CN215168776U - Building engineering construction safety rail guard - Google Patents
Building engineering construction safety rail guard Download PDFInfo
- Publication number
- CN215168776U CN215168776U CN202121088352.9U CN202121088352U CN215168776U CN 215168776 U CN215168776 U CN 215168776U CN 202121088352 U CN202121088352 U CN 202121088352U CN 215168776 U CN215168776 U CN 215168776U
- Authority
- CN
- China
- Prior art keywords
- upright
- upright post
- guard rail
- construction
- construction safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Special Spraying Apparatus (AREA)
Abstract
The utility model discloses a building engineering construction safety rail guard, include: a first upright post; the atomizing spray head is arranged on the first upright post; a second upright post; and a protection net disposed between the first column and the second column. The top is fixed with the cavity and connects in the first stand, be equipped with the internal thread in the cavity connects, atomizer pass first stand top with cavity connects thread tightening and intercommunication. Furthermore, the upper part and the lower part of the first upright post are connected with water pipe joints, the water pipe joints are communicated with the hollow joints through water pipes, and the water pipes are arranged in the first upright post. The problem that construction safety protective guard is convenient to store, simple to install and comprehensive in function can be effectively solved.
Description
Technical Field
The utility model relates to a building engineering construction safety protective guard.
Background
The construction guardrail is generally commonly used for common roads, expressways, roads at all levels, dangerous areas and road construction sections, and temporary barriers at meeting places and the like are used for road separation, area enclosure safety isolation, diversion and guidance or used for order maintenance of celebration activities of books or sports and entertainment and other competitive performance occasions. The common construction guardrail is made of an iron pipe and is manufactured by the seamless iron pipe bending, welding, polishing, high-pressure paint baking, film pasting and other layer-by-layer processes. Such barriers are bulky individually and relatively cumbersome to carry and store.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect and provide a building engineering construction safety protective guard, can effectively solve construction safety protective guard in the background art and accomodate convenient, install simple and the comprehensive problem of function.
The technical scheme for realizing the purpose is as follows: a safety guard rail for construction of building engineering, comprising: a first upright post;
the atomizing spray head is arranged on the first upright post; a second upright post; and a protection net disposed between the first column and the second column.
Furthermore, a hollow joint is fixed at the top of the first upright column, an internal thread is arranged in the hollow joint, and the atomizing nozzle penetrates through the top of the first upright column to be fixed and communicated with the hollow joint through the thread.
Furthermore, the upper part and the lower part of the first upright post are connected with water pipe joints, the water pipe joints are communicated with the hollow joints through water pipes, and the water pipes are arranged in the first upright post.
Furthermore, the top of the second upright post is downwards provided with an installation groove, the front end of the second upright post is inwards provided with an installation opening, and the installation opening is communicated with the installation groove; and one side edge of the mounting opening is hinged with a cover plate matched with the mounting opening.
Further, an LED lamp is installed at the top of the second stand column, and a base of the LED lamp covers the installation groove.
Furthermore, the upper part and the lower part of the left side surface and the right side surface of the first upright post are respectively provided with a first threaded hole inwards; and the upper part and the lower part of the left side surface and the right side surface of the second upright post are respectively provided with a second threaded hole inwards.
Further, the method also comprises the following steps: the end parts of the lifting rings are provided with threads, the two lifting rings are in threaded connection with the two first threaded holes in the right end face of the first upright column respectively through the threads, and the two lifting rings are in threaded connection with the two second threaded holes in the left end face of the second upright column respectively through the threads.
Furthermore, four corners of the protective net are fixedly connected with the four lifting rings through fixing ropes.
Furthermore, a plurality of reflective strips are arranged on the protective net.
Furthermore, fixing plates are respectively fixed to the bottoms of the first upright post and the second upright post, and fixing holes are respectively formed in four corners of each fixing plate.
The utility model has the advantages that: the hollow joint is arranged for being conveniently connected with the atomizing nozzle and a water pipe in the first upright post for use; the atomizing nozzle is used for dust fall work in a building construction site; the water pipe joint is respectively communicated with a water source and connected with a water pipe in the first upright post for use; the installation port is arranged, so that the LED lamp can be conveniently connected with electricity; the LED lamp is arranged for illuminating the guard rail; the protective net is used for protection in a construction site and is detachably mounted, so that the use and the storage are convenient; the light reflecting strips are arranged for reflecting light at night of the guard rail, so that accidents caused by unclear sight are prevented.
Drawings
Fig. 1 is an external structure diagram of the safety guard rail for construction engineering of the utility model;
fig. 2 is a cross-sectional view of a first upright of the present invention;
fig. 3 is a cross-sectional view of a second upright of the present invention;
fig. 4 is a schematic structural view of the hanging ring of the present invention.
Reference numerals: 1. first stand, 2, second stand, 3, hollow joint, 4, atomizer, 5, water pipe head, 6, water pipe, 7, first screw hole, 8, mounting groove, 9, installing port, 10, apron, 11, LED lamp (emitting diode), 12, second screw hole, 13, rings, 14, screw thread, 15, protection network, 16, reflection of light strip, 17, fixed plate, 18, fixed orifices.
Detailed Description
The technical solution of the present invention will be clearly and completely described with reference to the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance.
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1-4, the utility model relates to a building engineering construction safety protective guard, include: a first upright 1; the atomizing spray head 4 is arranged on the first upright post 1; a hollow joint 3 is fixed at the top of the first upright column 1, internal threads are arranged in the hollow joint 3, and the atomizing nozzle 4 penetrates through the top of the first upright column 1 and is fixed and communicated with the hollow joint 3 through the threads; the upper part and the lower part of the first upright post 1 are connected with water pipe joints 5, the water pipe joints 5 are communicated with the hollow joint 3 through water pipes 6, and the water pipes 6 are arranged in the first upright post 1; the hollow joint 3 is arranged for being conveniently connected with the atomizing nozzle 4 and the water pipe 6 in the first upright column 1 for use; the atomizing nozzle 4 is used for dust settling work in a building construction site; the water pipe joint 5 is arranged and is respectively communicated with a water source and connected with the water pipe 6 in the first upright post 1 for use; a second upright 2; the top of the second upright post 2 is downwards provided with an installation groove 8, the front end of the second upright post 2 is inwards provided with an installation opening 9, and the installation opening 9 is communicated with the installation groove 8; a cover plate 10 matched with the mounting opening 9 is hinged to one side edge of the mounting opening 9; an LED lamp 11 is installed at the top of the second upright post 2, and the base of the LED lamp 11 covers the installation groove 8; the installation port 9 is arranged to facilitate the connection of the LED lamp 11; the LED lamp 11 is arranged for lighting the guard rail; a protection net 15 disposed between the first column 1 and the second column 2; the upper part and the lower part of the left side surface and the right side surface of the first upright post 1 are respectively provided with a first threaded hole 7 inwards; the upper part and the lower part of the left side surface and the right side surface of the second upright post 2 are respectively provided with a second threaded hole 12 inwards; further comprising: the end parts of the hanging rings 13 are provided with threads 14, the two hanging rings 13 are respectively in threaded connection with the two first threaded holes 7 on the right side end face of the first upright post 1 through the threads 14, and the two hanging rings 13 are respectively in threaded connection with the two second threaded holes 12 on the left side end face of the second upright post 2 through the threads 14; a plurality of reflective strips 16 are arranged on the protective net 15; four corners of the protective net 15 are respectively and fixedly connected with the four lifting rings 13 through fixing ropes; the protective net 15 is used for protection in a construction site and is detachably mounted, so that the use and the storage are convenient; the light reflecting strips 16 are arranged and used for reflecting light at night of the guard rail, so that accidents caused by unclear sight are prevented; fixing plates 17 are respectively fixed at the bottoms of the first upright column 1 and the second upright column 2, and fixing holes 18 are respectively formed at four corners of each fixing plate 17.
The working principle is as follows: the method comprises the steps that a plurality of first upright columns 1 and second upright columns 2 are arranged on the periphery of a construction site at intervals, four lifting rings are screwed into first threaded holes 7 and second threaded holes 12 in the adjacent first upright columns 1 and second upright columns 2 respectively, and four corners of a protective net 15 are fixed with the four lifting rings 13 respectively through fixing ropes; the water source is communicated with the water pipe joint 5 and conveys water to the atomizing nozzle 4 through the water pipe 6; the power supply is electrically connected with the LED lamp 11 through the mounting port 9.
Through setting up first stand 1, second stand 2, atomizer 4, water pipe head 5, water pipe 6, first screw hole 7, installing port 9, LED lamp 11, second screw hole 12 and protection network 15, can effectively solve construction safety protective guard and accomodate convenient, simple and the comprehensive problem of function of installation.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.
Claims (7)
1. The utility model provides a building engineering construction safety rail guard which characterized in that includes:
a first upright (1);
the atomizing spray head (4) is arranged on the first upright post (1);
a second upright (2);
a protective net (15) arranged between the first upright (1) and the second upright (2); and
four lifting rings (13) for connecting the first upright (1) with the protective net (15) and the second upright (2) with the protective net (15);
the upper part and the lower part of the left side surface and the right side surface of the first upright post (1) are respectively provided with a first threaded hole (7) inwards; the upper part and the lower part of the left side surface and the right side surface of the second upright post (2) are respectively provided with a second threaded hole (12) inwards;
the end parts of the lifting rings (13) are provided with threads (14), the two lifting rings (13) are respectively in threaded connection with the two first threaded holes (7) on the end surface of the right side of the first upright post (1) through the threads (14), and the two lifting rings (13) are respectively in threaded connection with the two second threaded holes (12) on the end surface of the left side of the second upright post (2) through the threads (14);
the four corners of the protective net (15) are respectively and fixedly connected with the four lifting rings (13) through fixing ropes.
2. The safety guard rail for the construction of the building engineering as claimed in claim 1, wherein a hollow joint (3) is fixed at the top of the first upright column (1), an internal thread is arranged in the hollow joint (3), and the atomizing nozzle (4) penetrates through the top of the first upright column (1) to be fixed and communicated with the hollow joint (3) in a threaded manner.
3. A safety guard rail for construction of building engineering according to claim 2, characterized in that the upper and lower parts of the first upright (1) are connected with water pipe joints (5), the water pipe joints (5) are communicated with the hollow joint (3) through water pipes (6), and the water pipes (6) are arranged in the first upright (1).
4. The construction safety guard rail of claim 1, wherein the top of the second upright post (2) is provided with a mounting groove (8) downwards, the front end of the second upright post (2) is provided with a mounting port (9) inwards, and the mounting port (9) is communicated with the mounting groove (8); one side of the mounting opening (9) is hinged with a cover plate (10) matched with the mounting opening (9).
5. A construction safety guard rail according to claim 4, wherein the LED lamp (11) is installed on the top of the second upright post (2), and the base of the LED lamp (11) covers the installation groove (8).
6. A construction safety guard rail according to claim 1, wherein a plurality of reflective strips (16) are arranged on the protection net (15).
7. The safety guard rail for construction engineering of building according to claim 1, wherein fixing plates (17) are respectively fixed at the bottoms of the first upright column (1) and the second upright column (2), and fixing holes (18) are respectively formed at four corners of each fixing plate (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121088352.9U CN215168776U (en) | 2021-05-20 | 2021-05-20 | Building engineering construction safety rail guard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121088352.9U CN215168776U (en) | 2021-05-20 | 2021-05-20 | Building engineering construction safety rail guard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215168776U true CN215168776U (en) | 2021-12-14 |
Family
ID=79374108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121088352.9U Expired - Fee Related CN215168776U (en) | 2021-05-20 | 2021-05-20 | Building engineering construction safety rail guard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215168776U (en) |
-
2021
- 2021-05-20 CN CN202121088352.9U patent/CN215168776U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205576803U (en) | Multi -functional rail guard of municipal garden | |
CN213038918U (en) | Foundation ditch faces limit protective structure | |
CN215168776U (en) | Building engineering construction safety rail guard | |
CN219733029U (en) | Warning fence for civil engineering | |
CN209960359U (en) | Solar street lamp with long service life | |
CN209817576U (en) | Civil engineering is with dustproof jube | |
CN213143789U (en) | Steel structure scaffold | |
CN210460178U (en) | Assembled environmental protection rail guard for construction | |
CN220014695U (en) | Isolation fence | |
CN215056095U (en) | Safety device is used in road and bridge engineering construction | |
CN219548602U (en) | Can early warning face limit guard rail | |
CN216740998U (en) | Fence for building construction | |
CN219061185U (en) | Municipal works foundation ditch safety device | |
CN220705362U (en) | Rail guard is used in construction | |
CN218061782U (en) | Face limit protector with spraying system | |
CN218881826U (en) | Construction protective fence | |
CN215857419U (en) | Stainless steel light bottom guardrail bar | |
CN216617121U (en) | Rail guard for building engineering | |
CN213063183U (en) | Geotechnical engineering reconnaissance is with portable fender device that encloses | |
CN218861429U (en) | Guardrail installation mechanism | |
CN215441634U (en) | Connect convenient reflection of light road guardrail of installation | |
CN214993292U (en) | Anti-damage traffic sign post | |
CN217760433U (en) | Safety protective guard with illumination function | |
CN217233031U (en) | Building engineering protects rail | |
CN214996702U (en) | Security fence for building construction management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |