CN210583448U - Fire control installing support - Google Patents

Fire control installing support Download PDF

Info

Publication number
CN210583448U
CN210583448U CN201921159374.2U CN201921159374U CN210583448U CN 210583448 U CN210583448 U CN 210583448U CN 201921159374 U CN201921159374 U CN 201921159374U CN 210583448 U CN210583448 U CN 210583448U
Authority
CN
China
Prior art keywords
frame
hole
lock
fixed box
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921159374.2U
Other languages
Chinese (zh)
Inventor
胡成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pilot Intelligent Construction Technology Co ltd
Original Assignee
深圳市惠深博越智慧建造科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳市惠深博越智慧建造科技有限公司 filed Critical 深圳市惠深博越智慧建造科技有限公司
Priority to CN201921159374.2U priority Critical patent/CN210583448U/en
Application granted granted Critical
Publication of CN210583448U publication Critical patent/CN210583448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a fire-fighting installation bracket, which relates to the technical field of fire fighting, and comprises a fixed frame, a bearing frame, a fixed box and a rock wool board; the bearing frame is arranged at one end of the fixing frame, and the other end of the fixing frame is used for being connected with a wall body; the bottom of the fixed box is connected with the bearing frame, and the side edge of the fixed box is connected with the fixed frame; the fixed box is provided with a through hole for the fire fighting pipeline to pass through; the fixed box is internally provided with a rock wool board which is detachably connected with the fixed box. The utility model has the advantages of: 1. the fire fighting pipeline on the fire fighting installation support cannot be frozen in winter in low-temperature weather; 2. the bearing frame and the fixed frame are detachable; 3. the fixed box is detachably connected to the fire-fighting installation support; 4. the rock wool board is detachably connected to the fixed box; 5. the fire fighting pipeline is fixed in the fixed ring.

Description

Fire control installing support
Technical Field
The utility model belongs to the technical field of the technique of fire control and specifically relates to a fire control installing support is related to.
Background
At present, a plurality of potential safety hazards exist in the existing community, and the potential safety hazards often cause fire, so that the installation of fire-fighting facilities is very important, and the fire-fighting facilities in the community are fire-fighting pipelines installed on fire-fighting installation supports.
To current fire control installing support, in order to fix the fire control pipeline installation on fire control installing support, fire control installing support includes the mount, bears frame and solid fixed ring, and mount fixed mounting bears frame and mount fixed connection on the wall body, and solid fixed ring fixes the fire control pipeline on bearing the frame.
The above prior art solutions have the following drawbacks: in winter and other low-temperature weather, the fire fighting pipeline is easy to freeze, so that the supply of fire fighting water in the fire fighting pipeline is insufficient. People usually wrap the thermal insulation material on the fire fighting pipeline, but the fire fighting pipeline on the fire fighting installation support is mostly at the highest position of each floor, so that the thermal insulation material is difficult to wrap the fire fighting pipeline.
Disclosure of Invention
The utility model aims at providing a fire control installing support, the technical problem that solve is: how to prevent the fire fighting pipeline on the fire fighting installation support from freezing in low-temperature weather.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a fire fighting installation bracket comprises a fixed frame, a bearing frame, a fixed box and a rock wool board;
the bearing frame is arranged at one end of the fixing frame, and the other end of the fixing frame is used for being connected with a wall body;
the bottom of the fixed box is connected with the bearing frame, and the side edge of the fixed box is connected with the fixed frame;
the fixed box is provided with a through hole for the fire fighting pipeline to pass through; the fixed box is internally provided with a rock wool board which is detachably connected with the fixed box.
By adopting the technical scheme, because the bearing frame is arranged at one end of the fixing frame, the fixing frame is connected with the wall body, and when the bearing frame is connected with the fixing frame, the bearing frame and the fixing frame form a support for placing a fire fighting pipeline. Because the fixed box is respectively connected with the bearing frame and the fixed frame and is relatively fixed, the fire fighting pipeline is arranged in the fixed box, and the fire fighting pipeline can be prevented from being exposed in the air. The rock wool board is arranged on the inner surface of the fixing box, has a heat-preserving effect, and is arranged on the inner surface of the fixing box, so that the fire-fighting pipeline is heat-preserved by the rock wool board, and the fire-fighting pipeline cannot be frozen in low-temperature weather.
The utility model discloses further set up to: the fixing frame comprises a first fixing frame and a second fixing frame, one end of the bearing frame is connected with the first fixing frame through a first hinge piece, and the other end of the bearing frame is connected with the second fixing frame through a locking piece.
Through adopting above-mentioned technical scheme, the mount with bear the support that the frame is connected and is constituteed and prevent the fire-fighting pipeline, bear the frame both ends and all need be connected with the mount, ensure the fire-fighting pipeline position after the installation. Because bear a frame one end and first mount and pass through first articulated elements and be connected, bear a frame at this moment and can pass through the hasp piece for the mount up-and-down motion, and bear a frame other end and pass through the hasp piece with the second mount and be connected, when bearing a frame and rotate the hookup location with the second mount through first mount of articulated elements relatively, will bear a frame and be connected with the second mount through the hasp piece, and the hasp piece is connected and is conveniently dismantled also the installation of being convenient for.
The utility model discloses further set up to: the lock catch piece comprises a movable latch tongue arranged on the bearing frame and a socket correspondingly arranged on the second fixing frame; the movable inserting tongue is used for being mutually meshed with the socket or being separated from the socket, and the movable inserting tongue is in threaded connection with the second fixing frame.
Through adopting above-mentioned technical scheme, when bearing a frame and being connected with the second mount, bear a frame and rotate the junction with the second mount through the articulated elements, bear the socket on the movable bolt of a leaf inserts the mount of bearing, will bear the specific position of a leaf connection at the mount, when the movable bolt breaks away from the socket, bear a frame and the mount and dismantle and open, the socket is fixed to the hookup location. And moreover, the screw rod penetrates through the movable inserting tongue and the fixed frame, and the movable inserting tongue and the fixed frame are fixedly connected together by screwing the screw on the screw rod. The connection mode not only ensures the connection position, but also enables the bearing frame to be detachably connected with the fixed frame.
The utility model discloses further set up to: the fire control installing support further comprises screws, and the screws are used for penetrating through the limiting holes to be connected with the threaded holes.
Through adopting above-mentioned technical scheme, in order to make fixed box can fixed mounting bear on the frame, it has spacing hole to open at fixed box bottom, bears the weight of and is equipped with the screw hole again, passes spacing hole through using the screw, bears the weight of the threaded hole connection on the frame, just so can make fixed box and bear the weight of and link together.
The utility model discloses further set up to: and rock wool boards are arranged on the inner surfaces of the fixed boxes and are connected through threads.
Through adopting above-mentioned technical scheme, keep warm to the fire-fighting pipeline through setting up the rock wool board in fixed box, we all install the rock wool board on through each face in fixed box for the fire-fighting pipeline is in the world of a rock wool board parcel completely, and each face all receives the protection of rock wool board, is unlikely to receive the influence of winter low temperature weather, makes the heat preservation effect better. Then pass through threaded connection with the rock wool board on every face of fixed box and be in the same place, the connected mode is simple, can also dismantle the rock wool board under special circumstances.
The utility model discloses further set up to: the rock wool board is connected with the fixed box through a spring lock; the spring lock comprises a lock catch and a lock head;
the lock catch is arranged on the fixed box and provided with a lock well, a spring and a fastener; the lock catch is provided with a spring cavity, and the spring cavity is provided with a through hole;
one end of the fastener is positioned in the lock well, the other end of the fastener penetrates through the spring cavity from the through hole, and a shifting block is arranged at the other end of the fastener;
the spring is positioned in the spring cavity and sleeved on the fastener;
the lock head is arranged on the rock wool plate and is used for being matched with the lock well in an inserting manner; the lock head is provided with a lock hole, and the fastener is used for being matched with the lock hole in an inserting mode when the lock head is inserted into the lock well.
Through adopting above-mentioned technical scheme, in this fire control installing support, the rock wool board needs to be in the same place with fixed box installation, and this scheme links together rock wool board and fixed box through the spring lock, and is equipped with a plurality of spring locks and realizes diversified connection. The spring lock comprises a lock head arranged on the rock wool board and a lock catch on the fixed box, wherein the lock catch on the fixed box is provided with a lock well, a spring and a fastener; the hasp is equipped with the spring chamber, and the spring chamber is equipped with the through-hole, and the one end of fastener is located the lockwell, and the other end of fastener is followed the through-hole passes the spring chamber, and the other end of fastener is equipped with the shifting block, controls the concrete position of one end in the lockwell through stirring the shifting block, and when the hasp was inserted to the tapered end, the tapered end promoted the fastener, and the fastener is whole to be removed toward the direction of keeping away from lockwell one end, compresses the spring of spring intracavity simultaneously, inserts lockwell preset position at the tapered end, when lockhole position paralleled with the fastener position on the tapered end, the spring of compressed. The lock hole is arranged on the lock head on the rock wool board, and one end of the fastener is inserted into the lock hole after the lock head enters a certain position of the lock well, so that the lock head is fixedly connected with the lock catch, and the rock wool board is connected with the fixed box.
The utility model discloses further set up to: the fixing box is provided with a fixing ring, the fixing ring is used for being sleeved on the fire pipeline and comprises a first half ring and a second half ring, and one end of the first half ring is connected with one end of the second half ring through a second hinge;
the other end of the first half ring is provided with a convex block, and a through hole is formed in the convex block;
the other end of the second half ring is provided with a rotating piece, the rotating piece is provided with a threaded rod, and the threaded rod is used for penetrating through the through hole when the rotating piece rotates to a first position and is far away from the joint of the first half ring and the second half ring when the rotating piece rotates to a second position;
the fire control installing support includes the nut, the nut is used for threaded connection at the threaded rod when the threaded rod rotates to the first position wear out the one end of through-hole.
Through adopting above-mentioned technical scheme, when placing the fire control pipeline in fixed box, because the fire control pipeline is columniform, poor stability easily takes place to rotate, here we just need to fix the fire control pipeline with fixed box, prevent like this that the fire control pipeline from taking place to rotate in fixed box and bring inconvenience. This scheme is provided with solid fixed ring on fixed box and fixes fire-fighting pipeline, and this solid fixed ring's diameter is the same with fire-fighting pipeline's external diameter, can be so that there is not the clearance between fire-fighting pipeline and the solid fixed ring for fire-fighting pipeline is more firm with solid fixed ring's fixed. Because solid fixed ring is connected by first semi-ring and second semi-ring and is constituteed, first semi-ring one end passes through second articulated elements swing joint with second semi-ring one end, and first semi-ring and second semi-ring accessible articulated elements rotate, rotate the fire control pipeline can conveniently put into the solid fixed ring intra-annular can. Because the other end of the first semi-ring is provided with a convex block, the center of the convex block is provided with a concave hole; the second semi-ring other end is equipped with the arch, and the arch is equipped with the rotating member, and the rotating member is provided with the threaded rod, and the threaded rod is equipped with the nut, and the threaded rod is used for being connected with the lug center shrinkage pool of first semi-ring. When fixing the fire-fighting pipeline through the fixed ring, when the threaded rod on the second semi-ring rotates the lug center recess department of first semi-ring through the rotating member, put into the recess with the threaded rod, then tighten the nut on the threaded rod, can fix the fire-fighting pipeline on fixed ring.
The utility model discloses further set up to: the rotating piece comprises a rotating frame and a rotating rod, one end of the rotating frame is provided with a first round hole, the other end of the rotating frame is provided with a second round hole, one end of the rotating rod penetrates through the first round hole, and the other end of the rotating rod penetrates through the second round hole;
the threaded rod is arranged on the rotating rod.
By adopting the technical scheme, the threaded rod is positioned on the rotating rod, and the rotating frame drives the threaded rod to rotate through the rotating rod; and both ends on the swivel mount are equipped with the round hole respectively, and the rotary rod passes the round hole at swivel mount both ends respectively and connects on the swivel mount, and the rotary rod passes the round hole also probably wholly to wear out the round hole, and the rotary rod is unstable with the being connected of swivel mount, and at this moment the threaded rod is located the rotary rod, and the threaded rod is fixed the rotary rod on the swivel mount, and the threaded rod can block rotary rod roll-off swivel mount on the rotary rod, just so can prevent rotary rod and swivel mount and break away from.
To sum up, the utility model discloses a beneficial technological effect does:
1. the fire fighting pipeline on the fire fighting installation support cannot be frozen in winter in low-temperature weather;
2. the bearing frame and the fixed frame are detachable;
3. the fixed box is detachably connected to the fire-fighting installation support;
4. the rock wool board is detachably connected to the fixed box;
5. the fire fighting pipeline is fixed in the fixed ring.
Drawings
Fig. 1 is a schematic structural view of a fire fighting mounting bracket according to an embodiment of the present invention.
Fig. 2 is an exploded view of the snap lock portion of fig. 1.
In the figure, 1, a fixed frame; 101. a first fixing frame; 102. a second fixing frame; 2. a carrier; 3. a fixing box; 4. a first half ring; 5. rock wool boards; 6. a first hinge member; 7. a second half ring; 8. a second hinge member; 9. a latch; 10. a movable insertion tongue; 11. a socket; 12. a threaded rod; 13. a nut; 14. a bump; 15. a through hole; 16. rotating the rod; 17. a first circular hole; 18. a rotating frame; 19. a second circular hole; 91. locking; 92. locking the well; 93. a plug-in unit; 94. a fastener; 95. a spring cavity; 96. a spring; 97. shifting blocks; 98. a lock head; 99. and (6) locking the hole.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a fire control installing support, including mount 1, bear frame 2, fixed box 3 and rock wool board 5, mount 1, the material that bears frame 2 and fixed box 3 all can be the stainless steel preparation, and mount 1 can be L shape steelframe, bears frame 2 and can be the rectangular steel sheet, and fixed box 3 can be rectangular bodily form steel box, is difficult by corroding and damaging through using stainless steel material like this, and life and security also can obtain the reinforcing. Bear frame 2 and set up in 1 one end of mount, the mount 1 other end is used for being connected with the wall body, bears frame 2 and can dismantle with 1 one end of mount and be connected, and the one end of mount 1 also is through threaded connection with mount 11 on the wall body. The fixing box 3 can be a cuboid box, the bottom of the fixing box 3 is connected with the bearing frame 2, the side edge of the fixing box 3 is connected with the fixing frame 1, and the fixing of the fixing box 3 is realized by respectively connecting the bottom and the two side edges of the fixing box 3 with the bearing frame 2 and the fixing frame 1. Be equipped with the through-hole 15 that supplies the fire control pipeline to pass on fixed box 3, this through-hole 15 is the same with the size of fire control pipeline for the fire control pipeline can be fast convenient pass fixed box 3 contract in. Be provided with rock wool board 5 in the fixed box 3, rock wool board 5 is the same with each internal surface size of fixed box 3, makes it to install accurately on fixed box 3, for the assembly and disassembly convenient and fast between rock wool board 5 and the fixed box 3, rock wool board 5 is connected with dismantling of fixed box 3 adoption.
Further, referring to fig. 1, the fixing frame 1 includes a first fixing frame 101 and a second fixing frame 102, the first fixing frame 101 and the second fixing frame 102 have the same shape and size, and the second fixing frame 102 is disposed in parallel with respect to the first fixing frame 101, one end of the bearing frame 2 is connected to the first fixing frame 101 through the first hinge 6, the bearing frame 2 can rotate up and down with respect to the first fixing frame 101, when the bearing frame 2 rotates to a connection position with the second fixing frame 102 with respect to the first fixing frame 101, the other end of the bearing frame 2 is connected to the second fixing frame 102 through the locking device 91, so as to achieve detachable connection between the bearing frame 2 and the second fixing frame 102.
Referring to fig. 1, the locking device 91 includes a movable tongue 10 disposed on the carrier 2 and a corresponding socket 11 disposed on the second fixing frame 102, the movable tongue 10 may be a rectangular block, the socket 11 may be a socket 11 opened near one end of the carrier 2, the socket 11 is disposed on the second fixing frame 102 by disposing the movable tongue 10 on the carrier 2, where the second fixing frame 102 is fixed, the connecting position of the carrier 2 and the second fixing frame 102 is achieved by rotating the carrier 2, so that the movable tongue 10 is inserted into the socket 11 on the second fixing frame 102, and the movable tongue 10 is used for engaging with the socket 11 or disengaging from the socket 11. The movable latch 10 on the bearing frame 2 is mutually meshed and connected with the socket 11 on the fixed frame 1, the bearing frame 2 cannot be fixedly connected with the fixed frame 1 through the meshed connection of the movable latch 10 and the socket 11, at this time, the movable latch 10 is in threaded connection with the second fixed frame 1021, and the bearing frame 2 is fixedly connected with the fixed frame 1 through the movable latch 10 on the bearing frame 2 by screws.
Further, referring to fig. 1, the bottom of the fixing box 3 is provided with two limiting holes, which may be circular holes, and the two limiting holes may be disposed at the same distance from the first fixing frame 101 to the second fixing frame 102 at the bottom of the fixing box 3. Bear frame 2 and be equipped with the screw hole, the screw hole size is unanimous with spacing hole size, and the fire control installing support still includes the screw, and the screw is identical with the size of screw hole and spacing hole, and the screw is used for passing spacing hole and is connected with the screw hole, will fix the box 3 and install on bearing frame 2.
Further, referring to fig. 1, each internal surface of fixed box 3 all is equipped with rock wool board 5, and the shape size of rock wool board 5 shape is the same with the shape size of each internal surface of fixed box 3, and rock wool board 5 is the rectangle, installs the back on fixed box 3 at rock wool board 5 like this, all installs rock wool board 5 at each internal surface of fixed box 3 for rock wool board 5 is better to fire control pipeline's sealed insulation performance. The rock wool boards 5 are connected through threads between the rock wool boards 5, the rock wool boards 5 installed on the inner surfaces of the fixing boxes 3 are independently located on the inner surfaces of the fixing boxes 3, when the rock wool boards are put into installation and use, in order to guarantee the convenience and good sealing performance of connection between the rock wool boards 5, the fixing boxes 3 and the rock wool boards 5 are connected through the threads, and the objects in the threads are convenient to install and strong in connection compactness.
Wherein, referring to fig. 2, rock wool board 5 passes through spring lock 9 with fixed box 3 and is connected, and spring lock 9 can be the cuboid shape, and spring lock 9 includes hasp 91 and tapered end 98, and tapered end 98 can be massive structure, and hasp 91 sets up on fixed box 3, and hasp 91 is equipped with lock well 92, spring 96 and fastener 94, and lock well 92 be with the well hole that tapered end 98 shape is relative to, and spring 96 can be compression spring, and fastener 94 main part is the cylinder shape. The lock catch 91 is provided with a spring cavity 95, the spring cavity 95 can be cylindrical, the spring cavity 95 is provided with a through hole 15, and the through hole 15 can be a circular through hole 15; one end of a fastener 94 is located in the lock well 92, one end of the fastener 94 located in the lock well 92 is provided with an insertion block, the insertion block is an inclined plane body, the other end of the fastener 94 penetrates through a spring cavity 95 from the through hole 15, the other end of the fastener 94 penetrating through the spring cavity 95 is provided with a shifting block 97, the shifting block 97 can be circular, the spring 96 is located in the spring cavity 95, the length of the spring 96 is the same as that of the spring cavity 95, the spring 96 is sleeved on the fastener 94, the spring 96 is compressed when the fastener 94 moves towards one end far away from the lock well 92, and the compressed spring 96 is used for pushing the fastener 94 to move when the fastener 94 needs to move towards one end of the lock well 92; the lock 98 is arranged on the rock wool plate 5, the lock 98 can be rectangular, and the lock 98 is used for being matched with the lock well 92 in an inserted manner; the tapered end 98 is provided with a locking hole 99, the locking hole 99 can be called a circular hole, the fastener 94 is used for being matched with the locking hole 99 in an inserting manner when the tapered end 98 is inserted into the locking well 92, the inserting engagement means that when the rock wool board 5 is required to be connected to the fixing box 3, the tapered end 98 on the rock wool board 5 is inserted into the locking well 92 on the fixing box 3, the tapered end 98 extrudes the inclined surface of the inserting block to push the fastener 94 to compress the spring 96, when the tapered end 98 moves to the position of the locking hole 99 on the tapered end 98 to be parallel to the horizontal position of the fastener 94, the compressed spring 96 pushes the fastener 94 to drive the inserting block to be inserted into the locking hole 99, so.
Further, referring to fig. 1, the fixing box 3 is provided with a fixing ring, the fixing ring can be circular, the fixing ring is used for being sleeved on the fire-fighting pipeline, the position of the fire-fighting pipeline in the fixing box 3 is fixed, the fixing ring comprises a first half ring 4 and a second half ring 7, one end of the first half ring 4 is connected with one end of the second half ring 7 through a second hinge member 8, so that the second half ring 7 can rotate relative to the first half ring 4, and the size of an inner cavity of the fixing ring can be changed. The other end of the first half ring 4 is provided with a convex block 14, the convex block 14 is provided with a through hole 15 which penetrates through the convex block, the through hole 15 is larger than the threaded rod 12, the through hole 15 is smaller than the nut 13, the other end of the second half ring 7 is provided with a rotating piece, the rotating piece is provided with the threaded rod 12, the threaded rod 12 is used for penetrating through the through hole 15 when the rotating piece rotates to a first position, the first half ring 4 and the second half ring can be connected, and the joint of the first half ring 4 and the second half ring 7 is far away from when the rotating piece rotates to a second position, at the moment, the first half ring 44 and the second half ring 7 are opened, and the fixing ring is fixed on a fire fighting pipeline or is. The fire fighting mounting bracket comprises a nut 13, the nut 13 is used for being screwed at one end of the threaded rod 12 penetrating through the through hole 15 when the threaded rod 12 rotates to the first position, the nut 13 is moved on the threaded rod 12 by screwing the nut 13, the second half ring 7 is pushed to approach the first half ring 4 when the nut 13 moves to the through hole 15, and the nut 13 is stopped being screwed until the first half ring 4 and the second half ring 7 are connected together.
Further, referring to fig. 1, the rotating member includes a rotating frame 18 and a rotating rod 16, the rotating frame 18 may be in a rectangular parallelepiped block shape, one end of the rotating frame 18 is provided with a first circular hole 17, the other end is provided with a second circular hole 19, the first circular hole 17 and the second circular hole 19 may be circular holes having the same size, one end of the rotating rod 16 passes through the first circular hole 17, the other end passes through the second circular hole 19, and the rotating rod 16 may rotate on the rotating frame 18; the threaded rod 12 is arranged on the rotating rod 16, the threaded rod 12 is arranged on the part, located between the first round hole 17 and the second round hole 19, of the rotating rod 16, the threaded rod 12 can rotate relative to the second half ring 7 along with the rotation of the threaded rod 12, when the threaded rod 12 rotates to the joint of the first half ring 4 and the second half ring, the threaded rod 12 is inserted into the through hole 15, and then the nut 13 is screwed to connect the first half ring 4 and the second half ring 7.
The implementation principle of the embodiment is as follows: through utilizing the articulated elements to connect bearing frame 2 one end on first mount 101, bearing frame 2 passes through the articulated elements and rotates for first adjustable shelf, when bearing frame 2 rotates to bearing frame 2 and second mount 102 junction, with bearing frame 2 other end through hasp 91 piece connect on second mount 102, hasp 91 easily dismantles and installs. Set up fixed box 3 on the fire control installing support, the fire control pipeline passes from 3 both ends of fixed box, and 3 bottoms of fixed box are connected on bearing frame 2, and 3 sides of fixed box are connected on mount 1, set up rock wool board 5 in fixed box 3, and rock wool board 5 can dismantle through spring lock 9 and connect in fixed box 3. Through installing rock wool board 5 at fixed box 3, rock wool board 5 keeps warm in fixed box 3 to the fire control pipeline that is located on the fire control installing support that passes in fixed box 3 keeps warm, prevents that the fire control pipeline from freezing under winter low temperature weather, influences the supply of fire-fighting water.
Be equipped with solid fixed ring in fixed box 3, gu fixed ring is used for the cover to establish on the fire-fighting pipeline, fix the position of fire-fighting pipeline in fixed box 3, gu fixed ring includes first semi-ring 4 and second semi-ring 7, the articulated elements is passed through to the one end of first semi-ring 4 and second semi-ring 7 and is connected, can rotate relatively between first semi-ring 4 and the second semi-ring 7, when establishing the fire-fighting pipeline with solid fixed ring cover, first semi-ring 4 rotates the inner chamber that enlarges solid fixed ring with second semi-ring 7 relatively, it is more convenient when making the cover establish on the fire-fighting pipeline. The other end of the first semi-ring 4 is provided with a convex block 14, and the convex block 14 is provided with a through hole 15; the other end of the second semi-ring 7 is provided with a rotating part, the rotating part is provided with a threaded rod 12, the threaded rod 12 is used for penetrating through a through hole 15 when the rotating part rotates to a first position and is far away from the joint of the first semi-ring 4 and the second semi-ring 7 when the rotating part rotates to a second position, the first semi-ring 4 and the second semi-ring 7 can be connected together by rotating the threaded rod 12 and then screwing a nut 13 on the threaded rod 12, namely, the fixed ring is sleeved on the fire-fighting pipeline.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. A fire control installing support which characterized in that: comprises a fixed frame (1), a bearing frame (2), a fixed box (3) and a rock wool board (5);
the bearing frame (2) is arranged at one end of the fixing frame (1), and the other end of the fixing frame (1) is used for being connected with a wall body;
the bottom of the fixed box (3) is connected with the bearing frame (2), and the side edge of the fixed box (3) is connected with the fixed frame (1);
a through hole (15) for the fire fighting pipeline to pass through is arranged on the fixed box (3); be provided with rock wool board (5) in fixed box (3), rock wool board (5) with fixed box (3) can be dismantled and be connected.
2. A fire fighting mounting bracket as defined in claim 1, wherein: the fixing frame (1) comprises a first fixing frame (101) and a second fixing frame (102), one end of the bearing frame (2) is connected with the first fixing frame (101) through a first hinge piece (6), and the other end of the bearing frame (2) is connected with the second fixing frame (102) through a lock catch (91).
3. A fire fighting mounting bracket as defined in claim 2, wherein: the lock catch (91) comprises a movable inserting tongue (10) arranged on the bearing frame (2) and a socket (11) correspondingly arranged on the second fixing frame (102); the movable inserting tongue (10) is used for being mutually meshed with the socket (11) or being separated from the socket (11), and the movable inserting tongue (10) is in threaded connection with the second fixing frame (102).
4. A fire fighting mounting bracket as defined in claim 1 or 2, wherein: the fire control mounting bracket is characterized in that a limiting hole is formed in the bottom of the fixing box (3), a threaded hole is formed in the bearing frame (2), and the screw is used for penetrating through the limiting hole and connected with the threaded hole.
5. A fire fighting mounting bracket according to claim 4, characterized in that: each internal surface of fixed box (3) all is equipped with rock wool board (5), pass through threaded connection between rock wool board (5).
6. A fire fighting mounting bracket as defined in claim 5, wherein: the rock wool board (5) is connected with the fixed box (3) through a spring lock (9); the spring lock (9) comprises a lock catch (91) and a lock head (98);
the lock catch (91) is arranged on the fixed box (3), and the lock catch (91) is provided with a lock well (92), a spring (96) and a fastener (94); the lock catch (91) is provided with a spring cavity (95), and the spring cavity (95) is provided with a through hole (15);
one end of the fastener (94) is positioned in the lock well (92), the other end of the fastener (94) penetrates through the spring cavity (95) from the through hole (15), and the other end of the fastener (94) is provided with a shifting block (97);
the spring (96) is positioned in the spring cavity (95), and the spring (96) is sleeved on the fastener (94);
the lock head (98) is arranged on the rock wool plate (5), and the lock head (98) is used for being in plug-in fit with the lock well (92); the lock head (98) is provided with a lock hole (99), and the fastener (94) is used for being matched with the lock hole (99) in an inserting mode when the lock head (98) is inserted into the lock well (92).
7. A fire fighting mounting bracket according to any one of claims 1-3, 5-6, characterized in that: the fixing box (3) is provided with a fixing ring, the fixing ring is used for being sleeved on a fire-fighting pipeline and comprises a first half ring (4) and a second half ring (7), and one end of the first half ring (4) is connected with one end of the second half ring (7) through a second hinge piece (8);
the other end of the first half ring (4) is provided with a convex block (14), and the convex block (14) is provided with a through hole (15);
the other end of the second half ring (7) is provided with a rotating piece, the rotating piece is provided with a threaded rod (12), and the threaded rod (12) is used for penetrating through the through hole (15) when the rotating piece rotates to a first position and is far away from the joint of the first half ring (4) and the second half ring (7) when the rotating piece rotates to a second position;
the fire control installing support includes nut (13), nut (13) are used for threaded connection in threaded rod (12) when threaded rod (12) rotate to the first position wear out the one end of through-hole (15).
8. A fire fighting mounting bracket as defined in claim 7, wherein: the rotating piece comprises a rotating frame (18) and a rotating rod (16), one end of the rotating frame (18) is provided with a first round hole (17), the other end of the rotating frame is provided with a second round hole (19), one end of the rotating rod (16) penetrates through the first round hole (17), and the other end of the rotating rod penetrates through the second round hole (19);
the threaded rod (12) is arranged on the rotating rod (16).
CN201921159374.2U 2019-07-23 2019-07-23 Fire control installing support Active CN210583448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921159374.2U CN210583448U (en) 2019-07-23 2019-07-23 Fire control installing support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921159374.2U CN210583448U (en) 2019-07-23 2019-07-23 Fire control installing support

Publications (1)

Publication Number Publication Date
CN210583448U true CN210583448U (en) 2020-05-22

Family

ID=70701487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921159374.2U Active CN210583448U (en) 2019-07-23 2019-07-23 Fire control installing support

Country Status (1)

Country Link
CN (1) CN210583448U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114403120A (en) * 2022-02-28 2022-04-29 芜湖快螳螂智能设备有限公司 Steam sprayer convenient to disassemble

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114403120A (en) * 2022-02-28 2022-04-29 芜湖快螳螂智能设备有限公司 Steam sprayer convenient to disassemble

Similar Documents

Publication Publication Date Title
CN210583448U (en) Fire control installing support
CN215172827U (en) Energy-saving emission-reducing type fire-fighting pipeline installation structure
CN204898957U (en) Grafting connection structure of glass curtain wall crossbeam and stand
CN205475741U (en) Combination refrigeration house plate locking structure
CN111140724A (en) Pipeline protection casing of convenient maintenance
CN213847232U (en) Indoor temperature controller
CN206177022U (en) Clean stove furnace gate sealing pressing device of high temperature
CN214461446U (en) Stable form wall body installation mechanism
CN110107791B (en) Arc-shaped mounting and fixing structure of LED display screen box body
CN210638197U (en) Steel construction air conditioner support
CN214512418U (en) Novel indoor fire hydrant box
CN211058907U (en) Anti-disassembly unmanned mobile generator set
CN219351264U (en) Cable support and engineering machinery
CN218351931U (en) Integrated form switch board for data center that radiating effect is good
CN212776639U (en) Internet of things monitor mounting structure applied to big data aspect
CN112867306A (en) Converter cabinet
CN113700416A (en) Building energy-saving aluminum alloy door and window
CN219712799U (en) Lock catch
CN217011104U (en) Speaker is used in culture propaganda of basic level crowd
CN211743732U (en) Solid insulation looped netowrk cabinet is with solid switch that seals
CN220666544U (en) Energy-saving and heat-insulating device for assembled building
CN213806016U (en) Open type metal plate curtain wall hanging device
CN219808528U (en) Heat preservation and heat insulation wall is built in room
CN220704844U (en) Assembled heat preservation energy-saving wall structure
CN219261401U (en) Building firewall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.14, Shangdong 1st lane, Yingpan, Jinguang community, Pingshan street, Huidong County, Huizhou City, Guangdong Province, 516300

Patentee after: Guangdong pilot Intelligent Construction Technology Co.,Ltd.

Address before: 518112 room 205, building B, Lihao Industrial Park, 78 ainan Road, Longdong community, Baolong street, Longgang District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Huishen Boyue Wisdom Construction Technology Co.,Ltd.