CN215211107U - Water baffle for road construction - Google Patents
Water baffle for road construction Download PDFInfo
- Publication number
- CN215211107U CN215211107U CN202120607012.6U CN202120607012U CN215211107U CN 215211107 U CN215211107 U CN 215211107U CN 202120607012 U CN202120607012 U CN 202120607012U CN 215211107 U CN215211107 U CN 215211107U
- Authority
- CN
- China
- Prior art keywords
- water baffle
- groove
- road construction
- breakwater
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a road construction water baffle, which comprises a water baffle body and a fixed block hermetically connected with a baffle, wherein the bottom end of the fixed block is welded with more than one fixing nail, and is vertical to the bottom end of the fixed block, the top end of the fixed block is provided with a first groove matched with the thickness of the water baffle body, a first bulge is arranged in the first groove, a second groove matched with the first bulge is arranged at the bottom end of the water baffle body, the top end of the water baffle body is provided with a second bulge matched with the second groove, one side end of the water baffle body is provided with a third groove, a third bulge matched with the third groove is arranged at the other side end of the water baffle body, two connecting blocks are welded on one side of the water baffle body and are positioned on the same straight line, and a supporting rod is rotatably connected to each connecting block; the water baffle for road construction is simple in structure, convenient to use and install and high in adjustability.
Description
Technical Field
The utility model particularly relates to a breakwater for road construction.
Background
Along with the modern continuous development, the country is also building the road vigorously, if the road is built in a flat terrain or low-lying place, a foundation pit needs to be excavated on the ground, because the foundation pit is supposed to be lower than the terrain of the surrounding environment, rainwater and stagnant water in the surrounding environment are easy to gather in a roadbed foundation pit, accumulated water is formed in the foundation pit, if the rainwater is not blocked at an inlet and an outlet of the road construction in time, and when the water flows into the road to be built, the water needs to be cleaned, so that the engineering progress of the road construction is delayed, the difficulty in cleaning the water is complex, and the water retaining plate for road construction on the market at present is fixed in structure, complex and inconvenient to use and install.
Disclosure of Invention
In view of this, the utility model aims at providing a road construction water baffle that simple structure, use simple to operate, adjustability are high.
In order to solve the technical problem, the utility model discloses a technical scheme is:
the utility model provides a breakwater for road construction, includes the breakwater body, reaches the fixed block with baffle sealing connection, the welding of fixed block bottom has the staple, the staple sets up more than one, and is mutually perpendicular with the fixed block bottom, the fixed block top is equipped with the first recess with breakwater body thickness matched with, be provided with first arch in the first recess, breakwater body bottom is provided with the second recess with first protruding matched with, breakwater body top is provided with the second arch with second recess matched with, breakwater body one side is provided with the third recess, breakwater body another side is provided with the third arch with third recess matched with, breakwater body one side welding has two connecting blocks, and two connecting blocks are located same straight line, it is connected with the bracing piece to rotate on the connecting block.
Preferably, the fixing nails at the bottom ends of the fixing blocks are positioned on the same straight line, and the fixing nails are uniformly distributed.
Furthermore, the first groove is in interference fit connection with the bottom end of the water baffle body, and a first sealing strip is arranged at the joint of the bottom end of the water baffle body and the first groove.
Furthermore, the second groove is in interference fit connection with the first protrusion, and a second sealing strip is arranged at the joint of the second groove and the first protrusion.
Preferably, the height of the first protrusion is lower than the height of the first groove.
Further, a third sealing strip is arranged in the third groove.
Furthermore, the thickness of the second bulge and the third bulge is set to be one third of the thickness of the water baffle body.
Preferably, the length of the supporting rod is longer than the total height of the water baffle body after the water baffle body is inserted into the fixing block.
Furthermore, warning stripes are arranged on the opposite surfaces of the welding connection blocks of the water baffle body.
The utility model discloses technical effect mainly embodies in following aspect:
through the structure of optimizing the breakwater, improve the convenience of breakwater in the use, in the time of can height-adjusting, also further improve the probability of breakwater lower part infiltration, increase the waterproof function of waterproof board, and simultaneously, also make things convenient for the fixing between the adjacent baffler, the design of bracing piece makes the breakwater more firm on the one hand, on the other hand can also adjust the angle on breakwater and ground, overall structure easy operation can be fixed with ground fast, the leakproofness is strong, practical application is effectual.
Drawings
FIG. 1 is a schematic view of the whole structure of the water baffle for road construction of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is the utility model discloses a have a breakwater mosaic structure schematic diagram for road construction.
Detailed Description
The following detailed description of the embodiments of the present invention is made with reference to the accompanying drawings, so that the technical solution of the present invention can be more easily understood and grasped.
Referring to fig. 1-3, a road construction water baffle comprises a water baffle body 1 and a fixing block 2 hermetically connected with the baffle, wherein fixing nails 3 are welded at the bottom end of the fixing block 2, more than one fixing nail 3 is arranged and is perpendicular to the bottom end of the fixing block 2, a first groove 4 matched with the thickness of the water baffle body 1 is arranged at the top end of the fixing block 2, a first bulge 5 is arranged in the first groove 4, a second groove 6 matched with the first bulge 5 is arranged at the bottom end of the water baffle body 1, a second bulge 7 matched with the second groove 6 is arranged at the top end of the water baffle body 1, a second water baffle 16 can be installed according to actual requirements to increase the water baffle height, a third groove 8 is arranged at one side end of the water baffle body 1, a third bulge 9 matched with the third groove 8 is arranged at the other side end of the water baffle body 1, one side of the water baffle body 1 is welded with two connecting blocks 10, the two connecting blocks 10 are positioned on the same straight line, and the connecting blocks 10 are rotatably connected with a supporting rod 11.
The fixing nails 3 at the bottom ends of the fixing blocks 2 are positioned on the same straight line, the fixing nails 3 are uniformly distributed, the first groove 4 is in interference connection with the bottom end of the water baffle body 1, and a first sealing strip 12 is arranged at the joint of the bottom end of the water baffle body 1 and the first groove 4.
The second groove 6 is in interference connection with the first protrusion 5, a second sealing strip 13 is arranged at the joint of the second groove 6 and the first protrusion 5, when the water baffle is used, the bottom end of the water baffle body 1 is inserted into the fixing block 2, the first groove 4 is in interference connection with the bottom end of the water baffle body 1, the second groove 6 is in interference connection with the first protrusion 5, and the whole water baffle body 1 is connected with the fixing block 2 more firmly.
The height of the first bulge 5 is lower than that of the first groove 4, a third sealing strip 14 is arranged in the third groove 8, a same third water baffle 17 can be connected at the adjacent position in a sealing mode, and the thickness of the second bulge 7 and the thickness of the third bulge 9 are set to be one third of that of the water baffle body 1.
The length of the support rod 11 is longer than the total height of the water baffle body 1 after the water baffle body 1 is inserted into the fixing block 2, and warning stripes 15 are arranged on the opposite surfaces of the water baffle body 1 and the welding connecting blocks 10.
The utility model discloses technical effect mainly embodies in following aspect:
through the structure of optimizing the breakwater, improve the convenience of breakwater in the use, in the time of can height-adjusting, also further improve the probability of breakwater lower part infiltration, increase the waterproof function of waterproof board, and simultaneously, also make things convenient for the fixing between the adjacent baffler, the design of bracing piece makes the breakwater more firm on the one hand, on the other hand can also adjust the angle on breakwater and ground, overall structure easy operation can be fixed with ground fast, the leakproofness is strong, practical application is effectual.
The above embodiments of the present invention are not right the utility model discloses the limited protection scope, the utility model discloses an embodiment is not limited to this, all kinds of basis according to the above-mentioned of the utility model discloses an under the above-mentioned basic technical thought prerequisite of the utility model, right according to ordinary technical knowledge and the conventional means in this field the modification, replacement or the change of other multiple forms that above-mentioned structure made all should fall within the protection scope of the utility model.
Claims (9)
1. The utility model provides a breakwater for road construction which characterized in that: including the breakwater body, and with baffle sealing connection's fixed block, the welding of fixed block bottom has the staple, the staple sets up more than one, and is mutually perpendicular with the fixed block bottom, the fixed block top is equipped with the first recess with breakwater body thickness matched with, be provided with first arch in the first recess, breakwater body bottom is provided with the second recess with first protruding matched with, breakwater body top is provided with the second arch with second recess matched with, breakwater body one side is provided with the third recess, breakwater body another side is provided with the third arch with third recess matched with, breakwater body one side welding has two connecting blocks, and two connecting blocks are located same straight line, it is connected with the bracing piece to rotate on the connecting block.
2. The water deflector for road construction according to claim 1, wherein: the staple of fixed block bottom is located same straight line, and each the staple is evenly arranged.
3. The water deflector for road construction according to claim 1, wherein: the first groove is in interference connection with the bottom end of the water baffle body, and a first sealing strip is arranged at the connection position of the bottom end of the water baffle body and the first groove.
4. The water deflector for road construction according to claim 3, wherein: the second groove is in interference connection with the first protrusion, and a second sealing strip is arranged at the joint of the second groove and the first protrusion.
5. The water deflector for road construction according to claim 4, wherein: the height of the first protrusion is lower than that of the first groove.
6. The water deflector for road construction according to claim 5, wherein: and a third sealing strip is arranged in the third groove.
7. The water deflector for road construction according to claim 6, wherein: the thickness of the second bulge and the third bulge is set to be one third of that of the water baffle body.
8. The water deflector for road construction according to claim 1, wherein: the length of the supporting rod is longer than the total height of the water baffle body after the water baffle body is inserted into the fixing block.
9. The water deflector for road construction according to claim 8, wherein: and warning stripes are arranged on the opposite surfaces of the welding connection blocks of the water baffle body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120607012.6U CN215211107U (en) | 2021-03-25 | 2021-03-25 | Water baffle for road construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120607012.6U CN215211107U (en) | 2021-03-25 | 2021-03-25 | Water baffle for road construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215211107U true CN215211107U (en) | 2021-12-17 |
Family
ID=79444294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120607012.6U Active CN215211107U (en) | 2021-03-25 | 2021-03-25 | Water baffle for road construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215211107U (en) |
-
2021
- 2021-03-25 CN CN202120607012.6U patent/CN215211107U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215211107U (en) | Water baffle for road construction | |
CN211923267U (en) | Architectural design roof eaves mouth waterproof construction | |
CN213358642U (en) | Ecological slope protection for water and soil conservation | |
CN207597186U (en) | Draining road dental structure | |
CN209457026U (en) | Geotechnical engineering side slope drainage structure | |
CN211973769U (en) | Preset concrete escape canal | |
CN210713163U (en) | Self-collecting sludge self-cleaning pump station base | |
CN208329407U (en) | A kind of assembling type steel structure open valley water-falling structure | |
CN211499122U (en) | Highway subgrade drainage device | |
CN213061902U (en) | Ecological environment-friendly water conservancy bank protection | |
CN220133294U (en) | Drainage gutter for steel structure building roof | |
CN220166798U (en) | Hydraulic engineering retaining wall | |
CN208668200U (en) | It is a kind of to be used for the infiltration bread brick that road surface pattern is laid with label layer | |
CN219080369U (en) | Road slope protection brick and road slope protection | |
CN215668826U (en) | Water accumulation structure is prevented with road to hydraulic design | |
CN210002528U (en) | kinds of garden drainage channel | |
CN211947757U (en) | Highway engineering road bed drainage structures | |
CN209412646U (en) | A kind of PC Stone brick | |
CN218508229U (en) | Double-column type assembled pier | |
CN218562528U (en) | Connecting cover plate, cover plate assembly and drainage system | |
CN204783109U (en) | Wear drainage mechanism in formula tunnel down | |
CN211848689U (en) | Afforestation road surface drainage brick | |
CN210737938U (en) | Flow dispersing port | |
CN209443325U (en) | A kind of pumping station stone institutional framework applied to sponge city | |
CN208280116U (en) | One kind being used for the U-shaped net of preventing and fixing sand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |