CN215172827U - Energy-saving emission-reducing type fire-fighting pipeline installation structure - Google Patents

Energy-saving emission-reducing type fire-fighting pipeline installation structure Download PDF

Info

Publication number
CN215172827U
CN215172827U CN202121170056.3U CN202121170056U CN215172827U CN 215172827 U CN215172827 U CN 215172827U CN 202121170056 U CN202121170056 U CN 202121170056U CN 215172827 U CN215172827 U CN 215172827U
Authority
CN
China
Prior art keywords
pedestal
mounting substrate
spout
groove
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121170056.3U
Other languages
Chinese (zh)
Inventor
李复兴
吴小伟
彭中秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Tuoyuan Construction Group Co ltd
Original Assignee
Hubei Tuoyuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Tuoyuan Construction Group Co ltd filed Critical Hubei Tuoyuan Construction Group Co ltd
Priority to CN202121170056.3U priority Critical patent/CN215172827U/en
Application granted granted Critical
Publication of CN215172827U publication Critical patent/CN215172827U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Chairs For Special Purposes, Such As Reclining Chairs (AREA)

Abstract

The utility model belongs to the technical field of the fire control pipeline technique and specifically relates to a fire control pipeline mounting structure of energy saving and emission reduction type is related to, and it includes mounting substrate and gallows, and the fire control pipeline is installed on the mounting substrate, it is a pair of the gallows correspond set up in mounting substrate both ends and hoist and mount on the roof, the spout has been seted up to mounting substrate's one end, just the spout orientation in mounting substrate's upper surface is uncovered setting, swing joint has a plurality of removal pedestals that are used for fixed fire control pipeline in the spout, be provided with on the removal pedestal and be used for injecing remove the gliding setting element of pedestal. The application has the effect of improving the universality of the mounting substrate.

Description

Energy-saving emission-reducing type fire-fighting pipeline installation structure
Technical Field
The application relates to the field of fire fighting pipeline technology, in particular to an energy-saving and emission-reducing fire fighting pipeline mounting structure.
Background
At present, fire-fighting pipelines are generally used for connecting fire-fighting equipment and equipment, such as indoor fire hydrant case and indoor fire-fighting spray head, transmit the fire-fighting water in the fire-fighting water pond to indoor confession and use in putting out a fire, and in addition, fire-fighting pipelines still are used for conveying gas or other medium, because special demand, fire-fighting pipelines are one kind and have special requirements's pipeline material to thickness and material, need the red paint of spraying to be in order to make the sign.
A chinese patent that patent application number is 201920922618.1 discloses a novel construction fire control pipeline mounting structure, including a plurality of fire control pipelines and be used for installing the installing support of fire control pipeline, the installing support includes mounting substrate and gallows, and the mounting substrate both ends are installed in the roof through two gallows, and a plurality of spacing recesses that are used for installing the fire control pipeline and a plurality of fixed slot that communicate with spacing recess are seted up on the mounting substrate surface, through the fixed fire control pipeline of fixed clamp.
To the correlation technique among the above-mentioned, the inventor thinks that above-mentioned mounting structure will set up corresponding quantity's spacing recess on mounting substrate according to the fire-fighting pipeline quantity of waiting to install, so need select different mounting substrates to install according to the fire-fighting pipeline quantity of corresponding installation scene, have the relatively poor defect of commonality.
SUMMERY OF THE UTILITY MODEL
In order to improve mounting substrate's commonality, this application provides an energy-conservation subtracts row type fire control pipeline mounting structure.
The application provides a pair of energy-conservation subtracts row type fire pipeline mounting structure adopts following technical scheme:
the utility model provides an energy-conservation subtracts row type fire pipeline mounting structure, includes mounting substrate and gallows, and the fire pipeline is installed on the mounting substrate, it is a pair of the gallows correspond set up in mounting substrate both ends and hoist and mount on the roof, the spout has been seted up to mounting substrate's one end, just the spout orientation in mounting substrate's upper surface is uncovered setting, swing joint has a plurality of removal pedestals that are used for fixed fire pipeline in the spout, it is used for injecing to be provided with on the removal pedestal remove the gliding setting element of pedestal.
Through adopting above-mentioned technical scheme, when installer installs, will remove the pedestal and slide into the mounting substrate from the opening of spout in, slide to the assigned position after and inject the installation that can realize removing the pedestal that slides of removing the pedestal through the setting element, when the fire control pipeline of treating the installation has many, the removal pedestal of the same quantity of installation that can correspond, and adjust the interval between the adjacent removal pedestal and keep unanimous, in order to improve the holistic atress balance of mounting substrate, the assembly that corresponds every fire control pipeline again is on removing the pedestal, make mounting substrate's commonality can improve.
Optionally, the diapire of spout has seted up the sawtooth groove, just the groove of sawtooth groove to with the direction of seting up of spout is mutually perpendicular, the setting element includes the depression bar, set up on the terminal surface of removal pedestal and supply depression bar male pole hole, the depression bar orientation in the one end activity of spout is inlayed and is established in the sawtooth groove, just the tip of depression bar with sawtooth groove looks adaptation.
Through adopting above-mentioned technical scheme, through in inserting the pole hole of removing the pedestal with the depression bar, the tip of depression bar corresponds during the embedding sawtooth groove to the slip of injecing removal pedestal along the spout, thereby realized the fixed to removing the pedestal.
Optionally, the compression bar is sleeved with a spring, one end of the spring is abutted to the table board of the movable table seat, and the other end of the spring is fixed to the compression bar.
By adopting the technical scheme, when the spring is in a natural state, one end of the pressure rod, which faces the sawtooth groove, extends into the rod hole, and the other end of the pressure rod extends out of the rod hole and is positioned on the table board of the movable table seat, so that the movable table seat can slide in the sliding groove; when the fire pipeline shelved on the surface of removing the pedestal, the fire pipeline pushed down the depression bar just, and the spring compression holds power, pushes the tip of depression bar into the sawtooth groove, utilizes the dead weight of fire pipeline to realize the locking, pulls down the fire pipeline, can realize the depression bar under the elastic action of spring and reset, and simple structure practicality is high.
Optionally, a sinking groove for embedding the spring is formed in the table top of the movable table seat, and the end of the spring abuts against the bottom wall of the sinking groove.
Through adopting above-mentioned technical scheme, when the one end embedding sawtooth groove of depression bar, the other end of depression bar is downthehole as for the pole, and the spring is located the heavy groove just this moment to guarantee that fire-fighting pipeline can be steady shelve on removing the pedestal.
Optionally, the rotation is connected with the clamp on the terminal surface of removal pedestal, just the pivot of clamp with the groove of spout is to mutually perpendicular, be provided with the bolt on the free end of clamp, seted up on the terminal surface of removal pedestal with bolt threaded connection's locking via hole.
Through adopting above-mentioned technical scheme, place the installation pipeline on removing the pedestal mesa when installer installation fire control pipeline, rotate the clamp package along the pivot of clamp again and detain on fire control pipeline's week side, through wearing to establish the bolt on the free end of clamp and revolve wrong to lock the via hole in to when realizing fire control pipeline and removing the fixed of pedestal, the twist degree of depth of adjusting bolt can support the installation of the fire control pipeline of different bores, and the commonality further improves.
Optionally, it is a pair of the double-phase corresponding surface of gallows goes up the level and link up and has seted up a plurality of screw holes, and is a plurality of the screw hole is laid along vertical direction, all seted up the screw via hole on mounting substrate's the both ends terminal surface, the screw rod is installed to the screw hole internal thread, just screw rod tip threaded connection to in the screw via hole.
By adopting the technical scheme, installation personnel can select the corresponding screw hole to adjust the installation height of the installation substrate through the field environment during installation, and the adjustment of the installation height is realized.
Optionally, a groove is formed in the end face of the movable pedestal.
Through adopting above-mentioned technical scheme, the terminal surface that removes the pedestal is the groove design for can not control when installing the fire control pipeline on removing the pedestal mesa in the work progress and roll, swift convenient design has improved the efficiency of installation.
Optionally, the bottom end of the movable pedestal is provided with a ball.
Through adopting above-mentioned technical scheme, setting up of ball makes the better sliding in the spout of removal pedestal, reduces the wearing and tearing between removal pedestal and spout contact plane, reduces because of the emergence that long-time atress spout warp and makes the removal pedestal block the condition.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by adjusting the position of the movable pedestal in the chute, a plurality of fire fighting pipelines can be installed on the same installation substrate, the installation substrate does not need to be replaced, and the universality of the structure is improved;
2. when the fire fighting pipeline is installed, the fire fighting pipeline is placed in the groove, the compression rod is pressed up and down to complete positioning, when the fire fighting pipeline needs to be disassembled, the compression rod returns to an initial state under the restoring force of the spring, the movable pedestal can be adjusted again to be put into use again, and the movable pedestal is convenient to use and simple to disassemble;
3. the fire-fighting pipeline is placed on the recess after with the clamp ring cover on the fire-fighting pipeline, the free end of clamp is screwing through the bolt, all can lock the fire-fighting pipeline of different bores, has increased structure application scope.
Drawings
FIG. 1 is a schematic structural view of the present embodiment;
FIG. 2 is a schematic view of an exploded structure of the present embodiment;
FIG. 3 is a schematic front view of the present embodiment;
FIG. 4 is a schematic view of FIG. 3 taken along line A-A in partial cross section;
fig. 5 is an enlarged structural view at B in fig. 4.
Reference numerals: 1. a mounting substrate; 11. a chute; 12. a sawtooth groove; 13. a screw passing hole; 2. a hanger; 21. a screw hole; 22. a screw; 3. moving the pedestal; 31. a groove; 32. sinking a groove; 33. a rod hole; 34. locking the via hole; 4. a positioning member; 41. a pressure lever; 42. a spring; 5. clamping a hoop; 6. a bolt; 7. and a ball.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
Referring to fig. 1 and 2, the embodiment of the application discloses an energy-saving emission-reducing fire pipeline installation structure, which comprises a horizontally arranged installation base plate 1 and hangers 2 vertically hung on a roof through expansion bolts 6, wherein the hangers 2 are rectangular plates, and the two hangers 2 are respectively installed on two sides of the installation base plate 1; in order to make the interval between mounting substrate 1 and the roof adjustable, two double-phase corresponding surfaces of gallows 2 go up the level and link up and seted up a plurality of screw holes 21, a plurality of screw holes 21 are laid along vertical direction, screw via hole 13 has all been seted up on the terminal surface of both ends on the base plate, screw rod 22 is installed to screw hole 21 internal thread, threaded connection is in screw via hole 13 to the tip of screw rod 22 simultaneously, the installer is through corresponding screw via hole 13 not screw hole 21 of co-altitude, can make the adaptability adjustment by the environment on-the-spot to mounting substrate 1's height, gallows 2's commonality has been improved.
Referring to fig. 2, 3 and 4, a chute 11 is formed at one end of the mounting substrate 1, the chute 11 is open towards the upper surface of the mounting substrate 1, the cross section of the chute 11 is T-shaped, a sawtooth groove 12 is formed in the bottom wall of the chute 11, the groove direction of the sawtooth groove 12 is perpendicular to the opening direction of the chute 11, the groove length of the sawtooth groove 12 is the same as the width of the opening of the chute 11 towards the upper surface of the mounting substrate 1, the cross section of the sawtooth groove 12 is triangular, a plurality of movable pedestals 3 for fixing fire fighting pipelines are slidably connected in the chute 11, the cross section of the movable pedestals 3 is i-shaped, a groove 31 is formed in the table top of the movable pedestals 3, the opening direction of the groove 31 is perpendicular to the length direction of the mounting substrate 1, and the fire fighting pipelines are correspondingly placed in the groove 31;
move rotating on the diapire of keeping away from recess 31 of pedestal 3 and inlay and be equipped with four balls 7, and the activity of all sides of ball 7 is contradicted on the diapire of spout 11, and the setting up of ball 7 makes sliding friction between moving pedestal 3 and the spout 11 change rolling friction into, and the contact surface is littleer, and frictional force reduces to slowed down the wearing and tearing between moving pedestal 3 and the 11 contact surfaces of spout, improved the life of moving pedestal 3.
Referring to fig. 4 and 5, in order to position the movable pedestal 3 with the same number as the installed fire fighting pipelines in the chute 11, the movable pedestal 3 is further provided with a positioning part 4, the positioning part 4 comprises a pressing rod 41, a rod hole 33 for the pressing rod 41 to extend into is vertically arranged on the table top of the movable pedestal 3 in a through manner, the pressing rod 41 is inserted into the rod hole 33, one end facing the serrated groove 12 is inserted into the serrated groove 12, and is adapted to the serrated groove 12, and after the pressing rod 41 is embedded into the serrated groove 12, the sliding of the movable pedestal 3 in the direction along the chute 11 can be limited, so that the movable pedestal 3 is fixed;
the rod hole 33 is further provided with a sinking groove 32 on the table-board of the movable pedestal 3, in order to take the rod hole 33 out of the pressure hole, a spring 42 is sleeved on the periphery of the pressure rod 41, one end of the spring 42 is abutted to the inner wall of the sinking groove 32, the other end of the spring 42 is fixed on the periphery of the pressure rod 41, the spring 42 is sleeved on the periphery of the pressure rod 41, the diameter of the spring 42 is larger than that of the rod hole 33, one end of the spring 42 is abutted to the inner wall of the sinking groove 32, the other end of the spring 42 is fixed on the periphery of the pressure rod 41, when the fire fighting pipeline is placed on the groove 31 and the pressure rod 41 is pressed down, the pressure rod 41 moves towards the inner wall of the sinking groove 32, the spring 42 compresses and stores force, when the fire fighting pipeline is detached from the groove 31, the reset of the pressure rod 41 is realized under the elastic action of the spring 42, the movable pedestal 3 can slide in the sliding groove 11 again, the structure is simple and the practicability is high.
Referring to fig. 2 and 3, still rotate on the mesa of removal pedestal 3 and be connected with clamp 5 that is used for fixing a position the fire control pipeline, the mesa of removal pedestal 3 has set firmly a pair of otic placode (not shown in the figure), and the pivot level of clamp 5 is fixed between two otic placodes, the pivot of clamp 5 is perpendicular to the groove of spout 11 mutually, after the fire control pipeline was placed on recess 31, installer rotated clamp 5 along the pivot of clamp 5 and detained on the week side of fire control pipeline, be provided with bolt 6 on the free end of clamp 5, set up the locking via hole 34 of being connected with bolt 6 on the terminal surface of removal pedestal 3 that corresponds, after clamp 5 detained fire control pipeline week side, twist bolt 6 and lock the fire control pipeline, clamp 5 adopts elastic material, the degree of depth of adjustment bolt 6 can support the installation of the fire control pipeline of different bores of twist, the commonality further improves.
The implementation principle of the embodiment is as follows: the number of the movable pedestals 3 placed in the mounting substrate 1 is determined by an installer according to the field environment, the movable pedestals 3 are placed from the sliding grooves 11 in the mounting substrate 1, the positions of the movable pedestals 3 on the sliding grooves 11 are determined by the weight according to the number of the fire-fighting pipelines, the fire-fighting pipelines are placed on the grooves 31 after the movable pedestals 3 slide to the specified positions, the pressure rods 41 are pressed down by the fire-fighting pipelines, the end parts of the pressure rods 41 are pushed into the serrated groove 12, locking is achieved by the aid of the dead weight of the fire-fighting pipelines, a plurality of fire-fighting pipelines are disassembled in the later period, the disassembly work can be completed by adjusting the positions of other fire-fighting pipelines after the corresponding fire-fighting pipelines to be disassembled are disassembled, the mounting substrate 1 does not need to be replaced, and the universality of the structure is improved;
when the fire fighting pipeline is installed, the spring 42 fixed on the table board of the pressure lever 41 and the movable table seat 3 compresses to store force under the self weight of the fire fighting pipeline, the end part of the pressure lever 41 is pushed into the sawtooth groove 12, the locking is realized by the self weight of the fire fighting pipeline, the fire fighting pipeline is disassembled, the pressure lever 41 can be reset under the elastic action of the spring 42, the movable table seat 3 can slide in the sliding groove 11 again, the structure is simple, and the practicability is high;
after the installer placed the fire-fighting pipeline on recess 31, rotated the expansion end of clamp 5, the pivot of clamp 5 was rotated clamp 5 and is detained on the week side of fire-fighting pipeline, through wear to establish bolt 6 on the free end of clamp 5 and revolve wrong the fixing that realizes fire-fighting pipeline and removal pedestal 3 to locking via hole 34, the twist degree of depth of adjusting bolt 6 can support the installation of the fire-fighting pipeline of different bores, and the commonality further improves.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an energy-conservation subtracts row type fire pipeline mounting structure, includes mounting substrate (1) and gallows (2), and the fire pipeline is installed on mounting substrate (1), it is a pair of gallows (2) correspond set up in mounting substrate (1) both ends and hoist and mount on the roof, its characterized in that: spout (11) have been seted up to the one end of mounting substrate (1), just spout (11) towards in the upper surface of mounting substrate (1) is uncovered setting, swing joint has a plurality of removal pedestal (3) that are used for fixed fire control pipeline in spout (11), be provided with on removal pedestal (3) and be used for injecing remove gliding setting element (4) of pedestal (3).
2. The energy-saving emission-reducing fire fighting pipeline installation structure according to claim 1, characterized in that: seted up sawtooth groove (12) on the diapire of spout (11), just the groove of sawtooth groove (12) to with the orientation of seting up of spout (11) is mutually perpendicular, setting element (4) include depression bar (41), set up on the terminal surface of removal pedestal (3) and supply depression bar (41) male pole hole (33), depression bar (41) orientation in the one end activity of spout (11) is inlayed and is established in sawtooth groove (12), just the tip of depression bar (41) with sawtooth groove (12) looks adaptation.
3. The energy-saving emission-reducing fire fighting pipeline installation structure according to claim 2, characterized in that: the side cover is equipped with spring (42) all around depression bar (41), the one end of spring (42) with the mesa butt of removing pedestal (3), the other end of spring (42) with depression bar (41) week side is fixed.
4. An energy-saving emission-reducing type fire fighting pipeline installation structure according to claim 3, characterized in that: the table top of the movable table base (3) is provided with a sinking groove (32) for embedding the spring (42), and the end part of the spring (42) abuts against the bottom wall of the sinking groove (32).
5. The energy-saving emission-reducing fire fighting pipeline installation structure according to claim 1, characterized in that: move and rotate on the terminal surface of pedestal (3) and be connected with clamp (5), just the pivot of clamp (5) with the groove of spout (11) is to mutually perpendicular, be provided with bolt (6) on the free end of clamp (5), move on the terminal surface of pedestal (3) seted up with bolt (6) threaded connection's locking via hole (34).
6. The energy-saving emission-reducing fire fighting pipeline installation structure according to claim 1, characterized in that: it is a pair of the double-phase corresponding surface of gallows (2) goes up the level and link up and has seted up a plurality of screw holes (21), and is a plurality of screw hole (21) are laid along vertical direction, screw via hole (13) have all been seted up on the both ends terminal surface of mounting substrate (1), screw rod (22) are installed to screw hole (21) internal thread, just screw rod (22) tip threaded connection in screw via hole (13).
7. The energy-saving emission-reducing fire fighting pipeline installation structure according to claim 1, characterized in that: a groove (31) is formed in the end face of the movable pedestal (3).
8. The energy-saving emission-reducing fire fighting pipeline installation structure according to claim 1, characterized in that: the bottom end of the movable pedestal (3) is provided with a ball (7).
CN202121170056.3U 2021-05-27 2021-05-27 Energy-saving emission-reducing type fire-fighting pipeline installation structure Active CN215172827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121170056.3U CN215172827U (en) 2021-05-27 2021-05-27 Energy-saving emission-reducing type fire-fighting pipeline installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121170056.3U CN215172827U (en) 2021-05-27 2021-05-27 Energy-saving emission-reducing type fire-fighting pipeline installation structure

Publications (1)

Publication Number Publication Date
CN215172827U true CN215172827U (en) 2021-12-14

Family

ID=79373021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121170056.3U Active CN215172827U (en) 2021-05-27 2021-05-27 Energy-saving emission-reducing type fire-fighting pipeline installation structure

Country Status (1)

Country Link
CN (1) CN215172827U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114811189A (en) * 2022-05-23 2022-07-29 浙江中乐建设有限公司 House water pipe mounting structure
CN114877136A (en) * 2022-04-29 2022-08-09 彭小华 Modularized integrated multifunctional hanging bracket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114877136A (en) * 2022-04-29 2022-08-09 彭小华 Modularized integrated multifunctional hanging bracket
CN114877136B (en) * 2022-04-29 2023-11-03 深圳市甲骨文智慧实验室建设有限公司 Modularized integrated multifunctional hanging bracket
CN114811189A (en) * 2022-05-23 2022-07-29 浙江中乐建设有限公司 House water pipe mounting structure

Similar Documents

Publication Publication Date Title
CN215172827U (en) Energy-saving emission-reducing type fire-fighting pipeline installation structure
CN212613242U (en) Assembled curtain wall
CN112178277A (en) Auxiliary connecting mechanism of thermal power resource conveying pipeline
CN212839774U (en) Municipal administration water supply and drainage pipeline seat convenient to it is fixed fast
CN213018478U (en) Wisdom fire control cloud platform construction is with floor alarm device of dismouting of being convenient for
CN216725618U (en) Intelligent active water spraying device for space
CN210583448U (en) Fire control installing support
CN201967010U (en) Quick connecting mechanism for spherical camera
CN216623332U (en) Safety monitoring entrance guard's device convenient to installation is changed
CN210318922U (en) Convenient hydraulic engineering pipeline of adjusting stabilizes connecting device
CN210807965U (en) Server rack convenient to installation
CN211227943U (en) Dry land slipway floor tile and dry land slipway
CN221647956U (en) Bottom convenient installation structure for outdoor non-expansion steel structure fireproof coating production equipment
CN208202951U (en) A kind of mounting structure of metal door and window
CN213027337U (en) Bridge with adjustable hangers
CN216286989U (en) Exchange smoke detector convenient to dismouting
CN217652225U (en) Stone dry-hanging structure
CN220228097U (en) Quick installation device of fire control pipeline
CN217513704U (en) Spherical supporting device for waste heat power generation for cement preparation
CN218509399U (en) A stabilising arrangement for nodular cast iron cat ladder
CN220792323U (en) Fire control pipeline mounting bracket for fire engineering
CN213491714U (en) Fire water monitor positioning support frame convenient to installation
CN219808528U (en) Heat preservation and heat insulation wall is built in room
CN211716886U (en) Wall-hanging domestic heating boiler's hanging structure
CN219998827U (en) Be used for millet electricity to store electric energy device with outer wall mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant