmission rods are connected with the second handle; the second springs are connected between the second handle and the middle fixing block;
the two sides of the box body are connected with a plurality of fixed blocks;
one side of the transmission rod is connected with the connecting block;
the two sides of the connecting block are rotatably connected with the rotating pins, and one side of the guide rod is rotatably connected with the rotating pins;
the rotating rods are connected between the rotating pins on the two sides;
the guide rods are connected in the fixing blocks on the two sides in a sliding manner;
the locating piece, two locating pieces are all connected with to backup pad both sides.
Further, the first spring is a compression spring.
The beneficial effects are that: 1. the aim of storing the sulfur mortar is achieved through the matching of the box cover, the box body and the first handle.
2. The aim of filling the rail sleeper with sulfur mortar is achieved through the matching of the funnel and the guide cylinder.
3. The purpose that the sulfur mortar is filled into the rail sleeper and is stopped immediately after use is achieved through the matching of the fixing plate, the connecting rod, the gyroscope cone and the positioning pin.
4. The aim of filling the sulfur mortar at the fixed position is achieved through the matching of the transmission rod, the fixed block, the connecting block and the rotating pin.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic structural view of the storage assembly of the present invention.
Fig. 3 is a schematic structural view of the discharging assembly of the present invention.
Fig. 4 is a schematic view of a closure assembly of the present invention.
Fig. 5 is a schematic structural diagram of the positioning assembly of the present invention.
Part names and serial numbers in the figure: 1_ backup pad, 2_ storage component, 21_ box, 22_ case lid, 23_ first handle, 3_ ejection of compact subassembly, 31_ funnel, 32_ guide cylinder, 4_ closure component, 41_ fixed plate, 42_ connecting rod, 43_ top cone, 44_ locating pin, 45_ first spring, 5_ locating component, 51_ second handle, 52_ transfer line, 53_ second spring, 54_ fixed block, 55_ connecting block, 56_ rotating pin, 57_ dwang, 58_ guide bar, 59_ locating piece.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
Example 1
The utility model provides a railway sleeper wood screw spike anchor is with sulphur mortar filling equipment, as shown in figure 1, including backup pad 1, storage subassembly 2 and ejection of compact subassembly 3, sliding connection has storage subassembly 2 between the backup pad 1, and storage subassembly 2 downside is connected with ejection of compact subassembly 3.
When this equipment of needs use, the user of service can place this equipment on the rail sleeper, upwards remove storage assembly 2 afterwards, make storage assembly 2 upward movement, can place the sulphur mortar in storage assembly 2 this moment, in order to reach the purpose of storing the sulphur mortar, downwards remove storage assembly 2 afterwards, make storage assembly 2 move to the normal position downwards, then press down storage assembly 2, make storage assembly 2 slide downwards in backup pad 1, storage assembly 2 slides downwards and drives ejection of compact subassembly 3 and slide downwards, in order to reach the purpose of filling the rail sleeper with the sulphur mortar, after the operation, loosen storage assembly 2, make storage assembly 2 slide to the normal position upwards, when using again, repetitive operation can.
As shown in fig. 3 and 5, the storage assembly 2 includes a box 21, a cover 22 and a first handle 23, the box 21 is slidably connected between the supporting plates 1, the first handle 23 is connected to the left side of the box 21, and the cover 22 is disposed on the upper side of the box 21.
When this equipment of needs use, the user of service can place this equipment on the rail sleeper, upwards remove case lid 22 afterwards, make case lid 22 upwards move, can place the sulphur mortar in box 21 this moment, in order to reach the purpose of storing the sulphur mortar, downwards remove case lid 22 afterwards, make case lid 22 downwards move to the normal position, then press first handle 23 downwards, make first handle 23 downwards move, first handle 23 downwards moves and drives box 21 and slide downwards in backup pad 1, box 21 slides downwards and drives ejection of compact subassembly 3 and slide downwards, continue follow-up operation, after the operation, stop pressing first handle 23, make first handle 23 stop motion, then make box 21 stop sliding, when using again, repetitive operation can.
As shown in fig. 2 and 4, the discharging assembly 3 includes a funnel 31 and a guide cylinder 32, two funnels 31 are connected to the lower side of the box 21, and the guide cylinders 32 are connected to the lower sides of the funnels 31.
When box 21 slided downwards, drive funnel 31 downstream, funnel 31 downstream drives guide cylinder 32 downstream for sulphur mortar can downstream, in order to reach the purpose with sulphur mortar filling rail sleeper, continues follow-up operation, after the operation, stops to press first handle 23, makes first handle 23 stop motion, makes box 21 stop sliding, makes funnel 31 stop motion then, when using again, repeated operation can.
As shown in fig. 4, still including closing component 4, closing component 4 is including fixed plate 41, connecting rod 42, top awl 43, locating pin 44 and first spring 45, and the place ahead backup pad 1 rear side is connected with two fixed plates 41, and fixed plate 41 rear side all is connected with connecting rod 42, and the connecting rod 42 downside all is connected with top awl 43, and top awl 43 all contacts with guide cylinder 32, and both sides all are connected with two locating pins 44 around backup pad 1 is inside, all is connected with first spring 45 between locating pin 44 and the backup pad 1.
When the first handle 23 moves downwards, the box body 21 slides downwards on the connecting rod 42, the box body 21 slides downwards to drive the funnel 31 to move downwards, the funnel 31 moves downwards to drive the guide cylinder 32 to move downwards, when the guide cylinder 32 moves downwards to be not contacted with the gyroscope cone 43, the sulfur mortar can move downwards, and after the operation is finished, the first handle 23 is loosened, under the reset action of the first spring 45, the box body 21 slides upwards in the support plate 1, the box body 21 slides upwards to drive the funnel 31 to move upwards, the funnel 31 moves upwards to drive the guide cylinder 32 to move upwards, when the guide cylinder 32 moves upwards to be in contact with the gyro cone 43, the downward movement of the sulfur mortar is stopped, so as to achieve the purpose that the sulfur mortar is used for filling the rail sleeper and is stopped immediately, and then the box body 21 is upwards slid to the original position in the supporting plate 1, and when the rail sleeper is used again, the operation is repeated.
As shown in fig. 5, the device further comprises a positioning assembly 5, the positioning assembly 5 comprises a second handle 51, a transmission rod 52, a second spring 53 and a fixed block 54, connecting block 55, the rotating pin 56, the dwang 57, guide bar 58 and locating piece 59, the box 21 left and right sides all is connected with second handle 51, the box 21 left and right sides all is connected with a plurality of fixed blocks 54, all sliding connection has transfer line 52 in the middle fixed block 54, transfer line 52 all is connected with second handle 51, all be connected with second spring 53 between second handle 51 and the middle fixed block 54, the inboard connecting block 55 that all is connected with of transfer line 52, the equal rotary type in both sides is connected with the rotating pin 56 around the connecting block 55, all sliding connection has guide bar 58 in the fixed block 54 of front and back side, the inboard equal rotary type of guide bar 58 is connected with the rotating pin 56, all be connected with dwang 57 between the rotating pin 56 of upper and lower side, backup pad 1 front and back left and right sides all is connected with two locating pieces 59.
When the device is required to be used at a fixed position, a user can pull the second handle 51 upwards to enable the second handle 51 to move upwards, the second spring 53 is stretched, the second handle 51 moves upwards to drive the box body 21 to slide upwards in the supporting plate 1, the second handle 51 moves upwards to drive the transmission rod 52 to slide upwards in the fixed block 54, the transmission rod 52 slides upwards to drive the connecting block 55 to move upwards, the connecting block 55 moves upwards to drive the rotating rod 57 to rotate on the rotating pin 56, the rotating rod 57 rotates to enable the guide rod 58 to slide outwards in the fixed block 54 to be in contact with the positioning block 59, then the second handle 51 is released to achieve the purpose of filling the sulfur mortar at the fixed position, after the operation is finished, the second handle 51 is pressed downwards, then the second handle 51 moves downwards to the original position under the reset action of the second spring 53, the second handle 51 moves downwards to drive the box body 21 to slide downwards in the supporting plate 1, the second handle 51 moves downwards to drive the transmission rod 52 to slide downwards in the fixing block 54, the transmission rod 52 slides downwards to drive the connecting block 55 to move downwards, the connecting block 55 moves downwards to drive the rotating rod 57 to rotate on the rotating pin 56, the rotating rod 57 rotates to enable the guide rod 58 to slide inwards in the fixing block 54 until the guide rod does not contact with the positioning block 59, then the second handle 51 is released, and when the electric toothbrush is used again, the electric toothbrush is operated repeatedly.
While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. The scope of the following claims is to be accorded the broadest interpretation so as to encompass all such modifications and equivalent structures and functions.

Claims (6)

1. The utility model provides a railway sleeper wood screw spike anchor is with sulphur mortar filling equipment which characterized by includes:
a support plate (1);
the storage component (2) is connected between the supporting plates (1) in a sliding manner;
one side of the discharging component (3) and one side of the storage component (2) are connected with the discharging component (3).
2. The apparatus for filling sulfur mortar for screw spike anchoring of railroad tie as claimed in claim 1, wherein the storage unit (2) comprises:
the box body (21) is connected between the supporting plates (1) in a sliding way;
a box cover (22), wherein the box cover (22) is arranged on one side of the box body (21);
the first handle (23) is connected with one side of the box body (21).
3. The apparatus for filling sulfur mortar for anchoring the wooden screw spike of a railway sleeper according to claim 1, wherein the discharging unit (3) comprises:
the device comprises a hopper (31), wherein two hoppers (31) are connected to one side of a box body (21);
the guide cylinder (32) is connected with one side of the funnel (31).
4. A sulfur mortar filling apparatus for screw spike anchoring of railroad tie according to claim 3, further comprising a closing member (4), the closing member (4) comprising:
two fixing plates (41) are connected to one side of one supporting plate (1);
one side of the fixed plate (41) is connected with the connecting rod (42);
one side of each connecting rod (42) is connected with a gyroscope cone (43), and the gyroscope cones (43) are all contacted with the guide cylinder (32);
two positioning pins (44) are connected to two sides of the inner part of the supporting plate (1);
first springs (45) are connected between the first springs (45), the positioning pins (44) and the support plate (1).
5. The apparatus for filling sulfur mortar for anchoring the screw spike of the railroad tie as claimed in claim 4, further comprising a positioning member (5), wherein the positioning member (5) comprises:
the two sides of the box body (21) are both connected with a second handle (51);
the transmission rods (52) are connected in the middle fixing block (54) in a sliding mode, and the transmission rods (52) are connected with the second handle (51);
the second spring (53) is connected between the second handle (51) and the middle fixing block (54);
the two sides of the box body (21) are connected with a plurality of fixing blocks (54);
one side of each transmission rod (52) is connected with the connecting block (55);
the two sides of the connecting block (55) are rotatably connected with the rotating pins (56), and one side of the guide rod (58) is rotatably connected with the rotating pins (56);
the rotating rod (57) is connected between the rotating pins (56) on both sides of the rotating rod (57);
the guide rods (58) are connected in the fixed blocks (54) at the two sides of the guide rod (58) in a sliding manner;
two sides of the two parts of the supporting plate (1) are connected with two positioning blocks (59).
6. The apparatus for filling sulfur mortar for anchoring the wooden screw spike of the railroad tie according to claim 4, wherein the first spring (45) is a compression spring.
CN202120578300.3U 2021-03-22 2021-03-22 Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper Expired - Fee Related CN215252031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120578300.3U CN215252031U (en) 2021-03-22 2021-03-22 Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120578300.3U CN215252031U (en) 2021-03-22 2021-03-22 Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper

Publications (1)

Publication Number Publication Date
CN215252031U true CN215252031U (en) 2021-12-21

Family

ID=79504273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120578300.3U Expired - Fee Related CN215252031U (en) 2021-03-22 2021-03-22 Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper

Country Status (1)

Country Link
CN (1) CN215252031U (en)

Similar Documents

Publication Publication Date Title
CN107695746A (en) Ring flange stationary fixture
CN215252031U (en) Sulfur mortar filling equipment for anchoring wooden screw spike of iron sleeper
US3506058A (en) Method of matchplate molding
CN209409384U (en) Waste paper baler
CN109473723B (en) Square lithium cell pulls out glued membrane nail device
CN208575500U (en) A kind of screw indentation assembling mechanism
CN110295549A (en) A kind of Bridge Crack method for repairing and mending
CN214459767U (en) Down-through railway frame box culvert jacking construction device
CN210981967U (en) Cement mortar plain bumper closing device
CN213005305U (en) Automatic feeding and discharging truss manipulator
CN110026124A (en) A kind of cosmetic material mixing apparatus
CN117661847A (en) Device for rapidly plugging vault pouring opening and working method thereof
CN219486980U (en) Accounting bill sticking device
CN219431844U (en) Tunnel lining end mould plugging device
CN214497467U (en) Integration foundation pouring tamping equipment
CN113584966A (en) Multi-plate downward-pressing type track tamping device
CN219784643U (en) Automatic proportioning device for asphalt mixture
CN207439812U (en) A kind of concrete compression-resistanmodifier fixture
CN220392080U (en) Side pressure type roller body top pressing device and roller body transferring and packaging frame
CN217765737U (en) Cement mortar jolt ramming table with clamping mechanism
CN214277604U (en) Vibration compaction forming machine for highway detection
CN214201069U (en) Cement mortar fluidity measuring equipment
CN214315775U (en) Mechanism for automatically matching with chip mounter to transfer box body after loading materials into box
CN220598088U (en) Device for rapidly sealing edges of asphalt pavement
CN214729966U (en) Rotating support frame for elastic strip packaging

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221

CF01 Termination of patent right due to non-payment of annual fee