CN215172801U - Pipeline support for laying water supply and drainage pipeline - Google Patents

Pipeline support for laying water supply and drainage pipeline Download PDF

Info

Publication number
CN215172801U
CN215172801U CN202121235904.4U CN202121235904U CN215172801U CN 215172801 U CN215172801 U CN 215172801U CN 202121235904 U CN202121235904 U CN 202121235904U CN 215172801 U CN215172801 U CN 215172801U
Authority
CN
China
Prior art keywords
fixing
rod
horizontal pole
pipeline
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121235904.4U
Other languages
Chinese (zh)
Inventor
张子冰
靳嘉
魏明伟
李贵显
卢名扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121235904.4U priority Critical patent/CN215172801U/en
Application granted granted Critical
Publication of CN215172801U publication Critical patent/CN215172801U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model provides a lay and use pipeline support for drainage pipe relates to drain pipe support technical field, including base, horizontal pole, mounting bracket and connecting device, the base has been placed to the upper surface of mounting bracket, the last fixed surface of base is connected with the horizontal pole, the inner wall of horizontal pole is provided with connecting device, connecting device includes the connecting block, the inner wall sliding connection of connecting block and horizontal pole, the pipeline has been placed between connecting block and the horizontal pole, the fixed surface of horizontal pole is connected with the spliced pole, the surperficial cover of spliced pole is established and sliding connection has the connecting rod. The utility model discloses, set up connecting device, be convenient for carry out effectual connection and fixed to the pipeline, and then avoided traditional equipment to connect the operation through the mode of bolt often at the connecting tube, the easy atress deformation of bolt appears the condition of smooth silk when using equipment, and then reduces the fault rate of equipment, and then reduces the maintenance cost of equipment, the normal use of the equipment of being convenient for.

Description

Pipeline support for laying water supply and drainage pipeline
Technical Field
The utility model relates to a drain pipe support technical field especially relates to a pipeline support is used to laying for water supply and drainage pipeline.
Background
Water supply and drainage engineering is the system that is used for water to supply with and waste water to carry in the middle of the city, uses a large amount of pipe connections to form water supply and drainage pipeline, and some pipelines use welded connection, and some pipelines use threaded connection and seal, in order to carry out the tube coupling better sooner, need use auxiliary stand.
At present, most of existing drain pipes need to use a support when being laid, most of existing equipment are often connected through a bolt in a connecting pipeline, the bolt is easy to deform under stress when the equipment is used, the condition of wire sliding is caused, the fault rate of the equipment is improved, the maintenance cost of the equipment is increased, the normal use of the equipment is not facilitated, and the improvement is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having most equipment among the prior art and connect the operation through the mode of bolt often at the connecting tube, the easy atress deformation of bolt appears the condition of smooth silk when using of equipment, and then improve equipment's fault rate, and then increase the maintenance cost of equipment, be unfavorable for the shortcoming of equipment normal use, and the pipeline support for laying of a water drainage pipeline that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a for drainage pipe lays and uses pipeline support, includes base, horizontal pole, mounting bracket and connecting device, the base has been placed to the upper surface of mounting bracket, the last fixed surface of base is connected with the horizontal pole, the inner wall of horizontal pole is provided with connecting device, connecting device includes the connecting block, the inner wall sliding connection of connecting block and horizontal pole, the pipeline has been placed between connecting block and the horizontal pole, the fixed surface of horizontal pole is connected with the spliced pole, sliding connection has the connecting rod for the surface cover of spliced pole is established, the fixed surface of connecting rod is connected with connecting spring.
Preferably, one side of the connecting spring, which is far away from the connecting rod, is fixedly connected with the surface of the cross rod, the inner wall of the connecting rod penetrates through and is connected with a limiting rod in a sliding manner, and the surface of the limiting rod is fixedly connected with a limiting spring.
Preferably, one side of the limiting spring, which is far away from the limiting rod, is fixedly connected with the surface of the connecting rod, the limiting rod is matched with the inner wall of the connecting column, and the connecting rod is matched with the inner wall of the connecting block.
Preferably, the quantity of connecting block, connecting rod, spliced pole and gag lever post is two, two connecting block, connecting rod, spliced pole and gag lever post all use the pipeline to be the symmetry setting as the symmetry axis.
Preferably, the surface of base is provided with fixing device, fixing device includes fixed block and fixed column, the fixed block is connected with the fixed surface of base, the inner wall of base runs through and sliding connection has the fixed column, the inner wall of fixed column runs through and sliding connection has the dead lever.
Preferably, the fixed surface of the fixed rod is fixedly connected with a fixed spring, one side of the fixed spring, far away from the fixed rod, is fixedly connected with the base, and the inner wall of the fixed block is penetrated through and is connected with a pull rod in a sliding mode.
Preferably, the surface of the pull rod is fixedly connected with a tension spring, one side of the tension spring, far away from the pull rod, is fixedly connected with a fixed block, the number of the fixed blocks, the number of the fixed rods and the number of the fixed columns are two, and the two fixed blocks, the fixed columns and the fixed rods are symmetrically arranged by taking the pipeline as a symmetry axis.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. in the utility model, by arranging the connecting device, before the device is used, the pipeline is put into the cross rod, the connecting block and the inner wall of the cross rod slide down, the connecting rod is pulled to make the connecting rod displace and drive the connecting spring to displace and deform to generate elastic force, then the limiting rod loses constraint, the limiting spring resets and drives the limiting rod to be matched with the inner wall of the connecting column, when the connecting block slides to a proper position, the constraint on the limiting rod is loosened, then the connecting rod loses constraint, the connecting spring resets and drives the connecting rod to reset and be matched with the inner wall of the connecting block, the connection and the fixation of the device are completed, the connecting device is arranged to facilitate the effective connection and the fixation of the pipeline, thereby avoiding the connection operation of the traditional device in a bolt mode when the connecting pipeline is connected, the situation that the bolt is easy to be stressed and deformed to generate slippery threads when the device is used is avoided, further reducing the failure rate of the device, further reducing the maintenance cost of the device, the normal use of the equipment is convenient.
2. The utility model discloses in, through setting up fixing device, before the equipment fixing, the user places its base in the downward pulling pull rod of suitable position, make its pull rod displacement drive tension spring displacement deformation and produce elasticity, stimulate the dead lever immediately, the dead lever drives the deformation of fixed spring displacement and produces elasticity immediately, loosen the constraint to the pull rod, tension spring resets and drives pull rod displacement and dead lever counterbalance, the fixed column loses the constraint immediately, install and align, accomplish the fixed and removal of equipment, set up fixing device, be convenient for maintain equipment, avoid traditional support to adopt the mode that cement was pour to fix a position, there is complex operation's problem during the dismantlement equipment, and then reduce the dismantlement cost of equipment, reduce the maintenance degree of difficulty of equipment, and then improve equipment's life.
Drawings
FIG. 1 is a schematic perspective view of a pipe bracket for laying a water supply and drainage pipe according to the present invention;
FIG. 2 is a schematic side view of the pipe bracket for laying a water supply and drainage pipe according to the present invention;
FIG. 3 is a schematic view of the connection device of the pipe bracket for laying the water supply and drainage pipe according to the present invention;
FIG. 4 is a schematic structural view of a fixing device of a pipe bracket for laying a water supply and drainage pipe according to the present invention;
fig. 5 is a schematic view of a overlooking structure of the pipe bracket for laying the water supply and drainage pipe.
Illustration of the drawings: 1. a base; 2. a cross bar; 3. a mounting frame; 4. a connecting device; 41. connecting columns; 42. a connecting rod; 43. a limiting rod; 44. a limiting spring; 45. a connecting spring; 46. connecting blocks; 47. a pipeline; 5. a fixing device; 51. fixing the rod; 52. fixing the spring; 53. a fixed block; 54. a tension spring; 55. a pull rod; 56. and (5) fixing the column.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
Embodiment 1, as shown in fig. 1-5, a pipeline support for laying a water supply and drainage pipeline comprises a base 1, a cross rod 2, a mounting rack 3 and a connecting device 4, wherein the base 1 is placed on the upper surface of the mounting rack 3, and the cross rod 2 is fixedly connected to the upper surface of the base 1.
The specific arrangement and function of the connecting means 4 and the fixing means 5 will be described in detail below.
As shown in fig. 1 and 3, connecting device 4 includes connecting block 46, the inner wall sliding connection of connecting block 46 and horizontal pole 2, pipeline 47 has been placed between connecting block 46 and the horizontal pole 2, the fixed surface of horizontal pole 2 is connected with spliced pole 41, the surface cover of spliced pole 41 is established and sliding connection has connecting rod 42, the fixed surface of connecting rod 42 is connected with coupling spring 45, one side that connecting rod 42 was kept away from to coupling spring 45 is connected with the fixed surface of horizontal pole 2, the inner wall of connecting rod 42 runs through and sliding connection has gag lever post 43, the fixed surface of gag lever post 43 is connected with spacing spring 44, the setting of connecting rod 42 makes its device more fixed on it.
Spacing spring 44 keeps away from one side of gag lever post 43 and connecting rod 42's fixed surface connection, gag lever post 43 and spliced pole 41's inner wall looks adaptation, connecting rod 42 and connecting block 46's inner wall looks adaptation, connecting block 46, connecting rod 42, the quantity of spliced pole 41 and gag lever post 43 is two, two connecting blocks 46, connecting rod 42, spliced pole 41 and gag lever post 43 all use pipeline 47 to be the symmetry setting as the symmetry axis, the setting up of gag lever post 43 makes its device more reasonable on it.
The whole connecting device 4 achieves the effect that by arranging the connecting device 4, before the device is used, a pipeline 47 is placed in a cross rod 2, a connecting block 46 and the inner wall of the cross rod 2 slide down, a connecting rod 42 is pulled to displace and drive a connecting spring 45 to displace and deform to generate elastic force, then a limiting rod 43 loses constraint, a limiting spring 44 resets and drives the limiting rod 43 to be matched with the inner wall of a connecting column 41, when the connecting block 46 slides to a proper position, the constraint on the limiting rod 43 is loosened, then the connecting rod 42 loses constraint, the connecting spring 45 resets and drives the connecting rod 42 to reset and be matched with the inner wall of the connecting block 46, the connection and the fixation of equipment are completed, the connecting device 4 is arranged to facilitate the effective connection and the fixation of the pipeline 47, further, the phenomenon that the traditional equipment is frequently connected and operated by a bolt in a bolt mode when the traditional equipment is used, and the bolt is easy to deform to generate a condition of thread sliding when the equipment is used is avoided, and further, the failure rate of the equipment is reduced, the maintenance cost of the equipment is reduced, and the normal use of the equipment is facilitated.
As shown in fig. 1 and 5, the fixing device 5 includes a fixing block 53 and a fixing column 56, the fixing block 53 is fixedly connected to the surface of the base 1, the fixing column 56 penetrates through and is slidably connected to the inner wall of the base 1, the fixing rod 51 penetrates through and is slidably connected to the inner wall of the fixing column 56, the fixing spring 52 is fixedly connected to the surface of the fixing rod 51, one side of the fixing spring 52, which is far away from the fixing rod 51, is fixedly connected to the base 1, the pull rod 55 penetrates through and is slidably connected to the inner wall of the fixing block 53, and the fixing rod 51 is arranged on the fixing block to enable the device to be more fixed.
The surface of the pull rod 55 is fixedly connected with a tension spring 54, one side of the tension spring 54, which is far away from the pull rod 55, is fixedly connected with the fixed block 53, the fixed rod 51 and the fixed rod 56 are respectively two in number, the two fixed blocks 53, the fixed rods 56 and the fixed rod 51 are symmetrically arranged by taking the pipeline 47 as a symmetry axis, and the tension spring 54 is arranged to facilitate use of a user.
The whole fixing device 5 has the effects that by arranging the fixing device 5, before the equipment is installed, a user places the base 1 of the equipment at a proper position to pull the pull rod 55 downwards to enable the pull rod 55 to displace and drive the tension spring 54 to displace and deform to generate elastic force, then pulls the fixed rod 51, then the fixed rod 51 drives the fixed spring 52 to displace and deform to generate elastic force, the constraint on the pull rod 55 is released, the tension spring 54 resets to drive the pull rod 55 to displace and abut against the fixed rod 51, then the fixed column 56 loses constraint to carry out installation and alignment, the fixing and the movement of the equipment are finished, the fixing device 5 is arranged, the equipment is convenient to maintain, the traditional bracket is prevented from being positioned by adopting a cement pouring mode, and the problem of complex operation is caused when the equipment is disassembled, therefore, the disassembly cost of the equipment is reduced, the maintenance difficulty of the equipment is reduced, and the service life of the equipment is prolonged.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (7)

1. The utility model provides a plumbing fixture is laid to water supply and drainage pipeline, includes base (1), horizontal pole (2), mounting bracket (3) and connecting device (4), its characterized in that: base (1) have been placed to the upper surface of mounting bracket (3), the last fixed surface of base (1) is connected with horizontal pole (2), the inner wall of horizontal pole (2) is provided with connecting device (4), connecting device (4) include connecting block (46), the inner wall sliding connection of connecting block (46) and horizontal pole (2), pipeline (47) have been placed between connecting block (46) and horizontal pole (2), the fixed surface of horizontal pole (2) is connected with spliced pole (41), sliding connection has connecting rod (42) is established and sliding connection to the surface cover of spliced pole (41), the fixed surface of connecting rod (42) is connected with connecting spring (45).
2. The pipe support for laying a water supply and drainage pipe according to claim 1, wherein: one side of connecting rod (42) is kept away from in connecting spring (45) is connected with the fixed surface of horizontal pole (2), the inner wall of connecting rod (42) runs through and sliding connection has gag lever post (43), the fixed surface of gag lever post (43) is connected with spacing spring (44).
3. The pipe support for laying a water supply and drainage pipe according to claim 2, wherein: spacing spring (44) keep away from the fixed surface of one side of gag lever post (43) and connecting rod (42) and be connected, gag lever post (43) and the inner wall looks adaptation of spliced pole (41), the inner wall looks adaptation of connecting rod (42) and connecting block (46).
4. A pipe support for laying a water supply and drainage pipe according to claim 3, wherein: the quantity of connecting block (46), connecting rod (42), spliced pole (41) and gag lever post (43) is two, two connecting block (46), connecting rod (42), spliced pole (41) and gag lever post (43) all use pipeline (47) to be the symmetry setting as the symmetry axis.
5. The pipe support for laying a water supply and drainage pipe according to claim 1, wherein: the surface of base (1) is provided with fixing device (5), fixing device (5) are including fixed block (53) and fixed column (56), the fixed block (53) is connected with the fixed surface of base (1), the inner wall of base (1) runs through and sliding connection has fixed column (56), the inner wall of fixed column (56) runs through and sliding connection has dead lever (51).
6. The pipe support for laying a water supply and drainage pipe according to claim 5, wherein: the surface of the fixing rod (51) is fixedly connected with a fixing spring (52), one side, far away from the fixing rod (51), of the fixing spring (52) is fixedly connected with the base (1), and the inner wall of the fixing block (53) penetrates through and is connected with a pull rod (55) in a sliding mode.
7. The pipe support for laying a water supply and drainage pipe according to claim 6, wherein: the surface of the pull rod (55) is fixedly connected with a tension spring (54), one side, far away from the pull rod (55), of the tension spring (54) is fixedly connected with a fixing block (53), the number of the fixing rod (51) and the number of the fixing column (56) are two, and the two fixing blocks (53), the fixing column (56) and the fixing rod (51) are symmetrically arranged by taking the pipeline (47) as a symmetry axis.
CN202121235904.4U 2021-06-03 2021-06-03 Pipeline support for laying water supply and drainage pipeline Expired - Fee Related CN215172801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121235904.4U CN215172801U (en) 2021-06-03 2021-06-03 Pipeline support for laying water supply and drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121235904.4U CN215172801U (en) 2021-06-03 2021-06-03 Pipeline support for laying water supply and drainage pipeline

Publications (1)

Publication Number Publication Date
CN215172801U true CN215172801U (en) 2021-12-14

Family

ID=79389853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121235904.4U Expired - Fee Related CN215172801U (en) 2021-06-03 2021-06-03 Pipeline support for laying water supply and drainage pipeline

Country Status (1)

Country Link
CN (1) CN215172801U (en)

Similar Documents

Publication Publication Date Title
CN209398949U (en) A kind of comprehensive support for Pipe installing
CN215172801U (en) Pipeline support for laying water supply and drainage pipeline
CN109163146A (en) Pipe installing structure and its installation method
CN203891468U (en) Fixing device for pouring building pipeline embedded part
CN113346425B (en) Cable trench supporting device
CN205811471U (en) The scalable cable clip device that a kind of mine down-hole is easy for installation
CN107120480A (en) A kind of anti-rock para-seismic support for being easy to adjust pipeline setting height(from bottom)
CN209066490U (en) A kind of dedicated bearing diagonal component of piping lane
CN215484886U (en) Adjustable strutting arrangement for building
CN215275559U (en) Water knockout drum for fire control
CN219082465U (en) Pipeline hanging bracket for electromechanical engineering
CN219673516U (en) Building pipeline support
CN210461961U (en) Pipeline connection construction supporting device
CN207144123U (en) A kind of building decoration floor drain
CN216667803U (en) Device for controlling distance between water supply and return branch pipes of radiator
CN219827983U (en) Pipeline support and hanger
CN210770696U (en) Pipe clamp for connecting wire arrangement pipes
CN212337724U (en) Quick installation of stealthily dirty pump directly links structure
CN209354755U (en) A kind of Pipe installing positioning device having enough to meet the need
CN220647041U (en) Combined support for inner pipeline of narrow pipe well
CN219388848U (en) Electromechanical installation antidetonation hoist and mount frame
CN219068099U (en) Can assemble flexible photovoltaic support of formula
CN215911874U (en) Pipeline modular structure is synthesized to segmentation integrated form subway
CN208441461U (en) A kind of Casing elevator hole device
CN217177699U (en) A pipeline installation support base for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214