CN214994031U - A assembled equipment basis for concrete subway station - Google Patents

A assembled equipment basis for concrete subway station Download PDF

Info

Publication number
CN214994031U
CN214994031U CN202120597507.5U CN202120597507U CN214994031U CN 214994031 U CN214994031 U CN 214994031U CN 202120597507 U CN202120597507 U CN 202120597507U CN 214994031 U CN214994031 U CN 214994031U
Authority
CN
China
Prior art keywords
foundation
buried
plate
subway station
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120597507.5U
Other languages
Chinese (zh)
Inventor
孙凤超
刘可
李云鹏
吴效超
马磊
王铁明
陈祥
周欣欣
高伟健
薛腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority to CN202120597507.5U priority Critical patent/CN214994031U/en
Application granted granted Critical
Publication of CN214994031U publication Critical patent/CN214994031U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to an assembled equipment basis for concrete subway station, its characterized in that: including basic body and ground coupling assembling, the basic body for pour the rectangle structure that the board encloses by a plurality of, pour the board and include plate body, pre-buried steel sheet and pre-buried base plate pre-buried steel sheet that has the level to set up on the up end of plate body the pre-buried base plate that has rather than bottom surface looks parallel and level in the lower part both sides of plate body is pre-buried, each is pour the board and realizes being connected with ground through pre-buried base plate and ground coupling assembling's cooperation. The utility model has the advantages of scientific and reasonable design, have convenient transportation, shorten the engineering time of equipment foundation, improve equipment's installation effectiveness, easily realization, be an assembled equipment foundation for concrete subway station that has higher novelty.

Description

A assembled equipment basis for concrete subway station
Technical Field
The utility model belongs to subway construction field relates to an equipment foundation, especially an assembled equipment foundation for concrete subway station.
Background
In the subway construction process, various devices are involved in ventilation, dynamic illumination, fire control and water supply and drainage. Before the installation of these devices, in order to ensure that these devices can work stably, the construction of the corresponding device foundation needs to be completed in advance on the site, and after the completion of the device foundation, the corresponding device is arranged on the device foundation so that the devices can be stably placed on the ground.
The existing equipment foundation is generally a concrete piece, a large amount of materials such as concrete, reinforcing steel bars and the like are needed for constructing the equipment foundation on site, the concrete transportation efficiency is low, and the strength of the foundation concrete cannot reach the optimum; and concrete pouring still needs a period of time to harden, and the construction time of equipment foundation is long, has influenced the installation effectiveness of equipment.
Disclosure of Invention
An object of the utility model is to overcome prior art not enough, provide a convenient transportation, shorten the equipment foundation's engineering time, improve equipment's installation effectiveness, the assembled equipment foundation that is used for concrete subway station who easily realizes.
The utility model provides a its technical problem take following technical scheme to realize:
the utility model provides an assembled equipment basis for concrete subway station which characterized in that: including basic body and ground coupling assembling, the basic body for pour the rectangle structure that the board encloses by a plurality of, pour the board and include plate body, pre-buried steel sheet and pre-buried base plate pre-buried steel sheet that has the level to set up on the up end of plate body the pre-buried base plate that has rather than bottom surface looks parallel and level in the lower part both sides of plate body is pre-buried, each is pour the board and realizes being connected with ground through pre-buried base plate and ground coupling assembling's cooperation.
And, pour the board still include pre-buried steel sheet reinforcement hook the bottom welding of pre-buried steel sheet has the pre-buried steel sheet reinforcement hook of arranging the plate body inside in.
And the ground connecting assembly consists of foundation bolts, nuts and gaskets, the embedded floor plate is provided with mounting holes, the foundation bolts penetrate through the mounting holes from bottom to top, the gaskets sleeved on the foundation bolts are arranged on the embedded floor plate, the nuts in threaded connection with the foundation bolts are arranged above the gaskets, and the lower ends of the foundation bolts are vertically embedded in the ground.
And the connecting device also comprises connecting cross arms, wherein a plurality of connecting cross arms are uniformly distributed in the length direction of the base body at intervals, and the upper end faces of the connecting cross arms are flush with the upper end face of the base body.
The utility model has the advantages that:
1. this an assembled equipment foundation for concrete subway station, based on various concrete foundation requirements of subway station, reach basic assembly modularization, functional requirement. The equipment foundation adopts a modularization technology, the traditional equipment foundations are disassembled into the same casting plates, and the length, the width and the height of each casting plate are 2000mm 1000mm 200mm respectively. During installation, the foundation bolts are used for fixing and are spliced into an equipment foundation with the required size, so that the construction time of the equipment foundation is shortened, and the installation efficiency of the equipment is improved.
2. This an assembled equipment foundation for concrete subway station through the setting of connecting the cross arm, makes this equipment foundation can adapt to the installation needs of bulky equipment. When the size of the equipment to be installed on the device is large, in order to increase the stress capacity and firmness, a corresponding number of connecting cross arms need to be configured on the basis of the equipment.
3. The utility model has the advantages of scientific and reasonable design, have convenient transportation, shorten the engineering time of equipment foundation, improve equipment's installation effectiveness, easily realization, be an assembled equipment foundation for concrete subway station that has higher novelty.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the base body of the present invention;
fig. 3 is a schematic structural view of the pouring plate of the present invention;
fig. 4 is a side view of the pre-buried steel plate of the present invention;
fig. 5 is a schematic structural view of the display connection structure of the present invention;
fig. 6 is a schematic structural diagram of the assembly connecting cross arm of the present invention.
Description of the reference numerals
1-a foundation body, 2-a ground connection assembly, 3-a cement surface layer, 4-a structural slab, 5-a pouring slab, 6-an embedded baseboard, 7-an embedded steel plate, 8-an embedded steel plate reinforcing hook, 9-a foundation bolt, 10-a nut, 11-a gasket and 12-a connection cross arm.
Detailed Description
The embodiments of the present invention will be described in detail with reference to the accompanying drawings:
the utility model provides an assembled equipment basis for concrete subway station which innovation part lies in: including basic body 1 and ground coupling assembling 2, the basic body for pour the rectangle structure that board 5 enclosed by a plurality of, pour the board package rubbing board body, pre-buried steel sheet 7 and pre-buried base plate 6 pre-buried steel sheet that has the level to set up on the up end of board the pre-buried base plate that has rather than bottom surface looks parallel and level of lower part both sides of board body, each is pour the board and realize being connected with ground through pre-buried base plate and ground coupling assembling's cooperation.
The pouring plate further comprises an embedded steel plate reinforcing hook 8, and the embedded steel plate reinforcing hook arranged inside the plate body is welded at the bottom of the embedded steel plate. This pre-buried steel sheet reinforcing hook can guarantee the stability of pre-buried steel sheet setting on pouring the plate body to guarantee the stability that equipment connects on equipment foundation.
The ground connecting assembly is composed of foundation bolts 9, nuts 10 and gaskets 11, mounting holes are formed in the embedded floor boards, the foundation bolts penetrate through the mounting holes from bottom to top, the gaskets sleeved on the foundation bolts are arranged on the embedded floor boards, the nuts in threaded connection with the foundation bolts are arranged above the gaskets, and the lower ends of the foundation bolts are vertically embedded in the ground.
The connecting device further comprises connecting cross arms 12, wherein a plurality of connecting cross arms are uniformly distributed in the length direction of the base body at intervals, and the upper end faces of the connecting cross arms are flush with the upper end face of the base body.
In the subway, the ground is a cement-poured structural slab 4, and foundation bolts are embedded in the structural slab. During construction, according to the volume of equipment to be installed, selecting a corresponding number of pouring plates, and enclosing the pouring plates into a structure adaptive to the bottom surface of the equipment; sleeving an embedded baseboard at the bottom of the pouring plate on the foundation bolt penetrating out of the structural plate, and fixing the embedded baseboard through a ground connection assembly; thereby completing the installation of the fabricated equipment foundation;
then the equipment is placed on the equipment foundation and is connected to the embedded metal plate through the connecting piece.
The pouring plate with the standard specification is produced in advance by a processing factory, and is spliced, connected and fixed on site after being transported to a construction site; then, the alignment strength is checked, and equipment is installed after the alignment strength is checked to be qualified; finally, a cement surface layer 3 is laid on the structural slab, and the cement surface layer can further reinforce the equipment foundation.
Although the embodiments of the present invention and the accompanying drawings are disclosed for illustrative purposes, those skilled in the art will appreciate that: various substitutions, changes and modifications are possible without departing from the spirit and scope of the present invention and the appended claims, and therefore, the scope of the present invention is not limited to the disclosure of the embodiments and the accompanying drawings.

Claims (4)

1. The utility model provides an assembled equipment basis for concrete subway station which characterized in that: including basic body and ground coupling assembling, the basic body for pour the rectangle structure that the board encloses by a plurality of, pour the board and include plate body, pre-buried steel sheet and pre-buried base plate pre-buried steel sheet that has the level to set up on the up end of plate body the pre-buried base plate that has rather than bottom surface looks parallel and level in the lower part both sides of plate body is pre-buried, each is pour the board and realizes being connected with ground through pre-buried base plate and ground coupling assembling's cooperation.
2. The fabricated equipment foundation for a concrete subway station as claimed in claim 1, wherein: the pouring plate further comprises an embedded steel plate reinforcing hook, and the embedded steel plate reinforcing hook arranged inside the plate body is welded at the bottom of the embedded steel plate.
3. The fabricated equipment foundation for a concrete subway station as claimed in claim 1, wherein: the ground connecting assembly is composed of foundation bolts, nuts and gaskets, the embedded floor boards are provided with mounting holes, the foundation bolts penetrate through the mounting holes from bottom to top, the gaskets sleeved on the foundation bolts are arranged on the embedded floor boards, the nuts in threaded connection with the foundation bolts are arranged above the gaskets, and the lower ends of the foundation bolts are vertically embedded in the ground.
4. The fabricated equipment foundation for a concrete subway station as claimed in claim 1, wherein: the connecting device is characterized by further comprising connecting cross arms, wherein a plurality of connecting cross arms are uniformly distributed in the length direction of the foundation body at intervals, and the upper end faces of the connecting cross arms are flush with the upper end face of the foundation body.
CN202120597507.5U 2021-03-24 2021-03-24 A assembled equipment basis for concrete subway station Active CN214994031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120597507.5U CN214994031U (en) 2021-03-24 2021-03-24 A assembled equipment basis for concrete subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120597507.5U CN214994031U (en) 2021-03-24 2021-03-24 A assembled equipment basis for concrete subway station

Publications (1)

Publication Number Publication Date
CN214994031U true CN214994031U (en) 2021-12-03

Family

ID=79162341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120597507.5U Active CN214994031U (en) 2021-03-24 2021-03-24 A assembled equipment basis for concrete subway station

Country Status (1)

Country Link
CN (1) CN214994031U (en)

Similar Documents

Publication Publication Date Title
WO2009011516A2 (en) Form with reinforcing bars, non-support form system and non-support construction method using the same
CN207211428U (en) A kind of fabricated shear wall plate and its wallboard connecting structure
JP2013112926A (en) Foundation structure for photovoltaic generation device, and construction method for the same
CN107605065A (en) A kind of fabricated shear wall plate, wallboard connecting structure and its construction method
KR20100099495A (en) Central connecting apparatus engaged with lattice type steel pipe pile and construction method of assembling slab bridge using the same
CN111749364B (en) Assembled composite wall based on C-shaped steel and construction method thereof
CN108643042B (en) A kind of full Prefabricated composite bridge deck structure
JP6871495B1 (en) Solid foundation formwork and solid foundation construction method
CN214994031U (en) A assembled equipment basis for concrete subway station
CN110424601B (en) Concrete pouring anti-floating device for composite floor slab with fabricated structure and implementation method
CN111749277A (en) Pipe-jacking building wall structure and construction method thereof
CN216713984U (en) Prefabricated top plate for assembled concrete pool
CN216109354U (en) Conversion layer steel column mounting structure
CN210482352U (en) Assembled main basis that becomes of high voltage mortise-tenon joint structure
CN205502058U (en) Pin -connected panel tower crane foundation
CN210482635U (en) Concrete pillar reinforcing structure at lower part of shock insulation support
CN110172999B (en) Basement bottom plate pit formwork erecting method
CN218291979U (en) Can have enough to meet need bottom plate post-cast strip biography power roof beam
CN110777843A (en) Cantilever type retaining wall and construction method thereof
CN218541534U (en) UPVC pipe concrete column supporting system for post-cast strip of top plate of warehouse
CN114214961A (en) Integrally lowered underwater bearing platform mounting structure
CN213204438U (en) Semi-prefabricated and semi-cast-in-place building component
CN219527712U (en) Assembled foundation template
CN218346804U (en) A consolidate pull rod that is used for horizontal seam leak protection of superimposed sheet to starch
CN216634837U (en) Combined steel structure pedestal

Legal Events

Date Code Title Description
GR01 Patent grant