CN215166618U - Building structure for civil air defense building - Google Patents
Building structure for civil air defense building Download PDFInfo
- Publication number
- CN215166618U CN215166618U CN202120955838.1U CN202120955838U CN215166618U CN 215166618 U CN215166618 U CN 215166618U CN 202120955838 U CN202120955838 U CN 202120955838U CN 215166618 U CN215166618 U CN 215166618U
- Authority
- CN
- China
- Prior art keywords
- air defense
- building
- installation pipe
- bottom plate
- civil air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a building structure for people's air defense building, including roof, first installation pipe and bottom plate, the top equidistance of bottom plate is equipped with the second screw hole, there is the gim peg at the top of bottom plate through second screw hole movable mounting, the top center fixed mounting of bottom plate has the second installation pipe, the outside of second installation pipe is encircleed and is installed four group's second strengthening ribs. The utility model discloses an encircle in the outside of second installation pipe and install four group's second strengthening ribs, the hookup location of people's air defense building transverse fixation roof beam can be provided through the cooperation of second strengthening rib and first strengthening rib, can provide the hookup location of four directions for people's air defense building transverse fixation roof beam through four group's second strengthening ribs, and but the independent connection use, the inside a plurality of corners of adaptable building has improved the compatible rate of structure and people's air defense building, and the stability of connection can be guaranteed to the triangle stability that utilizes the structure.
Description
Technical Field
The utility model relates to a civil air defense building technical field specifically is a building structure for civil air defense building.
Background
The civil air defense construction is a general name of construction engineering taking civil air defense engineering as a necessary auxiliary engineering, mostly takes an underground garage as a main embodiment form, and is internally provided with hardware required by a civil air defense door, a plugging door, illumination, ventilation, water supply and drainage, a communication network and the like during war, and the civil air defense engineering, also called civil air defense work, refers to an underground protective building which is independently built for ensuring personnel and material masking during war, civil air defense command and medical rescue, and a basement which can be used for air defense during war and is built by combining with a ground building.
The existing civil air defense building has the following defects:
1. the building structure of the existing civil air defense building is inconvenient to quickly build and assemble, so that the civil air defense building cannot be quickly installed and used under the emergency demand condition, and meanwhile, the civil air defense building occupies a large amount of transportation space due to relatively fixed volume, so that the one-time transportation amount of the building structure is reduced, the engineering transportation in the emergency condition is not facilitated, and the practicability of the device is reduced;
2. the building structure of the existing civil air defense building is low in compatibility rate when civil air defense engineering is built, the building structure is often customized according to different installation positions of the structure when the building structure is connected, such as corners or supporting beams, and the building structure is often inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building structure for people's air defense building to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building structure for people's air defense building, includes roof, first installation pipe and bottom plate, the top equidistance of bottom plate is equipped with the second screw hole, there is the gim peg at the top of bottom plate through second screw hole movable mounting, the top center fixed mounting of bottom plate has the second installation pipe, the outside of second installation pipe is encircleed and is installed four groups of second strengthening ribs, the top center fixed mounting of second installation pipe has first inserted bar, first installation pipe is installed through first inserted bar in the top of second installation pipe, the bottom center of first installation pipe is equipped with the second jack, and second jack and first inserted bar joint, the top fixed mounting of first installation pipe has the roof, and the bottom of roof is connected with the top of first strengthening rib, the bottom equidistance of roof is equipped with first screw hole.
Preferably, the top of the top plate is fixedly provided with a top seat, and the center of the top seat is provided with a first jack.
Preferably, four groups of first reinforcing ribs are arranged on the outer side of the first mounting pipe in a surrounding mode, and two groups of first mounting holes are formed in the outer portion of each first reinforcing rib.
Preferably, two groups of second mounting holes are formed in the outer portion of the second reinforcing rib, and the bottom of the second reinforcing rib is connected with the top of the bottom plate.
Preferably, the bottom of the outer part of the fixing bolt is provided with a bolt seat in a sleeved mode, and the top of the fixing bolt extends to the inner part of the first threaded hole.
Preferably, the bottom of the bottom plate is fixedly provided with a base, and the bottom of the base is fixedly provided with a second inserted bar.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a top center fixed mounting at the second installation pipe has first inserted bar, can cooperate with the second jack through first inserted bar to be connected, and fix the relative position of roof and bottom plate through the gim peg during the connection to guarantee its steadiness, can be convenient for the staff to build the inside connection structure of civil air defense building fast through the cooperation, and can dismantle it when the transportation, so that save the occupation to the transportation space, improved the practicality of device.
2. The utility model discloses an encircle in the outside of second installation pipe and install four group's second strengthening ribs, the hookup location of people's air defense building transverse fixation roof beam can be provided through the cooperation of second strengthening rib and first strengthening rib, can provide the hookup location of four directions for people's air defense building transverse fixation roof beam through four group's second strengthening ribs, and but the independent connection use, the inside a plurality of corners of adaptable building has improved the compatible rate of structure and people's air defense building, and the stability of connection can be guaranteed to the triangle stability that utilizes the structure.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of a three-dimensional partial structure of the bottom plate of the present invention;
fig. 3 is a schematic bottom perspective partial structure view of the top plate of the present invention;
fig. 4 is a schematic bottom perspective partial structure of the bottom plate of the present invention;
fig. 5 is a schematic view of the front connection structure of the present invention.
In the figure: 1. a top plate; 101. a top seat; 102. a first jack; 103. a first threaded hole; 2. a first mounting tube; 201. a first reinforcing rib; 202. a second jack; 203. a first mounting hole; 3. a second mounting tube; 301. a second reinforcing rib; 302. a second mounting hole; 303. a first plunger; 4. a base plate; 401. a base; 402. a second threaded hole; 403. a fixing bolt; 404. a bolt seat; 405. a second plunger.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: a building structure for civil air defense buildings comprises a top plate 1, first mounting pipes 2 and a bottom plate 4, wherein second threaded holes 402 are equidistantly arranged at the top of the bottom plate 4, the bottom plate 4 can provide a mounting position for a device and can facilitate the welding and mounting of the device, fixing bolts 403 are movably mounted at the top of the bottom plate 4 through the second threaded holes 402 and can reinforce the building structure when the building structure is connected through the fixing bolts 403, the stability of the structure is ensured, a second mounting pipe 3 is fixedly mounted at the center of the top of the bottom plate 4, the second mounting pipe 3 can provide a mounting position for a second reinforcing rib 301 and can facilitate the welding and mounting of the second reinforcing rib 301, four groups of second reinforcing ribs 301 are arranged around the outer side of the second mounting pipe 3, the connecting positions of the transverse fixing beams of the civil air defense buildings can be provided through the matching of the second reinforcing ribs 301 and the first reinforcing ribs 201, the connecting positions of the transverse fixing beams of the civil air defense buildings can be provided for the four directions through the four groups of second reinforcing ribs 301, and can be used by connecting alone, can adapt to a plurality of corners in the building, improve the compatibility rate of the structure and the civil air defense building, and can ensure the stability of connection by utilizing the triangle stability of the structure, the top center of the second installation pipe 3 is fixedly provided with a first inserted bar 303, the first inserted bar 303 can be matched and connected with a second inserted hole 202, the relative position of the top plate 1 and the bottom plate 4 is fixed by a fixing bolt 403 during connection so as to ensure the stability of the connection, the matching can be convenient for workers to quickly build the connection structure in the civil air defense building, and the connection structure can be disassembled during transportation so as to save the occupation of the transportation space and improve the practicability of the device, the top of the second installation pipe 3 is provided with a first installation pipe 2 by the first inserted bar 303, the bottom center of the first installation pipe 2 is provided with the second inserted hole 202, and the second inserted hole 202 is connected with the first inserted bar 303 in a clamping way, the inside second jack 202 of first installation pipe 2 can provide the inserted position of first inserted bar 303, can be convenient for carry out fixed mounting to the structure, the top fixed mounting of first installation pipe 2 has roof 1, and the bottom of roof 1 is connected with the top of first strengthening rib 201, the bottom equidistance of roof 1 is equipped with first screw hole 103, first screw hole 103 that is equipped with through roof 1 surface equidistance can provide the hookup location of gim peg 403, can be convenient for fix the structure.
Further, the top fixed mounting of roof 1 has footstock 101, and the top center of footstock 101 is equipped with first jack 102, and footstock 101 can provide the welding position of erecting the roof beam, can be convenient for carry out compatible installation with structure and civil air defense building, can provide the inserted position of second inserted bar 405 through first jack 102, can be convenient for the staff uses according to actual demand superposes the structure, has improved the functional of structure.
Further, the outside of first installation pipe 2 is encircleed and is installed four first strengthening rib 201 of group, and the outside of first strengthening rib 201 is equipped with two sets of first mounting holes 203, can provide the hookup location of people's air defense building inside crossbeam through the outside first mounting hole 203 of first strengthening rib 201, can be convenient for the staff uses the bolt to be connected the crossbeam with first strengthening rib 201 and fixes.
Further, the outside of second strengthening rib 301 is equipped with two sets of second mounting holes 302, and the bottom of second strengthening rib 301 is connected with bottom plate 4's top, can provide the staff of being convenient for through second mounting hole 302 and use the bolt to be connected the inside crossbeam of civil air defense building with second strengthening rib 301 fixedly, steadiness when can improving the installation.
Further, the outside bottom installation cover of gim peg 403 has the key seat 404, and the top of gim peg 403 extends to the inside of first screw hole 103, can be convenient for the staff through key seat 404 and rotate gim peg 403, can guarantee the steadiness of connecting when installing structure through the cooperation of gim peg 403 and first screw hole 103.
Further, the bottom fixed mounting of bottom plate 4 has base 401, and base 401's bottom fixed mounting has second inserted bar 405, and base 401 can provide the welding position who erects the roof beam top, can be convenient for carry out compatible installation with structure and civil air defense building, can cooperate fixedly with first jack 102 through second inserted bar 405, can be convenient for the staff and stack the use to the structure according to actual demand, has improved the functional of structure.
The working principle is as follows: can cooperate with second jack 202 through first inserted bar 303 and be connected, during the connection and fix roof 1 and bottom plate 4's relative position through gim peg 403, in order to guarantee its steadiness, can be convenient for the staff to build the inside connection structure of people's air defense building fast through the cooperation, can provide the hookup location of the horizontal fixed beam of people's air defense building through the cooperation of second strengthening rib 301 and first strengthening rib 201, can provide the hookup location of four directions for the horizontal fixed beam of people's air defense building through four groups of second strengthening ribs 301, and can connect the use alone, the inside a plurality of corners of adaptable building, the compatibility rate of structure and people's air defense building has been improved, and the stability of connecting can be guaranteed to the triangle stability that utilizes the structure.
The details of the present invention are well known to those skilled in the art.
Finally, it is to be noted that: the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the examples, it should be understood by those skilled in the art that the technical solutions of the present invention can be modified and replaced with equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the scope of the claims of the present invention.
Claims (6)
1. A building structure for civil air defense construction, including roof (1), first installation pipe (2) and bottom plate (4), its characterized in that: the top equidistance of bottom plate (4) is equipped with second screw hole (402), there are gim peg (403) at the top of bottom plate (4) through second screw hole (402) movable mounting, there are second installation pipe (3) at the top center of bottom plate (4), the outside of second installation pipe (3) is encircleed and is installed four groups of second strengthening ribs (301), the top center fixed mounting of second installation pipe (3) has first inserted bar (303), the top of second installation pipe (3) is installed first installation pipe (2) through first inserted bar (303), the bottom center of first installation pipe (2) is equipped with second jack (202), and second jack (202) and first inserted bar (303) joint, the top fixed mounting of first installation pipe (2) has roof (1), and the bottom of roof (1) is connected with the top of first strengthening rib (201), the bottom equidistance of roof (1) is equipped with first screw hole (103).
2. A building structure for civil air defense construction according to claim 1, wherein: the top of roof (1) fixed mounting has footstock (101), and the top center of footstock (101) is equipped with first jack (102).
3. A building structure for civil air defense construction according to claim 1, wherein: the outside of first installation pipe (2) is encircleed and is installed four groups of first strengthening rib (201), and the outside of first strengthening rib (201) is equipped with two sets of first mounting holes (203).
4. A building structure for civil air defense construction according to claim 1, wherein: the outside of second strengthening rib (301) is equipped with two sets of second mounting holes (302), and the bottom of second strengthening rib (301) is connected with the top of bottom plate (4).
5. A building structure for civil air defense construction according to claim 1, wherein: the bottom of the outside of the fixing bolt (403) is sleeved with a bolt seat (404), and the top of the fixing bolt (403) extends to the inside of the first threaded hole (103).
6. A building structure for civil air defense construction according to claim 1, wherein: the bottom fixed mounting of bottom plate (4) has base (401), and the bottom fixed mounting of base (401) has second inserted bar (405).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120955838.1U CN215166618U (en) | 2021-05-07 | 2021-05-07 | Building structure for civil air defense building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120955838.1U CN215166618U (en) | 2021-05-07 | 2021-05-07 | Building structure for civil air defense building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215166618U true CN215166618U (en) | 2021-12-14 |
Family
ID=79366891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120955838.1U Expired - Fee Related CN215166618U (en) | 2021-05-07 | 2021-05-07 | Building structure for civil air defense building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215166618U (en) |
-
2021
- 2021-05-07 CN CN202120955838.1U patent/CN215166618U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215166618U (en) | Building structure for civil air defense building | |
CN217417897U (en) | Pipeline hoisting auxiliary tool and pipeline hoisting equipment | |
CN212518185U (en) | Erection supporting device for electromechanical installation | |
CN211849460U (en) | Town road foundation ditch safety device | |
CN212613690U (en) | Flat iron type rigid wall connecting piece for building construction scaffold | |
CN212614061U (en) | Building engineering construction protector | |
CN212642053U (en) | Scaffold for building construction | |
CN211500011U (en) | Stay wire construction hole clamp for four-angle steel combined iron tower | |
CN212153689U (en) | Precast concrete air conditioner board convenient to construction | |
CN220565931U (en) | Prefabricated bay window | |
CN219952361U (en) | Curtain perforation aluminum plate structure | |
CN218373913U (en) | Civil engineering construction excavation supporting device | |
CN211664531U (en) | Ceiling hoisting device | |
CN211472512U (en) | Prestressed connecting piece for building foundation pit support | |
CN213626582U (en) | Convenient building construction of dismantling climbs frame | |
CN219548440U (en) | Assembled building wall body installation component | |
CN213093765U (en) | Interim cable support with adjustable remove | |
CN215290590U (en) | Detachable combined house | |
CN214062526U (en) | Reinforcing apparatus of electric power angle steel iron tower | |
CN216360664U (en) | Bridge building templates link for civil engineering | |
CN210915045U (en) | Tower crane attaches wall safety fast assembly device | |
CN213869880U (en) | Scaffold structure for tunnel construction | |
CN220182494U (en) | Wall-supporting connecting device of construction elevator | |
CN220152138U (en) | Water supply pipe connecting piece in interior building decoration | |
CN219910172U (en) | Assembled building fixing device for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211214 |