CN215211489U - A super high brick fetal membrane structure for basement - Google Patents

A super high brick fetal membrane structure for basement Download PDF

Info

Publication number
CN215211489U
CN215211489U CN202120423946.4U CN202120423946U CN215211489U CN 215211489 U CN215211489 U CN 215211489U CN 202120423946 U CN202120423946 U CN 202120423946U CN 215211489 U CN215211489 U CN 215211489U
Authority
CN
China
Prior art keywords
baffle
base
wall
basement
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120423946.4U
Other languages
Chinese (zh)
Inventor
庞拓
郭瑞兴
杨俊�
张田庆
唐红源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120423946.4U priority Critical patent/CN215211489U/en
Application granted granted Critical
Publication of CN215211489U publication Critical patent/CN215211489U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an ultrahigh brick fetal membrane structure for basement, which comprises a base, wherein one side of the top end of the base is provided with a plurality of baffles in an inserting way, one side wall of each baffle is fixedly provided with a clamping strip, the other side wall of each baffle is provided with a clamping groove, adjacent baffles are connected through the clamping strips and the clamping grooves in a clamping way, one side wall of each baffle is fixedly provided with a reinforcing strip, the top of the base is provided with two grooves, and a mold wall is fixedly arranged in each groove; the utility model has the advantages that: the utility model relates to an ultra-high brick fetal membrane structure for basement can fix the reinforcement to the bottom of mould wall through the base, can support the reinforcement to the mould wall through the baffle, and adjacent baffle is connected through card strip and draw-in groove block, can consolidate the baffle through consolidating the strip, can pour into a mould the construction material through the pouring chamber, and the slope form design through a base lateral wall can make in the outside water of basement is difficult to permeate the base, and overall structure's stability is better, can build higher height.

Description

A super high brick fetal membrane structure for basement
Technical Field
The utility model relates to a brick fetal membrane structure, in particular to super high brick fetal membrane structure for basement.
Background
The brick bed course membrane is generally used for the side wall of a basement bottom plate, because the outer waterproof layer is required to be waterproof on a cushion layer, and the waterproof layer extends to the brick bed course membrane, so that after concrete is poured later, the waterproof layer can be turned up to the side wall concrete wall, if the side wall of the bottom plate uses a template, the waterproof layer cannot be waterproof, a method of using bricks as the template is adopted, and in addition, a method of using bricks to replace a common template is also adopted in places where the template cannot be removed or the difficulty in removal is very large after the concrete is poured. Conventional membrane structures are typically built at low heights and when high, they are less stable due to lack of support and reinforcement measures.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an ultra-high brick fetal membrane structure for basement to solve the common brick fetal membrane structure that proposes in the above-mentioned background art and build the relatively poor problem of stability when high.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an ultrahigh brick fetal membrane structure for basement, includes the base, a plurality of baffle is installed in pegging graft in one side on base top, a lateral wall of baffle is fixed and is provided with the card strip, the draw-in groove has been seted up to another lateral wall of baffle, and is adjacent the baffle passes through card strip and draw-in groove block to be connected, a lateral wall fixed mounting of baffle has the reinforcement strip, two recesses have been seted up at the top of base, fixed mounting has the mould wall, two in the recess constitute the pouring chamber between the mould wall.
As an optimal technical scheme of the utility model, concrete fixed mounting is passed through in the recess in the bottom of mould wall.
As an optimal technical scheme of the utility model, the reinforcing strip is through a plurality of rivet respectively with a plurality of baffle fixed connection.
As a preferred technical scheme of the utility model, it is provided with two, one of them to consolidate the strip and be located the top of a baffle lateral wall, another it is located the middle part of a baffle lateral wall to consolidate the strip.
As a preferred technical scheme of the utility model, the top of a lateral wall of base sets up to the slope form.
As an optimized technical scheme of the utility model, the mould wall is piled up by a plurality of bricks and is built and constitute.
As an optimal technical scheme of the utility model, the bottom of baffle is provided with grafting portion, the baffle passes through grafting portion and base plug-in connection.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to an ultra-high brick fetal membrane structure for basement can fix the reinforcement to the bottom of mould wall through the base, can support the reinforcement to the mould wall through the baffle, and adjacent baffle is connected through card strip and draw-in groove block, can consolidate the baffle through consolidating the strip, can pour into a mould the construction material through the pouring chamber, and the slope form design through a base lateral wall can make in the outside water of basement is difficult to permeate the base, and overall structure's stability is better, can build higher height.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic sectional structure of the present invention;
fig. 3 is an enlarged schematic view of a portion a of fig. 1.
In the figure: 1. a base; 101. a groove; 102. a tilted shape; 2. a baffle plate; 201. clamping the strip; 202. a card slot; 203. a plug-in part; 3. reinforcing the strips; 4. wall molding; 401. a brick block; 5. concrete; 6. riveting; 7. and (4) pouring a cavity.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, the utility model provides an ultrahigh brick fetal membrane structure for basement, which comprises a base 1, can fix the reinforcement to the bottom of mould wall 4 through base 1, one side grafting on 1 top of base installs a plurality of baffle 2, can support the reinforcement to mould wall 4 through baffle 2, a fixed card strip 201 that is provided with of a lateral wall of baffle 2, draw-in groove 202 has been seted up to another lateral wall of baffle 2, adjacent baffle 2 is connected through card strip 201 and draw-in groove 202 block, a lateral wall fixed mounting of baffle 2 has reinforcing strip 3, can consolidate baffle 2 through reinforcing strip 3, two recesses 101 have been seted up at the top of base 1, fixed mounting has mould wall 4 in the recess 101, constitute pouring chamber 7 between two mould walls 4, pouring chamber 7 is used for the pouring to build the material.
Preferably, the bottom of mould wall 4 is through concrete 5 fixed mounting in recess 101, it is respectively with a plurality of baffle 2 fixed connection to reinforce strip 3 through a plurality of rivet 6, it is provided with two to reinforce strip 3, one of them reinforces strip 3 and is located the top of 2 lateral walls of baffle, another reinforces strip 3 and is located the middle part of 2 lateral walls of baffle, the top of 1 lateral wall of base sets up to slope form 102, slope form 102 design through 1 lateral wall of base can make in the outside water of basement is difficult in order to permeate base 1, mould wall 4 comprises a plurality of bricks 401 piling up, the bottom of baffle 2 is provided with grafting portion 203, baffle 2 is through grafting portion 203 and 1 plug connection of base.
When specifically using, the utility model relates to an ultrahigh brick fetal membrane structure for basement, can fix the reinforcement to the bottom of mould wall 4 through base 1, can support the reinforcement to mould wall 4 through baffle 2, adjacent baffle 2 is connected through card strip 201 and draw-in groove 202 block, can consolidate baffle 2 through reinforcing strip 3, can pour into a mould through pouring into a mould chamber 7 and build the material, slope form 102 design through 1 lateral wall of base can make in the outside water of basement is difficult in order to permeate base 1, overall structure's stability is better, can build higher height.
In the description of the present invention, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an ultrahigh brick fetal membrane structure for basement, includes base (1), its characterized in that, a plurality of baffle (2) are installed in the grafting of one side on base (1) top, a lateral wall of baffle (2) is fixed and is provided with card strip (201), draw-in groove (202) have been seted up to another lateral wall of baffle (2), and are adjacent baffle (2) are connected through card strip (201) and draw-in groove (202) block, a lateral wall fixed mounting of baffle (2) has reinforcing strip (3), two recess (101) have been seted up at the top of base (1), recess (101) internal fixation installs mould wall (4), two constitute pouring chamber (7) between mould wall (4).
2. The ultra-high brick moulding bed structure for the basement according to claim 1, wherein: the bottom of the mould wall (4) is fixedly arranged in the groove (101) through concrete (5).
3. The ultra-high brick moulding bed structure for the basement according to claim 1, wherein: the reinforcing strip (3) is fixedly connected with the plurality of baffles (2) through a plurality of rivets (6).
4. The ultra-high brick moulding bed structure for the basement according to claim 1, wherein: the number of the reinforcing strips (3) is two, one of the reinforcing strips (3) is located at the top of one side wall of the baffle (2), and the other reinforcing strip (3) is located in the middle of one side wall of the baffle (2).
5. The ultra-high brick moulding bed structure for the basement according to claim 1, wherein: the top of one side wall of the base (1) is arranged to be inclined (102).
6. The ultra-high brick moulding bed structure for the basement according to claim 1, wherein: the mould wall (4) is formed by piling a plurality of bricks (401).
7. The ultra-high brick moulding bed structure for the basement according to claim 1, wherein: the bottom of baffle (2) is provided with grafting portion (203), baffle (2) are through grafting portion (203) and base (1) plug connection.
CN202120423946.4U 2021-02-26 2021-02-26 A super high brick fetal membrane structure for basement Expired - Fee Related CN215211489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120423946.4U CN215211489U (en) 2021-02-26 2021-02-26 A super high brick fetal membrane structure for basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120423946.4U CN215211489U (en) 2021-02-26 2021-02-26 A super high brick fetal membrane structure for basement

Publications (1)

Publication Number Publication Date
CN215211489U true CN215211489U (en) 2021-12-17

Family

ID=79440946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120423946.4U Expired - Fee Related CN215211489U (en) 2021-02-26 2021-02-26 A super high brick fetal membrane structure for basement

Country Status (1)

Country Link
CN (1) CN215211489U (en)

Similar Documents

Publication Publication Date Title
CN215211489U (en) A super high brick fetal membrane structure for basement
CN210282675U (en) Concrete prefabricated member forming die
CN211341396U (en) Building block, building block manufacturing device and constructional column mold
CN214885479U (en) Novel assembled turnover mould shell for building
CN210282666U (en) Hard concrete test block forming device futilely
CN210362269U (en) Mold of dustbin
CN110439279A (en) One kind is floatd window formwork-strengthening system and its construction method
CN211054017U (en) Forming die of roasting kiln flashboard
CN210453130U (en) Mould for making blank of baked brick
CN209855061U (en) High-performance cement-based cushion block
CN218905760U (en) Socket-and-spigot type prefabricated brick moulding bed
CN212984641U (en) Quick reinforced structure of template is pour to building subject
CN212795346U (en) Template is pour to assembled stair
CN216007544U (en) Structural column formwork-free component
CN211806921U (en) Fixing seat for fixing reinforcing steel bar layer in prefabricated part forming die
CN211775714U (en) Wall pouring formwork set
CN209760574U (en) Gypsum mould box with built-in reinforcing structure
CN214460658U (en) Raft post-cast strip construction structure
CN220261371U (en) Recycled concrete precast pile forming die
CN213226773U (en) Integral sand mold structure for fused zirconia-corundum bricks
CN213268601U (en) Plate thickness and concrete protective layer thickness integrated controller and manufacturing die
CN217948750U (en) Bridge side flange structure and box girder
CN212802062U (en) Connecting piece for cast-in-place concrete sandwich heat-insulation wallboard
CN213837726U (en) Reinforced concrete post preparation auxiliary device for building
CN219599876U (en) Mould is used in light brick production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211217

CF01 Termination of patent right due to non-payment of annual fee