CN215042914U - Simple hoisting trolley for constructional engineering - Google Patents

Simple hoisting trolley for constructional engineering Download PDF

Info

Publication number
CN215042914U
CN215042914U CN202121408816.XU CN202121408816U CN215042914U CN 215042914 U CN215042914 U CN 215042914U CN 202121408816 U CN202121408816 U CN 202121408816U CN 215042914 U CN215042914 U CN 215042914U
Authority
CN
China
Prior art keywords
base frame
frame
sides
adjusting
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121408816.XU
Other languages
Chinese (zh)
Inventor
赵锋
程建通
杜生丑
常志伟
张向乾
张智伟
冯宜晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Yian Construction Technology Group Co ltd
Original Assignee
Gansu Yian Construction Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Yian Construction Technology Group Co ltd filed Critical Gansu Yian Construction Technology Group Co ltd
Priority to CN202121408816.XU priority Critical patent/CN215042914U/en
Application granted granted Critical
Publication of CN215042914U publication Critical patent/CN215042914U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a simple and easy handling shallow is used to building engineering. Simple and easy handling shallow for building engineering includes: a base frame; the lifting frame is fixedly arranged at the top of the base frame; the fixing frames are fixedly arranged on the inner walls of the two sides of the base frame; the two partition plates are fixedly arranged on the inner walls of the two sides of the fixed frame; the adjusting motor is fixedly arranged on the inner wall of the bottom of the base frame; two threaded sleeves, two the equal slidable mounting of threaded sleeve is in on the both sides inner wall of fixed frame, and two the one end that the threaded sleeve kept away from each other all extends the base frame. The utility model provides a simple and easy handling shallow for building engineering has convenient to use, easy operation, advantage that stability is good.

Description

Simple hoisting trolley for constructional engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a simple and easy handling shallow for building engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, wherein the house buildings comprise top covers, beam columns, walls and foundations, and can form internal spaces, so that the engineering required by production, living, learning and public activities of people is met.
In the building engineering construction of today, can use some simple and easy handling shallow to assist when carrying some building materials, but handling shallow is because the structure is comparatively simple today, and because the ground of building site generally can not level, so when handling building materials, probably because the bottom plate is not horizontal, lead to the in-process of handling material to take place to turn on one's side, influence the handling efficiency of material then, and reduce the security of construction, and because the base top of handling shallow generally is the plane, so be located the handling shallow surface at building materials, can be along with the jolt of handling shallow removal and probably lead to building materials to drop from the handling shallow surface.
Therefore, it is necessary to provide a simple trolley for construction engineering to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a simple and easy handling shallow for building engineering convenient to use, easy operation, stability are good.
In order to solve the technical problem, the utility model provides a building engineering is with simple and easy handling shallow, include: a base frame; the lifting frame is fixedly arranged at the top of the base frame; the fixing frames are fixedly arranged on the inner walls of the two sides of the base frame; the two partition plates are fixedly arranged on the inner walls of the two sides of the fixed frame; the adjusting motor is fixedly arranged on the inner wall of the bottom of the base frame; the two threaded sleeves are both slidably mounted on the inner walls of the two sides of the fixed frame, and one ends, away from each other, of the two threaded sleeves extend out of the base frame; the two adjusting screws are respectively installed in the two threaded sleeves in a threaded manner, and one ends of the two adjusting screws respectively penetrate through the two partition plates and are respectively in rotary connection with the two partition plates; the two connecting plates are arranged on two sides of the base frame, and the outer walls of one sides of the two connecting plates are fixedly connected with one ends of the two threaded sleeves respectively; the four avoidance grooves are respectively formed at the bottoms of the two connecting plates; four adjusting cylinder, four adjusting cylinder is fixed mounting respectively four keep away on the top inner wall in groove.
Preferably, two wheels are rotatably mounted on the outer walls of the two sides of the base frame, and the four wheels are driven by a moving motor.
Preferably, a first gear is fixedly sleeved on a rotating shaft of the adjusting motor, a second gear is fixedly sleeved at one end, close to each other, of each adjusting screw, and the first gear is meshed with the second gear.
Preferably, the telescopic shafts of the four adjusting cylinders are fixedly provided with supporting blocks, and the bottoms of the supporting blocks are arranged to be spherical.
Preferably, the top of the base frame is provided with a balancing weight, and the top of the balancing weight is fixedly provided with a push rod.
Preferably, the top fixed mounting of base frame has the frame of placing, it all is provided with the pinch-off blades on the inner wall of frame both sides to place, equal fixed mounting has die clamping cylinder, two on the both sides outer wall of placing the frame die clamping cylinder's telescopic shaft all extends to place in the frame, and two die clamping cylinder's telescopic shaft respectively with two one side outer wall fixed connection that the pinch-off blades kept away from each other.
Preferably, the top of placing the frame and keep away from one side outer wall of balancing weight all establish to the opening.
Compared with the prior art, the utility model provides a building engineering is with simple and easy handling shallow has following beneficial effect:
the utility model provides a simple hoisting cart for construction engineering, which drives four wheels to move through a moving motor, and then drives a base frame to move, thereby driving the whole hoisting cart to move, thus facilitating the transportation of heavier building materials and saving the physical power of transport personnel;
the distance between the two connecting plates can be adjusted through the adjusting motor, the two adjusting screw rods and the two threaded sleeves, the stability of contact between the base frame and the ground can be improved through the four adjusting cylinders and the four supporting blocks, so that the base frame is prevented from being turned on laterally due to uneven ground when materials are hoisted, and the safety of the hoisted materials is guaranteed.
Drawings
Fig. 1 is a schematic structural view of a first embodiment of a simple lifting cart for construction engineering, provided by the present invention;
fig. 2 is a schematic top cross-sectional structural view of a base frame in a first embodiment of the simple lifting cart for construction engineering provided by the present invention;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is a schematic side sectional view of the connecting plate in the first embodiment of the simple lifting cart for construction engineering provided by the present invention;
fig. 5 is a schematic structural view of a second embodiment of the simple lifting cart for construction engineering;
fig. 6 is the utility model provides a structural schematic diagram is cut to side view of placing the frame in simple and easy handling shallow second embodiment for the building engineering.
Reference numbers in the figures: 1. a base frame; 2. a lifting frame; 3. a fixing frame; 4. a partition plate; 5. adjusting the motor; 6. a threaded sleeve; 7. adjusting the screw rod; 8. a connector tile; 9. an avoidance groove; 10. an adjusting cylinder; 11. placing the frame; 12. a clamping plate; 13. and clamping the cylinder.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
First embodiment
Referring to fig. 1 to 4, in a first embodiment of the present invention, a simple trolley for construction includes: the base frame 1 is convenient for installing a moving mechanism and a hoisting mechanism; the lifting frame 2 is fixedly arranged at the top of the base frame 1 and used for lifting materials; the fixing frame 3 is fixedly arranged on the inner walls of the two sides of the base frame 1; the two partition plates 4 are fixedly arranged on the inner walls of the two sides of the fixed frame 3; the adjusting motor 5 is fixedly arranged on the inner wall of the bottom of the base frame 1 and provides power for the movement of the two connecting plates 8; the two threaded sleeves 6 are mounted on the inner walls of the two sides of the fixed frame 3 in a sliding mode, and the ends, far away from each other, of the two threaded sleeves 6 extend out of the base frame 1; the two adjusting screws 7 are respectively installed in the two threaded sleeves 6 in a threaded manner, one ends of the two adjusting screws 7 respectively penetrate through the two partition plates 4 and are respectively rotatably connected with the two partition plates 4, and the distance between the two connecting plates 8 can be effectively adjusted through the two adjusting screws 7 and the two threaded sleeves 6; the two connecting plates 8 are arranged on two sides of the base frame 1, and the outer walls of one sides of the two connecting plates 8 are fixedly connected with one ends of the two threaded sleeves 6 respectively to play a role in connection, so that the stability of the base frame 1 is improved conveniently; the four avoidance grooves 9 are respectively formed at the bottoms of the two connecting plates 8; four adjusting cylinders 10, four adjusting cylinders 10 respectively fixed mounting be four keep away on the top inner wall of groove 9, make two joint board 8 can effectual and ground contact.
In order to enable the base frame 1 to move more conveniently, two wheels are installed on the outer walls of the two sides of the base frame 1 in a rotating mode, and the four wheels are driven by a moving motor.
In order to enable the adjusting motor 5 to drive the two adjusting screws 7 to rotate, a first gear is fixedly sleeved on a rotating shaft of the adjusting motor 5, a second gear is fixedly sleeved at one end, close to each other, of each of the two adjusting screws 7, and the first gear is meshed with the two second gears.
In order to enable the four adjusting cylinders 10 to be stably contacted with the ground, supporting blocks are fixedly mounted on telescopic shafts of the four adjusting cylinders 10, and the bottoms of the supporting blocks are spherical.
In order to increase the stability of the base frame 1, a balancing weight is arranged at the top of the base frame 1, and a push rod is fixedly mounted at the top of the balancing weight.
In this embodiment:
the lifting frame 2 is formed by adopting the prior art;
the four wheels are driven to move by the moving motor, and then the base frame 1 is driven to move, so that the whole lifting trolley is driven to move, heavy building materials can be conveniently transported, and the physical strength of a carrier is saved;
when handling the material, can start adjusting motor 5 and drive two second gear rotations through first gear, drive two adjusting screw 7 rotations again, under the effect of fixed frame 3, make two adjusting screw 7 promote two screw sleeve 6 and remove towards the direction of keeping away from each other, thereby promote two joint plate 8 and remove towards the direction of keeping away from each other, after two joint plate 8 removed suitable place, can start four adjusting cylinder 10 and promote four supporting shoe downstream respectively and with four ground contact under adjusting cylinder 10, just so prevent to lead to base frame 1 to turn on one's side because of the ground is uneven when handling the material, guarantee the security of handling the material then.
Compared with the prior art, the utility model provides a building engineering is with simple and easy handling shallow has following beneficial effect:
the four wheels are driven to move by the moving motor, and then the base frame 1 is driven to move, so that the whole lifting trolley is driven to move, heavy building materials can be conveniently transported, and the physical strength of a carrier is saved;
the distance between the two connecting plates 8 can be adjusted through the adjusting motor 5, the two adjusting screw rods 7 and the two threaded sleeves 6, the stability of the base frame 1 contacting with the ground can be improved through the four adjusting cylinders 10 and the four supporting blocks, so that the base frame 1 is prevented from being turned over due to uneven ground when materials are hoisted, and the safety of the hoisted materials is further ensured.
Second embodiment:
based on the simple lifting trolley for the constructional engineering provided by the first embodiment of the application, the second embodiment of the application provides another simple lifting trolley for the constructional engineering. The second embodiment is merely a preferred way of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
The second embodiment of the present invention will be further explained with reference to the drawings and the embodiments.
Referring to fig. 5 to 6, the simple lifting trolley for the construction engineering further includes a placing frame 11, the placing frame 11 is fixedly installed at the top of the base frame 1, in order to stably place materials on the top of the base frame 1, clamping plates 12 are respectively arranged on inner walls of two sides of the placing frame 11, clamping cylinders 13 are respectively fixedly installed on outer walls of two sides of the placing frame 11, telescopic shafts of the two clamping cylinders 13 extend into the placing frame 11, the telescopic shafts of the two clamping cylinders 13 are respectively fixedly connected with an outer wall of one side, away from each other, of the two clamping plates 12, and a distance between the two clamping plates 12 is adjusted.
In order to make the material can be stable place to place in the frame 11, place the top of frame 11 and keep away from one side outer wall of balancing weight all establishes to the opening.
In this embodiment:
can make the stable top of placing base frame 1 of material through placing frame 11 to avoid making the material drop subaerially because of jolting of base frame 1 in the handling, influence the handling efficiency of material, and can effectually press from both sides tightly the material of placing in the frame 11 through two die clamping cylinder 13 and two clamp plates 12, thereby improve the stability of material in placing frame 11.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a simple and easy handling shallow for building engineering which characterized in that includes:
a base frame;
the lifting frame is fixedly arranged at the top of the base frame;
the fixing frames are fixedly arranged on the inner walls of the two sides of the base frame;
the two partition plates are fixedly arranged on the inner walls of the two sides of the fixed frame;
the adjusting motor is fixedly arranged on the inner wall of the bottom of the base frame;
the two threaded sleeves are slidably mounted on the inner walls of the two sides of the fixing frame, and one ends, far away from each other, of the two threaded sleeves extend out of the base frame;
the two adjusting screws are respectively installed in the two threaded sleeves in a threaded manner, and one ends of the two adjusting screws respectively penetrate through the two partition plates and are respectively in rotary connection with the two partition plates;
the two connecting plates are arranged on two sides of the base frame, and the outer walls of one sides of the two connecting plates are fixedly connected with one ends of the two threaded sleeves respectively;
the four avoidance grooves are respectively formed at the bottoms of the two connecting plates;
four adjusting cylinder, four adjusting cylinder is fixed mounting respectively four keep away on the top inner wall in groove.
2. The simple lifting trolley for the construction engineering as claimed in claim 1, wherein two wheels are rotatably mounted on the outer walls of two sides of the base frame, and four wheels are driven by a moving motor.
3. The simple trolley for construction engineering as claimed in claim 1, wherein a rotating shaft of the adjusting motor is fixedly sleeved with a first gear, one end of each of the two adjusting screws close to each other is fixedly sleeved with a second gear, and the first gear is engaged with the two second gears.
4. The simple lifting trolley for the construction engineering as claimed in claim 1, wherein support blocks are fixedly mounted on telescopic shafts of the four adjusting cylinders, and the bottom of each support block is spherical.
5. The simple lifting trolley for the building engineering as claimed in claim 1, wherein a counterweight is arranged on the top of the base frame, and a push rod is fixedly mounted on the top of the counterweight.
6. The simple lifting trolley for the building engineering as claimed in claim 5, wherein a placing frame is fixedly mounted on the top of the base frame, clamping plates are arranged on inner walls of two sides of the placing frame, clamping cylinders are fixedly mounted on outer walls of two sides of the placing frame, telescopic shafts of the two clamping cylinders extend into the placing frame, and the telescopic shafts of the two clamping cylinders are fixedly connected with an outer wall of one side, far away from the two clamping plates, of the two clamping cylinders.
7. The simple lifting trolley for the building engineering as claimed in claim 6, wherein the top of the placing frame and the outer wall of one side far away from the counterweight block are all provided with through holes.
CN202121408816.XU 2021-06-24 2021-06-24 Simple hoisting trolley for constructional engineering Active CN215042914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121408816.XU CN215042914U (en) 2021-06-24 2021-06-24 Simple hoisting trolley for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121408816.XU CN215042914U (en) 2021-06-24 2021-06-24 Simple hoisting trolley for constructional engineering

Publications (1)

Publication Number Publication Date
CN215042914U true CN215042914U (en) 2021-12-07

Family

ID=79201919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121408816.XU Active CN215042914U (en) 2021-06-24 2021-06-24 Simple hoisting trolley for constructional engineering

Country Status (1)

Country Link
CN (1) CN215042914U (en)

Similar Documents

Publication Publication Date Title
CN204802756U (en) There is balanced cable winding device of pole
CN207793894U (en) A kind of composite slide form surfacing device
CN112497132A (en) Mobile positioning auxiliary device for maintenance of electromechanical equipment
CN215042914U (en) Simple hoisting trolley for constructional engineering
CN212769476U (en) Electric hoist bridge crane
CN210973592U (en) Different-caliber corrugated pipe mixed hoisting and transporting device
CN212403160U (en) Assembled steel structure hoist device
CN106703509B (en) Suspension type fence hoisting equipment and hoisting method thereof
CN220412685U (en) Material overhead hoist is used in bridge construction
CN214780348U (en) Plate hoisting device for building construction
CN214365902U (en) Oil derrick auxiliary fixture
CN212893592U (en) Gallows is used in bridge construction
CN212740410U (en) Assembled building hoist device
CN211945883U (en) Assembled building structure subassembly convenient to transportation
CN113550554A (en) Guide rail type attached lifting accessory based on scaffold
BRPI1100106A2 (en) tower crane and method of assembly, disassembly and lift in elevator shaft
CN219708993U (en) Lifting frame for building precast slabs
CN213391127U (en) Adjustable fabricated building construction working frame
AU2008200290A1 (en) Panel handling apparatus and method for handling panels
CN210594980U (en) Quick detachable hoisting accessory based on building major structure
CN216915941U (en) High stability conveyer for building engineering
CN210505313U (en) Roller hoisting and grabbing equipment
CN212450211U (en) Material lifting machine for building engineering
CN213654241U (en) Building formwork module
CN215110920U (en) Municipal administration water supply and drainage pipeline optimizes laying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant