CN214999840U - Municipal administration rain sewage pipeline construction positioner - Google Patents

Municipal administration rain sewage pipeline construction positioner Download PDF

Info

Publication number
CN214999840U
CN214999840U CN202121168802.5U CN202121168802U CN214999840U CN 214999840 U CN214999840 U CN 214999840U CN 202121168802 U CN202121168802 U CN 202121168802U CN 214999840 U CN214999840 U CN 214999840U
Authority
CN
China
Prior art keywords
pipeline
locking
rod
sleeve
check lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121168802.5U
Other languages
Chinese (zh)
Inventor
吴涛
廖何兴
周游
邓国俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Aerospace Construction Engineering Co ltd
Original Assignee
Sichuan Aerospace Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Aerospace Construction Engineering Co ltd filed Critical Sichuan Aerospace Construction Engineering Co ltd
Priority to CN202121168802.5U priority Critical patent/CN214999840U/en
Application granted granted Critical
Publication of CN214999840U publication Critical patent/CN214999840U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a municipal administration rain sewage pipeline construction positioner belongs to municipal works's field, and it includes the pipeline support, be provided with fixed establishment on the pipeline support, fixed establishment is used for pipeline support and ground fixed connection, still be provided with locking mechanism on the pipeline support, locking mechanism is used for locking the pipeline. This application can improve the location effect to the pipeline.

Description

Municipal administration rain sewage pipeline construction positioner
Technical Field
The application relates to the field of municipal works, in particular to a municipal rainwater and sewage pipeline construction positioning device.
Background
With the continuous development of urbanization, the construction of rain and sewage pipe networks has made great progress as important municipal facilities. In municipal investment, the investment cost of the rain and sewage pipe network accounts for a considerable proportion, so that the rain and sewage pipe network is optimally designed, a large amount of investment cost can be reduced, and the optimal economic benefit can be obtained.
At present, rain sewage pipeline lays in the both sides of town road more, when laying the facility, often need utilize the pipeline support to carry out bed hedgehopping and fixed to reach whole steady effect to the pipeline.
To the correlation technique among the above-mentioned, the inventor thinks that common pipeline support is mostly ordinary design, can only play simple supporting role, and is relatively poor to the location effect of pipeline, leads to the pipeline skew to rock easily, and then has influenced the efficiency of construction.
SUMMERY OF THE UTILITY MODEL
In order to improve the location effect to the pipeline, this application provides a municipal administration rain sewage pipeline construction positioner.
The application provides a pair of municipal administration rain sewage pipeline construction positioner adopts following technical scheme:
the utility model provides a municipal administration rain sewage pipeline construction positioner, includes the pipeline support, be provided with fixed establishment on the pipeline support, fixed establishment is used for pipeline support and ground fixed connection, still be provided with locking mechanism on the pipeline support, locking mechanism is used for locking the pipeline.
Through adopting above-mentioned technical scheme, when laying the pipeline, utilize fixed establishment with pipeline support and ground fixed connection, recycle locking mechanism with pipeline locking on pipeline support to improve the location effect to the pipeline, reduced to a certain extent and place the condition emergence that the skew rocked when on pipeline support with the pipeline.
Optionally, a lifting assembly is further arranged on the pipeline support, and the lifting assembly is used for driving the locking mechanism to move up and down.
Through adopting above-mentioned technical scheme, utilize locking mechanism with the pipeline locking back, utilize lifting unit drive locking mechanism lift removal, can drive the pipeline in the locking mechanism and carry out lift removal to be convenient for adapt to different mounting height when the piping erection, improved the accommodation of device.
Optionally, the lifting assembly includes a sleeve, a moving cylinder, a threaded rod and a driving member, the sleeve is disposed on the pipeline support, the moving cylinder is movably inserted into one end of the sleeve, which is far away from the pipeline support, the locking mechanism is disposed at one end of the moving cylinder, which is far away from the sleeve, the threaded rod is rotatably disposed in the sleeve, the length direction of the threaded rod is the same as the length direction of the sleeve, the moving cylinder is threadedly sleeved on the threaded rod, and the driving member is used for driving the threaded rod to rotate; the limiting piece is used for preventing the movable cylinder from rotating circumferentially.
Through adopting above-mentioned technical scheme, when needs are adjusted, utilize driving piece drive threaded rod to rotate, because the locating part can prevent to move a section of thick bamboo and follow threaded rod circumferential direction, the threaded rod rotates and drives a section of thick bamboo that moves and reciprocate along telescopic length direction in the sleeve, and then can drive the pipeline in locking mechanism and the locking mechanism and reciprocate to be convenient for adjust according to the mounting height of pipeline.
Optionally, the driving piece includes first bevel gear, second bevel gear, dwang and rotation piece, the fixed cover of first bevel gear is established on the threaded rod, the dwang rotates and sets up on telescopic inner wall, the fixed cover of second bevel gear is established in the one end that the dwang is located the sleeve, first bevel gear meshes with second bevel gear mutually, it is used for driving the dwang rotation to rotate the piece.
Through adopting above-mentioned technical scheme, utilize and rotate a drive dwang and rotate, the dwang rotates and drives the second bevel gear on the dwang and rotate, because first bevel gear meshes with second bevel gear mutually, can drive first bevel gear and rotate to can drive the threaded rod with first bevel gear fixed connection and rotate, be convenient for adjust the mounting height of pipeline.
Optionally, the locating part includes spacing, the spacing groove has been seted up on the telescopic inner wall, and the length direction of spacing groove is the same with the length direction of screw rod, spacing is fixed to be set up on the outer wall of a removal section of thick bamboo, spacing and spacing groove looks adaptation, spacing passes through the spacing groove and removes the setting in the sleeve.
By adopting the technical scheme, the limiting effect of the limiting groove on the limiting strip is utilized, so that the limiting strip and the movable barrel fixedly connected with the limiting strip can not rotate circumferentially, and the stability of the movable barrel during movement is improved.
Optionally, the locking mechanism comprises a first locking rod, a second locking rod and a fixing piece, the first locking rod is fixedly connected to one end, away from the pipeline support, of the movable cylinder, the second locking rod is connected and arranged on the first locking rod, a locking cavity used for placing a pipeline is formed between the first locking rod and the second locking rod, the inner wall of the locking cavity is used for being attached to the outer wall of the pipeline, and the fixing piece is used for fixedly connecting the first locking rod and the second locking rod.
Through adopting above-mentioned technical scheme, place the pipeline in the locking intracavity that forms between first check lock lever and second check lock lever, make the inner wall in locking chamber laminate mutually with the outer wall of pipeline, recycle the mounting with first check lock lever and second check lock lever fixed connection, can accomplish the locking to the pipeline to the condition of skew has been reduced to the pipeline.
Optionally, the fixing piece includes a bolt and a nut, mounting holes are formed in both ends of the first locking rod and the second locking rod, and the bolt is in threaded fit with the nut after penetrating through the mounting holes.
By adopting the technical scheme, after the pipeline is locked, the first locking rod and the second locking rod are fixedly connected by utilizing the threaded fit of the bolt and the nut after penetrating through the mounting hole, so that the stability in locking and positioning is improved; when the pipeline needs to be taken out, the bolt is separated from the nut, and the first locking rod and the second locking rod can be detached.
Optionally, a propping piece is further arranged in the locking cavity and used for propping the pipeline tightly.
Through adopting above-mentioned technical scheme, utilize to support the tight piece and support tightly to the pipeline in the locking cavity to further improve locking effect.
Optionally, the abutting piece comprises a spring and an abutting plate, one end of the spring is arranged on one side, close to the second locking rod, of the first locking rod, the abutting plate is arranged at the other end of the spring, and the spring enables the abutting plate to always have a trend of moving towards the second locking rod.
Through adopting above-mentioned technical scheme, when the pipeline was placed in the locking intracavity, the pipeline extrusion was supported tight board and is made the spring compression, and the spring atress can reverse application of force for supporting tight board to make and support tight board and support tightly the pipeline, further improved the stability when locking the pipeline.
Optionally, the fixing mechanism comprises a plurality of fixed inserted bars, the fixed inserted bars are arranged on the pipeline support in a penetrating mode through threads, and one end, penetrating through the pipeline support, of each fixed inserted bar is used for being matched with the ground in an inserting mode.
Through adopting above-mentioned technical scheme, place the pipe support subaerial, insert ground through rotating a plurality of fixed inserted bars, can accomplish the fixed connection on pipe support and ground to stability when the pipe support uses has been improved.
In summary, the present application includes at least one of the following beneficial technical effects:
when the pipeline is laid, the pipeline support is fixedly connected with the ground by using the fixing mechanism, and the pipeline is locked on the pipeline support by using the locking mechanism, so that the positioning effect of the pipeline is improved, and the condition of offset and shaking when the pipeline is placed on the pipeline support is reduced to a certain extent;
after the pipeline is locked by the locking mechanism, the lifting assembly is used for driving the locking mechanism to move up and down, so that the pipeline in the locking mechanism can be driven to move up and down, the pipeline can be conveniently adapted to different installation heights during pipeline installation, and the application range of the device is improved;
when the pipeline was placed in the locking intracavity, the pipeline extrusion was supported tight board and is made the spring compression, and the spring atress can reverse application of force for supporting tight board to make and support tight board and support tightly the pipeline, stability when further having improved the pipeline and locking.
Drawings
Fig. 1 is a schematic structural diagram of a municipal rainwater and sewage pipeline construction positioning device according to an embodiment of the application.
Fig. 2 is a schematic partial cross-sectional view of a municipal storm sewage pipe construction positioning apparatus of an embodiment of the application, showing a lifting assembly.
Fig. 3 is a partial exploded view of a municipal storm sewage pipeline construction positioning device, aiming at a locking mechanism, according to an embodiment of the application.
Description of reference numerals: 1. a pipeline support; 2. fixing the inserted rod; 3. a locking mechanism; 31. a first locking lever; 32. a second locking lever; 33. a fixing member; 331. a bolt; 332. a nut; 4. a lifting assembly; 41. a sleeve; 411. a limiting groove; 42. moving the drum; 43. a threaded rod; 44. a drive member; 441. a first bevel gear; 442. a second bevel gear; 443. rotating the rod; 444. rotating the handle; 5. a rolling bearing; 6. a limiting strip; 7. a locking cavity; 8. mounting holes; 9. an abutting piece; 91. a spring; 92. and tightly abutting against the plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses municipal administration rain sewage pipeline construction positioner. Referring to fig. 1, a municipal administration rain sewage pipeline construction positioner includes pipeline support 1, and pipeline support 1 is the cuboid, is provided with fixed establishment, locking mechanism 3 and lifting unit 4 on the pipeline support 1, and fixed establishment is used for pipeline support 1 and ground fixed connection, and locking mechanism 3 is used for locking the pipeline, and lifting unit 4 is used for driving 3 lifting movements of locking mechanism.
As an embodiment of the fixing mechanism, referring to fig. 1, the fixing mechanism includes four fixing insertion rods 2, the four fixing insertion rods 2 are all threaded through the pipeline support 1, the fixing insertion rods 2 penetrate through one end of the pipeline support 1 for being in insertion fit with the ground, and the bottom ends of the fixing insertion rods 2 can be arranged in a taper shape, so that the stress area is reduced, and the fixing insertion rods are convenient to insert into the ground; the pipeline support 1 is placed on the ground, and the four fixed insertion rods 2 are inserted into the ground in a rotating mode, so that the pipeline support 1 can be fixedly connected with the ground, and the stability of the pipeline support 1 in use is improved; in addition, as an implementation mode of the fixed inserting rods 2, the fixed inserting rods 2 can be set to other numbers, and the number of the fixed inserting rods 2 can be adjusted according to actual conditions, namely, the effect of fixedly connecting the pipeline support 1 with the ground can be achieved.
As an embodiment of the lifting assembly 4, referring to fig. 1 and 2, the lifting assembly 4 includes a sleeve 41, a moving cylinder 42, a threaded rod 43 and a driving member 44, the sleeve 41 is a cylinder, the sleeve 41 is welded on the top of the pipeline support 1, the moving cylinder 42 is a cylinder, the moving cylinder 42 is movably inserted on the top of the sleeve 41, the threaded rod 43 is rotatably disposed in the sleeve 41 through a rolling bearing 5, the length direction of the threaded rod 43 is the same as the length direction of the sleeve 41, the moving cylinder 42 is threadedly sleeved on the threaded rod 43, and the driving member 44 is used for driving the threaded rod 43 to rotate; a limiting member is further included for preventing the movable barrel 42 from rotating circumferentially.
Referring to fig. 2, as an embodiment of the driving member 44, the driving member 44 includes a first bevel gear 441, a second bevel gear 442, a rotating rod 443, and a rotating member, the first bevel gear 441 is fixedly secured to the threaded rod 43, the rotating rod 443 is rotatably secured to the inner wall of the sleeve 41, the second bevel gear 442 is fixedly secured to an end of the rotating rod 443 located inside the sleeve 41, the first bevel gear 441 is engaged with the second bevel gear 442, and the rotating member is configured to drive the rotating rod 443 to rotate.
Referring to fig. 2, the rotation member is a rotation handle 444, the rotation handle 444 is welded to an end of the rotation rod 443 extending out of the sleeve 41, and a worker rotates the rotation handle 444 to rotate the rotation rod 443.
In addition, as another embodiment of the rotating member, the rotating member may also be configured as a motor, when the rotating member is configured as a motor, the motor is fixedly disposed on the sleeve 41, an output shaft of the motor is coaxially disposed on the rotating rod 443 through a coupling, and the rotating rod 443 can be driven to rotate by starting the motor.
As an embodiment of the limiting member, referring to fig. 2, the limiting member is a limiting strip 6, a limiting groove 411 is formed in an inner wall of the sleeve 41, a length direction of the limiting groove 411 is the same as a length direction of the threaded rod 43, the limiting strip 6 is welded on an outer wall of the moving cylinder 42, the limiting strip 6 is matched with the limiting groove 411, and the limiting strip 6 is movably disposed in the sleeve 41 through the limiting groove 411.
As an embodiment of the limiting strip 6, referring to fig. 2, the limiting strip 6 is a T-shaped strip, and correspondingly, the limiting groove 411 is a T-shaped groove, and the limiting effect of the limiting groove 411 on the limiting strip 6 is utilized to prevent the limiting strip 6 and the moving cylinder 42 fixedly connected with the limiting strip 6 from rotating circumferentially, so that the stability of the moving cylinder 42 during moving is improved; in addition, the cross-sectional shape of the limiting strip 6 can also be set to other shapes, such as a rectangle, a dovetail shape, etc., that is, the effect of preventing the moving cylinder 42 from rotating circumferentially can be achieved.
As an implementation manner of the locking mechanism 3, referring to fig. 1 and fig. 3, the locking mechanism 3 includes a first locking lever 31, a second locking lever 32 and a fixing member 33, the first locking lever 31 is composed of an arc-shaped lever and straight levers integrally arranged at two ends of the arc-shaped lever, the cross-sectional shape of the arc-shaped lever is semicircular, the second locking lever 32 is completely the same as the first locking lever 31, the first locking lever 31 is welded at one end of the movable cylinder 42 away from the pipeline support 1, the second locking lever 32 is connected and arranged on the first locking lever 31, a locking cavity 7 for placing a pipeline is formed between the arc-shaped lever of the first locking lever 31 and the arc-shaped lever of the second locking lever 32, the inner wall of the locking cavity 7 is used for being attached to the outer wall of the pipeline, the straight lever of the first locking lever 31 is attached to the straight lever of the second locking lever 32, and the fixing member 33 is used for fixedly connecting the first locking lever 31 and the second locking lever 32.
As an embodiment of the fixing member 33, referring to fig. 3, two fixing members 33 are provided, each fixing member 33 includes a bolt 331 and a nut 332, the straight bars at the two ends of the first locking rod 31 and the straight bars at the two ends of the second locking rod 32 are both provided with mounting holes 8, the bolt 331 is threaded through the mounting holes 8 and then is in threaded fit with the nut 332, so as to fixedly connect the straight bars of the first locking rod 31 and the straight bars of the second locking rod 32.
Referring to fig. 3, a propping member 9 is further arranged in the locking cavity 7, and the propping member 9 is used for propping the pipeline tightly; as an embodiment of the abutting member 9, the abutting member 9 is disposed on the first locking rod 31, the abutting member 9 includes a spring 91 and an abutting plate 92, the abutting plate 92 is disposed as an arc-shaped plate, one end of the spring 91 is welded on the inner wall of the arc-shaped rod of the first locking rod 31, the abutting plate 92 is welded on the other end of the spring 91, and the spring 91 makes the abutting plate 92 always have a tendency to move toward the second locking rod 32; as an embodiment of the springs 91, three springs 91 are provided, and the springs 91 may be provided in other numbers, that is, the effect of tightly pressing the pipe by the pressing plate 92 may be achieved.
In addition, the fastening pieces 9 can be arranged on the second locking rod 32, and the number of the fastening pieces 9 can be one or more, namely, the effect of fastening the pipeline can be achieved.
In the above embodiment, when the pipeline is placed in the locking cavity 7, the pipeline extrudes the abutting plate 92 to compress the spring 91, and the stress of the spring 91 can reversely apply force to the abutting plate 92, so that the abutting plate 92 abuts against the pipeline, and the stability of the pipeline when being locked is further improved.
The implementation principle of the municipal administration rain sewage pipeline construction positioner of this application embodiment is: when laying the pipeline, steadily place pipeline support 1 in the position that needs the installation earlier, utilize fixed inserted bar 2 with pipeline support 1 and ground fixed connection, place the pipeline in locking chamber 7 again, utilize the tight board 92 of supporting in the locking chamber 7 to support tightly to the pipeline, cooperation through bolt 331 and nut 332 with first check lock lever 31 and second check lock lever 32 fixed connection, can accomplish the locking to the pipeline to the condition that the skew was rocked to the pipeline has been reduced.
When the mounting height of pipeline needs to be adjusted, the staff rotates the turning handle 444, drive the dwang 443 to rotate, the dwang 443 rotates and drives the second bevel gear 442 on the dwang 443 to rotate, because first bevel gear 441 meshes with second bevel gear 442, can drive first bevel gear 441 to rotate, and then can drive the threaded rod 43 with first bevel gear 441 fixed connection to rotate, because spacing groove 411 is to spacing effect of spacing strip 6, make the movable cylinder 42 can't follow threaded rod 43 circumferential direction and rotate, threaded rod 43 rotates and drives movable cylinder 42 and reciprocate along the length direction of sleeve 41 in sleeve 41, and then can drive first check lock lever 31 and second check lock lever 32 and reciprocate, thereby be convenient for adjust according to the mounting height of pipeline, positioner's accommodation has been improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a municipal administration rain sewage pipeline construction positioner which characterized in that: including pipeline support (1), be provided with fixed establishment on pipeline support (1), fixed establishment is used for pipeline support (1) and ground fixed connection, still be provided with locking mechanism (3) on pipeline support (1), locking mechanism (3) are used for locking the pipeline.
2. The municipal rainwater and sewage pipeline construction positioning device of claim 1, wherein: the pipeline support (1) is further provided with a lifting assembly (4), and the lifting assembly (4) is used for driving the locking mechanism (3) to move up and down.
3. The municipal rainwater and sewage pipeline construction positioning device of claim 2, wherein: the lifting assembly (4) comprises a sleeve (41), a moving barrel (42), a threaded rod (43) and a driving piece (44), the sleeve (41) is arranged on the pipeline support (1), the moving barrel (42) is movably inserted into one end, far away from the pipeline support (1), of the sleeve (41), the locking mechanism (3) is arranged at one end, far away from the sleeve (41), of the moving barrel (42), the threaded rod (43) is rotatably arranged in the sleeve (41), the length direction of the threaded rod (43) is the same as that of the sleeve (41), the moving barrel (42) is sleeved on the threaded rod (43), and the driving piece (44) is used for driving the threaded rod (43) to rotate; the device also comprises a limiting piece which is used for preventing the moving cylinder (42) from rotating in the circumferential direction.
4. The municipal rainwater and sewage pipeline construction positioning device of claim 3, wherein: the driving piece (44) comprises a first bevel gear (441), a second bevel gear (442), a rotating rod (443) and a rotating piece, wherein the first bevel gear (441) is fixedly sleeved on the threaded rod (43), the rotating rod (443) is rotatably arranged on the inner wall of the sleeve (41), the second bevel gear (442) is fixedly sleeved at one end of the rotating rod (443) located in the sleeve (41), the first bevel gear (441) is meshed with the second bevel gear (442), and the rotating piece is used for driving the rotating rod (443) to rotate.
5. The municipal rainwater and sewage pipeline construction positioning device of claim 4, wherein: the locating part includes spacing (6), spacing groove (411) have been seted up on the inner wall of sleeve (41), and the length direction of spacing groove (411) is the same with the length direction of threaded rod (43), spacing (6) are fixed to be set up on the outer wall of a removal section of thick bamboo (42), spacing (6) and spacing groove (411) looks adaptation, spacing (6) are removed through spacing groove (411) and are set up in sleeve (41).
6. The municipal rainwater and sewage pipeline construction positioning device of claim 3, wherein: locking mechanism (3) include first check lock pole (31), second check lock pole (32) and mounting (33), first check lock pole (31) fixed connection is in the one end of pipeline support (1) is kept away from in a removal section of thick bamboo (42), second check lock pole (32) are connected and are set up on first check lock pole (31), form between first check lock pole (31) and second check lock pole (32) and be used for placing locking chamber (7) of pipeline, the inner wall in locking chamber (7) is used for laminating mutually with the outer wall of pipeline, mounting (33) be used for with first check lock pole (31) and second check lock pole (32) fixed connection.
7. The municipal rainwater and sewage pipeline construction positioning device of claim 6, wherein: the fixing piece (33) comprises a bolt (331) and a nut (332), mounting holes (8) are formed in two ends of the first locking rod (31) and the second locking rod (32), and the bolt (331) penetrates through the mounting holes (8) and then is in threaded fit with the nut (332).
8. The municipal rainwater and sewage pipeline construction positioning device of claim 6, wherein: the locking device is characterized in that a supporting piece (9) is further arranged in the locking cavity (7), and the supporting piece (9) is used for supporting the pipeline tightly.
9. The municipal rainwater and sewage pipeline construction positioning device of claim 8, wherein: the abutting piece (9) comprises a spring (91) and an abutting plate (92), one end of the spring (91) is arranged on one side, close to the second locking rod (32), of the first locking rod (31), the abutting plate (92) is arranged at the other end of the spring (91), and the spring (91) enables the abutting plate (92) to always have the trend of moving towards the direction of the second locking rod (32).
10. The municipal storm sewer locating device of any one of claims 1 to 9, wherein: the fixing mechanism comprises a plurality of fixed insertion rods (2) which are arranged on the pipeline support (1) in a penetrating mode through threads, and one end, penetrating through the pipeline support (1), of each fixed insertion rod (2) is used for being matched with the ground in an inserting mode.
CN202121168802.5U 2021-05-27 2021-05-27 Municipal administration rain sewage pipeline construction positioner Active CN214999840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121168802.5U CN214999840U (en) 2021-05-27 2021-05-27 Municipal administration rain sewage pipeline construction positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121168802.5U CN214999840U (en) 2021-05-27 2021-05-27 Municipal administration rain sewage pipeline construction positioner

Publications (1)

Publication Number Publication Date
CN214999840U true CN214999840U (en) 2021-12-03

Family

ID=79088102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121168802.5U Active CN214999840U (en) 2021-05-27 2021-05-27 Municipal administration rain sewage pipeline construction positioner

Country Status (1)

Country Link
CN (1) CN214999840U (en)

Similar Documents

Publication Publication Date Title
CN110847620B (en) Assembled wall body temporary connection fixed equipment
CN214999840U (en) Municipal administration rain sewage pipeline construction positioner
CN201661828U (en) Portable retractable supporting device
CN214220517U (en) Fine adjustment device for PC building wallboard
CN207597398U (en) Foundation pit supporting construction
CN111196582A (en) Building template erecting machine
CN212376322U (en) A consolidate bearing structure for building engineering
CN216227047U (en) Quick positioning and punching tool for secondary water supply equipment base
CN214783978U (en) Large-scale deep basal pit supporting construction
CN215483003U (en) Municipal administration drainage pipeline hole groove supporting construction
CN210704655U (en) Ceiling intelligence house mounting plate
CN212360366U (en) Cylinder convenient to installation and dismantlement
CN219862851U (en) Supporting mechanism for interior of municipal pipeline foundation pit
CN219622243U (en) Building structure consolidates connecting device
CN112900913A (en) Auxiliary reinforcing device for building wall
CN203462788U (en) Synchronizing mechanism for self-elevating platform of stereo garage
CN212129185U (en) Cofferdam reinforced structure for water conservancy construction
CN216194667U (en) Construction device for pile foundation engineering
CN217177695U (en) Town and country planning is with rain sewage pipeline laying fixable anchor clamps
CN215373017U (en) Coaxial honeycomb shallow geothermal energy buried pipe
CN216715421U (en) Water supply and drainage pipeline strutting arrangement for building engineering
CN217170257U (en) PVC pipe production is with beating mark device
CN113944191B (en) Adjustable equipment horizontal arm rod for construction based on pipe well and adjusting method thereof
CN212775944U (en) Municipal pipeline lays fixing device
CN210316611U (en) Connecting device is consolidated in construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant