- CN218508229U CN218508229U CN202222726832.4U CN202222726832U CN218508229U CN 218508229 U CN218508229 U CN 218508229U CN 202222726832 U CN202222726832 U CN 202222726832U CN 218508229 U CN218508229 U CN 218508229U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- pier
- groove
- connecting seat
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model belongs to the technical field of the pier, especially, be a double-column type assembled pier, including the base, the connecting seat is installed down at the top of base, and a cylinder is connected to the upper end of lower connecting seat, and the top of cylinder is connected with the assembly cylinder, and the top of assembly cylinder is connected with the top cylinder, and the upper end of top cylinder is provided with the mount pad, and the junction of cylinder, assembly cylinder and top cylinder is provided with respectively assembles the structure, and the inside of mount pad is provided with drainage structure and dismouting structure respectively, and the bottom fixed mounting of mount pad has last connecting seat. The utility model discloses a structure is assembled in the setting, can reach and realize that each cylinder assembles fast, and the cylinder of having solved current pier causes the whole overweight of cylinder and leads to the problem of installation difficulty for a whole, and simultaneously, spacing bounding wall can effectually play spacing effect when the assembly, makes it ensure the regularity nature after each cylinder assembly to guaranteed that the post-assembly cylinder is the vertical state.
Description
Technical Field
The utility model relates to a pier technical field specifically is a double column type assembled pier.
Background
The pier is a sub-building for supporting the bridge span structure and transmitting the dead load and the live load of the vehicle to the foundation, the abutment is arranged at two sides of the bridge, the pier is used for supporting the bridge span structure and is also connected with the embankment and preventing the embankment from sliding, in order to protect the abutment and the embankment, soil is filled, protection and diversion projects are usually arranged at two sides of the abutment, the pier mainly comprises a top cap and a pier body, along with the continuous development of economy, the pier is widely used, the types of the pier are numerous according to different use places, and can be divided into a solid type, a hollow type or a column type, and the column type can be divided into a single column type and a double column type.
The prior art has the following problems:
1. the existing double-column pier has the advantages that the columns are integrated, the columns are poured by reinforced concrete, and the weight of the columns is too heavy, so that the installation is difficult, the working strength and the working difficulty of workers during installation are increased, and certain potential safety hazards also exist;
2. the existing double-column type bridge pier is not provided with a drainage structure, and in rainy days, rainwater in the mounting seat preset groove flows into the joints of all parts along the external edge of the bridge pier in a turbulent manner, so that the joints are corroded by the rainwater to cause the joints to be loose, the safety of the bridge pier in use is reduced, and the service time of the bridge pier is also reduced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a double column type assembled pier has solved the cylinder that exists double column type pier today and is a whole, and the cylinder adopts reinforced concrete to pour, and its weight is overweight, makes it lead to the installation difficulty, working strength and the work degree of difficulty when having increased the staff installation to and during the rainy day, the rainwater in the mount pad pre-determined groove then flows in each partial junction along the outside indiscriminate stream in pier, make the junction receive the rainwater corruption and lead to the not hard up problem of junction.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a two-column type assembled pier, includes the base, the connecting seat is installed down at the top of base, the upper end of connecting seat is connected with end cylinder down, the top of end cylinder is connected with the assembly cylinder, the top of assembly cylinder is connected with the ejection of compact cylinder, the upper end of ejection of compact cylinder is provided with the mount pad, the junction of end cylinder, assembly cylinder and ejection of compact cylinder is provided with the structure of assembling respectively, the inside of mount pad is provided with drainage structure and dismouting structure respectively, and the bottom fixed mounting of mount pad has last connecting seat, horizontal reinforcing bar and slant reinforcing bar are all installed to the inside of end cylinder, assembly cylinder and ejection of compact cylinder.
As a preferred technical scheme of the utility model, it includes spacing bounding wall, board groove and filling hole to assemble the structure, spacing bounding wall sets up respectively on the outer table wall upper portion of end cylinder body, assembly cylinder body and fore-set, spacing bounding wall top is arranged in to the board groove, and the interior table wall in board groove installs the butt joint seat, the draw-in groove has been seted up to the inside of butt joint seat, the inside of draw-in groove runs through there is the fixture block, the quantity of fixture block is a plurality of, and the fixture block symmetry respectively sets up on the outer table wall of end cylinder body, assembly cylinder body, fore-set body and last connecting seat.
As the utility model discloses a preferred technical scheme, drainage structures includes water leakage groove, communicating pipe and drain pipe, the water leakage groove sets up at the top of mount pad, and installs the filter sieve on the inside of water leakage groove, the bottom of water leakage groove is connected with the downcomer, the downcomer sets up on the lateral wall of communicating pipe, the drain pipe symmetry sets up the bottom at communicating pipe.
As a preferred technical scheme of the utility model, the dismouting structure includes the fixed block, the slot has been seted up to the inside of fixed block, the inside of slot is inserted and is equipped with the inserted block, the top of inserted block is connected with the filtration sieve.
As a preferred technical scheme of the utility model, the interior table wall of lower connecting seat is provided with the abaculus, the caulking groove has been seted up to the outside of abaculus and the bottom that is located the end column body.
As a preferred technical scheme of the utility model, the quantity of filling hole is a plurality of groups, and the filling hole sets up respectively on the preceding table wall of spacing bounding wall and lower connecting seat.
Compared with the prior art, the utility model provides a double column formula assembled pier possesses following beneficial effect:
1. this a double column formula assembled pier, assemble the structure through the setting, it is by spacing bounding wall to assemble the structure, the board groove, the butt joint seat, the draw-in groove, fixture block and filling hole are constituteed, when installing the pier, in the draw-in groove of seting up in the butt joint seat is gone into to the fixture block card, can realize that each cylinder assembles fast, the cylinder of having solved current pier is a whole problem that causes the whole weight of cylinder overweight and lead to the installation difficulty, and simultaneously, the exterior wall upper end of each cylinder is equipped with spacing bounding wall, can effectually play spacing effect when the assembly, make it ensure the alignment nature after each cylinder assembly, thereby guaranteed that the post-assembling cylinder is the vertical condition, prevented that the post-assembling cylinder is the slope form and lead to taking place the phenomenon of empting after using a period, the security when using has been strengthened, furthermore, after assembling, pour into the adhesive into to the filling hole, can further strengthen the fastness after each cylinder assembly, make it guarantee the live time of pier.
2. This a double column formula assembled pier, through setting up drainage structures and dismouting structure, drainage structures is by the water leakage groove, filter the sieve, the downcomer, communicating pipe and drain pipe are constituteed, the dismouting structure is by the fixed block, slot and inserted block are constituteed, when the pier uses, rainwater in the mount pad predetermined groove flows into in the downcomer through the water leakage groove, flow into in the communicating pipe after that, discharge from the drain pipe at last, make this pier have the drainage function, prevented that rainwater in the recess from causing along the border random flow and flowing into each cylinder junction and lead to the poor problem of adhesive bonding effect, when drainage, the rainwater at first filters through filtering the sieve, prevent to contain in the rainwater in the debris admission line and lead to causing the phenomenon of jam, furthermore, through the fixed block, the cooperation of slot and inserted block, can realize dismantling filter the sieve, can wash filtering the sieve, and is simple in operation convenient, the drainage effect of pier has been guaranteed.
Drawings
Fig. 1 is a schematic plan sectional view of the present invention;
FIG. 2 is an enlarged view of the assembly structure of the present invention;
FIG. 3 is an enlarged schematic view of the drainage structure of the present invention;
FIG. 4 is a schematic view of the detachable structure of the present invention;
FIG. 5 is a perspective view of the assembled cylinder of the present invention;
fig. 6 is a perspective view of the whole appearance of the present invention.
In the figure: 1. a base; 2. a lower connecting seat; 3. a base cylinder; 4. assembling a column body; 5. a top column; 6. A mounting base; 7. assembling the structure; 71. limiting enclosing plates; 72. a plate groove; 73. a docking station; 74. a card slot; 75. a clamping block; 76. an injection hole; 8. a drainage structure; 81. a water leakage groove; 82. filtering the sieve plate; 83. a sewer pipe; 84. a communicating pipe; 85. a drain pipe; 9. a disassembly and assembly structure; 91. a fixed block; 92. inserting slots; 93. Inserting a block; 10. an upper connecting seat; 11. transverse reinforcing steel bars; 12. oblique reinforcing steel bars; 13. an insert block; 14. and (5) caulking the groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, in the present embodiment: the utility model provides a double column formula assembled pier, the on-line screen storage device comprises a base 1, connecting seat 2 is installed down at base 1's top, connecting seat 2 is used for being connected of base 1 and bottom column body 3 down, bottom column body 3 is connected to the upper end of lower connecting seat 2, the top of bottom column body 3 is connected with assembly cylinder 4, the top of assembly cylinder 4 is connected with top column body 5, the upper end of top column body 5 is provided with mount pad 6, bottom column body 3, the junction of assembly cylinder 4 and top column body 5 is provided with respectively assembles structure 7, it is used for the assembly of each cylinder to assemble structure 7, the inside of mount pad 6 is provided with drainage structures 8 and dismouting structure 9 respectively, drainage structures 8 can make this pier have the drainage function, and the bottom fixed mounting of mount pad 6 has last connecting seat 10, it is used for being connected of mount pad 6 and top column body 5 to go up connecting seat 10, bottom column body 3, horizontal reinforcing bar 11 and slant reinforcing bar 12 are all installed to the inside of assembly cylinder 4 and top column body 5, the overall strength of horizontal reinforcing bar 11 and slant reinforcing bar 12 can strengthen the cylinder.
In this embodiment, the assembling structure 7 includes a limiting surrounding plate 71, a plate groove 72 and an injection hole 76, the limiting surrounding plate 71 is respectively disposed on the upper portions of the outer surface walls of the bottom column 3, the assembling column 4 and the top column 5, the plate groove 72 is disposed on the top of the limiting surrounding plate 71, the abutting seat 73 is mounted on the inner surface wall of the plate groove 72, a clamping groove 74 is disposed inside the abutting seat 73, clamping blocks 75 penetrate through the clamping groove 74, the number of the clamping blocks 75 is several, and the clamping blocks 75 are respectively symmetrically disposed on the outer surface walls of the bottom column 3, the assembling column 4, the top column 5 and the upper connecting seat 10, so that each column can be rapidly assembled, the problem that the installation is difficult due to the fact that the whole weight of the column is too heavy as a whole existing pier is solved, and meanwhile, the limiting surrounding plate 71 is disposed to effectively play a limiting role, so that the column can be assembled neatly; the drainage structure 8 comprises a water leakage groove 81, a communication pipe 84 and a drainage pipe 85, wherein the water leakage groove 81 is arranged at the top of the mounting seat 6, a filtering sieve plate 82 is arranged at the upper end inside the water leakage groove 81, the bottom of the water leakage groove 81 is connected with a drainage pipe 83, the drainage pipe 83 is arranged on the outer side wall of the communication pipe 84, the drainage pipes 85 are symmetrically arranged at the bottom of the communication pipe 84, rainwater in a preset groove of the mounting seat 6 flows into the drainage pipe 83 through the water leakage groove 81, then flows into the communication pipe 84, and finally is discharged from the drainage pipe 85, so that the pier has a drainage function, the problem that the rainwater in the groove flows into the connection position of each column along the edge in a random manner to cause poor adhesive effect is solved, the filtering sieve plate 82 can filter sundries contained in the rainwater, and the pipeline is prevented from being blocked; the dismounting structure 9 comprises a fixing block 91, a slot 92 is formed in the fixing block 91, an insertion block 93 is inserted into the slot 92, the top of the insertion block 93 is connected with the filter sieve plate 82, the filter sieve plate 82 can be dismounted through the matching of the fixing block 91, the slot 92 and the insertion block 93, the filter sieve plate 82 can be cleaned, and the drainage effect of the pier is guaranteed; the inner surface wall of the lower connecting seat 2 is provided with an embedded block 13, an embedded groove 14 is formed outside the embedded block 13 and at the bottom of the bottom column body 3, and the lower connecting seat 2 can be connected with the bottom column body 3 through the matching of the embedded block 13 and the embedded groove 14; the quantity of filling hole 76 is a plurality of groups, and the filling hole 76 sets up respectively on spacing bounding wall 71 and the preceding table wall of connecting seat 2 down, through filling hole 76, can pour into the adhesive into the junction to the fastness of each junction connection has been guaranteed.
The utility model discloses a theory of operation and use flow: the staff is at first placed base 1 in required mounted position, through hoist device with the fore-set column body 3 after that, a plurality of assembly cylinder 4 and top cylinder body 5 assemble in proper order, during the assembly, in the draw-in groove 74 of seting up in the fixture block 75 card income butt joint seat 73, can realize that each cylinder assembles fast, and simultaneously, be equipped with spacing bounding wall 71 and can effectually play spacing effect, make it ensure the regularity nature after each cylinder assembly, after the assembly, pour the concrete into it, pour the completion back, install mount pad 6 on top cylinder body 5 through hoist device, finally, pour into the adhesive into injection hole 76, can further strengthen the fastness after each cylinder assembly, in addition. In rainy days, rainwater in the preset groove of the mounting seat 6 flows into the sewer pipe 83 through the water leakage groove 81, then flows into the communicating pipe 84, and finally is discharged from the drain pipe 85, so that the pier has a drainage function, the problem that the rainwater in the groove flows into the joint of each column along the edge in a random manner to cause poor adhesive bonding effect is solved, and during drainage, the rainwater is firstly filtered through the filtering sieve plate 82 to prevent impurities in the rainwater from entering the pipeline to cause blockage.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a double column formula assembled pier, includes base (1), its characterized in that: the connecting seat is characterized in that a lower connecting seat (2) is installed at the top of the base (1), a bottom cylinder (3) is connected to the upper end of the lower connecting seat (2), an assembling cylinder (4) is connected to the top of the bottom cylinder (3), a top cylinder (5) is connected to the top of the assembling cylinder (4), a mounting seat (6) is arranged at the upper end of the top cylinder (5), splicing structures (7) are respectively arranged at the joints of the bottom cylinder (3), the assembling cylinder (4) and the top cylinder (5), a drainage structure (8) and a dismounting structure (9) are respectively arranged inside the mounting seat (6), an upper connecting seat (10) is fixedly installed at the bottom of the mounting seat (6), and transverse reinforcing steel bars (11) and oblique reinforcing steel bars (12) are respectively installed inside the bottom cylinder (3), the assembling cylinder (4) and the top cylinder (5).
2. The double-post fabricated pier of claim 1, wherein: assemble structure (7) including spacing bounding wall (71), board groove (72) and filling hole (76), spacing bounding wall (71) set up respectively on end cylinder (3), assembly cylinder (4) and top cylinder (5) exterior wall upper portion, spacing bounding wall (71) top is arranged in board groove (72), and the interior table wall of board groove (72) installs docking seat (73), draw-in groove (74) have been seted up to docking seat (73) inside, the inside of draw-in groove (74) is run through fixture block (75), the quantity of fixture block (75) is a plurality of, and fixture block (75) symmetry respectively sets up on the exterior wall of end cylinder (3), assembly cylinder (4), top cylinder (5) and last connecting seat (10).
3. The double-post fabricated pier of claim 1, wherein: the drainage structure (8) comprises a water leakage groove (81), a communicating pipe (84) and a drainage pipe (85), wherein the water leakage groove (81) is arranged at the top of the mounting seat (6), a filtering sieve plate (82) is arranged at the upper end inside the water leakage groove (81), a sewer pipe (83) is connected to the bottom of the water leakage groove (81), the sewer pipe (83) is arranged on the outer side wall of the communicating pipe (84), and the drainage pipe (85) is symmetrically arranged at the bottom of the communicating pipe (84).
4. The double-post fabricated pier of claim 1, wherein: dismouting structure (9) are including fixed block (91), slot (92) have been seted up to the inside of fixed block (91), insert in the inside of slot (92) and be equipped with inserted block (93), the top of inserted block (93) is connected with filtration sieve (82).
5. The double-post assembled pier as claimed in claim 1, wherein: an embedded block (13) is arranged on the inner surface wall of the lower connecting seat (2), and an embedded groove (14) is formed in the outer portion of the embedded block (13) and the bottom of the bottom column body (3).
6. The double-post fabricated pier of claim 2, wherein: the number of the injection holes (76) is a plurality of groups, and the injection holes (76) are respectively arranged on the front surface walls of the limiting enclosing plate (71) and the lower connecting seat (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222726832.4U CN218508229U (en) | 2022-10-17 | 2022-10-17 | Double-column type assembled pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222726832.4U CN218508229U (en) | 2022-10-17 | 2022-10-17 | Double-column type assembled pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218508229U true CN218508229U (en) | 2023-02-21 |
Family
ID=85216871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222726832.4U Active CN218508229U (en) | 2022-10-17 | 2022-10-17 | Double-column type assembled pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218508229U (en) |
-
2022
- 2022-10-17 CN CN202222726832.4U patent/CN218508229U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836444B (en) | A kind of drainage ditch cover plate structure of resist fluids impact | |
CN209907985U (en) | Protection device for foundation pit edge | |
CN111519744A (en) | Rainwater collection device for municipal afforestation | |
CN218508229U (en) | Double-column type assembled pier | |
CN210917223U (en) | Hydraulic engineering slope net convenient to installation | |
CN209854460U (en) | Novel railway roadbed drainage device | |
CN209741874U (en) | Ecological bank protection of prefabricated brick | |
CN212896754U (en) | Novel water drainage tank for highway engineering device | |
CN209457026U (en) | Geotechnical engineering side slope drainage structure | |
CN209704123U (en) | The ramp of basement parking garage | |
CN217204568U (en) | Anti-blocking filter device for drainage well | |
CN218812985U (en) | Assembled hollow drainage channel tooth | |
CN208874233U (en) | Cable channel cover plate | |
CN215668826U (en) | Water accumulation structure is prevented with road to hydraulic design | |
CN216195253U (en) | Light prefabricated channel cover plate | |
CN220267768U (en) | Drainage blind ditch structure with protective cover | |
CN219410532U (en) | Steel construction drainage of bridge is at cloth covering device | |
CN2929003Y (en) | Water drain base for city road | |
CN218786812U (en) | Bank protection rapid prototyping structure | |
CN214220635U (en) | Post-cast strip baffle and baffle support system supporting structure | |
CN220847923U (en) | Assembled municipal road escape canal | |
CN212335693U (en) | Highway prevents stifled drainage system | |
CN219732253U (en) | Municipal works's inlet for stom water filter equipment | |
CN221193602U (en) | Roadbed slope temporary drainage device | |
CN212223602U (en) | Bridge railing drainage structures with environmental protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |