CN214995703U - Boom punching and mounting integrated machine - Google Patents

Boom punching and mounting integrated machine Download PDF

Info

Publication number
CN214995703U
CN214995703U CN202121426820.9U CN202121426820U CN214995703U CN 214995703 U CN214995703 U CN 214995703U CN 202121426820 U CN202121426820 U CN 202121426820U CN 214995703 U CN214995703 U CN 214995703U
Authority
CN
China
Prior art keywords
fixedly connected
machine
electric push
suspender
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121426820.9U
Other languages
Chinese (zh)
Inventor
陈彬
李琼
李元可
李冠军
焦道伟
赵辰
刘东超
张嘉琦
田昊
许长志
高建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou University of Technology
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
Lanzhou University of Technology
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University of Technology, China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical Lanzhou University of Technology
Priority to CN202121426820.9U priority Critical patent/CN214995703U/en
Application granted granted Critical
Publication of CN214995703U publication Critical patent/CN214995703U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a jib installation all-in-one that punches, including the movable plate, electric putter of the anterior fixedly connected with in upper end of movable plate, electric putter's output fixedly connected with rotating electrical machines, rotating electrical machines's output fixedly connected with slewing mechanism, the last swing joint of slewing mechanism has jib fixed establishment, can place in the jib fixed establishment and wait to adorn the jib, the last swing joint that alternates of jib fixed establishment has the bolt, electric putter No. two of upper end rear portion fixedly connected with of movable plate, No. two electric putter is provided with threely, fixedly connected with coupling mechanism alternates jointly for three electric putter's output No. two, coupling mechanism's upper end fixedly connected with puncher, coupling mechanism's anterior and jib fixed establishment swing joint. The utility model provides an all-in-one collects and punches, installs in integrative machinery, need not the operation workman and ascends a height the operation, and the infrared ray location construction, the degree of accuracy is high.

Description

Boom punching and mounting integrated machine
Technical Field
The utility model relates to an electromechanical erection equipment technical field, in particular to jib installation all-in-one that punches.
Background
In the building engineering, a large number of suspenders are installed in an electromechanical mode, and before a keel is installed, the clear height of a room, the elevation of a hole and the elevations of a suspended ceiling pipeline, equipment and a support of the equipment are subjected to handover inspection according to design requirements. The wooden hanger rods, wooden keels and wooden veneer of the ceiling project must be fire-proof and should meet the regulations of the relevant design fire-proof specifications. The embedded parts, the steel bar suspender and the profile steel suspender in the ceiling engineering are subjected to rust prevention treatment.
At present, the lifting rod needs to be manually climbed to punch and install the movable scaffold one by one in the installation and construction process, so that time and labor are wasted. Moreover, the operation error of workers is large, the hanger rods are often not straight or have different lengths after installation, and the installation quality is poor.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides the jib installation all-in-one that punches, when can effectively solving the jib installation of present stage, construction difficulty, error are many, waste time and energy, technical problem such as cost uncontrollable.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the boom punching and mounting integrated machine comprises a moving plate 1, wherein the front part of the upper end of the moving plate 1 is fixedly connected with a first electric push rod 2, the output end of the first electric push rod 2 is fixedly connected with a rotating motor 4, the output end of the rotating motor 4 is fixedly connected with a rotating mechanism 5, the rotating mechanism 5 is movably connected with a boom fixing mechanism 7, a boom 10 to be mounted is arranged in the boom fixing mechanism 7, a bolt 8 is inserted and movably connected on the boom fixing mechanism 7, the rear part of the upper end of the moving plate 1 is fixedly connected with a second electric push rod 3, the second electric push rod 3 is provided with three, the output ends of the three second electric push rods 3 are inserted and fixedly connected with a connecting mechanism 6, the upper end of the connecting mechanism 6 is fixedly connected with a punching machine 9, the front part of the connecting mechanism 6 is movably connected with the boom fixing mechanism 7, and the left part of the upper end of the moving plate 1 is fixedly connected with a pull rod 11, an operation panel 12 is fixedly connected to the front part of the left end of the pull rod 11, and moving wheels 13 are fixedly connected to the four corners of the lower end of the moving plate 1.
Further, slewing mechanism 5 includes carousel 51, and carousel 51's upper end fixedly connected with connecting seat 52, and connecting seat 52 is provided with two, alternates swing joint jointly on two connecting seats 52 and has fastening bolt 53, and fastening bolt 53 and connecting seat 52's junction swing joint have an extrusion cover 54, carousel 51's lower extreme and rotating electrical machines 4's output fixed connection.
Further, the width of the pressing sleeve 54 is greater than that of the coupling seat 52.
Furthermore, three electric push rods 3 enclose a combined equilateral triangle, and the punching machine 9 is arranged at the geometric center of the equilateral triangle.
Further, coupling mechanism 6 is including connecting the platform 61, connecting groove 62 has been seted up to the front portion of connecting platform 61, movable groove 63 has all been seted up on the left internal face of connecting groove 62 and on the right internal face, the equal fixedly connected with spring 64 in bottom of two movable grooves 63, the one end that movable groove 63 bottom was kept away from to two spring 64 all is fixed with buckle 65, connect platform 61 upper end and the lower extreme fixed connection of puncher 9, the left part and the right part of connecting platform 61 all alternate fixed connection with No. two electric putter 3's output.
Further, the boom fixing mechanism 7 includes a fixed cylinder 71, a lower end of the fixed cylinder 71 is fixedly connected with a rotating sleeve 72, an inner hexagonal fastening device 73 is nested at the upper end of the fixed cylinder 71, and an insertion hole 74 is formed in the outer surface of the fixed cylinder 71.
Further, the lower part of the to-be-assembled hanging rod 10 is connected with the fixed cylinder 71 through the inner hexagonal fastening device 73, the plug pin 8 is inserted and movably connected into the insertion hole 74, the rotating sleeve 72 is connected with the connecting seat 52 through the fastening bolt 53 and the extrusion sleeve 54, and the fixed cylinder 71 is movably arranged in the connecting groove 62.
Further, the operation panel 12 is electrically connected to the first electric push rod 2, the second electric push rod 3, the rotating motor 4 and the punch 9.
Further, the movable wheels 13 are steerable wheels.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model provides a jib installation all-in-one that punches controls an electric putter, No. two electric putter, rotating electrical machines and puncher operation respectively through operating panel, carries out the operation of driling in proper order and will wait to adorn jib and the installation operation that the hole fixed connection that has bored is in the same place, need not adopt the manual work to climb up and remove the scaffold frame and punch, install labour saving and time saving one by one.
2. The utility model provides a jib installation all-in-one that punches, this jib installation all-in-one that punches's four sides all have with the absolute parallel mark line of hole puncher drill bit, during the construction, as long as with laying out the infrared ray alignment mark line, can show that the drill bit is perpendicular and with the front and back position of punching on a straight line, the installation accuracy is high, can not lead to the jib not directly or differ in size, installation quality is good.
3, the utility model provides a jib installation all-in-one that punches, when the design, there is the gyro wheel of taking fixed brake bottommost, and it is convenient to remove, and is fixed convenient during the construction.
4, the utility model provides a jib installation all-in-one that punches, motor operating button such as all jacking, rotation are in push rod one side, convenient operation.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
FIG. 1 is a schematic view of the overall structure of the boom drilling and mounting integrated machine of the present invention;
fig. 2 is a schematic view of the overall structure of the rotating mechanism of the boom drilling and mounting integrated machine of the present invention;
fig. 3 is a schematic view of the overall structure of the connecting mechanism of the boom drilling and mounting integrated machine of the present invention;
fig. 4 is a schematic view of the overall structure of the boom fixing mechanism of the boom drilling and mounting integrated machine of the present invention;
FIG. 5 is a top view of the coupling mechanism;
FIG. 6 is a schematic view of the entire structure of embodiment 2.
In the figure: 1-moving plate, 2-first electric push rod, 3-second electric push rod, 4-rotating motor, 5-rotating mechanism, 51-rotating disc, 52-connecting seat, 53-fastening bolt, 54-extruding sleeve,
6-connecting mechanism, 61-connecting table, 62-connecting groove, 63-movable groove, 64-spring, 65-fastener,
7-a suspender fixing mechanism, 71-a fixing cylinder, 72-a rotating sleeve, 73-an inner hexagonal fastening device, 74-an insertion hole,
8-bolt, 9-perforating machine, 10-to-be-assembled hanging rod, 11-pull rod, 12-operation panel and 13-moving wheel.
Detailed Description
The technical solutions of the present invention are described in detail below by way of examples, which are only exemplary and can be used only for explaining and explaining the technical solutions of the present invention, but not for explaining the limitations of the technical solutions of the present invention.
Example 1
As shown in fig. 1 and 5, the integrated suspender punching and installing machine comprises a movable plate 1, wherein a first electric push rod 2 is fixedly connected to the front part of the upper end of the movable plate 1, an output end of the first electric push rod 2 is fixedly connected with a rotating motor 4, an output end of the rotating motor 4 is fixedly connected with a rotating mechanism 5, a suspender fixing mechanism 7 is movably connected to the rotating mechanism 5, a to-be-installed suspender 10 is arranged in the suspender fixing mechanism 7, a bolt 8 is inserted and movably connected to the suspender fixing mechanism 7, a second electric push rod 3 is fixedly connected to the rear part of the upper end of the movable plate 1, three second electric push rods 3 are arranged, three output ends of the second electric push rods 3 are inserted and fixedly connected with a connecting mechanism 6, a puncher 9 is fixedly connected to the upper end of the connecting mechanism 6, the front part of the connecting mechanism 6 is movably connected with the suspender fixing mechanism 7, and a pull rod 11 is fixedly connected to the left part of the upper end of the movable plate 1, an operation panel 12 is fixedly connected to the front part of the left end of the pull rod 11, and moving wheels 13 are fixedly connected to the four corners of the lower end of the moving plate 1. The movable wheels 13 can be universal wheels capable of being braked, and are convenient to move and fix during construction.
Operation panel 12 and electric putter 2, No. two electric putter 3, rotating electrical machines 4 and the equal electric connection of puncher 9 can facilitate the operation and use, and wherein, puncher 9 can replace the drill bit diameter according to the engineering needs.
The three electric push rods 3 form an equilateral triangle in a surrounding mode, and the punching machine 9 is arranged at the geometric center of the equilateral triangle.
As shown in fig. 2, the rotating mechanism 5 includes a rotating disc 51, the upper end of the rotating disc 51 is fixedly connected with two connecting seats 52, two connecting seats 52 are provided, two connecting seats 52 are jointly inserted and movably connected with a fastening bolt 53, the joint of the fastening bolt 53 and the connecting seat 52 is movably connected with an extrusion sleeve 54, and the lower end of the rotating disc 51 is fixedly connected with the output end of the rotating motor 4. The pressing sleeve 54 has a width greater than that of the coupling seat 52. The rotating mechanism 5 is driven by the rotating motor 4 to drive the to-be-mounted suspender 10 installed in the fixed cylinder 71 to rotate, so that the to-be-mounted suspender 10 is connected with the drilled installation hole, and the installation operation of the to-be-mounted suspender 10 is facilitated.
As shown in fig. 3, coupling mechanism 6 includes connecting table 61, connecting groove 62 has been seted up to the front portion of connecting table 61, movable groove 63 has all been seted up on the left internal wall face of connecting groove 62 and on the right internal wall face, the equal fixedly connected with spring 64 in bottom of two movable grooves 63, the one end that movable groove 63 bottom was kept away from to two spring 64 all is fixed with buckle 65, the lower extreme fixed connection of connecting table 61 upper end and puncher 9, the left part and the right part of connecting table 61 all alternate fixed connection with No. two electric putter 3's output, can play the effect of installation lift puncher 9, make things convenient for drilling operation.
As shown in fig. 4, the boom fixing mechanism 7 includes a fixed cylinder 71, a rotating sleeve 72 is fixedly connected to a lower end of the fixed cylinder 71, an inner hexagonal fastening device 73 is nested at an upper end of the fixed cylinder 71, and an insertion hole 74 is formed in an outer surface of the fixed cylinder 71.
The lower part of the hanger rod 10 to be assembled is connected with the fixed cylinder 71 through the inner hexagonal fastening device 73, the plug pin 8 is inserted into the insertion hole 74 in a movable mode, the position of the plug pin 8 can be adjusted according to the length of the hanger rod 10 to be assembled, and therefore the effect of limiting the length of the hanger rod 10 to be assembled is achieved. The rotating sleeve 72 is connected with the connecting seat 52 through the fastening bolt 53 and the extrusion sleeve 54, and the fixed cylinder 71 is movably arranged in the connecting groove 62, so that the erected fixed cylinder 71 can be clamped under the condition that the rotation of the fixed cylinder 71 is not influenced, and the installation of the suspension rod 10 to be installed is facilitated.
The construction method of the integrated drilling and installing machine for the suspender comprises the following specific steps:
step one, according to the installation requirement of a construction site, assembling a drill bit with a matched specification on a perforating machine 9, assembling a matched suspender fixing mechanism 7, debugging a rotating mechanism 5 and a connecting mechanism 6; pushing the assembled all-in-one machine to a site to be constructed;
aligning the lofting infrared rays to a marking line on the connecting mechanism 6, and enabling the two vertical lofting infrared rays and the marking line to be superposed, so that the drill bit can be vertically and accurately positioned, and fixing the movable wheel 13;
step three, starting the three electric push rods 3, enabling the push rods to ascend synchronously, enabling the perforating machine 9 to start working synchronously, and controlling the hole depth according to the installation requirement of the suspender; after the punching is finished, the three electric push rods 3 fall back, the braking of the moving wheels 13 is released, the integrated machine is moved forwards, the suspender fixing mechanism 7 is aligned to the punched holes, and the moving wheels 13 are fixed again;
step four, the suspender fixing mechanism 7 is laid flat, the suspender with the expansion bolt is placed in the rod fixing mechanism 7, the suspender is controlled by the bolt 8, and sufficient supporting force is provided;
step five, erecting the suspender fixing mechanism 7 and clamping the suspender fixing mechanism into the connecting groove 62, starting the first electric push rod 2, and completely jacking the expansion bolts on the suspender into the drilled holes;
step six, starting the rotating mechanism 5, synchronously rotating screws on the suspender by utilizing the inner hexagonal fastening device of the suspender fixing mechanism 7, and fixing the suspender on the top plate;
and seventhly, falling the first electric push rod 2, separating the installed suspension rod from the suspension rod fixing mechanism 7, releasing the brake of the movable wheel 13, pushing the integrated machine to the next construction point, and performing line production.
It should be noted that the utility model discloses a jib installation all-in-one that punches, all there is the mark line absolutely parallel with the hole puncher drill bit on all-in-one four sides.
During construction, the lofting infrared ray is aligned with a marking line, that is, the drill bit is vertical and is in a straight line with the front and back punching positions, then the first electric push rod 2, the second electric push rod 3, the rotating motor 4 and the punching machine 9 are respectively controlled through the operation panel 12 to operate, the second electric push rod 3 is lifted up to lift up the punching machine 9 to enable the punching machine 9 to perform drilling operation, the first electric push rod 2 is lifted up to lift up the to-be-installed suspender 10 to enable the to-be-installed suspender 10 to be aligned with a drilled hole, then the rotating motor 4 and the first electric push rod 2 are simultaneously controlled to enable the to-be-installed suspender 10 to be fixedly connected with the drilled hole, and installation of the to-be-installed suspender 10 is completed.
Embodiment 2, a boom drilling and installing integrated machine is different from embodiment 1 in that the relative positional relationship between a moving plate 1, a pull rod 11 and an upper boom 10 to be installed is changed. The operation is smoother and the use is more convenient. As shown in fig. 6.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.

Claims (9)

1. Jib installation all-in-one that punches, including movable plate (1), its characterized in that: the front part of the upper end of the movable plate (1) is fixedly connected with a first electric push rod (2), the output end of the first electric push rod (2) is fixedly connected with a rotating motor (4), the output end of the rotating motor (4) is fixedly connected with a rotating mechanism (5), the rotating mechanism (5) is movably connected with a suspender fixing mechanism (7), a suspender (10) to be assembled is arranged in the suspender fixing mechanism (7), a bolt (8) is inserted and movably connected on the suspender fixing mechanism (7), the rear part of the upper end of the movable plate (1) is fixedly connected with a second electric push rod (3), three second electric push rods (3) are arranged, the output ends of the three second electric push rods (3) are inserted and fixedly connected with a connecting mechanism (6) together, the upper end of the connecting mechanism (6) is fixedly connected with a perforating machine (9), and the front part of the connecting mechanism (6) is movably connected with the suspender fixing mechanism (7), the left part of the upper end of the moving plate (1) is fixedly connected with a pull rod (11), the front part of the left end of the pull rod (11) is fixedly connected with an operation panel (12), and the four corners of the lower end of the moving plate (1) are fixedly connected with moving wheels (13).
2. The boom drilling and installing all-in-one machine of claim 1, wherein: slewing mechanism (5) are including carousel (51), upper end fixedly connected with connecting seat (52) of carousel (51), and connecting seat (52) are provided with two, alternate swing joint jointly on two connecting seats (52) and have fastening bolt (53), and fastening bolt (53) and the junction swing joint of connecting seat (52) have extrusion cover (54), the lower extreme of carousel (51) and the output fixed connection of rotating electrical machines (4).
3. The boom drilling and installing all-in-one machine of claim 2, wherein: the width of the extrusion sleeve (54) is larger than that of the connecting seat (52).
4. The boom drilling and installing all-in-one machine of claim 1, wherein: the three second electric push rods (3) enclose a synthesized equilateral triangle, and the punching machine (9) is arranged at the geometric center of the equilateral triangle.
5. The boom drilling and installing all-in-one machine of claim 1, wherein: coupling mechanism (6) are including connecting platform (61), spread groove (62) have been seted up to the front portion of connecting platform (61), movable groove (63) have all been seted up on the left internal face of spread groove (62) and on the right internal face, the equal fixedly connected with spring (64) in bottom of two movable grooves (63), the equal fixedly connected with buckle (65) of one end that movable groove (63) bottom was kept away from in two spring (64), the lower extreme fixed connection of connecting platform (61) upper end and puncher (9), the left part and the right part of connecting platform (61) all alternate fixed connection with the output of No. two electric putter (3).
6. The boom drilling and installing all-in-one machine of claim 1, wherein: the suspender fixing mechanism (7) comprises a fixing cylinder (71), a rotating sleeve (72) is fixedly connected to the lower end of the fixing cylinder (71), an inner hexagonal fastening device (73) is nested at the upper end of the fixing cylinder (71), and a jack (74) is formed in the outer surface of the fixing cylinder (71).
7. The boom drilling and installing all-in-one machine of claim 1, wherein: the lower part of the to-be-installed hanging rod (10) is connected with a fixed cylinder (71) through an inner hexagonal fastening device (73), a plug pin (8) is inserted and movably connected into an insertion hole (74), a rotating sleeve (72) is connected with a connecting seat (52) through a fastening bolt (53) and an extrusion sleeve (54), and the fixed cylinder (71) is movably arranged in a connecting groove (62).
8. The boom drilling and installing all-in-one machine of claim 1, wherein: the operation panel (12) is electrically connected with the first electric push rod (2), the second electric push rod (3), the rotating motor (4) and the punching machine (9).
9. The boom drilling and installing all-in-one machine of claim 1, wherein: the moving wheel (13) is a universal wheel capable of braking.
CN202121426820.9U 2021-06-25 2021-06-25 Boom punching and mounting integrated machine Active CN214995703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121426820.9U CN214995703U (en) 2021-06-25 2021-06-25 Boom punching and mounting integrated machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121426820.9U CN214995703U (en) 2021-06-25 2021-06-25 Boom punching and mounting integrated machine

Publications (1)

Publication Number Publication Date
CN214995703U true CN214995703U (en) 2021-12-03

Family

ID=79102683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121426820.9U Active CN214995703U (en) 2021-06-25 2021-06-25 Boom punching and mounting integrated machine

Country Status (1)

Country Link
CN (1) CN214995703U (en)

Similar Documents

Publication Publication Date Title
CN201231532Y (en) Mobile boring device for building top board
KR19990072014A (en) Lift-up method for building buildings from above to the ground
CN214995703U (en) Boom punching and mounting integrated machine
KR101632201B1 (en) Prefabricated steel pipe scaffold frame for power generation
CN113482368B (en) Suspender punching and mounting integrated machine and construction method thereof
CN106695356A (en) Top plate drilling device and application method thereof
CN218561044U (en) A operation platform for installing template
JP4377311B2 (en) Pile column erection device
CN109653518B (en) Assembly type component efficient pre-assembly equipment capable of quality inspection and electromagnetic hoisting fine adjustment
CN113700311B (en) Construction method for high-altitude positioning of steel casting of steel structure building
KR101179743B1 (en) Lift apparatus using inch-worm type
JP3049583B2 (en) Composite jack device for lifting and lifting
CN213268981U (en) Locating rack for quickly installing prefabricated wall panel
CN211647234U (en) Overhanging type scaffold
CN219818117U (en) Top plate punching device
CN220565228U (en) Pile head pre-cutting device for inserted bored pile
JP3034960B2 (en) Equipment installed in hoistway
CN214561483U (en) Building perforating device
CN220389912U (en) Roof board punching auxiliary device
CN216180437U (en) Working frame for maintaining construction engineering machinery
CN204401619U (en) precast pile fixing device
CN220955476U (en) Hydropower station civil construction perforating device
CN220791130U (en) Positioning device for construction engineering construction
JPS63107657A (en) Method and apparatus for assembling steel material for construction
CN215969469U (en) Height-adjustable drilling device for housing construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant