CN215105063U - Water retaining device is used in hydraulic engineering construction - Google Patents
Water retaining device is used in hydraulic engineering construction Download PDFInfo
- Publication number
- CN215105063U CN215105063U CN202121297769.6U CN202121297769U CN215105063U CN 215105063 U CN215105063 U CN 215105063U CN 202121297769 U CN202121297769 U CN 202121297769U CN 215105063 U CN215105063 U CN 215105063U
- Authority
- CN
- China
- Prior art keywords
- breakwater
- apron
- fixedly connected
- water
- bracing piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a water retaining device is used in hydraulic engineering construction, including the breakwater, the lower extreme both sides fixedly connected with inserted bar of breakwater, the mounting groove has been seted up to the upper end of breakwater, the joint has the installation piece in the mounting groove, the upper end fixedly connected with apron of installation piece, the spread groove has been seted up to the upper end both sides of apron, the pivot has been cup jointed in the activity of spread groove, the pivot has cup jointed the support pole, the lower extreme fixedly connected with of bracing piece stabilizes the board. Through the breakwater that sets up and inserted bar can be better with breakwater fixed mounting in the regulation position, then expand the bracing piece can be better carry out further support to the breakwater, be in order can be better to install the apron through setting up the mounting groove in the upper end of breakwater to the convenience supports the breakwater through the bracing piece, thereby makes the more stability of breakwater, has prevented that rivers from crossing the problem of falling the breakwater promptly.
Description
Technical Field
The utility model belongs to the technical field of the water conservancy construction, especially, relate to a water retaining device is used in hydraulic engineering construction.
Background
Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, water quantity is adjusted and distributed, the requirements of people on water resources in life and production are met, and different types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transit tanks, rafts, fishways and the like need to be built for the hydraulic engineering, so that the aims of the hydraulic engineering are achieved.
Current water conservancy construction water retaining device all blocks rivers mostly, blocks the pressure increase that can make the breakwater receive with rivers for a long time to lead to the breakwater to appear breaking, the breakwater is too urgent and then is washed away too much silt when collapsing moreover, leads to the phenomenon of soil erosion and water loss.
SUMMERY OF THE UTILITY MODEL
Problem to prior art exists, the utility model provides a water retaining device is used in hydraulic engineering construction, through breakwater and inserted bar that set up can be better with breakwater fixed mounting in the regulation position, then expand the bracing piece can be better carry out further support to the breakwater, it installs the apron in order can be better to set up the mounting groove through the upper end at the breakwater, thereby conveniently support the breakwater through the bracing piece, thereby make the more stability of breakwater, the problem of rivers excessively rushing down the breakwater has been prevented.
The utility model discloses a realize like this, including the breakwater, the lower extreme both sides fixedly connected with inserted bar of breakwater, the mounting groove has been seted up to the upper end of breakwater, the joint has the installation piece in the mounting groove, the upper end fixedly connected with apron of installation piece, the spread groove has been seted up to the upper end both sides of apron, the pivot has been cup jointed in the activity in the spread groove, the bracing piece has been cup jointed to the pivot, the lower extreme fixedly connected with stabilizing plate of bracing piece.
As the utility model discloses it is preferred, the surperficial lower extreme of breakwater is provided with the first mouth of a river that falls, breakwater surface upper end is provided with the second mouth of a river that falls.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a breakwater and inserted bar that set up can be better with breakwater fixed mounting in the regulation position, then expand the bracing piece can be better carry out further support to the breakwater, be in order can be better to install the apron through setting up the mounting groove in the upper end of breakwater, thereby conveniently support the breakwater through the bracing piece, thereby make the breakwater more stable, prevented that rivers from crossing the problem of falling the breakwater urgently.
2. The utility model discloses a first mouth of a river and the second mouth of a river that falls that sets up the first mouth of a river that falls through the surperficial lower extreme at the breakwater, then set up the second at the breakwater upper surface and fall the mouth of a river and be in order can be better fall the mouth of a river and fall the pressure that the rivers that the breakwater blockked through first mouth of a river and second and subduct to better having prevented that the breakwater is not destroyed, better solution rivers too fast and cause the problem of soil erosion and water loss.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a structural sectional view provided in the embodiment of the present invention.
In the figure: 1. a water baffle; 2. inserting a rod; 3. a first water reducing port; 4. a second water reducing port; 5. a cover plate; 6. connecting grooves; 7. a support bar; 8. mounting grooves; 9. mounting blocks; 10. a rotating shaft; 11. and (5) stabilizing the plate.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 2, the embodiment of the utility model provides a pair of water retaining device for hydraulic engineering construction, including breakwater 1, breakwater 1's lower extreme both sides fixedly connected with inserted bar 2, mounting groove 8 has been seted up to breakwater 1's upper end, and the joint has installation piece 9 in the mounting groove 8, and the upper end fixedly connected with apron 5 of installation piece 9, spread groove 6 has been seted up to the upper end both sides of apron 5, and pivot 10 has been cup jointed in the spread groove 6 activity, and bracing piece 7 has been cup jointed to pivot 10, and the lower extreme fixedly connected with of bracing piece 7 stabilizes board 11.
Referring to fig. 1, a first water reducing opening 3 is provided at a lower surface end of a water guard plate 1, and a second water reducing opening 4 is provided at an upper surface end of the water guard plate 1.
Adopt above-mentioned scheme: through the first mouth of a river 3 and the second mouth of a river 4 that falls that sets up, through the first mouth of a river 3 that falls that sets up at breakwater 1's surperficial lower extreme, then it falls mouth of a river 4 to set up the second in breakwater 1 upper end and falls the pressure that the rivers that mouth 4 blockked 1 through first mouth of a river 3 and the second that falls that can be better and reduce, thereby better prevent breakwater 1 not destroyed, better solution rivers too fast and cause the problem of soil erosion and water loss.
The utility model discloses a theory of operation:
when using, at first fix breakwater 1 in the position of regulation through the inserted bar 2 that the lower extreme set up, then install apron 5 through the installation piece 9 that the lower extreme set up and mounting groove 8 of breakwater 1 upper end, thereby be in the same place apron 5 and breakwater 1 are installed, then support breakwater 1 through bracing piece 7 on the apron 5, thereby make breakwater 1 more stable, then through the first mouth of a river 3 that falls that sets up and the better pressure that has reduced rivers to breakwater 1 of second mouth of a river 4, thereby the better phenomenon that has prevented soil erosion and water loss.
In summary, the following steps: this water retaining device is used in hydraulic engineering construction, breakwater 1 through setting up, inserted bar 2, the first mouth of a river 3 that falls, the second falls mouth of a river 4, apron 5, spread groove 6, bracing piece 7, mounting groove 8, installation piece 9, pivot 10 and firm board 11's cooperation is used, it blocks rivers mostly to have solved current water conservancy construction water retaining device, block the pressure increase that can make the breakwater receive with rivers for a long time, thereby lead to the breakwater to appear breaking, and the breakwater is too urgent and then washes away too much silt when collapsing, lead to the phenomenon of soil erosion and water loss.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (2)
1. The utility model provides a water retaining device is used in hydraulic engineering construction, includes breakwater (1), its characterized in that: lower extreme both sides fixedly connected with inserted bar (2) of breakwater (1), mounting groove (8) have been seted up to the upper end of breakwater (1), the joint has installation piece (9) in mounting groove (8), the upper end fixedly connected with apron (5) of installation piece (9), spread groove (6) have been seted up to the upper end both sides of apron (5), pivot (10) have been cup jointed in spread groove (6) activity, bracing piece (7) have been cup jointed in pivot (10), the lower extreme fixedly connected with of bracing piece (7) stabilizes board (11).
2. The water retaining device for hydraulic engineering construction according to claim 1, characterized in that: the water baffle is characterized in that a first water reducing opening (3) is formed in the lower end of the surface of the water baffle (1), and a second water reducing opening (4) is formed in the upper end of the surface of the water baffle (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121297769.6U CN215105063U (en) | 2021-06-10 | 2021-06-10 | Water retaining device is used in hydraulic engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121297769.6U CN215105063U (en) | 2021-06-10 | 2021-06-10 | Water retaining device is used in hydraulic engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215105063U true CN215105063U (en) | 2021-12-10 |
Family
ID=79305625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121297769.6U Expired - Fee Related CN215105063U (en) | 2021-06-10 | 2021-06-10 | Water retaining device is used in hydraulic engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215105063U (en) |
-
2021
- 2021-06-10 CN CN202121297769.6U patent/CN215105063U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210975715U (en) | Scour protection water conservancy dykes and dams | |
CN215105063U (en) | Water retaining device is used in hydraulic engineering construction | |
CN210002360U (en) | kinds of mountain gorge damming flood discharge structure | |
CN212896234U (en) | Connection structure of bank spillway slow-leveling section and steep groove section | |
CN211872855U (en) | Be applied to cut-off equipment of hydraulic engineering construction | |
Petrascheck et al. | Routing of dam break floods | |
CN203795388U (en) | Mixed earth dam and gravity dam arrangement structure | |
CN101165277B (en) | Reservoir dredging method | |
CN215367094U (en) | Slope protection device for hydraulic engineering | |
CN215405918U (en) | Dam type combining gravity dam and rock-fill dam | |
CN210658224U (en) | Water blocking device that hydraulic engineering used | |
CN208857763U (en) | A kind of water conservancy dam configuration | |
CN204000796U (en) | Power station in river channel's structure | |
CN211898438U (en) | Hydraulic engineering protector | |
CN210262967U (en) | Energy dissipation structure of diversion tunnel plug | |
CN205894043U (en) | Hydrocone type shaft spillway | |
CN221480706U (en) | Hydraulic engineering slope protection net | |
CN115162271B (en) | Water conservancy dyke slope protection structure of quick construction | |
CN221798319U (en) | Water conservancy and hydropower engineering slope protection module | |
CN215977139U (en) | Ecological overflow weir | |
CN111058422A (en) | Water blocking and draining structure | |
CN1238408A (en) | Low dam for eliminating potential energy by drainage and its construction method | |
CN212052583U (en) | Water blocking and draining structure | |
CN2503113Y (en) | Arch dam large differential tooth bank flood discharging structure | |
CN215669347U (en) | Gate for water conservancy channel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211210 |
|
CF01 | Termination of patent right due to non-payment of annual fee |