CN215055559U - Roof steel beam installation protection structure of electronic factory building - Google Patents

Roof steel beam installation protection structure of electronic factory building Download PDF

Info

Publication number
CN215055559U
CN215055559U CN202120566197.0U CN202120566197U CN215055559U CN 215055559 U CN215055559 U CN 215055559U CN 202120566197 U CN202120566197 U CN 202120566197U CN 215055559 U CN215055559 U CN 215055559U
Authority
CN
China
Prior art keywords
steel
steel pipe
factory building
protective structure
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120566197.0U
Other languages
Chinese (zh)
Inventor
龚锦
于永浩
刘泽芳
陈翰林
汪永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202120566197.0U priority Critical patent/CN215055559U/en
Application granted granted Critical
Publication of CN215055559U publication Critical patent/CN215055559U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a roof steel beam installation protective structure of an electronic factory building, which comprises a steel pipe, a fixed seat, a circular ring, a steel wire rope, a fixed inclined strut and a temporary storage platform; the fixing seat is connected with a steel beam, the lower end of the steel pipe is welded on the upper part of the fixing seat, the lower end of the steel pipe is connected with the fixing seat through a screw rod, and circular rings are welded on two sides of the steel pipe and used for binding a steel wire rope; the fixed seat is connected with the upper flange of the steel beam through a fastening screw; an inclined strut is welded and fixed between the steel pipe and the fixed seat; the temporary storage platform comprises a steel plate and a short pipe welded at the lower part of the steel plate, the temporary storage platform is connected with the upper end of the steel plate in a splicing mode through the short pipe at the lower part of the temporary storage platform, and a worker hangs a tool bag on the temporary storage platform when walking; the steel wire rope is connected with the circular ring through a buckle; the utility model discloses an adopt but cyclic utilization can dismantle and face limit girder steel installation protective structure, the operation faces the limit and protects when satisfying the girder steel installation.

Description

Roof steel beam installation protection structure of electronic factory building
Technical Field
The utility model relates to a protective structure, specific electron factory building roofing girder steel installation protective structure that says so.
Background
At present, steel structure systems are generally adopted by large-scale electronic factory building roof structure systems, the mounting amount of roof layer steel structures is large, workers need to walk on steel beams when mounting the steel beams due to high and large layers, edge protection must be set, and materials are inconvenient to construct and wasted by follow-up protective steel bar cutting when welding steel bars are traditionally adopted.
Disclosure of Invention
The utility model aims at overcoming prior art's defect, provide an electron factory building roofing girder steel installation protective structure, but cyclic utilization, safe and reliable.
In order to solve the technical problem, the utility model discloses a realize like this:
the utility model provides an electron factory building roofing girder steel installation protective structure which characterized in that: the steel pipe comprises a steel pipe, a fixed seat, a circular ring and a steel wire rope; the fixing base is connected with the steel beam, the lower end of the steel pipe is welded on the upper portion of the fixing base, the lower end of the steel pipe is connected with the fixing base through a screw rod, and welding rings on two sides of the steel pipe are used for binding the steel wire rope.
Electronic factory building roofing girder steel installation protective structure, its characterized in that: the fixing seat is formed by bending a 5mm thick steel plate into a U shape and clamping the U shape on one side of the upper flange of the steel beam, and the fixing seat is connected with the upper flange of the steel beam through a fastening screw rod.
Electronic factory building roofing girder steel installation protective structure, its characterized in that: still including fixed bracing, the welded fastening bracing between steel pipe and the fixing base.
Electronic factory building roofing girder steel installation protective structure, its characterized in that: still put the thing platform temporarily including putting, the steel pipe upper end is equipped with puts the thing platform temporarily, puts the thing platform temporarily and includes the steel sheet and welds the nozzle stub in the steel sheet lower part, puts the connection mode that thing platform was pegged graft through nozzle stub and the steel pipe upper end of its lower part temporarily and connects, hangs the saddlebag on putting the thing platform temporarily when the workman walks.
Electronic factory building roofing girder steel installation protective structure, its characterized in that: the steel wire rope is connected with the circular ring through a buckle.
The utility model has the advantages that: can dismantle through adopting cyclic utilization and face limit girder steel installation protective structure, the operation faces limit protection when satisfying girder steel installation, and can cyclic utilization.
Drawings
The invention will be described in further detail with reference to the following drawings and embodiments:
fig. 1 is a schematic structural diagram of the present application.
FIG. 2 is a schematic view of the connection between the fixing base and the steel pipe.
Fig. 3 is a schematic structural view of the temporary placement platform.
Fig. 4 is a use state reference diagram.
Detailed Description
As shown in fig. 1, 2, 3, 4: a roof steel beam installation protection structure of an electronic factory building comprises a steel pipe 2, a fixed seat 3, a circular ring 6 and a steel wire rope; the steel wire rope binding device is characterized in that the fixed seat is connected with a steel beam 1, the lower end of a steel pipe is welded on the upper portion of the fixed seat, the lower end of the steel pipe is connected with the fixed seat through a screw 10, circular rings are welded on two sides of the steel pipe and used for binding a steel wire rope 9, and the steel wire rope and the circular rings are connected through a buckle; the fixing seat is bent into a U shape by adopting a steel plate with the thickness of 5mm and clamped on one side of the upper flange of the steel beam, and the fixing seat is connected with the upper flange of the steel beam through a fastening screw rod 5; the steel pipe fixing device further comprises a fixed inclined strut 4, and the inclined strut is welded and fixed between the steel pipe and the fixing seat; the temporary storage platform is arranged at the upper end of the steel pipe and comprises a steel plate 71 and a short pipe 72 welded at the lower part of the steel plate, the temporary storage platform is connected with the upper end of the steel pipe in an inserting mode through the short pipe at the lower part of the temporary storage platform, and a worker hangs the tool bag 8 on the temporary storage platform when walking; install this application protective structure once every 2 meters on the girder steel, adopt 16 wire ropes to connect, one wire rope is 1100mm apart from the roof beam top above, one wire rope is 300mm apart from the roof beam top below.

Claims (5)

1. The utility model provides an electron factory building roofing girder steel installation protective structure which characterized in that: the steel pipe comprises a steel pipe, a fixed seat, a circular ring and a steel wire rope; the fixing base is connected with the steel beam, the lower end of the steel pipe is welded on the upper portion of the fixing base, the lower end of the steel pipe is connected with the fixing base through a screw rod, and welding rings on two sides of the steel pipe are used for binding the steel wire rope.
2. The electronic factory building roof girder steel installation protective structure of claim 1, characterized in that: the fixing seat is formed by bending a 5mm thick steel plate into a U shape and clamping the U shape on one side of the upper flange of the steel beam, and the fixing seat is connected with the upper flange of the steel beam through a fastening screw rod.
3. The electronic factory building roof girder steel installation protective structure of claim 1, characterized in that: still including fixed bracing, the welded fastening bracing between steel pipe and the fixing base.
4. The electronic factory building roof girder steel installation protective structure of claim 1, characterized in that: still put the thing platform temporarily including putting, the steel pipe upper end is equipped with puts the thing platform temporarily, puts the thing platform temporarily and includes the steel sheet and welds the nozzle stub in the steel sheet lower part, puts the connection mode that thing platform was pegged graft through nozzle stub and the steel pipe upper end of its lower part temporarily and connects, hangs the saddlebag on putting the thing platform temporarily when the workman walks.
5. The electronic factory building roof girder steel installation protective structure of claim 1, characterized in that: the steel wire rope is connected with the circular ring through a buckle.
CN202120566197.0U 2021-03-19 2021-03-19 Roof steel beam installation protection structure of electronic factory building Active CN215055559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120566197.0U CN215055559U (en) 2021-03-19 2021-03-19 Roof steel beam installation protection structure of electronic factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120566197.0U CN215055559U (en) 2021-03-19 2021-03-19 Roof steel beam installation protection structure of electronic factory building

Publications (1)

Publication Number Publication Date
CN215055559U true CN215055559U (en) 2021-12-07

Family

ID=79153519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120566197.0U Active CN215055559U (en) 2021-03-19 2021-03-19 Roof steel beam installation protection structure of electronic factory building

Country Status (1)

Country Link
CN (1) CN215055559U (en)

Similar Documents

Publication Publication Date Title
CN206289945U (en) A kind of assembled Portable safety crosshead
CN214834605U (en) A climb a structure that adheres to for structure disappearance layer
CN215055559U (en) Roof steel beam installation protection structure of electronic factory building
CN203066491U (en) Locator for installing round tube type connection member
CN212105057U (en) High-altitude large-span cantilever formwork operation platform
CN211007585U (en) Elevator well protector
CN217631164U (en) Overhanging type operating platform for mounting steel structure corridor type steel beam
CN217175863U (en) Quick ann tears lifeline support device open
CN107795133B (en) Integral protective frame platform and construction method thereof
CN215671267U (en) Telescopic edge protection device
CN216007760U (en) Non-counterweight ultrahigh hanging basket suspension device
CN215107152U (en) High-altitude lateral angle control overhanging operation platform
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN211775082U (en) Jig frame for large-span pipe truss
CN201321723Y (en) Steel column none-cable wind rope correcting structure
CN108412230A (en) Assembled is bolted carpenter's machining shed and its assemble method entirely
CN104818856B (en) Mounting method of roof thin-wall Z-shaped purline
CN210289158U (en) Temporary support device for connecting laminated plate with beam or wall
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN112647718A (en) Siphon pipeline suspension joint structure of steel structure roof and construction method thereof
CN221216936U (en) Wall-riding type installation hanging bracket of high-altitude hoisting equipment
CN218493158U (en) Face limit protector suitable for steel-pipe bundle
CN115075530B (en) Cantilever structure and construction method thereof
CN216516786U (en) Flexible structure of encorbelmenting of dismantling of peripheral protection circulation of superelevation layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant