CN215167941U - A protection construction platform for high-rise building - Google Patents

A protection construction platform for high-rise building Download PDF

Info

Publication number
CN215167941U
CN215167941U CN202120657077.1U CN202120657077U CN215167941U CN 215167941 U CN215167941 U CN 215167941U CN 202120657077 U CN202120657077 U CN 202120657077U CN 215167941 U CN215167941 U CN 215167941U
Authority
CN
China
Prior art keywords
ceiling
construction platform
rise building
sleeve
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120657077.1U
Other languages
Chinese (zh)
Inventor
谢连生
周静
谢雨薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120657077.1U priority Critical patent/CN215167941U/en
Application granted granted Critical
Publication of CN215167941U publication Critical patent/CN215167941U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction technical field especially relates to a protection construction platform for high-rise building, solved among the prior art because the majority is in construction building unit, especially the higher place of floor can drop stone, reinforcing bar or metal part, only a canopy is regarded as the protection in current construction platform's top, can't block the heavy object that drops, not only can produce the damage to the canopy, and can lead to the workman in the platform be injured to greatly reduced construction platform's the problem of security. The utility model provides a protection construction platform for high-rise building, includes operation panel and ceiling, and the operation panel is connected with the ceiling through the support component of four corners in top, and the inner chamber bottom of ceiling is provided with the metal sheet, and the top of ceiling is provided with elasticity wire mesh. The utility model provides the high protective strength of ceiling has avoided ceiling and personnel to receive the damage, has consequently improved the security, and the easy dismounting later stage of being convenient for transports and used repeatedly.

Description

A protection construction platform for high-rise building
Technical Field
The utility model relates to a construction technical field especially relates to a protection construction platform for high-rise building.
Background
The construction platform belongs to a protection facility, is a facility for workers to operate and solve vertical and horizontal transportation on a construction site, and is mainly used in an outer wall, interior decoration or a place where the floor height is high and cannot be directly constructed on a construction site, so that the falling accident rate of high-rise construction is reduced, and a fire disaster is avoided.
However, because the stone, the reinforcing steel bar or the metal part can fall in most of the construction building units, especially in the higher places of the floors, only one shed at the top of the existing construction platform is used as protection, the falling heavy object cannot be blocked, the shed can be damaged, workers in the platform can be injured, and therefore the safety of the construction platform is greatly reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a protection construction platform for high-rise building has solved among the prior art because the majority is in construction building unit, especially the higher place of floor can drop stone, reinforcing bar or metal part, and only a canopy is regarded as the protection in current construction platform's top, can't block the heavy object that drops, not only can produce the damage to the canopy, and can lead to the workman be injured in the platform to greatly reduced construction platform's the problem of security.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a protection construction platform for high-rise building, includes operation panel and ceiling, the operation panel is connected with the ceiling through the support component of four corners at top, the inner chamber bottom of ceiling is provided with the metal sheet, the top of ceiling is provided with elastic wire mesh, the bottom both sides of ceiling all are provided with the drain pipe that a plurality of and the inner chamber of ceiling are linked together, the equal fixedly connected with a plurality of installation cover in both sides of elastic wire mesh, every the installation cover all through screw rod one and ceiling bolt fixed connection.
Preferably, the two sides of the bottom of the metal plate are both provided with supporting plates connected with the bottom of the inner cavity of the ceiling, and the two ends of the two supporting plates are both fixedly connected with the two inner side walls of the ceiling.
Preferably, both sides of the top of the metal plate are in threaded connection with a plurality of second screw rods penetrating through the metal plate, and one end of the extending section of each second screw rod is fixedly connected with the support plate bolt.
Preferably, the supporting part includes sleeve and spliced pole, spliced pole and sleeve sliding connection, telescopic bottom and operation panel fixed connection, the one end and the ceiling fixed connection of spliced pole, telescopic one side threaded connection has the screw rod three that runs through sleeve one side, the screw of a plurality of and screw rod three-phase adaptation is seted up along vertical direction in one side of spliced pole.
Preferably, the both sides of spliced pole all fixedly connected with inserts the piece, the slot with insert a looks adaptation is all seted up to telescopic two inside walls.
Preferably, the cylinders are installed on two sides of the top of the operating platform, and the output ends of the two cylinders are connected with the bottom of the ceiling through connecting rods.
The utility model discloses possess following beneficial effect at least:
according to the actual situation, the third screw rod in the sleeve is screwed out, the air cylinder is started to adjust the height of the ceiling, after the adjustment is completed, the third screw rod is screwed in the sleeve and fixedly connected with the connecting column bolt, so that the position of the ceiling is fixed, the metal plate effectively improves the top blocking strength of the ceiling, heavy objects such as stones and parts are prevented from penetrating through the ceiling to threaten workers, the elastic metal wire mesh effectively buffers and blocks falling objects, the damage to the ceiling is avoided, rainwater in the ceiling can be discharged through the drain pipe to prevent water accumulation, when the elastic metal wire mesh is installed, the first screw rod penetrates through the installation sleeve and then is fixedly connected to the ceiling through the bolt, the installation can be completed, the later-stage disassembly and transportation are facilitated, the repeated use is realized, the protective strength of the ceiling is improved, the damage to the ceiling and personnel is avoided, the safety is improved, and the later-stage transportation and the repeated use are facilitated by the disassembly and the convenient use, the height of the ceiling is convenient to adjust, and the applicability of the ceiling is improved.
The utility model discloses still possess following beneficial effect:
through the metal sheet, elastic metal wire mesh, the drain pipe, the setting of installation cover and screw rod one, the effectual top separation intensity that has improved the ceiling of metal sheet, prevent that heavy objects such as stone and part from passing the ceiling and causing the threat to the workman, elastic metal wire mesh is effectual cushions and the separation to the article that drops, avoid causing the damage to the ceiling, the drain pipe can be with the rainwater discharge in the ceiling, prevent ponding, when installing elastic metal wire mesh, pass screw rod one and install the cover and then bolt fixed connection can accomplish the installation on the ceiling, the dismouting and the transportation in the later stage of being convenient for, repeatedly usable, but the proof strength of ceiling has been improved, ceiling and personnel receive the damage has been avoided, consequently, the security has been improved, and the easy later stage transportation and the used repeatedly of dismouting of being convenient for.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the support member of the present invention;
fig. 3 is a schematic diagram of the metal plate structure of the present invention.
In the figure: 1. an operation table; 2. a support member; 3. a drain pipe; 4. an elastic wire mesh; 5. a first screw rod; 6. installing a sleeve; 7. a ceiling; 8. a cylinder; 9. a support plate; 10. a second screw; 11. a metal plate; 201. a sleeve; 202. an insertion block; 203. a screw hole; 204. a third screw; 205. connecting columns.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-3, a protection construction platform for high-rise buildings comprises an operation table 1 and a ceiling 7, the operation table 1 is connected with the ceiling 7 through supporting parts 2 at four corners of the top, a metal plate 11 is arranged at the bottom of an inner cavity of the ceiling 7, an elastic metal wire mesh 4 is arranged at the top of the ceiling 7, a plurality of drain pipes 3 communicated with the inner cavity of the ceiling 7 are arranged at two sides of the bottom of the ceiling 7, a plurality of mounting sleeves 6 are fixedly connected with two sides of the elastic metal wire mesh 4, each mounting sleeve 6 is fixedly connected with the ceiling 7 through a screw rod one 5, specifically, through the arrangement of the metal plate 11, the elastic metal wire mesh 4, the drain pipes 3, the mounting sleeves 6 and the screw rods one 5, the metal plate 11 effectively improves the top blocking strength of the ceiling 7, and prevents heavy objects such as stones and parts from penetrating through the ceiling 7 to threaten workers, elastic metal mesh 4 is effectual cushions and the separation to the article that drop, avoid causing the damage to ceiling 7, drain pipe 3 can be with the rainwater discharge in the ceiling 7, prevent ponding, when installation elastic metal mesh 4, pass installation cover 6 with screw rod 5 and can accomplish the installation on bolt fixed connection to ceiling 7 after that, the dismouting and the transportation in the later stage of being convenient for, but reuse, the proof strength of ceiling 7 has been improved, ceiling 7 and personnel have been avoided receiving the damage, therefore, the security has been improved, and the easy dismounting later stage transportation and the used repeatedly of being convenient for.
The scheme has the following working processes:
according to the actual situation, the screw rod III 204 in the sleeve 201 is screwed out, the air cylinder 8 is started to adjust the height of the ceiling 7, after the adjustment is completed, the screw rod III 204 is screwed in the sleeve 201 and is fixedly connected with the connecting column 205 through bolts, so that the position of the ceiling 7 is fixed, the metal plate 11 effectively improves the top blocking strength of the ceiling 7, heavy objects such as stones and parts and the like are prevented from penetrating through the ceiling 7 to threaten workers, the elastic metal wire mesh 4 effectively buffers and blocks falling objects to avoid damage to the ceiling 7, the drain pipe 3 can drain rainwater in the ceiling 7 to prevent water accumulation, when the elastic metal wire mesh 4 is installed, the screw rod I5 penetrates through the installation sleeve 6 and is fixedly connected to the ceiling 7 through the bolts to complete installation, later-stage disassembly and transportation are facilitated, the screw rod III can be repeatedly used, the protection strength of the ceiling 7 is improved, damage to the ceiling 7 and personnel is avoided, and therefore the safety is improved, and the convenient later stage transportation of easy dismounting and reuse of being convenient for is convenient for, is convenient for adjust the height of ceiling 7, has improved its suitability.
According to the working process, the following steps are known:
through metal sheet 11, elastic metal mesh 4, drain pipe 3, the setting of installation cover 6 and screw rod 5, the effectual top separation intensity that has improved ceiling 7 of metal sheet 11, prevent that heavy objects such as stone and part from passing ceiling 7 and causing the threat to the workman, elastic metal mesh 4 is effectual cushions and the separation to the article that drops, avoid causing the damage to ceiling 7, drain pipe 3 can be with the rainwater discharge in ceiling 7, prevent ponding, when installing elastic metal mesh 4, pass screw rod 5 installation cover 6 and can accomplish the installation on bolt fixed connection to ceiling 7 after that, be convenient for the dismouting and the transportation in later stage, repeatedly usable, the protective strength of ceiling 7 has been improved, ceiling 7 and personnel have been avoided receiving the damage, therefore, the security has been improved, and be convenient for dismouting later stage transportation and used repeatedly.
Further, the bottom both sides of metal sheet 11 all are provided with the backup pad 9 of being connected with the inner chamber bottom of ceiling 7, and the both ends of two backup pads 9 all with two inside wall fixed connection of ceiling 7, specific, through the setting of backup pad 9, improved the support nature of ceiling 7 inner chamber, improved metal sheet 11 place stability.
Further, the equal threaded connection in top both sides of metal sheet 11 has two 10 of screw rods that a plurality of runs through metal sheet 11, and the one end of the extension of every two 10 of screw rods all with 9 bolt fixed connections of backup pad, specific, through the setting of two 10 of screw rods for the dismouting of being convenient for of metal sheet 11 makes things convenient for later stage dismouting and transportation.
Further, the supporting component 2 includes sleeve 201 and spliced pole 205, spliced pole 205 and sleeve 201 sliding connection, the bottom and the operation panel 1 fixed connection of sleeve 201, the one end and the ceiling 7 fixed connection of spliced pole 205, one side threaded connection of sleeve 201 has three 204 of screw rods that run through sleeve 201 one side, screw 203 of a plurality of and three 204 looks adaptations of screw rod is seted up along vertical direction in one side of spliced pole 205, and is concrete, through the setting of supporting component 2, be convenient for adjust the height of ceiling 7.
Further, the equal fixedly connected with of both sides of spliced pole 205 inserts piece 202, and the slot with inserting piece 202 looks adaptation is all seted up to two inside walls of sleeve 201, and is concrete, through the setting of inserting piece 202 for spliced pole 205 and sleeve 201's connection is more stable.
Further, the cylinders 8 are installed on two sides of the top of the operating platform 1, the output ends of the two cylinders 8 are connected with the bottom of the ceiling 7 through the connecting rod, specifically, the three screws 204 in the sleeve 201 are screwed out through the arrangement of the cylinders 8 according to actual conditions, the cylinder 8 is started to adjust the height of the ceiling 7, and after the adjustment is completed, the three screws 204 are screwed in the sleeve 201 to be fixedly connected with the connecting column 205 through bolts, so that the position of the ceiling 7 is fixed.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the principles of the present invention may be applied to any other embodiment without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a protection construction platform for high-rise building, includes operation panel (1) and ceiling (7), its characterized in that, operation panel (1) is connected with ceiling (7) through supporting component (2) of four corners in top, the inner chamber bottom of ceiling (7) is provided with metal sheet (11), the top of ceiling (7) is provided with elasticity woven wire (4), the bottom both sides of ceiling (7) all are provided with drain pipe (3) that the inner chamber of a plurality of and ceiling (7) is linked together, the equal fixedly connected with a plurality of installation cover (6) in both sides of elasticity woven wire (4), every installation cover (6) all through screw rod (5) and ceiling (7) bolt fixed connection.
2. The protective construction platform for the high-rise building is characterized in that supporting plates (9) connected with the bottom of an inner cavity of a ceiling (7) are arranged on two sides of the bottom of the metal plate (11), and two ends of the two supporting plates (9) are fixedly connected with two inner side walls of the ceiling (7).
3. The protective construction platform for the high-rise building as claimed in claim 2, wherein a plurality of second screws (10) penetrating through the metal plate (11) are in threaded connection with two sides of the top of the metal plate (11), and one end of the extension section of each second screw (10) is in bolt fixed connection with the support plate (9).
4. The protective construction platform for the high-rise building is characterized in that the supporting component (2) comprises a sleeve (201) and a connecting column (205), the connecting column (205) is connected with the sleeve (201) in a sliding mode, the bottom of the sleeve (201) is fixedly connected with the operating platform (1), one end of the connecting column (205) is fixedly connected with a ceiling (7), one side of the sleeve (201) is in threaded connection with a third screw rod (204) penetrating through one side of the sleeve (201), and one side of the connecting column (205) is provided with a plurality of screw holes (203) matched with the third screw rod (204) in the vertical direction.
5. The protective construction platform for the high-rise building as claimed in claim 4, wherein the connecting column (205) is fixedly connected with an inserting block (202) at both sides, and slots matched with the inserting block (202) are formed in both inner side walls of the sleeve (201).
6. The protective construction platform for the high-rise building is characterized in that air cylinders (8) are mounted on two sides of the top of the operating platform (1), and output ends of the two air cylinders (8) are connected with the bottom of a ceiling (7) through connecting rods.
CN202120657077.1U 2021-03-31 2021-03-31 A protection construction platform for high-rise building Active CN215167941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120657077.1U CN215167941U (en) 2021-03-31 2021-03-31 A protection construction platform for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120657077.1U CN215167941U (en) 2021-03-31 2021-03-31 A protection construction platform for high-rise building

Publications (1)

Publication Number Publication Date
CN215167941U true CN215167941U (en) 2021-12-14

Family

ID=79354586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120657077.1U Active CN215167941U (en) 2021-03-31 2021-03-31 A protection construction platform for high-rise building

Country Status (1)

Country Link
CN (1) CN215167941U (en)

Similar Documents

Publication Publication Date Title
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN204475593U (en) Support structure installed by a kind of curtain wall
CN215167941U (en) A protection construction platform for high-rise building
CN205369978U (en) Prefabricated plate support frame
CN215484886U (en) Adjustable strutting arrangement for building
CN114725859A (en) Tunnel cable installing support
JP6304523B2 (en) Suspended ceiling structure
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN208934379U (en) Super high-rise building goes out roof curtain wall installation system
CN216740618U (en) Steel construction protection scaffold puts up system suitable for light rail station
CN219451453U (en) Scaffold protection steel mesh
CN217205526U (en) Industrial and civil building wall reinforcing device
CN218643607U (en) Assembled shear wall structure
CN216042005U (en) Prefabricated curtain wall connecting piece
CN218061575U (en) Wall-hanging protection canopy with fast-assembling structure
CN209778043U (en) novel supplementary installation of super high-rise built-in fitting device
CN213745230U (en) Anti-seismic support for heat-preservation ventilation air-conditioning pipeline
CN218323200U (en) Anti-seismic combined beam for house building
CN217517890U (en) Curtain wall structure with high installation accuracy
CN203558672U (en) Connecting structure for reinforced concrete wall and construction elevator attachment rack
CN211499183U (en) Fireproof steel structure for green building
CN218265122U (en) Fire control vestibule bottom sprag device
CN214939361U (en) Adjustable cantilever operation platform
CN219034132U (en) Multilayer full-assembled building construction limb protection system
CN218161570U (en) Connecting structure of tunnel cable mounting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant