CN205772842U - Inverted arch prefabricated section suspender - Google Patents
Inverted arch prefabricated section suspender Download PDFInfo
- Publication number
- CN205772842U CN205772842U CN201620476822.1U CN201620476822U CN205772842U CN 205772842 U CN205772842 U CN 205772842U CN 201620476822 U CN201620476822 U CN 201620476822U CN 205772842 U CN205772842 U CN 205772842U
- Authority
- CN
- China
- Prior art keywords
- hole
- inverted arch
- arch prefabricated
- prefabricated block
- prefabricated section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于建筑加工工具领域,尤其涉及仰拱预制块吊具。 The utility model belongs to the field of building processing tools, in particular to an inverted arch prefabricated block hanger.
背景技术 Background technique
现有技术中的仰拱预制块制作采用工厂化、流水线的形式作业,制作过程中每一个工序占用的时间都将直接影响到仰拱预制块的生产效率。仰拱预制块在拆模后需要通过真空吸盘进行起吊,但是由于真空吸盘的故障率较高,该过程极大程度影响了下一道工序的作业效率。 The manufacture of inverted arch prefabricated blocks in the prior art adopts factory-like and assembly-line operations, and the time taken by each process in the manufacturing process will directly affect the production efficiency of inverted arch prefabricated blocks. The inverted arch prefabricated blocks need to be lifted by vacuum suction cups after demoulding, but due to the high failure rate of vacuum suction cups, this process greatly affects the working efficiency of the next process.
实用新型内容 Utility model content
本实用新型的目的是提供一种仰拱预制块吊具,本实用新型结构简单,经久耐用,能够对仰拱预制块进行快速起吊。 The purpose of the utility model is to provide a hanger for inverted arch prefabricated blocks. The utility model is simple in structure and durable, and can quickly lift the inverted arch prefabricated blocks.
为解决上述技术问题,本实用新型采用的技术方案如下: For solving the problems of the technologies described above, the technical scheme that the utility model adopts is as follows:
仰拱预制块吊具,包括仰拱预制块的轴线斜向设置的浇注孔,所述吊具包括吊盘,吊盘上设有与仰拱预制块的浇注孔同轴且孔径相同的第一通孔,第一通孔和浇注孔与插件配合,吊盘上还设有第一吊耳。 The inverted arch prefabricated block hanger includes pouring holes arranged obliquely to the axis of the inverted arch prefabricated block. The through hole, the first through hole and the pouring hole cooperate with the plug-in, and the first lifting lug is also arranged on the hanging plate.
优选的,所述吊盘为矩型钢板,吊盘上表面沿对角线方向焊接有长方形钢板,第一吊耳竖直方向设置于长方形钢板两端,长方形钢板上设有与第一通孔同轴且孔径相同的第二通孔。 Preferably, the hanging pan is a rectangular steel plate, the upper surface of the hanging pan is welded with a rectangular steel plate along the diagonal direction, the first lifting lug is vertically arranged at both ends of the rectangular steel plate, and the rectangular steel plate is provided with a first through hole The second through hole is coaxial and has the same diameter.
优选的,所述的插件为圆钢,圆钢外壁设有防滑纹。 Preferably, the insert is round steel, and the outer wall of the round steel is provided with anti-skid lines.
优选的,所述的吊盘两侧设有第二吊耳,第二吊耳水平方向设置。 Preferably, second lifting lugs are provided on both sides of the suspension pan, and the second lifting lugs are arranged in a horizontal direction.
优选的,所述的第一通孔、第二通孔和浇注孔至少各设两个。 Preferably, at least two of the first through hole, the second through hole and the pouring hole are respectively provided.
工作时,将圆钢斜向放置并顺次穿过长方形钢板和吊盘上的第二通孔和第一通孔,然后将圆钢插入仰拱预制块的浇注孔内。然后将桥吊吊钩通过钢丝绳与长方形钢板上的第一吊耳连接,在通过第一吊耳起吊的过程中,由于第一通孔、第二通孔和浇注孔同轴且孔径相同且第一通孔、第二通孔和浇注孔为斜向设置,所以圆钢与三个孔配合后处于倾斜状态,起吊时圆钢下端受到仰拱预制块的重力作用,上端受到吊盘和长方形钢板的限位,利用杠杆原理带动仰拱预制块上升。 During work, place the round steel obliquely and pass through the second through hole and the first through hole on the rectangular steel plate and the hanging pan in sequence, and then insert the round steel into the pouring hole of the inverted arch prefabricated block. Then connect the bridge crane hook with the first lifting lug on the rectangular steel plate through the steel wire rope. The first through hole, the second through hole and the pouring hole are arranged obliquely, so the round steel is in an inclined state after being matched with the three holes. The limit of the position, using the principle of leverage to drive the prefabricated block of the inverted arch to rise.
同时为了确保百分之百安全起吊,吊盘的两侧设计第二吊耳,当仰拱预制块通过第一吊耳起吊离模具约30cm时,工作人员立即将吊带穿过第二吊耳并缠绕仰拱预制块,对仰拱预制块和吊盘进行绑定连接。 At the same time, in order to ensure 100% safe lifting, second lifting lugs are designed on both sides of the hanging plate. When the inverted arch prefabricated block is lifted about 30cm away from the mold through the first lifting lug, the staff will immediately pass the sling through the second lifting lug and wrap the inverted arch. The prefabricated block is used to bind and connect the inverted arch prefabricated block and the hanging pan.
本实用新型与现有技术相比,具有如下优点: Compared with the prior art, the utility model has the following advantages:
1)结构简单,通过重力和杠杆原理,即可实现对仰拱预制块的吊升; 1) The structure is simple, and the lifting of the inverted arch prefabricated block can be realized through the principle of gravity and leverage;
2)安全系数高,为了防止仰拱预制块从圆钢上脱落,一方面圆钢表面设有防滑纹,提高圆钢与仰拱预制块的浇注孔内壁的摩擦系数,另一方面设计第二吊耳,通过吊绳将仰拱预制块与吊盘捆绑一体。 2) The safety factor is high. In order to prevent the inverted arch prefabricated block from falling off the round steel, on the one hand, the surface of the round steel is provided with anti-slip lines to improve the friction coefficient between the round steel and the inner wall of the pouring hole of the inverted arch prefabricated block. On the other hand, the second design The lifting lug is used to bind the inverted arch prefabricated block with the hanging pan through the hanging rope.
附图说明 Description of drawings
图1为具体实施方式中仰拱预制块吊具的工作状态示意图; Fig. 1 is the working state schematic diagram of inverted arch prefabricated block spreader in the specific embodiment;
图2为图1中仰拱预制块吊具的俯视图。 Fig. 2 is a top view of the inverted arch prefabricated block hanger in Fig. 1 .
具体实施方式 detailed description
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。 In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.
如图1-2所示,仰拱预制块吊具,所述吊具包括吊盘1,吊盘1为矩型钢板,吊盘1上表面沿对角线方向焊接有长方形钢板2,吊盘1上设有第一通孔,长方形钢板上设有第二通孔7,第一通孔和第二通孔7的轴线斜向设置且与仰拱预制块8的浇注孔同轴且孔径相同;长方形钢板2两端设有位于竖直方向的第一吊耳3,吊盘1两侧设有第二吊耳6,第二吊耳6水平方向设置,所述吊具还包括与第一通孔、第二通孔7和浇注孔配合的圆钢4,圆钢4外壁设有防滑纹5。 As shown in Figure 1-2, the inverted arch prefabricated block hanger includes a hanging pan 1, the hanging pan 1 is a rectangular steel plate, and the upper surface of the hanging pan 1 is welded with a rectangular steel plate 2 along the diagonal direction. 1 is provided with a first through hole, and a rectangular steel plate is provided with a second through hole 7, the axes of the first through hole and the second through hole 7 are arranged obliquely and are coaxial with the pouring hole of the inverted arch prefabricated block 8 and have the same aperture The two ends of the rectangular steel plate 2 are provided with the first lifting lug 3 in the vertical direction, and the two sides of the suspension plate 1 are provided with the second lifting lug 6, and the second lifting lug 6 is arranged in the horizontal direction. The round steel 4 matched with the through hole, the second through hole 7 and the pouring hole, and the outer wall of the round steel 4 is provided with anti-slip lines 5 .
工作时,将圆钢4斜向放置并顺次穿过长方形钢板2和吊盘1上的第二通孔7和第一通孔,然后将圆钢4插入仰拱预制块8的浇注孔内。然后将桥吊吊钩通过钢丝绳与长方形钢板2上的第一吊耳3连接,在通过第一吊耳3起吊的过程中,由于第一通孔、第二通孔7和浇注孔同轴且孔径相同且第一通孔、第二通孔7和浇注孔为斜向设置,所以圆钢4与三个孔配合后处于倾斜状态,起吊时圆钢4下端受到仰拱预制块8的重力作用,上端受到吊盘1和长方形钢板2的限位,利用杠杆原理带动仰拱预制块8上升。 When working, place the round steel 4 obliquely and pass through the second through hole 7 and the first through hole on the rectangular steel plate 2 and the suspension plate 1 in sequence, and then insert the round steel 4 into the pouring hole of the inverted arch prefabricated block 8 . Then the bridge crane hook is connected with the first lifting lug 3 on the rectangular steel plate 2 through the wire rope, in the process of lifting by the first lifting lug 3, because the first through hole, the second through hole 7 and the pouring hole are coaxial and The hole diameters are the same and the first through hole, the second through hole 7 and the pouring hole are arranged obliquely, so the round steel 4 is in an inclined state after being matched with the three holes, and the lower end of the round steel 4 is subjected to the gravity of the inverted arch prefabricated block 8 when lifting , the upper end is limited by the hanging pan 1 and the rectangular steel plate 2, and the leverage principle is used to drive the inverted arch prefabricated block 8 to rise.
同时为了确保百分之百安全起吊,吊盘1的两侧设计第二吊耳6,当仰拱预制块8通过第一吊耳3起吊离模具约30cm时,工作人员立即将吊带穿过第二吊耳6并缠绕仰拱预制块8,对仰拱预制块8和吊盘1进行绑定连接。 At the same time, in order to ensure 100% safe lifting, second lifting lugs 6 are designed on both sides of the hanging pan 1. When the inverted arch prefabricated block 8 is hoisted about 30cm away from the mold through the first lifting lugs 3, the staff immediately pass the sling through the second lifting lugs 6 and wind the inverted arch prefabricated block 8, and bind and connect the inverted arch prefabricated block 8 and the hanging pan 1.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620476822.1U CN205772842U (en) | 2016-05-24 | 2016-05-24 | Inverted arch prefabricated section suspender |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620476822.1U CN205772842U (en) | 2016-05-24 | 2016-05-24 | Inverted arch prefabricated section suspender |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205772842U true CN205772842U (en) | 2016-12-07 |
Family
ID=58115206
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620476822.1U Expired - Fee Related CN205772842U (en) | 2016-05-24 | 2016-05-24 | Inverted arch prefabricated section suspender |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205772842U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109736834A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | Installation process method and apparatus, processor and the memory of inverted arch prefabricated film |
-
2016
- 2016-05-24 CN CN201620476822.1U patent/CN205772842U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109736834A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | Installation process method and apparatus, processor and the memory of inverted arch prefabricated film |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203269355U (en) | A spreader for lifting concrete pipes | |
| CN205772842U (en) | Inverted arch prefabricated section suspender | |
| CN204342298U (en) | A kind of double track transfer crane | |
| CN204689351U (en) | A kind of H profile steel structural elements suspender | |
| CN204490327U (en) | Joist steel hoisting clamp | |
| CN204737579U (en) | Spacing hoist of pipe | |
| CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
| CN203833473U (en) | Clamping hanger with adjustable width for hanging square tubular object | |
| CN204125020U (en) | Blind plate special hanger | |
| CN104528519A (en) | Clamping tool for assisting in hoisting cement electric poles | |
| CN210133802U (en) | A simple spreader for skid-mounted equipment in oil field | |
| CN204211348U (en) | A kind of hanging apparatus | |
| CN211664530U (en) | Integral hoisting sling of straightening machine | |
| CN203545458U (en) | Concrete pipe piece lifting appliance | |
| CN206033024U (en) | Pipeline hoist and mount mould | |
| CN205603058U (en) | Track hoist and mount construction equipment | |
| CN206927475U (en) | Handling centrifuges the anti-skidding suspender of pipe | |
| CN2827985Y (en) | Cathod steel bar lifter | |
| CN217578020U (en) | Lifting appliance for mounting rotor of hydraulic generator | |
| CN203767840U (en) | Lifting hook capable of allowing hung article to automatically fall off | |
| CN205328438U (en) | Handling is from lift -type cylindric spud leg hanging beam | |
| CN203382379U (en) | Turnover lifting device for swing bolster mud core | |
| CN204310691U (en) | Tower machine standard knot Combined type sling | |
| CN205577386U (en) | Inserted lift scaffold movable pulley hoist and mount system | |
| CN203754278U (en) | Device capable of preventing hoisting decoupling of crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 |