CN211500011U - Stay wire construction hole clamp for four-angle steel combined iron tower - Google Patents
Stay wire construction hole clamp for four-angle steel combined iron tower Download PDFInfo
- Publication number
- CN211500011U CN211500011U CN201922381004.XU CN201922381004U CN211500011U CN 211500011 U CN211500011 U CN 211500011U CN 201922381004 U CN201922381004 U CN 201922381004U CN 211500011 U CN211500011 U CN 211500011U
- Authority
- CN
- China
- Prior art keywords
- angle steel
- clamp
- installation
- mounting
- movably connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a construction hole anchor clamps of acting as go-between for four angle steel combination iron towers belongs to electric power construction technical field. A stay wire construction hole clamp for a four-angle steel combined iron tower comprises an installation clamp plate and an inner clamp plate, wherein the outer surface of the installation clamp plate is movably connected with main material angle steel, the outer surface of the main material angle steel is movably connected with the inner clamp plate, the outer surface of the inner clamp plate is fixedly connected with two stiffened plates, a vertical plate is fixedly connected between the two stiffened plates, and the outer surface of the vertical plate is fixedly connected with an installation ring; the utility model discloses, through the setting of installation splint, inner splint and right angle steel clamp, installation splint lock through locking bolt and inner splint, and right angle steel clamp locks through installation threaded rod and installation splint, and inner splint locks through erecting strutting arrangement and right angle steel clamp, makes the principal material angle steel of angle steel tower firmly the centre gripping between the three, forms a stable clamping state.
Description
Technical Field
The utility model relates to an electric power construction technical field especially relates to a construction hole anchor clamps of acting as go-between for four corners steel combination iron tower.
Background
In the line construction of electric power, an assembled iron tower is generally required to realize the erection of the line. In the process of assembling and lifting the iron tower, in order to ensure the stability of the iron tower, diagonal ground stay wires need to be arranged after the underframe foundation is installed, the stay wires on the underframe foundation are arranged to balance the horizontal force of the iron tower foundation, and the stay wires need to be arranged all the time in the process of installation, use and disassembly of the iron tower.
The installation method for installing the additional device on the angle steel tower is mainly characterized in that two limbs of the angle steel are fixed by bolts and hooks, or the angle steel is provided with holes or is fastened on the device in a welding mode.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the better clamping effect can not be realized by the device and the angle steel in the prior art, and the provided stay wire construction hole clamp for the four-corner steel combined iron tower.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a construction hole anchor clamps of acting as go-between for four angle steel combination iron tower, includes installation splint and inner splint, the surface swing joint of installation splint has the main material angle steel, the surface swing joint of main material angle steel has the inner splint, the outer fixed surface of inner splint is connected with the gusset, the quantity of gusset is two, two fixedly connected with riser between the gusset, the outer fixed surface of riser is connected with the collar, the inside wall swing joint of collar has perpendicular strutting arrangement, the one end of erecting strutting arrangement has the construction bolt through pivot swing joint, the surface swing joint of construction bolt has the right angle steel clamp.
Preferably, the outer surfaces of the mounting clamping plate and the inner clamping plate are provided with mounting holes.
Preferably, the outer surface of the right-angle steel clamp is fixedly connected with an installation threaded rod, and the installation threaded rod is movably connected to the outer surface of the installation clamping plate through an installation hole.
Preferably, the vertical supporting device comprises a supporting sleeve and a supporting rod, a compression spring is fixedly connected inside the supporting sleeve, and one end of the compression spring is fixedly connected with the supporting rod.
Preferably, the outer surface of the right-angle steel clamp is provided with a connecting installation groove, and the inside of the connecting installation groove is movably connected with an installation bolt.
Preferably, the outer surface of the mounting clamping plate is movably connected with a locking bolt, and the locking bolt penetrates through the mounting hole and is movably connected with the outer surface of the inner clamping plate.
Compared with the prior art, the utility model provides a construction hole anchor clamps of acting as go-between for four angle steel combination iron towers possesses following beneficial effect:
the utility model discloses, through the setting of installation splint, inner splint and right angle steel clamp, installation splint lock through locking bolt and inner splint, and right angle steel clamp locks through installation threaded rod and installation splint, and inner splint locks through erecting strutting arrangement and right angle steel clamp, makes the principal material angle steel of angle steel tower firmly the centre gripping between the three, forms a stable clamping state, can not cause any harm to the principal material angle steel simultaneously, and the mounting means is comparatively simple, and the centre gripping effect promotes and is showing.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the inner splint of the present invention;
FIG. 3 is a schematic structural view of the installation splint of the present invention;
fig. 4 is a schematic structural view of the vertical supporting device of the present invention.
In the figure: 1. installing a clamping plate; 2. main material angle steel; 3. an inner splint; 4. adding a rib plate; 5. a vertical plate; 6. a mounting ring; 7. a vertical support device; 8. installing a bolt; 9. a right angle steel clamp; 10. mounting holes; 11. mounting a threaded rod; 12. connecting the mounting groove; 13. and locking the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a stay wire construction hole clamp for a four-angle steel combined iron tower comprises an installation clamp plate 1 and an inner clamp plate 3, wherein the outer surface of the installation clamp plate 1 is movably connected with main angle steel 2, the outer surface of the main angle steel 2 is movably connected with the inner clamp plate 3, the outer surface of the inner clamp plate 3 is fixedly connected with two stiffened plates 4, a vertical plate 5 is fixedly connected between the two stiffened plates 4, the outer surface of the vertical plate 5 is fixedly connected with an installation ring 6, the inner side wall of the installation ring 6 is movably connected with a vertical supporting device 7, one end of the vertical supporting device 7 is movably connected with an installation bolt 8 through a rotating shaft, and the outer surface of the installation bolt 8 is movably connected with a right angle steel;
the mounting clamp plate 1 is locked with the inner clamp plate 3 through the locking bolt 13, the right-angle steel clamp 9 is locked with the mounting clamp plate 1 through the mounting threaded rod 11, and the inner clamp plate 3 is locked with the right-angle steel clamp 9 through the vertical supporting device, so that the main material angle steel 2 of the angle steel tower is firmly clamped among the three to form a stable clamping state, meanwhile, the main material angle steel 2 cannot be damaged, the mounting mode is simple, and the clamping effect is improved remarkably;
mounting hole 10 has all been seted up to the surface of installation splint 1 and interior splint 3, the outer fixed surface of right angle steel clamp 9 is connected with installation threaded rod 11, installation threaded rod 11 pass through mounting hole 10 swing joint at the surface of installation splint 1, it includes supporting sleeve and bracing piece to erect strutting arrangement 7, supporting sleeve's inside fixedly connected with pressure spring, pressure spring's one end fixedly connected with bracing piece, connect the mounting groove 12 has been seted up to right angle steel clamp 9's surface, connect the inside swing joint of mounting groove 12 and have the construction bolt 8, the outer swing joint of installation splint 1 has locking bolt 13, locking bolt 13 runs through the surface of 10 swing joints of mounting hole at interior splint 3.
The utility model discloses in, installation splint 1 locks through locking bolt 13 and inner splint 3, and right angle steel presss from both sides 9 and locks through installation threaded rod 11 and installation splint 1, and inner splint 3 locks through erecting strutting arrangement and right angle steel clamp 9, makes the main material angle steel 2 of angle steel tower firmly by the centre gripping between the three, forms a stable clamping state, can not cause any harm to main material angle steel 2 simultaneously.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A bracing wire construction hole clamp for a quadrangular steel combined iron tower, which comprises an installation clamping plate (1) and an inner clamping plate (3), it is characterized in that the outer surface of the mounting splint (1) is movably connected with a main material angle steel (2), the outer surface of the main material angle steel (2) is movably connected with an inner clamping plate (3), the outer surface of the inner clamping plate (3) is fixedly connected with a stiffened plate (4), the number of the reinforcing plates (4) is two, a vertical plate (5) is fixedly connected between the two reinforcing plates (4), the outer surface of the vertical plate (5) is fixedly connected with a mounting ring (6), the inner side wall of the mounting ring (6) is movably connected with a vertical supporting device (7), one end of the vertical supporting device (7) is movably connected with a mounting bolt (8) through a rotating shaft, the outer surface of the mounting bolt (8) is movably connected with a right-angle steel clip (9).
2. The stay wire construction hole clamp for the quadrangular steel combined iron tower according to claim 1, wherein the outer surfaces of the mounting clamp plate (1) and the inner clamp plate (3) are provided with mounting holes (10).
3. The stay wire construction hole clamp for the quadrangular steel combined iron tower according to claim 1, wherein a mounting threaded rod (11) is fixedly connected to the outer surface of the rectangular steel clamp (9), and the mounting threaded rod (11) is movably connected to the outer surface of the mounting clamp plate (1) through a mounting hole (10).
4. The stay wire construction hole clamp for the quadrangular steel combined iron tower according to claim 1, wherein the vertical supporting device (7) comprises a supporting sleeve and a supporting rod, a compression spring is fixedly connected inside the supporting sleeve, and one end of the compression spring is fixedly connected with the supporting rod.
5. The stay wire construction hole clamp for the quadrangular steel combined iron tower according to claim 1, wherein a connection installation groove (12) is formed in the outer surface of the rectangular steel clamp (9), and an installation bolt (8) is movably connected to the inside of the connection installation groove (12).
6. The stay wire construction hole clamp for the quadrangular steel combined iron tower according to claim 1, wherein the outer surface of the mounting clamp plate (1) is movably connected with a locking bolt (13), and the locking bolt (13) penetrates through the mounting hole (10) and is movably connected with the outer surface of the inner clamp plate (3).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922381004.XU CN211500011U (en) | 2019-12-26 | 2019-12-26 | Stay wire construction hole clamp for four-angle steel combined iron tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922381004.XU CN211500011U (en) | 2019-12-26 | 2019-12-26 | Stay wire construction hole clamp for four-angle steel combined iron tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211500011U true CN211500011U (en) | 2020-09-15 |
Family
ID=72419914
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922381004.XU Expired - Fee Related CN211500011U (en) | 2019-12-26 | 2019-12-26 | Stay wire construction hole clamp for four-angle steel combined iron tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211500011U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113250518A (en) * | 2021-03-30 | 2021-08-13 | 国网河北省电力有限公司邢台供电分公司 | Electric power iron tower extension device and use method thereof |
-
2019
- 2019-12-26 CN CN201922381004.XU patent/CN211500011U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113250518A (en) * | 2021-03-30 | 2021-08-13 | 国网河北省电力有限公司邢台供电分公司 | Electric power iron tower extension device and use method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN213952938U (en) | A cantilever beam with adjustable support position | |
| CN113356551A (en) | Cantilever frame structure | |
| CN211500011U (en) | Stay wire construction hole clamp for four-angle steel combined iron tower | |
| CN215630807U (en) | A fast positioning connection structure for steel plate shear walls in prefabricated buildings | |
| CN216640226U (en) | Locking device for bracket on triangular bracket | |
| CN216276798U (en) | I-steel scaffold steel pipe connecting piece | |
| KR20210078117A (en) | Clamp for scaffold pipes | |
| CN214423197U (en) | Operation platform that construction was used | |
| CN206580473U (en) | Exempt from the integration of falling beam inner climbing crane tower support meanss | |
| CN108775144B (en) | External sleeve type scaffold special for building | |
| CN220705330U (en) | Auxiliary supporting device of suspension holding pole for mounting television signal tower | |
| CN221942056U (en) | An ultra-high and ultra-long cantilevered inclined steel column anti-overturning support tire frame | |
| CN219411711U (en) | Expandable combined scaffold | |
| CN220469406U (en) | Template system convenient to dismantle | |
| CN222541968U (en) | A hanging basket bracket for super-high parapet wall or flower rack beam on roof | |
| CN223462690U (en) | Photovoltaic tubular pile bridge support mounting structure and light Fu Guanzhuang | |
| CN214365422U (en) | Enclosure wall device for building | |
| CN220599113U (en) | Fixing device of cantilever type outer scaffold upright rod | |
| CN214192350U (en) | Tower crane frame structure | |
| CN224173684U (en) | Scaffold for construction | |
| CN221256226U (en) | Building engineering construction is with facing limit protection strutting arrangement | |
| CN218758283U (en) | Lattice type support column for heavy steel workshop | |
| CN223967823U (en) | Portable photovoltaic support installation device | |
| CN218092148U (en) | Building engineering protection canopy convenient to dismouting | |
| CN217579797U (en) | Hanging basket for bridge construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200915 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |