CN215165783U - A assembled basis for support is set up - Google Patents

A assembled basis for support is set up Download PDF

Info

Publication number
CN215165783U
CN215165783U CN202120686386.1U CN202120686386U CN215165783U CN 215165783 U CN215165783 U CN 215165783U CN 202120686386 U CN202120686386 U CN 202120686386U CN 215165783 U CN215165783 U CN 215165783U
Authority
CN
China
Prior art keywords
lap joint
connecting plate
prefabricated section
precast block
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120686386.1U
Other languages
Chinese (zh)
Inventor
赵云
刘万顺
刘磊
王猛
李文勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202120686386.1U priority Critical patent/CN215165783U/en
Application granted granted Critical
Publication of CN215165783U publication Critical patent/CN215165783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to an assembled basis for support setting, including bar-shaped first prefabricated section and second prefabricated section, the one end of first prefabricated section is equipped with down the lap joint, and the lower lap joint top surface is equipped with the recess, and both sides are established the connecting plate respectively, and the one end of second prefabricated section is equipped with the upper lap joint, and the upper lap joint bottom surface is equipped with the lug that matches with the recess, and both sides are established the connecting plate respectively, and two prefabricated section other end top surfaces are equipped with respectively and are used for the pre-buried steel sheet of being connected with steel-pipe pile lower extreme, and the top surface of every prefabricated section is established 4 rings; the upper lap joint and the lower lap joint are overlapped up and down, the convex block is clamped in the groove, and the upper connecting plate and the lower connecting plate are connected through a bolt. The utility model is prefabricated in advance, and can ensure the construction continuity; can be repeatedly used, saves consumables and is beneficial to environmental protection.

Description

A assembled basis for support is set up
Technical Field
The utility model belongs to bridge construction field relates to the support in the bridge construction and sets up, concretely relates to an assembled basis for support setting up.
Background
A temporary steel pipe pile support is often required to be erected on a bridge construction site, and the lower end of a steel pipe pile is required to be supported on a solid foundation. The common support foundation is cast in place by adopting concrete, the cast-in-place foundation can be used only after reaching a certain strength, the maintenance and equal strength time is long, and the construction progress requirement is difficult to adapt to under the condition of tight construction period; in addition, the concrete foundation poured in situ cannot move, and the concrete foundation is often broken after construction is finished, so that great waste is caused, and the environment is also influenced.
Disclosure of Invention
The utility model aims at the above-mentioned problem, a fabricated support basis is provided, adopt the concrete prefabrication, install fast at the job site, satisfy the construction progress requirement.
The technical scheme of the utility model as follows:
an assembled basis for scaffold erection which characterized in that: the steel pipe pile comprises a first strip-shaped precast block and a second strip-shaped precast block, wherein one end of the first precast block is provided with a lower lap joint, the top surface of the lower lap joint is provided with a groove, two sides of the lower lap joint are respectively provided with a lower connecting plate extending outwards, one end of the second precast block is provided with an upper lap joint, the bottom surface of the upper lap joint is provided with a convex block matched with the shape of the groove, two sides of the upper lap joint are respectively provided with an upper connecting plate extending outwards, the top surfaces of the other ends of the two precast blocks are respectively provided with a pre-embedded steel plate used for being connected with the lower end of a steel pipe pile, and the top surface of each precast block is respectively provided with a hanging ring corresponding to 4 corners; the upper connecting plate, the lower connecting plate, the embedded steel plate and the hanging ring are all welded with the steel reinforcement framework of the precast block; the upper lap joint and the lower lap joint are overlapped up and down, the convex block on the bottom surface of the upper lap joint is clamped in the groove of the lower lap joint, and the upper connecting plate and the lower connecting plate are connected through a bolt.
The utility model is processed in advance in a prefabricating yard, and can be put into use after being transported to a site for assembly according to construction needs, thereby being beneficial to the continuity of site construction and ensuring the construction period; dividing a foundation into two prefabricated blocks, wherein the weight of each prefabricated block can be hoisted by adopting conventional hoisting equipment; after the construction is finished, the movable type building wall can move to a storage place to wait for repeated use, so that consumables can be saved, and the environment-friendly type building wall is favorable for environmental protection.
Drawings
Fig. 1 is a schematic elevation structure of the present invention;
fig. 2 is a schematic plan view of the present invention;
FIG. 3 is a schematic view of a first preform block;
fig. 4 is a schematic structural view of a second preform block.
Detailed Description
As shown in fig. 1, 2, 3 and 4, the utility model comprises a first bar-shaped precast block 1 and a second bar-shaped precast block 2, wherein both precast blocks are cast by reinforced concrete; one end of the first precast block 1 is provided with a lower lap joint 11, the top surface of the lower lap joint is provided with a groove 12, the two sides of the lower lap joint are respectively provided with a lower connecting plate 13 extending outwards, one end of the second precast block 2 is provided with an upper lap joint 21, the bottom surface of the upper lap joint 21 is provided with a convex block 22 matched with the groove in shape, the two sides of the upper lap joint are respectively provided with an upper connecting plate 23 extending outwards, the top surfaces of the other ends of the two precast blocks are respectively provided with an embedded steel plate 3 used for being connected with the lower end of the steel pipe pile, and the top surface of each precast block is provided with a hanging ring 4 corresponding to 4 corners; the upper connecting plate, the lower connecting plate, the embedded steel plate and the hanging ring are all welded with the steel reinforcement framework of the precast block; the upper lap joint 21 of the second precast block and the lower lap joint 11 of the first precast block are overlapped up and down, the convex block 22 on the bottom surface of the upper lap joint is clamped in the groove 12 of the lower lap joint, and the upper connecting plate 23 and the lower connecting plate 13 are connected through the bolt 5.

Claims (1)

1. An assembled basis for scaffold erection which characterized in that: the steel pipe pile comprises a first strip-shaped precast block and a second strip-shaped precast block, wherein one end of the first precast block is provided with a lower lap joint, the top surface of the lower lap joint is provided with a groove, two sides of the lower lap joint are respectively provided with a lower connecting plate extending outwards, one end of the second precast block is provided with an upper lap joint, the bottom surface of the upper lap joint is provided with a convex block matched with the shape of the groove, two sides of the upper lap joint are respectively provided with an upper connecting plate extending outwards, the top surfaces of the other ends of the two precast blocks are respectively provided with a pre-embedded steel plate used for being connected with the lower end of a steel pipe pile, and the top surface of each precast block is respectively provided with a hanging ring corresponding to 4 corners; the upper connecting plate, the lower connecting plate, the embedded steel plate and the hanging ring are all welded with the steel reinforcement framework of the precast block; the upper lap joint and the lower lap joint are overlapped up and down, the convex block on the bottom surface of the upper lap joint is clamped in the groove of the lower lap joint, and the upper connecting plate and the lower connecting plate are connected through a bolt.
CN202120686386.1U 2021-04-03 2021-04-03 A assembled basis for support is set up Active CN215165783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120686386.1U CN215165783U (en) 2021-04-03 2021-04-03 A assembled basis for support is set up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120686386.1U CN215165783U (en) 2021-04-03 2021-04-03 A assembled basis for support is set up

Publications (1)

Publication Number Publication Date
CN215165783U true CN215165783U (en) 2021-12-14

Family

ID=79358579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120686386.1U Active CN215165783U (en) 2021-04-03 2021-04-03 A assembled basis for support is set up

Country Status (1)

Country Link
CN (1) CN215165783U (en)

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN108978434B (en) Bracket-free industrialized construction method of steel-concrete combined continuous box girder bridge
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN210975404U (en) Composite assembled road surface board
CN209555978U (en) A kind of cast-in-situ steel reinforced concrete manhole shaft shaping combined steel shuttering
CN110409492A (en) The combination assembled piping lane of one kind more structures containing superposed member and its construction method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN211340386U (en) Novel connection structure of pier is assembled to prefabricated segment
CN209907841U (en) Prefabricated high-strength concrete floor tile of assembled
CN103806593B (en) A kind of precast concrete
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN212582727U (en) Modular assembly type retaining wall
CN215165783U (en) A assembled basis for support is set up
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN218757587U (en) Prefabricated assembled reinforced concrete retaining wall
CN208792483U (en) Combined-type sewage well prefabricated component
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN213508545U (en) Large-volume concrete formwork connecting structure capable of improving stability
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN112064824A (en) Combined-connection prefabricated shear wall system
CN212052293U (en) Wet seam structure of prefabricated combination beam
CN211113708U (en) Can have enough to meet need dry powder mortar reinforced concrete basis
CN210288825U (en) Assembled and cast-in-situ combined beam plate structure
CN206359993U (en) Stud structure for main transformer fire wall
CN214272511U (en) Prefabricated assembled shear force wall perps connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant