CN201777775U - Hoisting tooling - Google Patents

Hoisting tooling Download PDF

Info

Publication number
CN201777775U
CN201777775U CN201020298678XU CN201020298678U CN201777775U CN 201777775 U CN201777775 U CN 201777775U CN 201020298678X U CN201020298678X U CN 201020298678XU CN 201020298678 U CN201020298678 U CN 201020298678U CN 201777775 U CN201777775 U CN 201777775U
Authority
CN
China
Prior art keywords
hoisting
hoist cable
balance plate
cables
bights
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020298678XU
Other languages
Chinese (zh)
Inventor
徐向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHANGJIAGANG NEWGANGXING TECHNOLOGY Co Ltd
Original Assignee
ZHANGJIAGANG NEWGANGXING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANGJIAGANG NEWGANGXING TECHNOLOGY Co Ltd filed Critical ZHANGJIAGANG NEWGANGXING TECHNOLOGY Co Ltd
Priority to CN201020298678XU priority Critical patent/CN201777775U/en
Application granted granted Critical
Publication of CN201777775U publication Critical patent/CN201777775U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hoisting tooling, which is capable of always keeping hoisting cables expanded, thereby avoiding breakage of a wood bracket. The hoisting tooling comprises a hoisting ring; four upper hoisting cables are connected onto the hoisting ring; the tail ends of the four upper hoisting cables are connected with four corners of a balancing plate in a one-to-one corresponding manner; and four lower hoisting cables are respectively connected to the corners of the balancing plate. By dividing each hoisting cable into an upper hoisting cable and a lower hoisting cable which are connected together by the balancing plate, the hoisting tooling is capable of always keeping the hoisting cables expanded outwards in the whole hoisting process, and avoids breakage of the wood bracket caused by deformation in squeezing, thereby avoiding unnecessary loss and accidents.

Description

The lifting frock
Technical field
The utility model relates to the lifting frock, refers more particularly to the lifting frock that is used to hang on the suspension hook of hanging devices such as driving, crane.
Background technology
At present, for the sake of security, the vertical standard export packages of coil of strip all will be placed wooden in the coil of strip bottom usually.When the coil of strip that is placed with wooden being lifted with traditional hoist cable (being generally suspender belt), hoist cable is under the effect that the gravity and the suspension hook of coil of strip hangs power, can not keep outside open attitude, often make wooden be squeezed the distortion and rupture, cause coil of strip to fall volume, cause damage, even lead to a disaster.
The utility model content
Technical problem to be solved in the utility model is: thus provide a kind of hoist cable that makes to remain the lifting frock that open attitude is avoided the wooden fracture.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopted is: the lifting frock, comprise: suspension ring, be connected with four on the suspension ring and go up hoist cable, four ends of going up hoist cable link to each other with four bights of balance plate are corresponding one by one, and four bights of this piece balance plate also are connected with a following hoist cable respectively.
The top of the end of last hoist cable and following hoist cable links to each other with balance plate by the U type attaching parts that the end is equipped with bearing pin respectively, its concrete set-up mode is: the positive and negative in four bights of described balance plate are respectively arranged with upper and lower hangers, and the bearing pin on the U type attaching parts on the upper and lower hoist cable is located in respectively in the upper and lower hangers.
Described upper and lower hoist cable is chain sling.
The beneficial effects of the utility model are: by hoist cable being divided into two sections is upper and lower hoist cable, and between upper and lower hoist cable, link together by balance plate, so just can allow hoist cable in whole hoisting process, remain outside open attitude, make and to hang power and gravity disperses by balance plate, avoided wooden to rupture, thereby avoided the generation of unnecessary loss and accident because of the distortion that is squeezed.
Description of drawings
Fig. 1 is a perspective view of the present utility model.
Among the figure: 1, suspension hook, 2, suspension ring, 3, go up hoist cable, 4, hoist cable down, 5, attaching parts, 6, attaching parts, 7, bearing pin, 8, bearing pin, 9, balance plate, 91, go up hangers.
The specific embodiment
Below in conjunction with accompanying drawing, describe specific embodiments of the present utility model in detail.
As shown in Figure 1, lifting frock described in the utility model, comprise: suspension ring 2, on balance plate 9 and the four pairs of chain types, following hoist cable 3 and 4, suspension ring 2 link to each other with four tops of going up hoist cable 3, four ends of going up hoist cables 3 link to each other with the U type attaching parts 5 that the end is equipped with bearing pin 7 respectively, bearing pin 7 on four attaching partss 5 is located in the last hangers 91 in four bights of described balance plate 9 correspondingly, the back side in 9 four bights of described balance plate is respectively arranged with down hangers---and its structure is referring to last hangers 91, the top of described down hoist cable 4 links to each other with the U type attaching parts 6 that the end is equipped with bearing pin 8, and the bearing pin 8 on four attaching partss 6 is located in the following hangers in four bights of described balance plate 9 correspondingly.
During use, suspension ring 2 are hung on the suspension hook 1 of driving or crane, with corresponding one by one being fixed on four angles of the wooden that objects such as coil of strip are housed of end of four following hoist cables 4.So just can lift coil of strip.

Claims (3)

1. lifting frock comprises: suspension ring is characterized in that: be connected with four on the described suspension ring and go up hoist cable, four ends of going up hoist cable link to each other with four bights of balance plate are corresponding one by one, and four bights of this piece balance plate also are connected with a following hoist cable respectively.
2. lifting frock as claimed in claim 1, it is characterized in that: the top of going up the end of hoist cable and following hoist cable links to each other with balance plate by the U type attaching parts that the end is equipped with bearing pin respectively, its concrete set-up mode is: the positive and negative in four bights of described balance plate are respectively arranged with upper and lower hangers, and the bearing pin on the U type attaching parts on the upper and lower hoist cable is located in respectively in the upper and lower hangers.
3. lifting frock as claimed in claim 1 or 2 is characterized in that: described upper and lower hoist cable is chain sling.
CN201020298678XU 2010-08-20 2010-08-20 Hoisting tooling Expired - Fee Related CN201777775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020298678XU CN201777775U (en) 2010-08-20 2010-08-20 Hoisting tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020298678XU CN201777775U (en) 2010-08-20 2010-08-20 Hoisting tooling

Publications (1)

Publication Number Publication Date
CN201777775U true CN201777775U (en) 2011-03-30

Family

ID=43790996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020298678XU Expired - Fee Related CN201777775U (en) 2010-08-20 2010-08-20 Hoisting tooling

Country Status (1)

Country Link
CN (1) CN201777775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102009908A (en) * 2010-08-20 2011-04-13 张家港市新港星科技有限公司 Hoisting tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102009908A (en) * 2010-08-20 2011-04-13 张家港市新港星科技有限公司 Hoisting tool

Similar Documents

Publication Publication Date Title
CN201439475U (en) Multifunctional balance hanging beam
CN2915812Y (en) High capacity distribution and main transformer coil sling
CN202214131U (en) Three-point lifting beam
CN102009908A (en) Hoisting tool
CN201553534U (en) Novel lifting appliance for transformer coil
CN201777775U (en) Hoisting tooling
CN204752012U (en) Wall -hanging miniature hoist
CN204702408U (en) Link-type suspender
CN208454266U (en) A kind of lifting device for integral new-energy passenger fuel cylinder group
CN202944976U (en) Hoisting device of light hollow partition board
CN105329766A (en) Automatic balance type lifting beam
CN205990181U (en) A kind of light-duty shockproof suspension hook
CN102009909A (en) Multi-lifting point hanger for lifting nuclear power station module
CN202897773U (en) Combined balance beam
CN202414964U (en) Travelling crane hoisting auxiliary device
CN205257764U (en) Shovel quick -witted butter dish special lifting device device
CN201626767U (en) Dual-head jib
CN201545596U (en) Sling with multiple connecting rings
CN201458512U (en) Balance hanger
CN205772842U (en) Inverted arch prefabricated section suspender
CN204778302U (en) Aluminium alloy transport frock
CN204675618U (en) Steel rope special hanger
CN214828330U (en) Vertical lifting appliance
CN201458513U (en) Double-hook balance lifting appliance
CN206219041U (en) A kind of novel transformer hanger structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110330

Termination date: 20170820