CN215164683U - Pier shaft sprays maintenance frame - Google Patents

Pier shaft sprays maintenance frame Download PDF

Info

Publication number
CN215164683U
CN215164683U CN202120120672.1U CN202120120672U CN215164683U CN 215164683 U CN215164683 U CN 215164683U CN 202120120672 U CN202120120672 U CN 202120120672U CN 215164683 U CN215164683 U CN 215164683U
Authority
CN
China
Prior art keywords
water
column
pipe
connecting pipe
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120120672.1U
Other languages
Chinese (zh)
Inventor
徐东旭
徐英平
朱俊丽
陈露辉
钟楚怡
赵力
李云
覃东琼
腾佳莹
吴展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinzhu Transportation Construction Co Ltd
Original Assignee
Zhejiang Jinzhu Transportation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinzhu Transportation Construction Co Ltd filed Critical Zhejiang Jinzhu Transportation Construction Co Ltd
Priority to CN202120120672.1U priority Critical patent/CN215164683U/en
Application granted granted Critical
Publication of CN215164683U publication Critical patent/CN215164683U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technical field of pier shaft maintenance, especially, be a pier shaft sprays maintenance frame, including first water spray post, one side of first water spray post is provided with first pipeline, and the one end of fourth connecting tube is provided with third water spray post, and one side of first fixed block is provided with the second water pipe, and the surface of first water pipe and the surface of second water pipe all are provided with anchor clamps, and one side of second connecting pipe is provided with fourth water spray post, the surface of first water spray post, the surface of second water spray post, the surface of third water spray post and the surface of fourth water spray post all are provided with the water spray piece, and the medial surface of first water spray post is provided with the pier shaft. The utility model discloses a set up the water spray piece, accomplish the omnidirectional with the maintenance of pier shaft and spray, improved work efficiency, reduced intensity of labour, the maintenance effect is good, through setting up anchor clamps, makes the second water pipe firmly fix on first fixed block, has avoided the problem that drops because of the second water pipe is insecure.

Description

Pier shaft sprays maintenance frame
Technical Field
The utility model relates to a pier shaft maintenance technical field specifically is a pier shaft sprays maintenance frame.
Background
A plurality of bridges need to be erected in the highway and railway construction process, the bridges need to be erected on piers, a plurality of piers need to be poured, and water spraying maintenance needs to be carried out after pouring of the piers is completed so as to guarantee the structural strength of concrete and prevent cracking.
There are the following problems:
1. when the existing pier body is maintained, the spraying pipe is directly adopted to spray towards the pier body, so that the working efficiency is low, the labor intensity is high, the spraying is uneven, and the maintenance effect is not good.
2. Present pier shaft maintenance frame, when inserting the water pipe into the connecting pipe, the water pipe of connection is insecure to lead to the water pipe to drop, influenced for pier shaft maintenance, the workman still must climb again on the pier shaft and connect the water pipe, more troublesome.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a pier shaft sprays maintenance frame has solved and has sprayed the problem inhomogeneous and water piping connection insecure dropping.
In order to achieve the above object, the utility model provides a following technical scheme: a pier body spraying maintenance frame comprises a first water spraying column, wherein a first pipeline is arranged on one side of the first water spraying column, a first water pipe is arranged on one side of the first pipeline, a second pipeline is arranged on one side of the first water spraying column, a second water spraying column is arranged on one side of the second pipeline, a fourth connecting pipeline is arranged on one side of the second water spraying column, a third water spraying column is arranged at one end of the fourth connecting pipeline, a second connecting pipe is arranged on one side of the third water spraying column, a first fixing block is arranged on one side of the second connecting pipe and one side of the first pipeline, a second water pipe is arranged on one side of the first fixing block, clamps are arranged on the outer surfaces of the first water pipe and the second water pipe, a second connecting pipe is arranged at one end of the third water spraying column, and a fourth water spraying column is arranged on one side of the second connecting pipe, the up end of first spray column and the up end of fourth spray column all are provided with the support column, the surface of support column is provided with the second fixed block, the surface of first spray column, the surface of second spray column, the surface of third spray column and the surface of fourth spray column all are provided with the water spray piece, the medial surface of first spray column is provided with the pier shaft, the medial surface of first connecting pipe, the medial surface of second connecting pipe, the medial surface of third connecting pipe and the medial surface of fourth connecting pipe all are provided with the friction pad, one side of friction pad is provided with the sealing washer.
As a preferred technical scheme of the utility model, first pipeline fixed connection is in one side of first water spray column, first water pipe swing joint is in one side of first pipeline.
As a preferred technical scheme of the utility model, first connecting pipe fixed connection is in one side of first water spray column, second water spray column fixed connection is in one side of first connecting pipe.
As a preferred technical scheme of the utility model, fourth connecting tube fixed connection is in one side of second water spray column, third water spray column fixed connection is in the one end of fourth connecting tube.
As a preferred technical scheme of the utility model, second pipeline fixed connection is in one side of third water spray column, first fixed block difference fixed connection is in one side of second pipeline and one side of first pipeline.
As a preferred technical scheme of the utility model, second water pipe fixed connection is in one side of first fixed block, anchor clamps swing joint is in the surface of first water pipe and the surface of second water pipe respectively.
As an optimal technical scheme of the utility model, second connecting pipe fixed connection is in the one end of third water spray column, fourth water spray column fixed connection is in one side of second connecting pipe.
As a preferred technical scheme of the utility model, support column difference fixed connection is in the up end of first water spray column and the up end of fourth water spray column, second fixed block fixed connection is in the surface of support column.
Compared with the prior art, the utility model provides a pier shaft sprays maintenance frame possesses following beneficial effect:
1. this pier shaft sprays maintenance frame through setting up the water spray piece, can accomplish the omnidirectional with the maintenance of pier shaft and spray, has improved work efficiency, has reduced intensity of labour, and the maintenance effect is good.
2. This pier shaft sprays maintenance frame through setting up anchor clamps, makes the second water pipe firmly fix on first fixed block, has avoided the problem that drops because of the second water pipe insecure.
Drawings
FIG. 1 is a top view of the present invention;
fig. 2 is a schematic structural view of a first connecting pipe of the present invention;
fig. 3 is a schematic diagram of a first fixing block according to the present invention.
In the figure: 1. a first water spray column; 2. a first conduit; 3. a first water pipe; 4. a first fixed block; 5. a clamp; 6. a first connecting pipe; 7. a second water jet column; 8. spraying water blocks; 9. a third water jet column; 10. a fourth water spray column; 11. a second conduit; 12. a second water pipe; 13. a second fixed block; 14. a pier body; 15. a friction pad; 16. a seal ring; 17. a second connecting pipe; 18. a third connecting pipe; 19. a fourth connecting pipe; 20. and (4) a support column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a pier body spraying maintenance frame comprises a first water spraying column 1, a first pipeline 2 is arranged on one side of the first water spraying column 1, a first water pipe 3 is arranged on one side of the first pipeline 2, a first connecting pipe 6 is arranged on one side of the first water spraying column 1, a second water spraying column 7 is arranged on one side of the first connecting pipe 6, a fourth connecting pipe 19 is arranged on one side of the second water spraying column 7, a third water spraying column 9 is arranged at one end of the fourth connecting pipe 19, a second pipeline 11 is arranged on one side of the third water spraying column 9, a first fixing block 4 is arranged on one side of the second pipeline 11 and one side of the first pipeline 2, a second water pipe 12 is arranged on one side of the first fixing block 4, clamps 5 are arranged on the outer surface of the first water pipe 3 and the outer surface of the second water pipe 12, a second connecting pipe 17 is arranged at one end of the third water spraying column 9, a fourth water spraying column 10 is arranged on one side of the second water spraying column 17, the up end of first spray column 1 and the up end of fourth spray column 10 all are provided with support column 20, the surface of support column 20 is provided with second fixed block 13, the surface of first spray column 1, the surface of second spray column 7, the surface of third spray column 9 and the surface of fourth spray column 10 all are provided with water spray piece 8, the medial surface of first spray column 1 is provided with pier shaft 14, the medial surface of first connecting pipe 6, the medial surface of second connecting pipe 17, the medial surface of third connecting pipe 18 and the medial surface of fourth connecting pipe 19 all are provided with friction pad 15, one side of friction pad 15 is provided with sealing washer 16.
In this embodiment, the water spray block 8 sprays the water in the first water spray column 1, the water in the second water spray column 7, the water in the third water spray column 9 and the water in the fourth water spray column 10 to the outer surface of the pier body 14, the friction pad 15 increases the connection tightness between the first connection pipe 6 and the second water spray column 7, and the sealing ring 16 prevents the water in the first connection pipe 6 from leaking out.
Specifically, the first pipeline 2 is fixedly connected to one side of the first water spray column 1, and the first water pipe 3 is movably connected to one side of the first pipeline 2.
In this embodiment, the first water jet columns 1 are used for maintaining the left side portion of the pier body 14, and water is introduced into the first water jet columns 1 through the first water pipes 3.
Specifically, the first connection pipe 6 is fixedly connected to one side of the first spray column 1, and the second spray column 7 is fixedly connected to one side of the first connection pipe 6.
In this embodiment, the first connection pipe 6 allows water in the first spray post 1 to flow into the second spray post 7, and the second spray post 7 provides an installation location for the fourth connection pipe 19.
Specifically, the fourth connection pipe 19 is fixedly connected to one side of the second spray column 7, and the third spray column 9 is fixedly connected to one end of the fourth connection pipe 19.
In this embodiment, the fourth connection pipe 19 allows water in the second spray post 7 to flow into the third spray post 9, and the third spray post 9 is used to fix the installation position of the second pipe 11.
Specifically, the second pipeline 11 is fixedly connected to one side of the third water jet column 9, and the first fixing block 4 is fixedly connected to one side of the second pipeline 11 and one side of the first pipeline 2 respectively.
In this embodiment, the second pipe 11 provides a mounting position for the first fixing block 4, and the water in the second water pipe 12 flows into the third water jet column 9 through the second pipe 11.
Specifically, the second water pipe 12 is fixedly connected to one side of the first fixing block 4, and the clamp 5 is movably connected to the outer surface of the first water pipe 3 and the outer surface of the second water pipe 12 respectively.
In this embodiment, the first fixing block 4 provides a mounting position for the second water pipe 12, and the clamp 5 is used to fix the mounting position of the second water pipe 12 on the first fixing block 4.
Specifically, the second connection pipe 17 is fixedly connected to one end of the third spray column 9, and the fourth spray column 10 is fixedly connected to one side of the second connection pipe 17.
In this embodiment, the second connecting pipe 17 is used to flow the water in the third spray post 9 into the fourth spray post 10, and the fourth spray post 10 provides an installation position for the third connecting pipe 18.
Specifically, the supporting column 20 is fixedly connected to the upper end surface of the first water jet column 1 and the upper end surface of the fourth water jet column 10, respectively, and the second fixing block 13 is fixedly connected to the outer surface of the supporting column 20.
In this embodiment, the supporting column 20 is used to support the position of the curing frame on the pier body 14, and the second fixing block 13 fixes the supporting column 20.
The utility model discloses a theory of operation and use flow: firstly, a worker needs to put the maintenance frame on the upper end of the pier body 14, fix the maintenance frame on the pier body 14 through the support column 20, after the maintenance frame is fixed, the worker inserts the first water pipe 3 into the first pipeline 2, inserts the second water pipe 12 into the second pipeline 11, fix the first water pipe 3 and the first pipeline 2 together through the clamp 5, fix the second water pipe 12 and the second pipeline 11 together, the problem that the first water pipe 3 or the second water pipe 12 fall off due to insecurity is avoided, after the above procedures are completed, the worker firstly gets off the pier body 14, connect the first water pipe 3 and the second water pipe 12 to the water pump, open the water pump, start maintenance on the pier body 14, the water spraying block 8 replaces a spraying pipe, so that the water spraying block 8 can spray the pier body 14 in all directions, so that spraying is even, and the working strength is reduced.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a pier shaft sprays maintenance frame, includes first water spray column (1), its characterized in that: a first pipeline (2) is arranged on one side of the first water spraying column (1), a first water pipe (3) is arranged on one side of the first pipeline (2), a first connecting pipe (6) is arranged on one side of the first water spraying column (1), a second water spraying column (7) is arranged on one side of the first connecting pipe (6), a fourth connecting pipe (19) is arranged on one side of the second water spraying column (7), a third water spraying column (9) is arranged at one end of the fourth connecting pipe (19), a second pipeline (11) is arranged on one side of the third water spraying column (9), a first fixing block (4) is arranged on one side of the second pipeline (11) and one side of the first pipeline (2), a second water pipe (12) is arranged on one side of the first fixing block (4), and clamps (5) are arranged on the outer surfaces of the first water pipe (3) and the second water pipe (12), a second connecting pipe (17) is arranged at one end of the third water spraying column (9), a fourth water spraying column (10) is arranged on one side of the second connecting pipe (17), a supporting column (20) is arranged on each of the upper end face of the first water spraying column (1) and the upper end face of the fourth water spraying column (10), a second fixing block (13) is arranged on the outer surface of the supporting column (20), a water spraying block (8) is arranged on each of the outer surface of the first water spraying column (1), the outer surface of the second water spraying column (7), the outer surface of the third water spraying column (9) and the outer surface of the fourth water spraying column (10), a pier body (14) is arranged on the inner side face of the first water spraying column (1), a friction pad (15) is arranged on each of the inner side face of the first connecting pipe (6), the inner side face of the second connecting pipe (17), the inner side face of the third connecting pipe (18) and the inner side face of the fourth connecting pipe (19), and a sealing ring (16) is arranged on one side of the friction pad (15).
2. The pier body spray maintenance frame according to claim 1, characterized in that: the first pipeline (2) is fixedly connected to one side of the first water spray column (1), and the first water pipe (3) is movably connected to one side of the first pipeline (2).
3. The pier body spray maintenance frame according to claim 1, characterized in that: the first connecting pipe (6) is fixedly connected to one side of the first water spray column (1), and the second water spray column (7) is fixedly connected to one side of the first connecting pipe (6).
4. The pier body spray maintenance frame according to claim 1, characterized in that: the fourth connecting pipe (19) is fixedly connected to one side of the second water spray column (7), and the third water spray column (9) is fixedly connected to one end of the fourth connecting pipe (19).
5. The pier body spray maintenance frame according to claim 1, characterized in that: the second pipeline (11) is fixedly connected to one side of the third water spray column (9), and the first fixing block (4) is fixedly connected to one side of the second pipeline (11) and one side of the first pipeline (2) respectively.
6. The pier body spray maintenance frame according to claim 1, characterized in that: the second water pipe (12) is fixedly connected to one side of the first fixing block (4), and the clamp (5) is movably connected to the outer surface of the first water pipe (3) and the outer surface of the second water pipe (12) respectively.
7. The pier body spray maintenance frame according to claim 1, characterized in that: the second connecting pipe (17) is fixedly connected to one end of the third water spraying column (9), and the fourth water spraying column (10) is fixedly connected to one side of the second connecting pipe (17).
8. The pier body spray maintenance frame according to claim 1, characterized in that: the supporting column (20) is fixedly connected to the upper end face of the first water spraying column (1) and the upper end face of the fourth water spraying column (10) respectively, and the second fixing block (13) is fixedly connected to the outer surface of the supporting column (20).
CN202120120672.1U 2021-01-18 2021-01-18 Pier shaft sprays maintenance frame Active CN215164683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120120672.1U CN215164683U (en) 2021-01-18 2021-01-18 Pier shaft sprays maintenance frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120120672.1U CN215164683U (en) 2021-01-18 2021-01-18 Pier shaft sprays maintenance frame

Publications (1)

Publication Number Publication Date
CN215164683U true CN215164683U (en) 2021-12-14

Family

ID=79403778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120120672.1U Active CN215164683U (en) 2021-01-18 2021-01-18 Pier shaft sprays maintenance frame

Country Status (1)

Country Link
CN (1) CN215164683U (en)

Similar Documents

Publication Publication Date Title
CN214737834U (en) Simple fastener type steel pipe operation platform
CN212926515U (en) Multifunctional water stop steel plate with double dovetail type prevention, drainage and blocking combination
CN204844444U (en) Concrete tower crane high altitude sprays maintenance system
CN109487813A (en) A kind of integrated prefabricated tube coupling and its construction method of pipe gallery street crossing push pipe
CN215164683U (en) Pier shaft sprays maintenance frame
CN110242313A (en) A kind of tunnel portal sealing safeguard construction and construction method
CN210858069U (en) Concrete curing device for ultrahigh independent structure column
CN112282345B (en) Prestressed cable-stayed hanging basket installation method and installation structure
CN205296105U (en) Field irrigation is with " U " shape concrete water conservation channel
CN211775776U (en) Socket joint type exhaust passage structure for multi-story and high-rise building
CN210263093U (en) Highway bridge construction cofferdam device
CN109371915B (en) Rectangular channel repairing method and rectangular channel repairing structure
CN111535173A (en) Bridge wet joint connecting structure and connecting method
CN218436662U (en) High pier stud sprays curing means
CN110578326A (en) manual hole digging pile structure and construction method thereof
CN207048079U (en) Waterproof structure for embedded steel-concrete connecting piece
CN114000699B (en) Multifunctional concrete formwork
CN217782843U (en) Aluminum mold connecting structure at junction of upper inverted beam and vertical wall of balcony
CN215857202U (en) Water retaining device for inlet of suspension cable and bridge box girder
CN215441966U (en) Foundation pit drainage structure
CN217681764U (en) Shield constructs section of jurisdiction reinforced structure
CN219032937U (en) Lower cover arch reinforcement hanging mould component of arch bridge
CN213539326U (en) Seagull type water stop steel plate
CN218540771U (en) Waterproof structure for structural joint of underground pipe gallery
CN212336690U (en) Sleeve structure for protecting installation of steel pipe non-penetrating structure floor slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant