CN215167708U - Green building engineering wall plastering unit - Google Patents

Green building engineering wall plastering unit Download PDF

Info

Publication number
CN215167708U
CN215167708U CN202121176484.7U CN202121176484U CN215167708U CN 215167708 U CN215167708 U CN 215167708U CN 202121176484 U CN202121176484 U CN 202121176484U CN 215167708 U CN215167708 U CN 215167708U
Authority
CN
China
Prior art keywords
fixedly connected
adjusting screw
building engineering
wall plastering
green building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121176484.7U
Other languages
Chinese (zh)
Inventor
李理
孙丽平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121176484.7U priority Critical patent/CN215167708U/en
Application granted granted Critical
Publication of CN215167708U publication Critical patent/CN215167708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a construction technical field specifically is a green building engineering wall plastering unit, including the mounting panel, the swing joint of mounting panel has adjusting screw, adjusting screw's surface swing joint has the fixed block, the top fixedly connected with scraper blade of fixed block, one side fixedly connected with connecting plate of scraper blade is kept away from to the fixed block, the equal fixedly connected with backup pad in the left and right sides of connecting plate, one side swing joint of backup pad has the roller. The utility model has the advantages that: through setting up scraper blade and roller, reached and to have effectively promoted the purpose of the effect of plastering through scraper blade and roller, and also can be according to the thickness of plastering of actual work condition control, through setting up the motor, reached and to have avoided the condition that the certain region of wall top can not carry out the spraying when can avoiding appearing constructing to increase the use convenience of device, collect the structure through setting up, reached can effectually carry out the purpose of collecting to unnecessary raw materials.

Description

Green building engineering wall plastering unit
Technical Field
The utility model relates to a construction technical field, especially a green building engineering wall plastering unit.
Background
The technical field of the prior art is mainly responsible for teaching and management of the building engineering direction of civil engineering major, mainly cultures and masters the basic theory and basic knowledge of engineering mechanics, soil mechanics, surveying, housing architecture and structural engineering subjects, and refers to a general term of various buildings and engineering facilities which provide material technology foundation for human life and production, and the wall surface is often plastered in the housing decoration process.
Disclosed in chinese patent CN209817369U a wall plastering unit is used in green building engineering construction, this wall plastering unit is used in green building engineering construction, through setting up the blowout pipe, rotation axis and work roll, can be convenient plaster, operation in the middle of not needing, save time, it is efficient, through setting up the barrier plate, threaded rod and a collecting vessel, can guarantee the stability of raw materials, the setting of collection, it is extravagant to reduce, save raw materials but, this wall plastering unit is used in green building engineering construction, in the time of solving the problem, have following shortcoming:
1. when the device works, the ash needs to be sprayed to the working roller through the spraying pipe and then plastering is carried out on the wall surface, so that the plastering effect is not ideal, the ash cannot be well adhered to the wall body, the plastering thickness cannot be well controlled, and the application range of the device is smaller;
2. the device need artifically carry out closely the laminating with the wall when plastering and just can carry out the work of leveling plastering, and because the relation of supporting shoe and blowout pipe, the wall top can cause the certain region to carry out the spraying during the construction, and then leads to operating comparatively inconveniently when using.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a green building engineering wall plastering unit.
The purpose of the utility model is realized through the following technical scheme: a green building engineering wall plastering device comprises a mounting plate, wherein an adjusting screw is movably connected with the mounting plate, a fixed block is movably connected with the outer surface of the adjusting screw, a scraper is fixedly connected with the top of the fixed block, a connecting plate is fixedly connected with one side of the fixed block, which is far away from the scraper, supporting plates are fixedly connected with the left side and the right side of the connecting plate, a roller shaft is movably connected with one side of each supporting plate, and a collecting structure is arranged on one side of the mounting plate;
the collecting structure comprises a collecting box, a through groove, a sliding groove and a baffle, wherein the through groove is formed in the bottom of the collecting box, the sliding groove is formed in one side, close to the through groove, of the collecting box, and the baffle is movably connected to the inside of the sliding groove.
Preferably, one side fixedly connected with connecting block of mounting panel, one side of connecting block is provided with the motor, the bottom fixedly connected with connecting rod of motor, the bottom fixedly connected with hydraulic stem of connecting rod, one side fixedly connected with handle of hydraulic stem.
Through adopting above-mentioned technical scheme, can have the person of facilitating the use to mention the hydraulic stem to control the hydraulic stem through the handle, thereby make things convenient for the floating work in later stage.
Preferably, one side fixedly connected with that the mounting panel is close to the top divides the stream block, divide one side of stream block to be provided with the material spraying mouth, divide one side of stream block to be connected with coupling hose, one side of coupling hose is connected with former feed tank.
By adopting the technical scheme, the spraying work of the raw materials can be conveniently controlled.
Preferably, one side that the mounting panel is located adjusting screw is provided with the bearing, one side fixed connection of adjusting screw is in the inner wall of bearing, one side fixedly connected with regulation of adjusting screw far away from the mounting panel is turned round, the surface of turning round in the regulation is provided with anti-skidding line.
Through adopting above-mentioned technical scheme, can be convenient for the staff rotate adjusting screw when using.
Preferably, a thread groove is formed in one side, located on the adjusting screw, of the fixing block, and the fixing block is in threaded connection with the adjusting screw.
By adopting the technical scheme, when the adjusting screw rod rotates, the fixed block can be promoted to move on the surface of the fixed block.
Preferably, the mounting panel is located the position of scraper blade and backup pad and has all seted up the activity groove, one side of scraper blade is provided with the scale mark, the backup pad is located the position of roller and all is provided with the bearing.
Through adopting above-mentioned technical scheme, staff controls the position of scraper blade and backup pad when can be convenient for use.
Preferably, the collecting box is L-shaped, and the collecting box is fixedly connected with the supporting plate.
By adopting the technical scheme, the gathering effect of redundant raw materials can be effectively promoted.
Preferably, the output end of the motor is fixedly connected with the connecting block, and the ejector rod of the hydraulic rod is fixedly connected with the connecting rod.
Through adopting above-mentioned technical scheme, when making the motor rotate on the one hand, the connecting block can rotate along with it, and then adjusts the angle of mounting panel, and on the other hand makes the hydraulic stem can make the ejector pin direct action on the connecting rod of hydraulic stem when the staff to highly adjusting the connecting rod.
Preferably, one side of raw materials case is provided with control panel, the top of raw materials case is provided with the feed inlet, the bottom of raw materials case is provided with the universal wheel.
Through adopting above-mentioned technical scheme, control panel can be convenient for control the circuit system of device on the one hand, and another makes things convenient for the universal wheel can be convenient for the staff to remove raw material tank.
The utility model has the advantages of it is following:
1. the green building engineering wall plastering device is provided with the scraper and the roller, the top of the fixed block is fixedly connected with the scraper, one side of the supporting plate is movably connected with the roller, when in use, the raw material box and the spraying port are controlled to work by using the control panel, then the hydraulic rod is lifted by the handle, the spraying port is used for spraying the wall surface, the hydraulic rod is pushed upwards, the scraper plate is used for primarily scraping the raw material, the roller shaft is used for secondarily flattening the raw material, when the plastering thickness needs to be adjusted, the adjusting button is rotated by observing the scale marks, so that the adjusting screw drives the scraping plate and the roll shaft to move, thereby adjusting the position relation between the scraping plate and the roll shaft and the material spraying opening, the material spraying speed is controlled to enable the scraper and the roll shaft to trowel the raw materials, so that the purpose of effectively promoting the plastering effect through the scraper and the roll shaft is achieved, and the plastering thickness can be controlled according to the actual working condition;
2. according to the green building engineering wall plastering device, the motor is arranged on one side of the connecting block, when the green building engineering wall plastering device is used, the mounting plate can be rotated by controlling the rotation of the motor, so that the mounting plate can be rotated by 90 degrees, the included angle of the top of the wall can be plastered by controlling the movement of the mounting plate, the situation that a certain area of the top of the wall cannot be sprayed during construction can be avoided, and the use convenience of the device is improved;
3. this green building engineering wall plastering unit, collect the structure through setting up, one side of mounting panel is provided with collects the structure, collection box through L shape, unnecessary raw materials can all get into the inside of collecting the box and collect when making scraper blade and roller floating, and when scraper blade and roller removed, it also can remove along with it to collect the box, thereby effectually collect the raw materials, when needing to get rid of inside raw materials, through pulling the baffle, make inside raw materials discharge from leading to the groove, discharge and insert the spout with the baffle again after finishing, and then seal leading to the groove, reached can effectually carry out the purpose of collecting unnecessary raw materials.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of another perspective structure of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 2 according to the present invention;
fig. 4 is a schematic structural diagram of a second working state of the present invention;
fig. 5 is a schematic structural view of the collecting structure of the present invention.
In the figure: 1-mounting plate, 2-adjusting screw rod, 201-adjusting knob, 3-fixing block, 4-scraper, 401-scale mark, 5-connecting plate, 6-supporting plate, 7-roller shaft, 8-collecting structure, 801-collecting box, 802-through groove, 803-sliding groove, 804-baffle, 9-connecting block, 10-motor, 11-connecting rod, 12-hydraulic rod, 13-handle, 14-shunting block, 15-spraying port, 16-connecting hose, 17-raw material box, 1701-control panel, 1702-feeding port and 1703-universal wheel.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-5, a green plastering device for construction engineering wall comprises a mounting plate 1, wherein the mounting plate 1 is movably connected with an adjusting screw 2, the outer surface of the adjusting screw 2 is movably connected with a fixed block 3, the top of the fixed block 3 is fixedly connected with a scraper 4, one side of the fixed block 3 away from the scraper 4 is fixedly connected with a connecting plate 5, the left side and the right side of the connecting plate 5 are both fixedly connected with supporting plates 6, one side of each supporting plate 6 is movably connected with a roller shaft 7, and one side of the mounting plate 1 is provided with a collecting structure 8;
the collecting structure 8 comprises a collecting box 801, a through groove 802, a sliding groove 803 and a baffle 804, wherein the through groove 802 is formed in the bottom of the collecting box 801, the sliding groove 803 is formed in one side, close to the through groove 802, of the collecting box 801, and the baffle 804 is movably connected inside the sliding groove 803.
As a preferred technical scheme, one side fixedly connected with connecting block 9 of mounting panel 1, one side of connecting block 9 is provided with motor 10, and motor 10's bottom fixedly connected with connecting rod 11, connecting rod 11's bottom fixedly connected with hydraulic stem 12, one side fixedly connected with handle 13 of hydraulic stem 12 set up handle 13, can make things convenient for the staff to mention the use to hydraulic stem 12, increase the convenience of device when using.
As a preferred technical scheme of the utility model, one side fixedly connected with branch stream block 14 that mounting panel 1 is close to the top, and one side of branch stream block 14 is provided with material spraying mouth 15, and one side of branch stream block 14 is connected with coupling hose 16, and one side of coupling hose 16 is connected with raw material tank 17.
As a preferred technical scheme, one side that mounting panel 1 is located adjusting screw 2 is provided with the bearing, and one side fixed connection of adjusting screw 2 is in the inner wall of bearing, and adjusting screw 2 keeps away from one side fixedly connected with of mounting panel 1 and adjusts and turn round 201, and the surface that 201 was turned round in the regulation is provided with anti-skidding line, sets up anti-skidding line, can increase the regulation and turn round 201 frictional force when rotating, and then increase the rotation effect.
As a preferred technical scheme of the utility model, fixed block 3 is located one side of adjusting screw 2 and has seted up the thread groove, fixed block 3 and 2 threaded connection of adjusting screw.
As a preferred technical scheme of the utility model, the movable groove has all been seted up to the position that mounting panel 1 is located scraper blade 4 and backup pad 6, and one side of scraper blade 4 is provided with scale mark 401, and the position that backup pad 6 is located roller 7 all is provided with the bearing.
As an optimized technical scheme of the utility model, the shape of collecting box 801 is L shape, collects box 801 and backup pad 6 fixed connection.
As a preferred technical scheme, the output and the 9 fixed connection of connecting block of motor 10, the ejector pin and the 11 fixed connection of connecting rod of hydraulic stem 12, the shape of connecting rod 11 are the arc to be convenient for the during operation, mounting panel 1 direct action is in the wall, thereby increases the travelling comfort when using.
As a preferred technical scheme of the utility model, one side of raw material tank 17 is provided with control panel 1701, and the top of raw material tank 17 is provided with feed inlet 1702, and the bottom of raw material tank 17 is provided with universal wheel 1703, and the inside of raw material tank 17 is provided with the stirring structure, and then makes the raw materials can directly follow feed inlet 1702 and annotate the inside of raw material tank 17, makes the stirring structure stir the raw materials to promote the discharge effect of raw materials.
The working principle of the utility model is as follows:
s1, during construction, the control panel 1701 is used to control the operation of the material box 17 and the material spraying port 15;
s2, lifting the hydraulic rod 12 through the handle 13, and spraying the wall surface through the spraying port 15;
s3, pushing the hydraulic rod 12 upwards to enable the scraper 4 to primarily scrape the raw materials, and enabling the roller shaft 7 to secondarily flatten the raw materials;
s4, through the L-shaped collection box 801, the redundant raw materials can enter the collection box 801 for collection when the scraper 4 and the roller shaft 7 are leveled;
s5, when the internal raw materials need to be removed, the baffle 804 is pulled to discharge the internal raw materials from the through groove 802, and after the discharge is finished, the baffle 804 is inserted into the sliding groove 803, so that the through groove 802 is closed.
To sum up, during construction, the control panel 1701 is used to control the operation of the raw material box 17 and the spraying opening 15, and further the handle 13 is used to lift the hydraulic rod 12, so that the spraying opening 15 sprays the wall surface, and then the hydraulic rod 12 is pushed upwards to primarily scrape the raw material by the scraper 4, the roller 7 flattens the raw material for the second time, when the plastering thickness needs to be adjusted, the adjusting knob 201 is rotated by observing the scale mark 401, so that the adjusting screw 2 drives the scraper 4 and the roller 7 to move, thereby adjusting the position relationship between the scraper 4 and the roller 7 and the spraying opening 15, and further the scraper 4 and the roller 7 are used to smoothen the raw material by controlling the spraying speed, thereby achieving the purpose of effectively promoting the plastering effect through the scraper 4 and the roller 7, and also controlling the plastering thickness according to the actual working condition, when in use, the plastering motor 10 is controlled to rotate, the mounting plate 1 is rotated, so that the mounting plate 1 is rotated by 90 degrees, at the moment, the movement of the mounting plate 1 is controlled to plaster the included angle of the top of the wall surface, thereby avoiding the condition that a certain area on the top of the wall surface can not be sprayed during construction, thereby increasing the use convenience of the device, when in work, the L-shaped collecting box 801 ensures that the redundant raw materials can enter the collecting box 801 to be collected when the scraping plate 4 and the roller shaft 7 are leveled, and when the scraping plate 4 and the roller shaft 7 move, the collecting box 801 can move along with the same, thereby effectively collecting the raw materials, when the internal raw materials need to be discharged, the internal raw materials are discharged from the through groove 802 by pulling the baffle 804, after the discharge is finished, the baffle 804 is inserted into the chute 803, further, the through groove 802 is sealed, and the purpose of effectively collecting redundant raw materials is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a green building engineering wall plastering unit which characterized in that: the device comprises a mounting plate (1), wherein an adjusting screw (2) is movably connected to the mounting plate (1), a fixed block (3) is movably connected to the outer surface of the adjusting screw (2), a scraper (4) is fixedly connected to the top of the fixed block (3), a connecting plate (5) is fixedly connected to one side, away from the scraper (4), of the fixed block (3), supporting plates (6) are fixedly connected to the left side and the right side of the connecting plate (5), a roller shaft (7) is movably connected to one side of each supporting plate (6), and a collecting structure (8) is arranged on one side of the mounting plate (1);
the collecting structure (8) comprises a collecting box (801), a through groove (802), a sliding groove (803) and a baffle (804), wherein the through groove (802) is formed in the bottom of the collecting box (801), the sliding groove (803) is formed in one side, close to the through groove (802), of the collecting box (801), and the baffle (804) is movably connected inside the sliding groove (803).
2. The green building engineering wall plastering device of claim 1, wherein: one side fixedly connected with connecting block (9) of mounting panel (1), one side of connecting block (9) is provided with motor (10), the bottom fixedly connected with connecting rod (11) of motor (10), the bottom fixedly connected with hydraulic stem (12) of connecting rod (11), one side fixedly connected with handle (13) of hydraulic stem (12).
3. The green building engineering wall plastering device of claim 1, wherein: one side fixedly connected with of mounting panel (1) near the top divides stream block (14), one side of dividing stream block (14) is provided with material spraying mouth (15), one side of dividing stream block (14) is connected with coupling hose (16), one side of coupling hose (16) is connected with former feed tank (17).
4. The green building engineering wall plastering device of claim 1, wherein: one side that mounting panel (1) is located adjusting screw (2) is provided with the bearing, one side fixed connection in the inner wall of bearing of adjusting screw (2), one side fixedly connected with that mounting panel (1) was kept away from in adjusting screw (2) is adjusted and is turned round (201), the surface that the adjustment was turned round (201) is provided with anti-skidding line.
5. The green building engineering wall plastering device of claim 1, wherein: one side of the fixing block (3) located on the adjusting screw rod (2) is provided with a thread groove, and the fixing block (3) is in threaded connection with the adjusting screw rod (2).
6. The green building engineering wall plastering device of claim 1, wherein: the mounting panel (1) is located the position of scraper blade (4) and backup pad (6) and has all seted up the activity groove, one side of scraper blade (4) is provided with scale mark (401), the position that backup pad (6) are located roller (7) all is provided with the bearing.
7. The green building engineering wall plastering device of claim 1, wherein: the collecting box (801) is L-shaped, and the collecting box (801) is fixedly connected with the supporting plate (6).
8. A green architectural engineering wall plastering apparatus according to claim 2, wherein: the output end of the motor (10) is fixedly connected with the connecting block (9), and the ejector rod of the hydraulic rod (12) is fixedly connected with the connecting rod (11).
9. A green architectural engineering wall plastering apparatus according to claim 3, wherein: one side of raw materials case (17) is provided with control panel (1701), the top of raw materials case (17) is provided with feed inlet (1702), the bottom of raw materials case (17) is provided with universal wheel (1703).
CN202121176484.7U 2021-05-28 2021-05-28 Green building engineering wall plastering unit Expired - Fee Related CN215167708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121176484.7U CN215167708U (en) 2021-05-28 2021-05-28 Green building engineering wall plastering unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121176484.7U CN215167708U (en) 2021-05-28 2021-05-28 Green building engineering wall plastering unit

Publications (1)

Publication Number Publication Date
CN215167708U true CN215167708U (en) 2021-12-14

Family

ID=79373320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121176484.7U Expired - Fee Related CN215167708U (en) 2021-05-28 2021-05-28 Green building engineering wall plastering unit

Country Status (1)

Country Link
CN (1) CN215167708U (en)

Similar Documents

Publication Publication Date Title
CN211817755U (en) Wall surface scraping device for building construction
CN215167708U (en) Green building engineering wall plastering unit
CN112610004A (en) Wall masonry auxiliary device
CN216380438U (en) Wall prosthetic devices for building decoration
CN209976052U (en) Masonry mortar paving equipment
CN203452353U (en) Wall body levelling machine
CN216109568U (en) Construction tool for quick pointing of building block wall
CN213046724U (en) Aerated concrete block mortar joint processing apparatus
CN220814993U (en) Wall body masonry tool for building construction
CN220100542U (en) Auxiliary device for paving ceramic tiles
CN212642187U (en) Brick laying pointing device
CN215519776U (en) Plastering device for building decoration
CN217581064U (en) Plastering auxiliary device
CN220166632U (en) Asphalt crack pouring machine for concrete pavement
CN219909829U (en) Anti-dripping wall trowelling mechanism
CN217631079U (en) Gypsum mortar screeding device
CN220014333U (en) Quick mortar beating tool for wall plastering
CN220014337U (en) Multifunctional plastering device
CN220747548U (en) Building plastering scraping plate
CN214530249U (en) Bridge surface pothole repairs with floating device
CN217897376U (en) Civil construction engineering structure gap grouting device
CN217812388U (en) Composite template surface adhesive cement removing tool for concrete structure construction
CN207177222U (en) A kind of regulating multi-functional trowel
CN213015230U (en) Plastering construction structure for stair step cement mortar surface
CN220486333U (en) Road silt cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214