CN214941857U - Construction process of fabric hard bag - Google Patents
Construction process of fabric hard bag Download PDFInfo
- Publication number
- CN214941857U CN214941857U CN202120841140.7U CN202120841140U CN214941857U CN 214941857 U CN214941857 U CN 214941857U CN 202120841140 U CN202120841140 U CN 202120841140U CN 214941857 U CN214941857 U CN 214941857U
- Authority
- CN
- China
- Prior art keywords
- fossil fragments
- fabric
- building wall
- fixedly connected
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a fabric hard package construction technology belongs to decoration construction technology field, including building wall, building wall's bottom is provided with the fossil fragments fastener that the equidistance was arranged, the beautiful nail of interior roof fixedly connected with of fossil fragments fastener, the top of beautiful nail run through and extend to building wall's inside and with building wall fixed connection, the inside of fossil fragments fastener is provided with covers fossil fragments, fixedly connected with cross countersunk head self tapping screw between the left and right sides of covering fossil fragments and fossil fragments fastener, the bottom that covers fossil fragments is through cross countersunk head self tapping screw fixedly connected with fabric hard package, adjacent two mutual joint between the fabric hard package. The utility model discloses a, possessing the compression wall space, having guaranteed the bigger utilization ratio in space, accomplish thinly with the wall veneer, more pleasing to the eye advantage has solved traditional way and has taken up the space very much, and the wall is thicker after the veneer is accomplished, influences the problem that the space is deepened.
Description
Technical Field
The utility model relates to a decorate the construction process field, more specifically say, relate to a fabric hard package construction technology.
Background
The hard package construction of fabric is one of the fine finishing engineering in the building, wraps up the welt with decorative cloth, leather, hangs again paste with indoor wall on, the colour is various, has better decorative effect good, can divide into according to the difference of hard package surface course material: the hard bag of panne fabric, brocade fabric, felt fabric, leather and artificial leather, pitted surface and the like can be divided into the following parts according to the difference of hard bag mounting materials: wood hard package engineering, plastic hard package engineering and stone hard package engineering.
In the tradition way, the hard package of wall way is fossil fragments fastener, fire-retardant board basic unit, hard package veneer, and the wall has done the back and has occupied the space very much, for reaching good syllable-dividing effect, the wall decoration common way is fossil fragments fastener, fire-retardant board basic unit, hard package veneer, and the veneer is thick after accomplishing, influences the space depth, provides a fabric hard package construction technology for this reason and solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a fabric hard bag construction technology possesses the compression wall space, has guaranteed the bigger utilization ratio in space, accomplishes thinly with the wall veneer, and more pleasing to the eye advantage has solved traditional way and has accounted for the space very much, and the wall is thicker after the veneer is accomplished, influences the problem that the space is deepened.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a fabric hard package construction technology, includes building wall, building wall's bottom is provided with the fossil fragments fastener that the equidistance was arranged, the beautiful nail of the interior roof fixedly connected with of fossil fragments fastener, the top of beautiful nail run through and extend to building wall's inside and with building wall fixed connection, the inside of fossil fragments fastener is provided with covers fossil fragments, fixedly connected with cross countersunk head self tapping screw between the left and right sides of covering fossil fragments and the left and right sides of fossil fragments fastener, the bottom of covering fossil fragments is through cross countersunk head self tapping screw fixedly connected with fabric hard package, adjacent two mutual joint between the fabric hard package.
As a further aspect of the present invention: the beauty nail comprises a plastic expansion pipe, the plastic expansion pipe is embedded in the building wall, and the beauty nail is fixedly connected inside the plastic expansion pipe.
As a further aspect of the present invention: the right side integrated into one piece of fabric hard package has the arch, the left side integrated into one piece of fabric hard package has the draw-in groove, and is adjacent realize tongue-and-groove concatenation through the cooperation of arch and draw-in groove between the fabric hard package.
As a further aspect of the present invention: the width of covering fossil fragments is 60mm, the height of covering fossil fragments is 27 mm.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
this fabric hard package construction technology, through at first drilling in the bottom of building wall, and strike the embedding hole with the plastics expansion pipe, arrange the bottom of plastics expansion pipe in the fossil fragments fastener, and through the cooperation of beautiful solid nail and plastics expansion pipe with fossil fragments fastener fixed mounting in the bottom of building wall, will beautifully fix the nail in the inside of fossil fragments fastener, will cover fossil fragments through cross countersunk head self tapping screw and fix in the inside of fossil fragments fastener, rethread cross countersunk head self tapping screw is with fabric hard package fixed mounting in the bottom that covers fossil fragments, realize tongue-and-groove concatenation through the cooperation of arch and draw-in groove between two adjacent fabric hard packages, compression wall space, the utilization ratio that the space is bigger has been guaranteed, guaranteeing the sound insulation function, under the unchangeable condition of security, accomplish thinlyer with the wall veneer, it is more pleasing to the eye.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the point A in FIG. 1 according to the present invention;
fig. 3 is a schematic view of the fabric hard bag structure of the present invention.
The reference numbers in the figures illustrate:
1. building a wall body; 2. a keel clamp; 3. fixing the nail; 31. a plastic expansion tube; 4. covering the keel; 5. a cross countersunk self-tapping screw; 6. a fabric hard bag; 61. a protrusion; 62. a clamping groove.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, a fabric hard pack construction process comprises a building wall 1, wherein keel clamping pieces 2 are arranged at the bottom of the building wall 1 at equal intervals, beautiful nails 3 are fixedly connected to the inner top wall of the keel clamping pieces 2, the top ends of the beautiful nails 3 penetrate through the building wall 1 and extend into the building wall 1 and are fixedly connected with the building wall 1, covering keels 4 are arranged inside the keel clamping pieces 2, cross countersunk self-tapping screws 5 are fixedly connected between the left side and the right side of the covering keels 4 and the left side and the right side of the keel clamping pieces 2, fabric hard packs 6 are fixedly connected to the bottoms of the covering keels 4 through the cross countersunk self-tapping screws 5, and two adjacent fabric hard packs 6 are clamped with each other.
Further, the beauty nail 3 comprises a plastic expansion pipe 31, the plastic expansion pipe 31 is embedded in the building wall 1, and the beauty nail 3 is fixedly connected inside the plastic expansion pipe 31.
Further, the right side of the fabric hard bag 6 is integrally formed with a protrusion 61, the left side of the fabric hard bag 6 is integrally formed with a clamping groove 62, and the adjacent fabric hard bags 6 are matched with each other through the protrusion 61 and the clamping groove 62 to realize tongue-and-groove splicing.
Further, the width of the covering keel 4 is 60mm, and the height of the covering keel 4 is 27 mm.
The working principle is as follows: the fabric hard bag construction process comprises the steps of firstly drilling a hole in the bottom of a building wall body 1, knocking and embedding a plastic expansion pipe 31 into the hole, arranging keel clamping pieces 2 at the bottom of the plastic expansion pipe 31, fixedly installing the keel clamping pieces 2 at the bottom of the building wall body 1 through matching of American fixing nails 3 and the plastic expansion pipe 31, placing the American fixing nails 3 inside the keel clamping pieces 2, fixing covering keels 4 inside the keel clamping pieces 2 through cross countersunk self-tapping screws 5, fixedly installing fabric hard bags 6 at the bottom of the covering keels 4 through the cross countersunk self-tapping screws 5, realizing splicing of tongue-and-groove through matching of protrusions 61 and clamping grooves 62 between every two adjacent fabric hard bags 6, compressing the space of a wall surface, ensuring the greater utilization rate of the space, ensuring the sound insulation function and keeping the safety unchanged, enabling the facing of the wall surface to be thinner and more beautiful, and solving the problem that the traditional method occupies a very large space, the wall surface is thicker after finishing, which affects the depth of the space.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.
Claims (4)
1. A fabric hard pack construction process comprises a building wall body (1), and is characterized in that: the utility model discloses a building wall, including building wall (1), the bottom of building wall (1) is provided with fossil fragments fastener (2) that the equidistance was arranged, the interior roof fixedly connected with of fossil fragments fastener (2) is beautiful solid nail (3), the top of beautiful solid nail (3) run through and extend to building wall (1) inside and with building wall (1) fixed connection, the inside of fossil fragments fastener (2) is provided with covers fossil fragments (4), fixedly connected with cross countersunk head self tapping screw (5) between the left and right sides of covering fossil fragments (4) and the left and right sides of fossil fragments fastener (2), the bottom that covers fossil fragments (4) is through cross countersunk head self tapping screw (5) fixedly connected with fabric bale (6), adjacent two mutual joint between fabric bale (6).
2. The fabric hard pack construction process according to claim 1, characterized in that: the beauty nail (3) comprises a plastic expansion pipe (31), the plastic expansion pipe (31) is embedded in the building wall body (1), and the beauty nail (3) is fixedly connected in the plastic expansion pipe (31).
3. The fabric hard pack construction process according to claim 1, characterized in that: protruding (61) have in the right side integrated into one piece of fabric hardbag (6), the left side integrated into one piece of fabric hardbag (6) has draw-in groove (62), and is adjacent realize tongue-and-groove concatenation through the cooperation of protruding (61) and draw-in groove (62) between the fabric hardbag (6).
4. The fabric hard pack construction process according to claim 1, characterized in that: the width of covering fossil fragments (4) is 60mm, the height of covering fossil fragments (4) is 27 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120841140.7U CN214941857U (en) | 2021-04-22 | 2021-04-22 | Construction process of fabric hard bag |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120841140.7U CN214941857U (en) | 2021-04-22 | 2021-04-22 | Construction process of fabric hard bag |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214941857U true CN214941857U (en) | 2021-11-30 |
Family
ID=79066140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120841140.7U Active CN214941857U (en) | 2021-04-22 | 2021-04-22 | Construction process of fabric hard bag |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214941857U (en) |
-
2021
- 2021-04-22 CN CN202120841140.7U patent/CN214941857U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214941857U (en) | Construction process of fabric hard bag | |
CN201236399Y (en) | Concealed dry hanging decoration board | |
CN202644918U (en) | Back hanging part for mounting of fluorocarbon decoration inorganic single-plate | |
CN109532127A (en) | It is a kind of flexible foamed to colour solid brick wall modelled after an antique patch | |
CN205976309U (en) | Dress escutcheon section bar and dress escutcheon that furred ceiling or wall were used | |
CN212927084U (en) | New and old wall bar planting structure | |
CN213087286U (en) | Environment-friendly splicing type decorative plate | |
CN209874141U (en) | Steel-concrete heat-insulation decoration integrated wall | |
CN209924321U (en) | Novel hui party headwall modeling mounting structure | |
CN110802880B (en) | Aluminum-plastic panel with built-in reinforcing rib placing holes | |
CN209053328U (en) | Energy saving building wallboard | |
CN206987304U (en) | A kind of bamboo and wood composite fibre corner angle staff | |
CN217782658U (en) | Conveniently-installed stone crystal wallboard for decoration | |
CN211949410U (en) | Edge banding structure for installing composite floor | |
CN217326190U (en) | Heat preservation and decoration integrated composite ceramic plate mounting structure | |
CN213291621U (en) | High-strength flame-retardant environment-friendly shaving board made of rubber wood | |
CN2530996Y (en) | Metal net wall base plate | |
CN212689472U (en) | Novel adjusting pressing strip | |
CN210857884U (en) | Decorative strip of stone curtain wall | |
CN215716785U (en) | Soft packet of connection buckle structure and close up subassembly | |
CN212984460U (en) | Fixing structure of external wall heat-insulation decorative plate | |
CN209011475U (en) | A kind of dry word fastener anchor structure of heat preservation decoration integrative composite plate | |
CN218061114U (en) | Fixing device is laid to waterproofing membrane for building engineering | |
CN215442869U (en) | Medium density fiber cement board decorative structure | |
CN205476226U (en) | Foamed ceramics thermal -insulation decorative integrated board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |