CN215076642U - Engineering cost progress management device - Google Patents

Engineering cost progress management device Download PDF

Info

Publication number
CN215076642U
CN215076642U CN202121400318.0U CN202121400318U CN215076642U CN 215076642 U CN215076642 U CN 215076642U CN 202121400318 U CN202121400318 U CN 202121400318U CN 215076642 U CN215076642 U CN 215076642U
Authority
CN
China
Prior art keywords
management
groove
main part
grooves
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121400318.0U
Other languages
Chinese (zh)
Inventor
赵忠杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongde Gaolu Consulting Yunnan Co ltd
Original Assignee
Yunnan Huihenggao Road Engineering Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Huihenggao Road Engineering Project Management Co ltd filed Critical Yunnan Huihenggao Road Engineering Project Management Co ltd
Priority to CN202121400318.0U priority Critical patent/CN215076642U/en
Application granted granted Critical
Publication of CN215076642U publication Critical patent/CN215076642U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • General Factory Administration (AREA)

Abstract

The utility model discloses an engineering cost progress management device, including the management main part, the equal fixedly connected with stabilizer blade in lower extreme four corners of management main part, the front end of management main part is opened there is the management groove, the inside of management main part is opened there is a device groove and No. two device grooves, a device groove and No. two device grooves all communicate with each other with the management inslot portion, the common swing joint of the interior cell wall in a device groove and No. two device grooves has the regulation structure, the surface middle part fixedly connected with management structure of regulation structure, management structure is located the management inslot, the front end left part hinge connection of management main part has the door plant. An engineering cost progress management device, rotatory stability when increasing the look for data avoids the too big progress data slope or skew phenomenon that causes of the rotatory gravity of data frame, improves the high-efficient agility that the data was looked for, avoids the data to receive the indiscriminate phenomenon of inertia rotation data departure when the rotatory data of looking for.

Description

Engineering cost progress management device
Technical Field
The utility model relates to an engineering cost technical field, in particular to engineering cost progress management device.
Background
The project cost refers to the construction cost expected or actually paid out during the construction period of the constituent project. The method comprehensively utilizes knowledge and skills in the aspects of management, economics, engineering technology and the like, the working process of predicting, planning, controlling, accounting, analyzing, evaluating and the like the engineering cost is called engineering cost management, a progress management device is needed during engineering cost operation, and most of the working process is engineering cost progress data management equipment; 2. when current progress data management device used, the progress data was easily slided and is easily askew to fall when depositing, and the management area of progress data is less easily piled up, reduces the convenience of management equipment use and the clarity of arrangement when the progress data was deposited, so we provide a neotype engineering cost progress management device.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide an engineering cost progress management device, which can effectively solve the problems in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an engineering cost progress management device, includes the management main part, the equal fixedly connected with stabilizer blade in lower extreme four corners of management main part, the front end of management main part is opened there is the management groove, the inside of management main part is opened there is a device groove and No. two device grooves, a device groove and No. two device grooves all communicate with each other with the management inslot portion, the common swing joint of the interior cell wall in a device groove and No. two device grooves has the regulation structure, the surface middle part fixedly connected with management structure who adjusts the structure, management structure is located the management inslot, the front end left part hinge connection of management main part has the door plant.
Preferably, the management body is internally provided with two sliding grooves which are respectively communicated with the first device groove and the second device groove, and the management body is internally provided with a sliding rail which is communicated with the inside of the sliding groove at the upper part.
Preferably, the adjusting structure comprises a connecting rod, a supporting tube is fixedly connected to the lower end of the connecting rod, a roller plate is fixedly connected to the lower end of the supporting tube, a plurality of stabilizing plates are fixedly connected to the outer surface of the supporting tube and the upper end of the roller plate together, a rotating plate is fixedly connected to the upper end of the connecting rod, and a plurality of rolling balls are movably connected to the middle of the outer surface of the rotating plate.
Preferably, the connecting rod is movably connected with the management main body through a first device groove and a second device groove, the stabilizing plates and the rotating plates are respectively located in the two sliding grooves, and the rolling balls are located in the sliding rails.
Preferably, the management structure includes the data frame, the storage tank has all been opened to the front end and the rear end of data frame, three draw-in groove, a plurality of spacing groove and two antiskid groove have all been opened to the front end and the rear end of data frame.
Preferably, the data frame is penetrated and fixedly connected with the outer surface of the connecting rod, and the clamping grooves, the limiting grooves and the four anti-slip grooves are communicated with the inner parts of the two storage grooves respectively.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses in, through setting up the regulation structure in the management main part, and connect stay tube and roller plate on the connecting rod of regulation structure, connect a plurality of firm board jointly on stay tube and roller plate, the stay tube that connects on the connecting rod is located one device inslot and slides through the data frame on the rotatory management structure when the management main part uses, roller plate and a plurality of firm board are located the sliding tray of lower part and slide, the stability of rotatory when increasing the look for data, avoid the too big progress data slope or skew phenomenon that causes of data frame rotation gravity, connect the spin through connecting the commentaries on classics board on the connecting rod, the spin on the commentaries on classics board is located the slide rail and slides in the rotatory data frame that drives when the management main part uses, the flexibility of rotatory when increasing the look for data, improve the high-efficient rapidity that the data was looked for;
2. the utility model discloses in, through setting up the management structure in the management main part, and it has the draw-in groove to open in the storage tank on the data frame of management structure, spacing groove and antiskid groove, after putting into the storage tank with the progress data, draw-in groove and spacing groove are used for the spacing performance of fixed progress data, avoid the data to receive the indiscriminate phenomenon of inertial rotation data departure when rotatory data are sought, antiskid groove is used for the non slipping property to the progress data, easily slide easily askew phenomenon when avoiding the progress data to deposit, make the management area increase of progress data, improve the convenience that management equipment used and the definition of arrangement when the progress data are deposited.
Drawings
Fig. 1 is a schematic view of the overall structure of a construction cost progress management device of the present invention;
fig. 2 is a schematic view of an internal section of a management body of the construction cost progress management apparatus according to the present invention;
fig. 3 is a schematic structural view of an adjusting structure of the construction cost progress management device of the present invention;
fig. 4 is a schematic structural diagram of a management structure of the construction cost progress management device according to the present invention;
fig. 5 is the utility model relates to a construction cost progress management device's management main part operating condition's schematic structure diagram.
In the figure: 1. a management agent; 2. a support leg; 3. a management slot; 4. a first device slot; 5. a second device slot; 6. an adjustment structure; 7. a management structure; 8. a door panel; 41. a sliding groove; 42. a slide rail; 61. a connecting rod; 62. supporting a tube; 63. a roll plate; 64. a stabilizing plate; 65. rotating the plate; 66. rolling a ball; 71. a data shelf; 72. a storage tank; 73. a card slot; 74. a limiting groove; 75. and (4) an anti-slip groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-5, a construction cost progress management device, including management main part 1, the equal fixedly connected with stabilizer blade 2 in management main part 1's lower extreme four corners, management groove 3 has been opened to management main part 1's front end, management main part 1's inside is opened has device groove 4 and No. two device grooves 5, device groove 4 and No. two device grooves 5 all communicate with each other with management groove 3 inside, the common swing joint of the interior cell wall of device groove 4 and the interior cell wall of No. two device grooves 5 has regulation structure 6, the surface middle part fixedly connected with management structure 7 of regulation structure 6, management structure 7 is located management groove 3, the front end left part hinge connection of management main part 1 has door plant 8.
The inside of the management body 1 is provided with two sliding grooves 41, the two sliding grooves 41 are respectively communicated with the insides of the first device groove 4 and the second device groove 5, the inside of the management body 1 is provided with a sliding rail 42, and the sliding rail 42 is communicated with the insides of the sliding grooves 41 positioned at the upper part; the adjusting structure 6 comprises a connecting rod 61, a supporting tube 62 is fixedly connected to the lower end of the connecting rod 61, a roller plate 63 is fixedly connected to the lower end of the supporting tube 62, a plurality of stabilizing plates 64 are fixedly connected to the outer surface of the supporting tube 62 and the upper ends of the roller plates 63 together, a rotating plate 65 is fixedly connected to the upper end of the connecting rod 61, a plurality of rolling balls 66 are movably connected to the middle of the outer surface of the rotating plate 65, the supporting tube 62 connected to the connecting rod 61 is driven to be positioned in a first device groove 4 to slide by a data frame 71 on the rotating management structure 7 when the management main body 1 is used, the roller plate 63 and the plurality of stabilizing plates 64 are positioned in a sliding groove 41 at the lower part to slide, the rotating stability during data searching is improved, and the phenomenon that progress data are inclined or offset due to the fact that the rotating gravity of the data frame 71 is too large is avoided; the connecting rod 61 is movably connected with the management main body 1 through the first device groove 4 and the second device groove 5, the plurality of stabilizing plates 64 and the rotating plate 65 are respectively positioned in the two sliding grooves 41, the plurality of rolling balls 66 are positioned in the sliding rails 42, when the management main body 1 is used, the rotating data frame 71 is rotated to drive the rolling balls 66 on the rotating plate 65 to slide in the sliding rails 42, the flexibility of rotation during data searching is improved, and the high efficiency and the rapidness of data searching are improved; the management structure 7 comprises a data frame 71, wherein storage grooves 72 are formed in the front end and the rear end of the data frame 71, three clamping grooves 73, a plurality of limiting grooves 74 and two anti-skidding grooves 75 are formed in the front end and the rear end of the data frame 71, and after progress data are placed in the storage grooves 72, the clamping grooves 73 and the limiting grooves 74 are used for fixing the limiting performance of the progress data, so that the phenomenon that the data fly out of order due to inertial rotation when the data are searched in a rotating mode is avoided; the data frame 71 is fixedly connected with the outer surface of the connecting rod 61 in a penetrating manner, the plurality of clamping grooves 73, the plurality of limiting grooves 74 and the four anti-slip grooves 75 are respectively communicated with the interiors of the two storage grooves 72, and the anti-slip grooves 75 are used for preventing progress data from slipping easily and falling easily when being stored, so that the management area of the progress data is increased, and the use convenience of management equipment and the arrangement clearness of the progress data when being stored are improved; whole device simple structure simple operation reduces the hand labor power, and the data is avoided receiving the indiscriminate phenomenon of inertia rotation data departure when the rotatory data of looking for.
It should be noted that the utility model relates to an engineering cost progress management device, the utility model discloses the device is engineering cost progress management device, at first put into the management structure 7 in the management groove 3 with the progress data when managing the main part 1 and using, through having seted up draw-in groove 73, spacing groove 74 and antiskid groove 75 in the storage tank 72 on the data frame 71 on management structure 7, after putting the progress data into storage tank 72, draw-in groove 73 and spacing groove 74 are used for the spacing performance of fixed progress data, avoid the data to receive inertial rotation data to fly out in disorder phenomenon when the data is look for in the rotation, antiskid groove 75 is used for the antiskid performance to the progress data, easy smooth easy askew phenomenon when avoiding the progress data to deposit, make the management area of progress data increase, improve the convenience that management equipment used and the clarity of arrangement when the progress data is deposited; the supporting tube 62 and the roller plate 63 are connected to the connecting rod 61 on the adjusting structure 6, the plurality of stabilizing plates 64 are connected to the supporting tube 62 and the roller plate 63 together, when the management main body 1 is used, the supporting tube 62 connected to the connecting rod 61 is driven by the data frame 71 on the rotating management structure 7 to be positioned in the first device groove 4 to slide, the roller plate 63 and the plurality of stabilizing plates 64 are positioned in the lower sliding groove 41 to slide, the rotating stability during searching of data is improved, the phenomenon that progress data is inclined or offset due to overlarge rotating gravity of the data frame 71 is avoided, the connecting rod 61 is connected with the rolling ball 66 through the connecting rotating plate 65, when the management main body 1 is used, the rotating data frame 71 drives the rolling ball 66 on the rotating plate 65 to be positioned in the sliding rail 42 to slide, the rotating flexibility during searching of data is improved, and the efficient and quick data searching is improved; the whole device is simple in structure and suitable for being used as a project cost progress management device.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A project cost progress management device, includes management main part (1), its characterized in that: the utility model discloses a device, including management main part (1), the equal fixedly connected with stabilizer blade in lower extreme four corners (2) of management main part (1), the front end of management main part (1) is opened has management groove (3), the inside of management main part (1) is opened there are device groove (4) and No. two device grooves (5), device groove (4) and No. two device grooves (5) all communicate with each other with management groove (3) are inside, the common swing joint of the interior cell wall of device groove (4) and the interior cell wall of No. two device grooves (5) has regulation structure (6), the surface middle part fixedly connected with management structure (7) of regulation structure (6), management structure (7) are located management groove (3), the front end left part hinge connection of management main part (1) has door plant (8).
2. A construction cost progress management apparatus according to claim 1, characterized in that: two sliding grooves (41) are formed in the management main body (1), the two sliding grooves (41) are respectively communicated with the interiors of the first device groove (4) and the second device groove (5), a sliding rail (42) is formed in the management main body (1), and the sliding rail (42) is communicated with the interior of the sliding groove (41) on the upper portion.
3. A construction cost progress management apparatus according to claim 1, characterized in that: adjust structure (6) and include connecting rod (61), the lower extreme fixedly connected with stay tube (62) of connecting rod (61), the lower extreme fixedly connected with roll board (63) of stay tube (62), the surface of stay tube (62) and the common fixedly connected with a plurality of firm board (64) in the upper end of roll board (63), the upper end fixedly connected with who changes board (65) of connecting rod (61), the surface middle part swing joint who changes board (65) has a plurality of spin (66).
4. A construction cost progress management apparatus according to claim 3, characterized in that: connecting rod (61) are through device groove (4) and No. two device groove (5) and management main part (1) swing joint, a plurality of stabilizing plate (64) and commentaries on classics board (65) are located two sliding tray (41) respectively, a plurality of spin (66) all are located slide rail (42).
5. A construction cost progress management apparatus according to claim 1, characterized in that: management structure (7) are including data frame (71), storing groove (72) have all been opened to the front end and the rear end of data frame (71), three draw-in groove (73), a plurality of spacing groove (74) and two antiskid groove (75) have all been opened to the front end and the rear end of data frame (71).
6. A construction cost progress management apparatus according to claim 5, characterized in that: the data rack (71) is fixedly connected with the outer surface of the connecting rod (61) in a penetrating manner, and the clamping grooves (73), the limiting grooves (74) and the anti-skid grooves (75) are respectively communicated with the interiors of the two storage grooves (72).
CN202121400318.0U 2021-06-23 2021-06-23 Engineering cost progress management device Active CN215076642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121400318.0U CN215076642U (en) 2021-06-23 2021-06-23 Engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121400318.0U CN215076642U (en) 2021-06-23 2021-06-23 Engineering cost progress management device

Publications (1)

Publication Number Publication Date
CN215076642U true CN215076642U (en) 2021-12-10

Family

ID=79310537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121400318.0U Active CN215076642U (en) 2021-06-23 2021-06-23 Engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN215076642U (en)

Similar Documents

Publication Publication Date Title
WO2009121711A1 (en) Refrigeration device with removable module
CN206679992U (en) A kind of cable coiling apparatus
CN215076642U (en) Engineering cost progress management device
CN210300165U (en) Student manages archives device
CN209950737U (en) Combined type storage cabinet
CN214651080U (en) Partition plate type goods shelf convenient to adjust
CN207712919U (en) A kind of plastic tube blanking rack
CN213503346U (en) Device is kept to workshop appliance
CN215456399U (en) Engineering cost file data safe deposit box
CN215936766U (en) Frame is stored with veneer to aluminium veneer curtain convenient to get goods
CN111569394A (en) Multifunctional sport equipment safe storage vehicle
CN211177601U (en) Food is rack for freezing
CN221164413U (en) Embrace crossbeam storehouse storage goods shelves turning device
CN216221013U (en) Storage goods shelf convenient to stack and remove
CN218273714U (en) Multimedia device for medical teaching
CN219804219U (en) Sport equipment rack
CN211684284U (en) Manpower resource file box
CN216293443U (en) Filing cabinet with adjustable business administration is used
CN211919885U (en) Discharging and conveying system capable of improving environment
CN210762515U (en) Novel attic storage goods shelf
CN218702338U (en) Performance recording device
CN220981698U (en) Refrigerator convenient for storing and placing plates
CN220398086U (en) Drying apparatus for lithium battery
CN219257704U (en) Consignment device
CN215963677U (en) Telescopic test tube box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 709, Block B, Baifuqi Commercial Plaza, No. 183, Wujing Road, Guandu District, Kunming, Yunnan 650000

Patentee after: Zhongde Gaolu Consulting (Yunnan) Co.,Ltd.

Address before: 650000 No. 709, block B, baifuqi Commercial Plaza, No. 32, Wujing Road, Guandu District, Kunming, Yunnan

Patentee before: Yunnan huihenggao Road Engineering Project Management Co.,Ltd.