CN215107340U - Improved die box for reserving hole - Google Patents

Improved die box for reserving hole Download PDF

Info

Publication number
CN215107340U
CN215107340U CN202120622742.3U CN202120622742U CN215107340U CN 215107340 U CN215107340 U CN 215107340U CN 202120622742 U CN202120622742 U CN 202120622742U CN 215107340 U CN215107340 U CN 215107340U
Authority
CN
China
Prior art keywords
improved
rod
opening end
reserved hole
die box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120622742.3U
Other languages
Chinese (zh)
Inventor
李紫华
唐永旭
陈宇哲
仇智斌
冯月良
字凤彪
广明东
杨绍坤
胡相军
李一凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Original Assignee
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction and Investment Holding Group Co Ltd, YCIH No 2 Construction Co Ltd filed Critical Yunnan Construction and Investment Holding Group Co Ltd
Priority to CN202120622742.3U priority Critical patent/CN215107340U/en
Application granted granted Critical
Publication of CN215107340U publication Critical patent/CN215107340U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an improved die box for reserving a hole, which comprises a die body (1), wherein one end of the die body (1) is a big opening end (11), and the big opening end (11) is an open end; the other end of the die body (1) is a small-opening end (12), the small-opening end (12) is a closed end, at least one mounting rod (2) is arranged at the large-opening end (11), and a plurality of reinforcing rods (3) are further arranged in the die body (1). The utility model discloses it is more accurate to make reservation hole location and size, shortens construction period, makes things convenient for the site operation, also promotes the appearance quality of reserving concrete in the hole greatly.

Description

Improved die box for reserving hole
Technical Field
The utility model relates to a diaphragm capsule, specificly relate to a modified reserves entrance to a cave diaphragm capsule for the technical field who reserves hole customized formwork on the equipment foundation top belongs to construction articles for use technical field.
Background
Currently, most of the buildings in China adopt cast-in-place reinforced concrete structures, most of the templates are wooden templates, and most of the concrete is artificial stone prepared from cementing materials, aggregates and water according to a certain proportion, formed by stirring and vibrating and cured under certain conditions. Because a specific reserved hole needs to be reserved in the building process, the construction of reserving the hole in the building construction process is very important in order to ensure the quality and the attractiveness of the reserved hole in the building main body structure.
Because consider construction material turnover cost and want better assurance equipment foundation outward appearance concrete quality problem, and large-scale equipment foundation top reservation hole is great, when the location and the reinforcement degree of difficulty are higher, equipment fixing requires to reserve the hole location and dimensional deviation and not more than 5mm, and conventional wood system template has very big degree of difficulty in preparation and reinforcement construction, and the form removal is fairly difficult, and the template material of tearing out also can't have enough to meet the need.
Therefore, an improved reserved hole mold box which is accurate in positioning and can be used circularly needs to be developed to solve the key point of the technical problem.
Disclosure of Invention
To a great deal of defect and not enough that exist among the above-mentioned background art, the utility model discloses improve and the innovation to this, aim at provides not only can furthest also realize saving the resource when the life of the whole mould of extension, reaches the purpose of environmental protection, can also make equipment foundation top reserve the hole location and the size is more accurate, reduction construction period, make things convenient for the site operation, also can promote the appearance quality of concrete in the hole greatly.
The utility model discloses another invention purpose is that this mould can have enough to meet the need the use, reduces construction cost.
In order to solve the above problems and achieve the above object, the present invention provides an improved die box for reserving holes, which is implemented by adopting the following design structure and the following technical scheme:
the improved die box for reserving the hole comprises a die body (1), wherein one end of the die body (1) is a large opening end (11), and the large opening end (11) is an open end; the other end of the die body (1) is a small-opening end (12), the small-opening end (12) is a closed end, at least one mounting rod (2) is arranged at the large-opening end (11), and a plurality of reinforcing rods (3) are further arranged in the die body (1).
As the improvement of the utility model, the die body (1) is a steel inverted cone-shaped component which is composed of four trapezoidal side plates and a square mounting plate which are fixedly connected, and the inverted cone-shaped component is detachably arranged on the wall model suspender (4) through the mounting rod (2).
As the utility model discloses foretell further improvement, installation pole (2) are the angle steel, have seted up the several mounting hole on the length direction of one side of this angle steel.
As the above further improvement of the utility model, the outside of the mounting hole surface of the mounting rod (2) is also provided with a protective layer.
As the utility model discloses foretell further improvement again, the non-mounting hole face fixed mounting of installation pole (2) is in the middle part of mould body macrostoma end (11).
As the above-mentioned further improvement of the present invention, the reinforcing rod (3) is a rod-shaped member or a square-shaped member or a combination of a rod-shaped member and a square-shaped member.
As the above mentioned further improvement of the present invention, the total number of the reinforcing rods (3) is not less than 3.
As the utility model discloses foretell still further improvement again, all from interior to outer according to the preface spraying have injection moulding layer and antirust coat and warning layer on the surface of mould body (1) and installation pole (2) and stiffener (3), scribble phosphor powder on the warning layer.
As a still further improvement of the above structure of the present invention, a high molecular wear-resistant material is injected on the injection layer; the anti-rust layer comprises epoxy zinc-rich primer, chlorinated rubber finish paint and epoxy mica iron intermediate paint positioned between the epoxy zinc-rich primer and the chlorinated rubber finish paint; the warning layer is a yellow or black reflective warning tape or a reflective color film or reflective paint.
The working principle is as follows: an improved pre-orifice mould box of the above design needs to be installed as a spare before use.
The working flow during installation is as follows:
the installation rod and the wall form suspender are positioned according to the construction drawing to punch → the wall form suspender is corrected and fixed on the wall form → the mould body is installed on the wall form suspender → the installation rod is corrected and fixed → is rechecked and maintained.
The technological process during dismantling is as follows:
maintaining to be qualified → disassembling the bolt assembly between the mounting rod and the wall mold hanging rod → taking out the mold body → detecting the hole → storing the warehouse for reservation.
The specific using steps are as follows:
the concrete construction steps are as follows:
1. preparing a template: and (3) aligning the wall aluminum formwork according to a construction drawing, wherein the height of the formwork is consistent with the finished surface of the concrete of the equipment foundation, and punching holes at the joint of the wall formwork suspender (4) and the wall formwork (5).
Customizing a reserved hole die body (1), wherein the size of a die box sealing bottom plate is required to be consistent with that of the bottom of a designed hole, and the four sides are cut into a trapezoid shape and welded into an inverted cone shape; the top of the die body (1) is welded with an installation rod (2) connected with a wall formwork suspender (4) in a positioning mode according to a construction drawing, and punching is carried out according to the positioning; the internal welding reinforcing rod (3) supports to prevent deformation and is used as a handle to facilitate form removal, and the wall form hanging rod (4) is positioned according to a construction drawing and is punched through the mounting rod (2) at the top of the form box.
2. Binding the steel bars of the equipment foundation: and (5) binding steel bars according to the construction drawing, wherein the binding of the steel bars needs to meet the relevant specifications of 16G-101 atlas and the like.
3. Installing wall templates: before construction, all wall formworks (5) and steel mould boxes are brushed with a water release agent according to requirements, and the wall formworks (5), the back edges and the inclined struts are installed according to requirements, so that the installation is required to be firm.
4. And (3) installing a wall formwork suspender: a2 cm thick gasket is arranged at the joint of the wall form suspender (4) and the wall form (5), and the wall form suspender (4) is firmly connected with the wall form (5) through a bolt assembly.
5. Installing a mold box: the mounting rod (2) on the steel mould body (1) and the wall mould suspender (4) are firmly connected by a bolt component.
6. Pouring concrete: and after the rechecking is finished, pouring the foundation concrete of the equipment, wherein the relevant construction requirements are required to be met. The lower part of the wall form suspender (4) is 2cm higher than the finished concrete surface, so that the top of the equipment foundation can be conveniently folded.
7. Removing the mold: after the maintenance is qualified, demolish equipment foundation formwork, should separate box top installation pole (2) and wall form jib (4) earlier before demolising the wall form, the steel box receives tensile deformation, influences the hole size when avoiding demolising the wall form, demolishs wall form jib (4) and wall form (5) and diaphragm capsule in proper order again.
Compared with the prior art, the utility model produced beneficial effect is:
1. the utility model can ensure that the reserved holes on the top of the equipment foundation are more accurate in positioning and size, shorten the construction period, facilitate the site construction and greatly improve the appearance quality of the concrete in the holes;
2. the utility model can be used in a turnover way, thereby greatly reducing the construction cost;
3. the utility model has the advantages of rapid construction of installation engineering, convenient operation, no disturbance of the position of the hole during the construction process, accurate reserved position of the hole, time and labor saving, and improved working efficiency;
4. the utility model has the advantages of steel saving, less investment, less accessories, flexible assembly, strong universality, safe and environment-friendly mould, neat and beautiful installation site, and is beneficial to improving the safe and civilized construction image;
5. the utility model discloses an anti-rust paint on the outside, consequently can prevent also to prolong the life of whole device when rustting, the resource has also been saved when realizing the environmental protection, and simultaneously, scribble the fluorescent material that can self-luminous in the outside of device, can clearly mark this pay-off in night or darkroom and underground construction environment's position, can play the effect of safe suggestion effectively, improve the striking degree, easily people differentiate, increase the security in construction and the life.
Drawings
The following detailed description of embodiments of the invention is provided with reference to the accompanying drawings, in which:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is one of the usage state diagrams of the present invention;
fig. 4 is a second usage state diagram of the present invention;
wherein, the reference numbers in the figures: 1-a mould body, 11-a large opening end and 12-a small opening end;
2, mounting a rod;
3-a reinforcing rod;
4-wall form suspender;
5-wall form;
6, reserving holes;
7-building body.
Detailed Description
In order to make the technical means, the inventive features, the objectives and the functions of the present invention easy to understand, the technical solution of the present invention will be further described in detail with reference to the accompanying drawings and the following detailed description, and it should be noted that the embodiments and the features of the embodiments in the present application can be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
The improved reserved hole die box shown in the attached drawings comprises a die body 1, wherein one end of the die body 1 is a large-opening end 11, and the large-opening end 11 is an open end; the other end of the die body 1 is a small-mouth end 12, the small-mouth end 12 is a closed end, at least one mounting rod 2 is arranged at the position of the large-mouth end 11, and a plurality of reinforcing rods 3 are further arranged in the die body 1.
The utility model discloses in, the stiffener is still available as handle when form removal, makes things convenient for form removal.
Further, the mould body 1 is a steel inverted cone-shaped component which is formed by fixedly connecting four trapezoidal side plates and a square mounting plate, and the inverted cone-shaped component is detachably mounted on a wall mould suspension rod 4 through a mounting rod 2.
The utility model discloses in, be equipped with the bolt hole that the array passes through bolt assembly fastening connection with installation pole 2 on the wall form jib 4.
Further, the mounting rod 2 is an angle steel, and a plurality of mounting holes are formed in one surface of the angle steel in the length direction.
In the utility model, the installation rod 2 is positioned according to the construction drawing to be punched and is connected with the wall formwork suspender 4 through the bolt assembly, so that the fixation is firm; when the mold box is disassembled, the mounting rod 2 can be used as a lifting handle, so that the mold is convenient to disassemble.
Specifically, a protective layer is further arranged on the outer side of the mounting hole surface of the mounting rod 2.
In the present invention, the integrity of the mounting rod 2 is advantageously protected and is not easily worn by not shown in the protective layer diagram.
Specifically, the non-installation hole surface of the installation rod 2 is fixedly installed in the middle of the large opening end 11 of the die body.
In the present invention, the total number of the mounting rods 2 is 1.
Further, the reinforcing bar 3 is a rod-shaped member or a square-shaped member or a combination of a rod-shaped member and a square-shaped body.
The utility model discloses in, stiffener 3 is favorable to protecting the integrality of mould body 1, protects it and is difficult for receiving the deformation in the use, increases mould body 1's use number of times.
Further, the total number of the reinforcing rods 3 is more than or equal to 3.
In the present invention, the total number of the reinforcing rods 3 is 3.
Further, all from interior to outer spraying according to the preface has injection moulding layer and antirust coat and warning layer on the surface of mould body 1 and installation pole 2 and stiffener 3, scribbles phosphor powder on the warning layer.
Specifically, a high-molecular wear-resistant material is injected on the injection molding layer; the anti-rust layer comprises epoxy zinc-rich primer, chlorinated rubber finish paint and epoxy mica iron intermediate paint positioned between the epoxy zinc-rich primer and the chlorinated rubber finish paint; the warning layer is a yellow or black reflective warning tape or a reflective color film or reflective paint.
To sum up, the utility model discloses more specific embodiment is:
an improved pre-orifice mould box of the above design needs to be installed as a spare before use.
The working flow during installation is as follows:
the installation rod and the wall form suspender are positioned according to the construction drawing to punch → the wall form suspender is corrected and fixed on the wall form → the mould body is installed on the wall form suspender → the installation rod is corrected and fixed → is rechecked and maintained.
The technological process during dismantling is as follows:
maintaining to be qualified → disassembling the bolt assembly between the mounting rod and the wall mold hanging rod → taking out the mold body → detecting the hole → storing the warehouse for reservation.
The specific using steps are as follows:
the concrete construction steps are as follows:
1. preparing a template: and (3) aligning the wall aluminum formwork according to a construction drawing, wherein the height of the formwork is consistent with the finished surface of the equipment foundation concrete, and punching holes are formed at the joint of the wall formwork suspender 4 and the wall formwork 5.
Customizing a reserved hole die body 1, wherein the size of a die box sealing bottom plate is required to be consistent with that of the bottom of a designed hole, and the four sides are cut into trapezoids to be welded into inverted cone shapes; the top of the die body 1 is welded with an installation rod 2 connected with a wall formwork suspender 4 according to the positioning of a construction drawing, and punching is carried out according to the positioning; the internal welding reinforcing rod 3 supports to prevent deformation and is used as a handle to facilitate form removal, and the wall form hanging rod 4 is positioned according to a construction drawing and the die box top mounting rod 2 is used for punching.
2. Binding the steel bars of the equipment foundation: and (5) binding steel bars according to the construction drawing, wherein the binding of the steel bars needs to meet the relevant specifications of 16G-101 atlas and the like.
3. Installing wall templates: before construction, all the wall formworks 5 and the steel formwork boxes are brushed with a water release agent according to requirements, and the wall formworks 5, the back edges and the inclined struts are installed according to requirements, so that the installation is required to be firm.
4. And (3) installing a wall formwork suspender: set up 2cm thick gasket at wall form jib 4 and wall form 5 junction, through bolt assembly with wall form jib 4 and wall form 5 firm in connection.
5. Installing a mold box: the installation rod 2 on the steel mould body 1 and the wall mould suspender 4 are firmly connected by a bolt component.
6. Pouring concrete: and after the rechecking is finished, pouring the foundation concrete of the equipment, wherein the relevant construction requirements are required to be met. The height of the lower part of the wall form suspender 4 is 2cm higher than that of a concrete finished surface, so that the top of the equipment foundation can be conveniently folded.
7. Removing the mold: after the maintenance is qualified, demolish equipment foundation formwork, should separate box top installation pole 2 and wall form jib 4 earlier before demolising the wall form, the steel box receives tensile deformation, influence hole size when avoiding demolising the wall form, demolishs wall form jib 4 and wall form 5 and diaphragm capsule in proper order again.
Finally, it should be noted that the above-mentioned embodiments are only preferred embodiments of the present invention, and are not intended to limit the present invention in any way, and those skilled in the art may change or modify the technical content disclosed above into equivalent embodiments with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical substance of the present invention still belong to the protection scope of the technical solution of the present invention.

Claims (9)

1. An improved reserved hole die box comprises a die body (1), wherein one end of the die body (1) is a large opening end (11), and the large opening end (11) is an open end; the other end of the die body (1) is a small-opening end (12), and the small-opening end (12) is a closed end, and is characterized in that: at least one mounting rod (2) is arranged at the large opening end (11), and a plurality of reinforcing rods (3) are also arranged in the die body (1).
2. An improved reserved hole die box as claimed in claim 1, wherein: the die body (1) is a steel inverted cone-shaped component formed by fixedly connecting four trapezoidal side plates and a square mounting plate, and the inverted cone-shaped component is detachably mounted on a wall die hanging rod (4) through a mounting rod (2).
3. An improved reserved hole die box as claimed in claim 1, wherein: the mounting rod (2) is an angle steel, and a plurality of mounting holes are formed in one surface of the angle steel in the length direction.
4. An improved reserved hole die box as claimed in claim 3, wherein: and a protective layer is also arranged on the outer side of the mounting hole surface of the mounting rod (2).
5. An improved reserved hole die box as claimed in claim 3, wherein: the non-mounting hole surface of the mounting rod (2) is fixedly mounted in the middle of the large opening end (11) of the die body.
6. An improved reserved hole die box as claimed in claim 1, wherein: the reinforcing rod (3) is a rod-shaped body component or a square body component or a combination of the rod-shaped body component and the square body.
7. An improved reserved hole die box as claimed in claim 1, wherein: the total number of the reinforcing rods (3) is more than or equal to 3.
8. An improved reserved hole die box as claimed in claim 1, wherein: all from interior to outer spraying according to the preface has injection moulding layer and antirust coat and warning layer on the surface of mould body (1) and installation pole (2) and stiffener (3), scribbles phosphor powder on the warning layer.
9. An improved reserved hole die box as claimed in claim 8, wherein: the injection layer is injected with a high polymer wear-resistant material; the anti-rust layer comprises epoxy zinc-rich primer, chlorinated rubber finish paint and epoxy mica iron intermediate paint positioned between the epoxy zinc-rich primer and the chlorinated rubber finish paint; the warning layer is a yellow or black reflective warning tape or a reflective color film or reflective paint.
CN202120622742.3U 2021-03-26 2021-03-26 Improved die box for reserving hole Expired - Fee Related CN215107340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120622742.3U CN215107340U (en) 2021-03-26 2021-03-26 Improved die box for reserving hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120622742.3U CN215107340U (en) 2021-03-26 2021-03-26 Improved die box for reserving hole

Publications (1)

Publication Number Publication Date
CN215107340U true CN215107340U (en) 2021-12-10

Family

ID=79345255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120622742.3U Expired - Fee Related CN215107340U (en) 2021-03-26 2021-03-26 Improved die box for reserving hole

Country Status (1)

Country Link
CN (1) CN215107340U (en)

Similar Documents

Publication Publication Date Title
CN106182359B (en) The horizontal molding die of concrete list storehouse pipe gallery, system and piping lane molding methods
CN206189455U (en) Piping lane
CN206753064U (en) A kind of aluminum alloy mould plate pull-tab system
CN108060928A (en) Shield tunnel multiple tube piece ring structure, assembling method and the manufacturing method of compound section of jurisdiction
CN104563573B (en) A kind of Modular spliced pond
CN203856202U (en) Simple pullable sizing device of reserved holes
CN215107340U (en) Improved die box for reserving hole
CN101705692B (en) Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole
CN206267179U (en) A kind of flexible cladding soil nail wall protective slope structure
CN209243965U (en) A kind of assembly node of Side fascia and floor
CN101812921A (en) Combined construction mould for dust-free room air return slab and combined construction method thereof
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN207776424U (en) A kind of building template
CN206623199U (en) The horizontal mould of concrete list storehouse pipe gallery and system
CN212562476U (en) Improved disassembly-free constructional column cavity membrane shell structure
CN206189449U (en) Soleplate with lead integrated plank sheathing system of wall
CN214329857U (en) Building construction pouring template
CN211775770U (en) Synchronous dismouting mould of reservation entrance to a cave
CN210105728U (en) Steel structure door post
CN210597280U (en) Cast-in-situ anti-floating protective plate for hole digging pile
CN214615431U (en) Bathroom hangs mould and consolidates supporting component
CN206733262U (en) A kind of three word button box beams end-blocking template
CN105014773A (en) Y-shaped precast reinforced concrete pile mould
CN215164834U (en) Prefabricated apron is contained and is pour design auxiliary template subassembly
CN211974540U (en) Can have enough to meet need assembled flag platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211210

CF01 Termination of patent right due to non-payment of annual fee