CN214942232U - Novel portable operation platform that encorbelments - Google Patents

Novel portable operation platform that encorbelments Download PDF

Info

Publication number
CN214942232U
CN214942232U CN202120952818.9U CN202120952818U CN214942232U CN 214942232 U CN214942232 U CN 214942232U CN 202120952818 U CN202120952818 U CN 202120952818U CN 214942232 U CN214942232 U CN 214942232U
Authority
CN
China
Prior art keywords
platform
frame body
operation platform
supporting structure
plate surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120952818.9U
Other languages
Chinese (zh)
Inventor
王奕炯
虞炜敏
贾伟进
万大刚
沈映
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202120952818.9U priority Critical patent/CN214942232U/en
Application granted granted Critical
Publication of CN214942232U publication Critical patent/CN214942232U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a novel movable overhanging operation platform, which comprises an overhanging platform and a supporting structure, wherein the overhanging platform comprises a pattern steel plate surface layer platform plate, a stay bar and a protective railing; the supporting structure comprises a supporting frame body, an adjustable screw rod and a cement block counterweight structure, and is connected with the supporting structure through bolts, so that the overall rigidity of the cantilever platform and the supporting structure is ensured, and the integrity is improved through increasing the connecting steel pipes. The utility model discloses the atress is clear and definite, and ann tears the convenience open, uses conveniently, and the turnover is high-efficient, and standardized accessory is assembled on the scene, has better practicality.

Description

Novel portable operation platform that encorbelments
Technical Field
The utility model belongs to the construction field, concretely relates to novel portable operation platform that encorbelments.
Background
In a construction site, a scaffold or a hanging basket is usually erected as an operation platform in a construction stage of a building facade, the scaffold is usually erected on a first floor, an overhanging scaffold is erected on a middle floor or a hanging basket is arranged on a roof floor, construction operations in repair, chiseling and decoration stages of a structure of the building facade part are carried out, and the scaffold or the hanging basket is dismantled after construction is completed.
The traditional method for erecting the scaffold and the hanging basket has high requirements on the size and the flatness of a site at an erecting position; the construction time is long, and the influence on the construction period is large; the danger of installation and disassembly is high, and a specially-assigned person is required to supervise the installation and disassembly process; a large amount of mounting and dismounting workload, steel pipes and baskets are leased, and the labor cost and the material cost are required, so that the cost is not favorably controlled; the turnover use efficiency of the scaffold and the hanging basket is low, and convenient and quick turnover cannot be realized; the scaffold and the hanging basket are erected to occupy the site, influence other professional construction working faces and prolong the construction period.
Disclosure of Invention
The utility model aims to solve the technical problem that a novel portable operation platform of encorbelmenting is provided, aim at adopting the component of pin-connected panel, through adjustable vaulting pole and cement piece counter weight structure, fixed operation platform of encorbelmenting, the atress is clear and definite, and ann tears the convenience open, uses conveniently, and the turnover is high-efficient, and standardized accessory is assembled on the scene, has better practicality.
The utility model discloses mainly realize through following technical scheme:
a novel movable cantilever operation platform comprises a cantilever platform and a supporting structure, wherein the cantilever platform comprises a patterned steel plate surface layer platform plate, a stay bar and a protective railing; the supporting structure comprises a supporting frame body, an adjustable screw rod and a cement block counterweight structure, and is connected with the supporting structure through bolts, so that the overall rigidity of the cantilever platform and the supporting structure is ensured, and the integrity is improved through increasing the connecting steel pipes.
Preferably, the method comprises the following steps: the patterned steel plate surface layer platform plate is characterized in that a platform plate frame is formed by welding a plurality of square steel pipes, the platform plate frame is fixedly welded with the patterned steel plate surface layer, and lug plates are welded on the platform plate frame. And railing fixing bolt holes are formed in the surface layer of the patterned steel plate.
Preferably, the method comprises the following steps: the stay bar is processed and manufactured by adopting a round steel tube, and perforated round steel plates are welded at two ends of the stay bar.
Preferably, the method comprises the following steps: the guard rail is manufactured by adopting round steel tubes which are connected through welding.
Preferably, the method comprises the following steps: the support frame body adopts the circular steel tube with the diameter of 48mm to carry out welding connection, and can adopt the support frame body welding lug plate and the bottom welding finished universal wheel with the brake.
Preferably, the method comprises the following steps: the adjustable screw rod is arranged at the top of the support frame body, and an enlarged bearing plate is welded at the top of the adjustable screw rod; the bearing plate is made of a steel plate.
Preferably, the method comprises the following steps: the cement block counterweight structure is made of cement, and is connected with the support frame body through a counterweight support rod structure; the counterweight support rod structure comprises seven round steel pipes, perforated round steel plates are welded at two ends of each round steel pipe, the round steel pipes are connected through bolts, and the support frame body is fixed through the bolts.
Preferably, the method comprises the following steps: the pattern steel plate surface layer platform plate and the stay bar are fixed through bolts; the decorative pattern steel plate surface layer platform plate is fixed with the protective railing through a bolt, and a safety net is fixed on the protective railing through a binding belt.
Preferably, the method comprises the following steps: the pattern steel plate surface layer platform plate, the stay bar and the support frame body are fixed by bolts.
The novel component manufacturing and assembling of the movable cantilever operation platform are completed.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a processing preparation of mill, the component is standardized, welding quality is good, and each component connection node is reliable, assembles into whole back in the construction floor, can use after fixing the top tightly.
2. The utility model discloses an use after assembling in corresponding construction operation face floor, through adjusting adjustable screw's screw rod length can be suitable for the demand of the different floor height of different projects, the different floor height of same project, increases simultaneously cement piece counter weight structure ensures whole security.
3. The utility model discloses the required work load of dismouting process is few, but quick assembly disassembly, can ann tear open at any time, shifts to the one deck or with the position of layer operation face, realizes high-efficient turnover, saves labour cost and material cost.
4. The utility model discloses a general standardization constructs the accessory preparation, and required cost of manufacture is low.
5. The utility model discloses can realize reducing the place and occuping in intraformational high-efficient turnover of building for the construction is favorable to the time limit for the progress of construction.
6. The utility model discloses the practicality is strong, applicable with the wall face, elevartor shaft, floor top surface, balcony outside isotatic repair pick chisel and the construction operation in the stage of decorating.
Drawings
The invention will be further described with reference to the accompanying drawings:
fig. 1 is the utility model relates to a novel portable operation platform's of encorbelmenting facade schematic diagram 1.
Fig. 2 is the utility model relates to a novel portable operation platform that encorbelments's plan view 2.
The parts in the drawings are numbered as follows: 1. a safety net; 2. a guard rail; 3. a patterned steel plate surface layer platform plate; 4. a bolt; 5. a stay bar; 6. an ear plate; 7. a finished universal wheel with a brake; 8. round steel pipes; 9. an adjustable screw; 10. a cement counterweight block; 11. a concrete floor slab; 12. a support plate; 13. connecting the steel pipes.
Detailed Description
The present invention is described in further detail below with reference to specific embodiments:
a novel movable overhanging operation platform is shown in figure 1 and comprises an overhanging platform and a supporting structure, wherein the overhanging platform comprises a patterned steel plate surface layer platform plate 3, a stay bar 5 and a guard rail 2; the supporting structure comprises a supporting frame body, an adjustable screw rod 9 and a cement block counterweight structure which are connected with each other through bolts 4, and the integrity of the cantilever platform and the supporting structure is improved by increasing a connecting steel pipe 13 for ensuring the integral rigidity of the cantilever platform and the supporting structure.
The utility model discloses in the use, utilize tower crane or construction elevator to carry to corresponding construction operation face floor in with the support frame body that 8 welded connections of circular steel tube that adopt diameter 48mm formed, vaulting pole 5 is connected through the ear plate 6 of bolt on with the support frame body, decorative pattern steel sheet face layer landing slab 3 is connected fixedly through the ear plate on bolt and vaulting pole 5 and the support frame body, guard bar 2 passes through the bolt fastening with decorative pattern steel sheet face layer landing slab 3, guard bar 2 is last to be fixed safety net 1 with the ribbon, promote support frame body to the working face position immediately, the finished product universal wheel 7 locking that will take the brake, adjustable screw rod 9 at adjustment support frame body top, tight concrete floor 11 in top, the counter weight vaulting pole structure passes through the bolt and is connected fixedly with the ear plate on the support frame body, install cement balancing weight 10 on the counter weight vaulting pole structure, qualified in the inspection, ensure that the whole installation can use after stabilizing. After the construction working face is used, the adjustable screw rods 9 are loosened to be separated from the concrete floor 11, the cement balancing weights 10 are removed, the finished universal wheels 7 with brakes are opened, the frame body is pushed to other positions of the same floor, and the installation and the disassembly are carried out by adopting the method.

Claims (9)

1. The utility model provides a novel portable operation platform that encorbelments which characterized in that: the device comprises an overhanging platform and a supporting structure, wherein the overhanging platform comprises a patterned steel plate surface layer platform plate, a stay bar and a guard rail; the supporting structure comprises a supporting frame body, an adjustable screw rod and a cement block counterweight structure, and is connected with the supporting structure through bolts, so that the overall rigidity of the cantilever platform and the supporting structure is ensured, and the integrity is improved through increasing the connecting steel pipes.
2. The novel movable cantilever operation platform according to claim 1, wherein: patterned steel plate surface course landing slab is welded into the platform board frame by a plurality of square steel pipes, platform board frame and patterned steel plate surface course welded fastening weld the otic placode on the platform board frame set up railing fixing bolt hole on the patterned steel plate surface course.
3. The novel movable cantilever operation platform according to claim 1, wherein: the stay bar is processed and manufactured by adopting a round steel tube, and perforated round steel plates are welded at two ends of the stay bar.
4. The novel movable cantilever operation platform according to claim 1, wherein: the guard rail is manufactured by adopting round steel tubes which are connected through welding.
5. The novel movable cantilever operation platform according to claim 1, wherein: the support frame body adopts the circular steel tube with the diameter of 48mm to carry out welding connection, and can adopt the support frame body welding lug plate and the bottom welding finished universal wheel with the brake.
6. The novel movable cantilever operation platform according to claim 1, wherein: the adjustable screw rod is arranged at the top of the support frame body, and an enlarged bearing plate is welded at the top of the adjustable screw rod; the bearing plate is made of a steel plate.
7. The novel movable cantilever operation platform according to claim 1, wherein: the cement block counterweight structure is made of cement, and is connected with the support frame body through a counterweight support rod structure; the counterweight support rod structure comprises seven round steel pipes, perforated round steel plates are welded at two ends of each round steel pipe, the round steel pipes are connected through bolts, and the support frame body is fixed through the bolts.
8. The novel movable cantilever operation platform according to claim 1, wherein: the pattern steel plate surface layer platform plate and the stay bar are fixed through bolts; the decorative pattern steel plate surface layer platform plate is fixed with the protective railing through a bolt, and a safety net is fixed on the protective railing through a binding belt.
9. The novel movable cantilever operation platform according to claim 1, wherein: the pattern steel plate surface layer platform plate, the stay bar and the support frame body are fixed by bolts.
CN202120952818.9U 2021-05-07 2021-05-07 Novel portable operation platform that encorbelments Expired - Fee Related CN214942232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120952818.9U CN214942232U (en) 2021-05-07 2021-05-07 Novel portable operation platform that encorbelments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120952818.9U CN214942232U (en) 2021-05-07 2021-05-07 Novel portable operation platform that encorbelments

Publications (1)

Publication Number Publication Date
CN214942232U true CN214942232U (en) 2021-11-30

Family

ID=79062481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120952818.9U Expired - Fee Related CN214942232U (en) 2021-05-07 2021-05-07 Novel portable operation platform that encorbelments

Country Status (1)

Country Link
CN (1) CN214942232U (en)

Similar Documents

Publication Publication Date Title
CN107100358B (en) Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body
CN210482710U (en) Assembled template truss strutting arrangement
CN113789948B (en) Large-span atrium side wall sliding rail hanging basket with roof and construction method thereof
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN210013462U (en) Elevator shaft lifting type construction operation platform
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN202766972U (en) Circular pier column hoop
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN214942232U (en) Novel portable operation platform that encorbelments
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN2251595Y (en) Outside scaffold for building construction
CN106320699A (en) Quick disassembling and assembling method for truss type formwork bracket system
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN210659227U (en) Exterior wall formwork system free of external scaffold
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN206888511U (en) A kind of aluminum alloy formwork system for variable cross-section rectangular column
CN213174845U (en) Temporary assembling device for roof curved surface # -shaped combined steel truss beam construction
CN110259100A (en) A kind of overhanging scaffold inversely removes auxiliary frame
CN218988724U (en) Integrated mounting platform for purlines of roof of large-scale steel structure factory building
CN217400394U (en) High-altitude manual hoisting profiled steel sheet construction device
CN214302941U (en) Supporting-free and elevation-adjustable precast beam supporting tool
CN219386680U (en) High-speed railway station room quick column-beam connection node structure based on BIM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211130