CN215052017U CN202121077429.2U CN202121077429U CN215052017U CN 215052017 U CN215052017 U CN 215052017U CN 202121077429 U CN202121077429 U CN 202121077429U CN 215052017 U CN215052017 U CN 215052017U
Authority
CN
China
Prior art keywords
support
basket
compaction
prepressing
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121077429.2U
Other languages
Chinese (zh)
Inventor
雷成龙
王毅
余跃
母志成
朱天中
段伟
何天贵
刘凤群
谭俊
潘旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CN202121077429.2U priority Critical patent/CN215052017U/en
Application granted granted Critical
Publication of CN215052017U publication Critical patent/CN215052017U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a device for prepressing hanging baskets of a railway continuous beam, which comprises a plurality of groups of hanging basket prepressing devices, wherein the plurality of groups of hanging basket prepressing devices are arranged on a pier column in parallel, and each group of hanging basket prepressing devices comprises two support structures, two support prepressing structures and two hanging basket prepressing structures; the two support structures are symmetrically arranged on the pier column by the vertical central plane of the pier column; the support structure comprises a transverse support for bearing force; the first end and the horizontal support of support pre-compaction structure are connected, and the second end and the cushion cap of support pre-compaction structure are connected, hang basket pre-compaction structure's first end and horizontal support and are connected, and support pre-compaction structure's second end is connected with hanging the basket. The utility model discloses a supporting structure cooperates to realized carrying out the pre-compaction to hanging the basket through hanging the combination of basket pre-compaction structure and support pre-compaction structure, shared space is less, and required crane machine shift number reduces, and loading and uninstallation time shorten, very big improvement the efficiency of construction.

Description

Device for prepressing suspension basket of continuous railway beam
Technical Field
The utility model relates to a railway continuous beam construction technical field especially relates to a device that is used for railway continuous beam to hang basket pre-compaction.
Background
The purpose of hanging basket pre-compaction is that the inelastic deformation of eliminating hanging basket itself, support square timber and template and the compression of ground subsides the influence, measures the actual numerical value of support elastic deformation, sets up for the camber in advance of roof beam body founding the mould and provides the reference, and the stable condition of atress of hanging basket is examined simultaneously, guarantees the construction safety of subsequent handling.
The traditional cradle pre-pressing adopts a stacking pre-pressing method, standard weights (water bags, sand bags, concrete blocks and the like) are stacked according to the pre-pressing weight distribution by a crane, and the whole stacking and unloading process needs crane matching and is long in time.
Therefore, it is necessary to develop a device for prepressing the cradle of the railway continuous beam to solve the above problems.
Disclosure of Invention
The utility model aims at solving the problem that a device for prepressing of a railway continuous beam hanging basket is designed.
The utility model discloses a following technical scheme realizes above-mentioned purpose:
a device for basket pre-compaction is hung to continuous roof beam of railway, hang basket pre-compaction device including the multiunit, the multiunit is hung basket pre-compaction device parallel arrangement on the pier stud, and every group hangs basket pre-compaction device and includes:
two support structures; the two support structures are symmetrically arranged on the pier column by the vertical central plane of the pier column; the support structure comprises a transverse support for bearing force;
two support pre-pressing structures symmetrically arranged on the vertical central plane of the pier stud; the first end of the support frame prepressing structure is connected with the transverse support, the second end of the support frame prepressing structure is connected with the bearing platform,
two hanging basket pre-pressing structures symmetrically arranged on the vertical central plane of the pier stud; hang basket pre-compaction structure's first end and violently support and be connected, support pre-compaction structure's second end with hang the basket and be connected.
The support structure includes:
obliquely supporting;
a first hinge base; the first hinged support is hinged with one end of the transverse support;
a second hinge base;
a third free bearing; the third hinge seat is arranged below the middle part of the transverse support; the first end of the inclined support is hinged with the third hinged support, and the first end of the inclined support is hinged with the second hinged support;
a first anchor; the first anchoring piece is embedded in one side of the upper end of the pier stud; the first hinged support is connected with the first anchoring piece;
a second anchor; the second anchoring piece is embedded in one side of the middle part of the pier stud; the second hinge base is connected with the second anchoring piece.
The hanging basket pre-pressing device further comprises a first pair of pulling steel bars and a second pair of pulling steel bars, the first pair of pulling steel bars and the second pair of pulling steel bars are pre-embedded in the pier column, two ends of the first pair of pulling steel bars are respectively connected with the two first anchoring parts, and two ends of the second pair of pulling steel bars are respectively connected with the two second anchoring parts; the first pair of pulling steel bars and the second pair of pulling steel bars are both in pretensioning arrangement.
Hang basket pre-compaction structure and include:
a first cushion block; the first cushion block is arranged at the upper part of the hanging basket bottom plate;
oil jacking; the oil jack is arranged on the first cushion block;
an upper anchoring beam; the upper anchoring beam is arranged on the upper part of the action end of the oil jack;
a lower anchoring beam; the lower anchoring beam is arranged at the lower part of the transverse support;
a first connecting bar; the upper end of the first connecting reinforcing steel bar is connected with the upper anchoring beam, and the lower end of the first connecting reinforcing steel bar is connected with the lower anchoring beam.
Support pre-compaction structure includes:
a second cushion block; the second cushion block is arranged on the upper part of the transverse support;
a second connecting reinforcement;
a rotating member; the upper end of the second connecting steel bar is connected with the second cushion block, and the lower end of the second connecting steel bar is connected with the rotating piece;
a fourth free bearing; the rotating piece is hinged with the fourth hinged support;
embedding parts; the embedded part is embedded in the bearing platform, and the embedded part is fixedly connected with the fourth hinged support.
The beneficial effects of the utility model reside in that:
the utility model discloses a supporting structure cooperates to realized carrying out the pre-compaction to hanging the basket through hanging the combination of basket pre-compaction structure and support pre-compaction structure, shared space is less, and required crane machine shift number reduces, and loading and uninstallation time shorten, very big improvement the efficiency of construction.
Drawings
FIG. 1 is a left side view of the present application;
FIG. 2 is a front view of the stent structure of the present application;
FIG. 3 is an enlarged view of portion A of FIG. 1;
FIG. 4 is an enlarged view of portion B of FIG. 1;
FIG. 5 is a front view of the present application;
in the figure: 11. a beam; 12. pier studs; 13. hanging a basket; 14. a bearing platform; 21. a first anchor; 22. a first hinge base; 23. a first counter-pulling bar; 24. a third free bearing; 31. a second anchor; 32. a second hinge base; 33. a second pair of tie bars; 4. transversely supporting; 5. obliquely supporting; 61. a first connecting bar; 62. an upper anchoring beam; 63. oil jacking; 64. a first cushion block; 65. a second cushion block; 66. a lower anchoring beam; 67. a second connecting reinforcement; 71. a rotating member; 72. a fourth free bearing; 73. an embedded part.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "inner", "outer", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, or orientations or positional relationships that are conventionally placed when the products of the present invention are used, or orientations or positional relationships that are conventionally understood by those skilled in the art, and are merely for convenience of description of the present invention and simplifying the description, but do not indicate or imply that the device or element that is referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be further noted that, unless explicitly stated or limited otherwise, the terms "disposed" and "connected" are to be interpreted broadly, and for example, "connected" may be a fixed connection, a detachable connection, or an integral connection; can be mechanically or electrically connected; the connection may be direct or indirect via an intermediate medium, and may be a communication between the two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The following describes in detail embodiments of the present invention with reference to the accompanying drawings.
As shown in fig. 1 and 5, a device for basket pre-compaction is hung to continuous roof beam of railway, including the basket pre-compaction device is hung to the multiunit, basket pre-compaction device parallel arrangement is hung to the multiunit on pier stud 12, and basket pre-compaction device includes in every group:
two support structures; the two support structures are symmetrically arranged on the pier column 12 by the vertical central plane of the pier column 12; the support structure comprises a cross support 4 for bearing force;
two support pre-pressing structures symmetrically arranged on the vertical central plane of the pier stud 12; the first end of the support frame prepressing structure is connected with the transverse support 4, the second end of the support frame prepressing structure is connected with the bearing platform 14,
two hanging baskets 13 which are symmetrically arranged on the vertical central plane of the pier stud 12 are pre-pressed structures; hang basket 13 pre-compaction structure's first end and be connected with horizontal support 4, support pre-compaction structure's second end with hang basket 13 and be connected.
As shown in fig. 2, the support structure includes:
a diagonal brace 5;
a first hinge base 22; the first hinged support 22 is hinged with one end of the transverse support 4;
a second hinge base 32;
a third hinge base 24; the third hinged support 24 is arranged below the middle part of the transverse support 4; the first end of the inclined strut 5 is hinged with the third hinge base 24, and the first end of the inclined strut 5 is hinged with the second hinge base 32;
a first anchor 21; the first anchoring piece 21 is pre-embedded in one side of the upper end of the pier stud 12; the first hinge base 22 is connected with the first anchor member 21;
a second anchor 31; the second anchoring piece 31 is embedded in one side of the middle part of the pier stud 12; the second hinge base 32 is connected to the second anchor member 31.
As shown in fig. 2, the cradle pre-pressing device further includes a first pair of tie bars 23 and a second pair of tie bars 33, the first pair of tie bars 23 and the second pair of tie bars 33 are both pre-embedded in the pier stud 12, two ends of the first pair of tie bars 23 are respectively connected with the two first anchoring members 21, and two ends of the second pair of tie bars 33 are respectively connected with the two second anchoring members 31; the first pair of tie bars 23 and the second pair of tie bars 33 are both in a pre-tensioned arrangement. The first pair of tie bars 23 and the second pair of tie bars 33 are both made of PSB830 steel bars and bolts, and have the functions of firmly installing the hinged support by applying prestress, offsetting part of elastic deformation by utilizing the prestress and reducing the displacement of the hinged support.
As shown in fig. 3, the cradle preloading structure comprises:
a first spacer block 64; the first cushion block 64 is arranged at the upper part of the bottom plate of the hanging basket 13;
an oil top 63; the oil top 63 is mounted on the first cushion block 64;
an upper anchor beam 62; the upper anchoring beam 62 is mounted on the upper part of the action end of the oil top 63;
a lower anchor beam 66; the lower anchoring beam 66 is arranged at the lower part of the transverse support 4;
a first connecting bar 61; the upper end of the first connecting reinforcement 61 is connected to the upper anchoring beam 62, and the lower end of the first connecting reinforcement 61 is connected to the lower anchoring beam 66.
The upper anchoring beam 62 has the function of enabling the pre-pressing stress of the hanging basket 13 to be uniform; the lower anchoring beam 66 has the function of enabling the transverse support 4 to be stressed uniformly; when the oil top 63 works, the anchoring beam 62 is jacked up, and the first connecting steel bars 61 are unchanged in length, so that the hanging basket 13 receives downward pressure, and the pressure can be set as required. The first cushion block 64 is used for providing a good working supporting surface for the oil top 63, so that the hanging basket 13 is stressed uniformly;
as shown in fig. 3 and 4, the support frame preloading structure includes:
a second pad 65; the second cushion block 65 is arranged at the upper part of the transverse support 4;
second connecting bars 67;
a rotating member 71; the upper end of the second connecting steel bar 67 is connected with the second cushion block 65, and the lower end of the second connecting steel bar 67 is connected with the rotating piece 71;
a fourth hinge base 72; the rotating piece 71 is hinged with the fourth hinged support 72;
an embedment 73; the embedded part 73 is embedded in the bearing platform 14, and the embedded part 73 is fixedly connected with the fourth hinge base 72.
The second spacer 65 is used for providing a connection point for the second connecting steel bar 67 and for uniformly stressing the transverse support 4; by controlling the length of the second connecting reinforcement 67 it is achieved that a downward force is provided for the cross support 4, which force is transmitted via the first connecting reinforcement 61 to the hanging basket 13.
The method comprises the following steps:
the first step is as follows: the embedded parts 73 are accurately embedded before the bearing platform 14 is poured, and the first pair of tie bars 23, the second pair of tie bars 33, the first anchoring part 21 and the second anchoring part 31 are accurately embedded before the pier stud 12 is poured.
The second step is that: installing a hanging basket 13 prepressing structure, a support prepressing structure and a support structure;
the third step: and applying corresponding pressure to the oil tops 63 at different positions according to load distribution to pre-press the cradle 13.
The technical scheme of the utility model is not limited to the restriction of above-mentioned specific embodiment, all according to the utility model discloses a technical scheme makes technical deformation, all falls into within the protection scope of the utility model.

Claims (5)

1. A device for basket pre-compaction is hung to continuous roof beam of railway, a serial communication port, hang basket pre-compaction device including the multiunit, the multiunit is hung basket pre-compaction device parallel arrangement on the pier stud, and every group hangs basket pre-compaction device and includes:
two support structures; the two support structures are symmetrically arranged on the pier column by the vertical central plane of the pier column; the support structure comprises a transverse support for bearing force;
two support pre-pressing structures symmetrically arranged on the vertical central plane of the pier stud; the first end of the support frame prepressing structure is connected with the transverse support, the second end of the support frame prepressing structure is connected with the bearing platform,
two hanging basket pre-pressing structures symmetrically arranged on the vertical central plane of the pier stud; hang basket pre-compaction structure's first end and violently support and be connected, support pre-compaction structure's second end with hang the basket and be connected.
2. The apparatus for preloading a railway continuous beam cradle as recited in claim 1, wherein the cradle structure comprises:
obliquely supporting;
a first hinge base; the first hinged support is hinged with one end of the transverse support;
a second hinge base;
a third free bearing; the third hinge seat is arranged below the middle part of the transverse support; the first end of the inclined support is hinged with the third hinged support, and the first end of the inclined support is hinged with the second hinged support;
a first anchor; the first anchoring piece is embedded in one side of the upper end of the pier stud; the first hinged support is connected with the first anchoring piece;
a second anchor; the second anchoring piece is embedded in one side of the middle part of the pier stud; the second hinge base is connected with the second anchoring piece.
3. The device for prepressing the railway continuous beam hanging basket according to claim 2, characterized in that the hanging basket prepressing device further comprises a first pair of tie bars and a second pair of tie bars, the first pair of tie bars and the second pair of tie bars are both pre-embedded in the pier stud, both ends of the first pair of tie bars are respectively connected with the two first anchoring members, and both ends of the second pair of tie bars are respectively connected with the two second anchoring members; the first pair of pulling steel bars and the second pair of pulling steel bars are both in pretensioning arrangement.
4. The apparatus for preloading a railway continuous beam cradle of claim 1, wherein the cradle preloading structure comprises:
a first cushion block; the first cushion block is arranged at the upper part of the hanging basket bottom plate;
oil jacking; the oil jack is arranged on the first cushion block;
an upper anchoring beam; the upper anchoring beam is arranged on the upper part of the action end of the oil jack;
a lower anchoring beam; the lower anchoring beam is arranged at the lower part of the transverse support;
a first connecting bar; the upper end of the first connecting reinforcing steel bar is connected with the upper anchoring beam, and the lower end of the first connecting reinforcing steel bar is connected with the lower anchoring beam.
5. The apparatus for preloading a railway continuous beam cradle of claim 1, wherein the cradle preloading structure comprises:
a second cushion block; the second cushion block is arranged on the upper part of the transverse support;
a second connecting reinforcement;
a rotating member; the upper end of the second connecting steel bar is connected with the second cushion block, and the lower end of the second connecting steel bar is connected with the rotating piece;
a fourth free bearing; the rotating piece is hinged with the fourth hinged support;
embedding parts; the embedded part is embedded in the bearing platform, and the embedded part is fixedly connected with the fourth hinged support.
CN202121077429.2U 2021-05-19 2021-05-19 Device for prepressing suspension basket of continuous railway beam Expired - Fee Related CN215052017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121077429.2U CN215052017U (en) 2021-05-19 2021-05-19 Device for prepressing suspension basket of continuous railway beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121077429.2U CN215052017U (en) 2021-05-19 2021-05-19 Device for prepressing suspension basket of continuous railway beam

Publications (1)

Publication Number Publication Date
CN215052017U true CN215052017U (en) 2021-12-07

Family

ID=79212746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121077429.2U Expired - Fee Related CN215052017U (en) 2021-05-19 2021-05-19 Device for prepressing suspension basket of continuous railway beam

Country Status (1)

Country Link
CN (1) CN215052017U (en)

Similar Documents

Publication Publication Date Title
CN105129602B (en) Grow up vertical reinforcement monoblock type raising suspender
CN101761034A (en) Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN104533105B (en) A kind of Strengthening by Steel-Packing post pre-applied force device
CN215052017U (en) Device for prepressing suspension basket of continuous railway beam
CN214695184U (en) Pre-pressing system for double-thin-wall pier beam support bracket
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN215366868U (en) Prepressing system for hanging basket of cantilever beam
CN217476211U (en) Prefabricated case roof beam prevents centre form come-up depression bar device
CN209144666U (en) A kind of tooling suitable for the extra heavy 0# block bracket precompressed of high-block bridge degree continuous rigid frame
CN215797889U (en) Anti-deformation hoisting device for pile foundation reinforcement cage
CN204439518U (en) A kind of Multifunction lever for testing loading
CN215052020U (en) Reaction frame for prepressing zero block of railway continuous beam
CN210766412U (en) Hang basket pre-compaction counter-force support
CN218667689U (en) Anchor pile method static test force transmission device and system
CN212316690U (en) A pre-compaction device for bridge pier top bracket
CN111074794A (en) Prepressing system for hanging basket of cantilever beam
CN218674286U (en) Modular bridge door machine hanging flower basket for load test
CN215714684U (en) Cast-in-situ bent cap support
CN212801237U (en) A no bottom plate centre form support system for cable-stay bridge concrete girder
CN217711792U (en) High-altitude prestress tensioning auxiliary device
CN216247083U (en) Precast beam static test reaction frame
CN216272646U (en) Ultra-light prestressed laminated slab lifting and reinforcing device
CN211285289U (en) Pre-compaction device of cantilever construction bridge support and string basket
CN220376072U (en) Generating set braced frame convenient to hoist and mount
CN218621821U (en) Basket pre-compaction structure is hung to continuous beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211207