CN215208030U - Double-hook balance lifting appliance - Google Patents

Double-hook balance lifting appliance Download PDF

Info

Publication number
CN215208030U
CN215208030U CN202120408184.0U CN202120408184U CN215208030U CN 215208030 U CN215208030 U CN 215208030U CN 202120408184 U CN202120408184 U CN 202120408184U CN 215208030 U CN215208030 U CN 215208030U
Authority
CN
China
Prior art keywords
lifting
hook
rope
double
double hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120408184.0U
Other languages
Chinese (zh)
Inventor
刘华林
卿烈富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Donggang New Materials Co ltd
Original Assignee
Sichuan Donggang New Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Donggang New Materials Co ltd filed Critical Sichuan Donggang New Materials Co ltd
Priority to CN202120408184.0U priority Critical patent/CN215208030U/en
Application granted granted Critical
Publication of CN215208030U publication Critical patent/CN215208030U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a balanced hoist of double hook relates to double hook hoist technical field, and it includes jib, lifting hook that are parallel to each other, lifting rope, the stretch cord of being connected with the jib, and the one end of lifting rope, stretch cord is close to the both ends of jib respectively, and the other end interconnect of lifting rope and stretch cord. In an idle state, the device takes the connecting point of the lifting rope and the elastic rope as a lifting point, the lifting point is the gravity center of the whole device, and the suspender and the lifting hook are relatively horizontal, so that the lifting hook is convenient to be inserted into an object to be lifted subsequently; under the state of lifting the object, the elastic rope extends, and the gravity center of the device moves to the connecting point of the lifting rope and the lifting rod, so that the device and the object to be lifted can be smoothly lifted. The operator does not need to manually move the device in the process of hanging the objects, so that the consumption of manpower is relatively reduced, and potential safety hazards are relatively avoided under the condition that the objects to be hung are stacked in multiple layers.

Description

Double-hook balance lifting appliance
Technical Field
The utility model relates to a double hook hoist technical field, concretely relates to balanced hoist of double hook.
Background
The double-hook lifting appliance is generally used for lifting and moving coil rod type rolled articles, the gravity center points of the double-hook lifting appliance are different when the double-hook lifting appliance is in an idle load state and a lifting object state, and a lifting rod and a lifting hook of the double-hook lifting appliance are in a horizontal state when the double-hook lifting appliance is used for lifting the objects; when the double-hook lifting appliance is unloaded, the suspender of the double-hook lifting appliance faces upwards. Therefore, when lifting an object, a crane is required to connect the double hook hanger and move the double hook hanger to a position close to the object to be lifted, an operator approaches the double hook hanger, manually moves the double hook hanger to the horizontal position, inserts the double hook hanger into the hollow part of the coil-like object, and then the crane lifts the double hook hanger together with the object to be lifted and moves the double hook hanger to a required position.
However, the double-hook lifting appliance and the articles to be lifted have large mass, so that labor is consumed to a large extent by using the above method, and in the case that the articles to be lifted are stacked in multiple layers, an operator needs to climb on a lower layer to be lifted to contact and move the double-hook lifting appliance, which also causes great potential safety hazards.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: to the problem that above-mentioned existence, provide one kind and do not need operating personnel manual removal double hook hoist, can be at idle load and the balanced hoist of double hook of automatically regulated focus under the state of hanging the thing.
The utility model adopts the technical scheme as follows:
the utility model provides a balanced hoist of double hook, includes jib, the lifting hook that is parallel to each other, still includes lifting rope, the stretch cord of being connected with the jib, and the one end of lifting rope, stretch cord is close to the both ends of jib respectively, and the other end interconnect of lifting rope and stretch cord, and balanced hoist of double hook is hoisted for the hoisting point by the tie point of lifting rope and stretch cord.
Preferably, the double-hook balance lifting appliance further comprises an extension frame arranged along the extension line of the lifting rod, and the elastic rope is connected with the extension frame.
Preferably, the extension frame is further connected with an auxiliary rope.
Preferably, the tension of the bungee cord is one-half the weight of the hook.
Preferably, the bungee cord has the same original length as the length of the lifting cord.
Preferably, a connecting frame is connected between the hanging rod and the lifting hook, and the connecting frame is arranged close to the elastic rope.
Preferably, the extension bracket is fixed to the connection bracket.
Preferably, the lifting hook is provided with an anti-slip edge.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that: in the no-load state, the device takes the connecting point of the lifting rope and the elastic rope as a lifting point, the lifting point is the gravity center of the whole device, the suspender, the lifting rope and the elastic rope form a triangular stable state, and the suspender and the lifting hook are relatively horizontal, so that the lifting hook can be conveniently inserted into an object to be lifted subsequently; under the state of lifting the object, the elastic rope extends, and the gravity center of the device moves to the connecting point of the lifting rope and the lifting rod, so that the device and the object to be lifted can be smoothly lifted. The operator does not need to manually move the device in the process of hanging the objects, so that the consumption of manpower is relatively reduced, and potential safety hazards are relatively avoided under the condition that the objects to be hung are stacked in multiple layers.
Drawings
Fig. 1 is a schematic structural diagram of a double hook balancing sling.
The labels in the figure are: the lifting device comprises a lifting rod 1, a lifting hook 2, a lifting rope 3, an elastic rope 4, an extension frame 5, an auxiliary rope 6, a connecting frame 7 and an anti-skid edge 8.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1, a double-hook balance hanger includes a suspension rod 1 and two suspension hooks 2 parallel to each other, and further includes a lifting rope 3 and a stretch rope 4 connected to the suspension rod 1, the lifting rope 3 is a chain, the stretch rope 4 is a spring, one end of the lifting rope 3 and one end of the stretch rope 4 are respectively close to two ends of the suspension rod 1, the other end of the lifting rope 3 and the other end of the stretch rope 4 are connected to each other, and the double-hook balance hanger is lifted by using a connection point of the lifting rope 3 and the stretch rope 4 as a lifting point.
Furthermore, the double-hook balance hanger also comprises an extension frame 5 arranged along the extension line of the hanger rod 1, and one end of the elastic rope 4 is tied to the end part of the extension frame 5.
Furthermore, an auxiliary rope 6 is tied on the extension frame 5, one end of the auxiliary rope 6 is close to one end of the elastic rope 4, the other end of the auxiliary rope 6 is held by an operator, and when the double-hook balance hanger breaks the balance state under external force, the operator uses the auxiliary rope 6 to adjust the double-hook balance hanger to enable the double-hook balance hanger to reach the balance state as soon as possible.
Furthermore, the tension of the elastic rope 4 is half of the weight of the lifting hook 2, so that when the double-hook balance lifting appliance lifts an object to be lifted, the elastic rope 4 can be stretched to enable the gravity center of the double-hook balance lifting appliance to move to the connecting point of the lifting rope 3 and the lifting rod 1.
Further, the original length of the elastic rope 4 is the same as the length of the lifting rope 3, the suspender 1, the lifting rope 3 and the elastic rope 4 enclose an isosceles triangle or a regular triangle under the no-load state of the device, and the connection point of the elastic rope 4 and the lifting rope 3 is positioned on the perpendicular line of the suspender 1, so that when the device is in the no-load state and is lifted, the suspender 1 is positioned in the horizontal state, and the lifting hook 2 is also positioned in the horizontal state.
Further, be connected with link 7 between jib 1 and lifting hook 2, link 7 is isosceles triangle or regular triangle, and its apex angle is connected with jib 1, and its two base angles are connected with two lifting hooks 2 respectively, and link 7 is close to stretch cord 4 and sets up.
Furthermore, the extension frame 5 is fixed on the connecting frame 7, and the extension frame 5 is also triangular, so that the stability of the extension frame is ensured.
Further, the upper surface of lifting hook 2 when being located the horizontality evenly is provided with anti-skidding arris 8, and anti-skidding arris 8 on every lifting hook 2 is more than 3, and anti-skidding arris 8 are used for increasing lifting hook 2 and wait to hang the frictional force between the article, and then guarantee to lift by crane stability.
The principles and embodiments of the present invention have been explained herein using specific examples, which are presented only to aid in understanding the methods and their core concepts. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (8)

1. The utility model provides a balanced hoist of double hook, includes jib, lifting hook that are parallel to each other, its characterized in that still includes lifting rope, the stretch cord of being connected with the jib, and the one end of lifting rope, stretch cord is close to the both ends of jib respectively, and the other end interconnect of lifting rope and stretch cord, and balanced hoist of double hook is hoisted for the hoisting point by the tie point of lifting rope and stretch cord.
2. The double hook spreader of claim 1, further comprising an extension bracket disposed along an extension of the hanger bar, the bungee cord being connected to the extension bracket.
3. The double hook balancing sling according to claim 2, wherein an auxiliary rope is further connected to the elongated frame.
4. The double hook balancing sling according to any one of claims 1 to 3, wherein the tensile force of the elastic rope is half the weight of the hook.
5. The double hook balancing sling according to claim 4, wherein the bungee cord has the same original length as the length of the lifting rope.
6. The double hook balancing sling according to claim 2, wherein a connection frame is connected between the boom and the hook, the connection frame being located adjacent to the bungee cord.
7. The double hook balance spreader of claim 6, wherein the extension frame is secured to the attachment frame.
8. The double hook balancing sling according to claim 1, wherein the hook is provided with anti-slip ribs.
CN202120408184.0U 2021-02-24 2021-02-24 Double-hook balance lifting appliance Active CN215208030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120408184.0U CN215208030U (en) 2021-02-24 2021-02-24 Double-hook balance lifting appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120408184.0U CN215208030U (en) 2021-02-24 2021-02-24 Double-hook balance lifting appliance

Publications (1)

Publication Number Publication Date
CN215208030U true CN215208030U (en) 2021-12-17

Family

ID=79440967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120408184.0U Active CN215208030U (en) 2021-02-24 2021-02-24 Double-hook balance lifting appliance

Country Status (1)

Country Link
CN (1) CN215208030U (en)

Similar Documents

Publication Publication Date Title
CN202609767U (en) Adjustable hanging beam special for bag goods
CN2915812Y (en) High capacity distribution and main transformer coil sling
CN205916895U (en) But chain hoist that multiple spot hung
CN215208030U (en) Double-hook balance lifting appliance
CN219098520U (en) Falling-preventing hanging structure
CN207142642U (en) A kind of multilayer steel plates suspender
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN205990181U (en) A kind of light-duty shockproof suspension hook
CN202944976U (en) Hoisting device of light hollow partition board
CN210340060U (en) Equidistant lifting hook carrying pole for traveling crane
CN102009908A (en) Hoisting tool
CN2500659Y (en) Lifter for overlength steel plate
CN202414964U (en) Travelling crane hoisting auxiliary device
CN205662225U (en) Become a bundle semitrailer pterygoid lamina special lifting device
CN218520883U (en) Automatic balance hook device
CN201961955U (en) Dual C-shaped lifting sling for rolling plate
CN207684721U (en) Suspender
CN201777775U (en) Hoisting tooling
CN216403580U (en) Brick lifting appliance
CN205892517U (en) Two cable compensating beam hoists of weighing
CN2564526Y (en) 150 ton multi-lifting point slings
CN203345920U (en) Multifunctional lifting hook
CN209740491U (en) I-steel lifting fixing device
CN217627095U (en) Hanging bracket for rear counter weight of forklift
CN214989642U (en) A novel hoist for steel shotcrete hoist and mount

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant