CN214941092U - Detachable flower basket pull rod type overhanging scaffold embedded part - Google Patents

Detachable flower basket pull rod type overhanging scaffold embedded part Download PDF

Info

Publication number
CN214941092U
CN214941092U CN202121363857.1U CN202121363857U CN214941092U CN 214941092 U CN214941092 U CN 214941092U CN 202121363857 U CN202121363857 U CN 202121363857U CN 214941092 U CN214941092 U CN 214941092U
Authority
CN
China
Prior art keywords
connecting rod
embedded
pull rod
concrete beam
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121363857.1U
Other languages
Chinese (zh)
Inventor
侯雪峰
颜伟栋
高玉娇
张虎军
唐淑婷
苏海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202121363857.1U priority Critical patent/CN214941092U/en
Application granted granted Critical
Publication of CN214941092U publication Critical patent/CN214941092U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a detachable basket pull rod type overhanging scaffold embedded part, which comprises a pre-embedded pipe pre-embedded in a concrete beam, wherein the pre-embedded pipe is fixedly connected with a steel reinforcement framework in the concrete beam through an iron wire, both sides of the concrete beam are provided with pouring templates, and the corresponding part of the outer wall of each pouring template and the pre-embedded pipe is provided with a matching hole; the utility model discloses a set up the connecting rod, first chock, the second chock, first clamp splice, the second clamp splice, the nut etc, can be before concreting the roof beam, pour the template to buried pipe and two and fix, thereby the effectual pouring of having avoided the concrete beam vibrates the in-process, the buried pipe takes place to squint or the concrete gets into in the buried pipe in advance, after the concrete beam solidifies, dismantle when pouring the template again dismantle connecting rod, the nut, dismantle when first chock etc. can, the operation is simple and convenient, when installation basket pull rod or cantilever shaped steel, need not to carry out secondary treatment to buried pipe in advance.

Description

Detachable flower basket pull rod type overhanging scaffold embedded part
Technical Field
The utility model relates to an embedded part specifically is a detachable basket of flowers pull rod formula scaffold frame embedded part that encorbelments.
Background
In the construction of building engineering in China, building materials are continuously upgraded and developed, and the flower basket pull rod cantilever scaffold is widely applied due to wide adaptability, strong bearing capacity, convenience in erection and dismantling and the like.
When the flower basket pull rod cantilever scaffold is used, a sleeve needs to be embedded in a beam of a building floor, so that when the scaffold is erected, a bolt can be conveniently fixed by the sleeve after penetrating through a beam body.
However, when the existing sleeve is embedded, the existing sleeve is simply fixed with a steel reinforcement framework of a beam in a mode of binding or welding through iron wires, although the length of the sleeve is equal to the design width of the beam, two ends of the sleeve can be abutted against a pouring template, in the concrete pouring and vibrating process of the beam, the sleeve is prone to deviation and concrete enters the sleeve, and therefore when a basket pull rod or overhanging section steel is installed in the later period, secondary treatment has to be carried out on the sleeve which is deviated or blocked, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a detachable basket of flowers pull rod formula scaffold frame built-in fitting of encorbelmenting to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a detachable flower basket pull rod type overhanging scaffold embedded part comprises a pre-embedded pipe embedded in a concrete beam, wherein the pre-embedded pipe is fixedly connected with a steel bar framework in the concrete beam through iron wires, pouring templates are arranged on two sides of the concrete beam, matching holes are formed in the outer wall of each pouring template and the corresponding position of each pre-embedded pipe, a connecting rod is arranged in each pre-embedded pipe, the outer wall of one end of each connecting rod is rotatably connected with a first plug head, one end of each first plug head is located in each pre-embedded pipe, the other end of each first plug head penetrates through the corresponding matching hole and then is fixedly connected with a first clamping block, the outer wall of each connecting rod is movably sleeved with a second plug head, one end of each second plug head is located in each pre-embedded pipe, the other end of each second plug head penetrates through the corresponding matching hole and then is fixedly connected with a second clamping block, the outer walls of the first clamping blocks and the second clamping blocks are attached to the outer walls of the corresponding pouring templates, the outer wall of the connecting rod is connected with a nut in a matched mode through external threads.
As a further aspect of the present invention: the mounting hole has been seted up with the department that corresponds of first chock plug to the outer wall of first clamp splice, the tip of connecting rod runs through and is located the mounting hole behind the first chock plug, the one end fixedly connected with stopper that the connecting rod is located the mounting hole, the diameter of stopper is greater than the diameter of connecting rod, stopper and first clamp splice swing joint.
As a further aspect of the present invention: the outer wall of the connecting rod is movably sleeved with a gasket, and the gasket is located between the nut and the second clamping block.
As a further aspect of the present invention: the end part of the connecting rod is fixedly connected with a regular hexagonal prism.
As a further aspect of the present invention: the aperture of the matching hole is smaller than the outer diameter of the embedded pipe, and the aperture of the matching hole is not smaller than the inner diameter of the embedded pipe.
As a further aspect of the present invention: the embedded pipe is bound and fixed with a steel reinforcement framework in the concrete beam through an iron wire.
As a further aspect of the present invention: the embedded pipe is welded and fixed with a steel reinforcement framework in the concrete beam.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up the connecting rod, first chock, the second chock, first clamp splice, the second clamp splice, the nut etc, can be before concreting the roof beam, pour the template to buried pipe and two and fix, thereby the effectual pouring of having avoided the concrete beam vibrates the in-process, the buried pipe takes place to squint or the concrete gets into in the buried pipe in advance, after the concrete beam solidifies, dismantle when pouring the template again dismantle connecting rod, the nut, dismantle when first chock etc. can, the operation is simple and convenient, when installation basket pull rod or cantilever shaped steel, need not to carry out secondary treatment to buried pipe in advance.
2. The utility model discloses a setting of regular hexagonal prism when the installation, the drill chuck that can use pistol drill or similar instrument is adjusted well hexagonal prism and is carried out the centre gripping fixed to use the spanner to carry out the centre gripping back to the nut, accessible pistol drill etc. rotates the connecting rod, thereby is convenient for fasten between pouring template and the buried pipe in advance more.
Drawings
Fig. 1 is a schematic structural diagram of a detachable flower basket pull rod type overhanging scaffold embedded part.
Fig. 2 is an enlarged view of fig. 1A.
Fig. 3 is a cross-sectional view of a regular hexagonal prism in a detachable basket pull rod type overhanging scaffold embedment.
The concrete beam comprises a concrete beam 1, a pre-buried pipe 2, a pouring template 3, a matching hole 4, a first plug head 5, a first clamping block 6, a mounting hole 7, a connecting rod 8, a limiting block 9, a second plug head 10, a second clamping block 11, a nut 12, a gasket 13, an external thread 14 and a regular hexagonal prism 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment of the present invention, a detachable flower basket pull rod type embedded part for overhanging scaffold includes an embedded pipe 2 embedded in a concrete beam 1, the embedded pipe 2 is fixedly connected to a steel bar framework in the concrete beam 1 through an iron wire, both sides of the concrete beam 1 are provided with a pouring template 3, a mating hole 4 is formed at a position corresponding to the embedded pipe 2 on an outer wall of the pouring template 3, a connecting rod 8 is arranged inside the embedded pipe 2, an outer wall at one end of the connecting rod 8 is rotatably connected to a first plug 5, one end of the first plug 5 is located in the embedded pipe 2, the other end of the first plug 5 is fixedly connected to a first clamping block 6 after passing through the corresponding mating hole 4, a second plug 10 is movably sleeved on an outer wall of the connecting rod 8, one end of the second plug 10 is located in the embedded pipe 2, and a second clamping block 11 is fixedly connected to the other end of the second plug 10 after passing through the corresponding mating hole 4, the outer walls of the first clamping blocks 6 and the second clamping blocks 11 are attached to the outer walls of the corresponding pouring formworks 3, and the outer wall of the connecting rod 8 is connected with a nut 12 in a matched mode through an external thread 14.
Mounting hole 7 has been seted up with the department that corresponds of first chock plug 5 to the outer wall of first clamp splice 6, the tip of connecting rod 8 runs through behind the first chock plug 5 and is located mounting hole 7, the one end fixedly connected with stopper 9 that connecting rod 8 is located mounting hole 7, the diameter of stopper 9 is greater than the diameter of connecting rod 8, stopper 9 and 6 swing joint of first clamp splice.
The outer wall of the connecting rod 8 is movably sleeved with a gasket 13, and the gasket 13 is positioned between the nut 12 and the second clamping block 11.
The end part of the connecting rod 8 is fixedly connected with a regular hexagonal prism 15.
The aperture of the matching hole 4 is smaller than the outer diameter of the embedded pipe 2, and the aperture of the matching hole 4 is not smaller than the inner diameter of the embedded pipe 2.
The embedded pipe 2 is bound and fixed with a steel bar framework in the concrete beam 1 through an iron wire; the embedded pipe 2 can also be welded and fixed with a steel reinforcement framework in the concrete beam 1.
The utility model discloses a theory of operation is:
before the concrete beam 1 is poured, after the embedded pipe 2 and a steel bar framework of the concrete beam 1 are fixed, matching holes 4 matched with the embedded pipe 2 are drilled in the surfaces of the pouring templates 3 on two sides, then the first plug 5 and the first clamping block 6 are sleeved on the connecting rod 8, the connecting rod 8 penetrates through the embedded pipe 2, then the second plug 10, the second clamping block 11 and the gasket 13 are installed, the nut 12 is screwed through the matching of the nut 12 and the external thread 14, the first clamping block 6 and the second clamping block 11 extrude the two pouring templates 3 towards the end part of the embedded pipe 2, so that the embedded pipe 2 and the two pouring templates 3 are fixed, the embedded pipe 2 is effectively prevented from deviating or concrete enters the embedded pipe 2, and after the concrete beam 1 is solidified, the pouring templates 3 are disassembled, and the connecting rod 8, the nut 12 and the embedded pipe 2 are simultaneously, First chock plug 5 etc. dismantle can, easy operation is convenient, when installation basket pull rod or the shaped steel of encorbelmenting, need not to carry out secondary treatment to buried pipe 2 in advance.
The utility model discloses a setting of regular hexagonal prism 15 when the installation, the drill chuck that can use pistol drill or similar instrument carries out the centre gripping fixedly well hexagonal prism 15 to use the spanner to carry out the centre gripping back to nut 12, accessible pistol drill etc. rotates connecting rod 8, thereby is convenient for fasten between pouring template 3 and buried pipe 2 more.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. The utility model provides a detachable basket pull rod formula scaffold frame built-in fitting of encorbelmenting, includes pre-buried pipe (2) of pre-buried in concrete beam (1), its characterized in that: the embedded pipe (2) is fixedly connected with a steel bar framework in the concrete beam (1) through an iron wire, the two sides of the concrete beam (1) are respectively provided with a pouring template (3), the corresponding position of the outer wall of the pouring template (3) and the embedded pipe (2) is provided with a matching hole (4), the inside of the embedded pipe (2) is provided with a connecting rod (8), the outer wall of one end of the connecting rod (8) is rotatably connected with a first plug head (5), one end of the first plug head (5) is positioned in the embedded pipe (2), the other end of the first plug head (5) penetrates through the corresponding matching hole (4) and then is fixedly connected with a first clamping block (6), the outer wall of the connecting rod (8) is movably sleeved with a second plug head (10), one end of the second plug head (10) is positioned in the embedded pipe (2), and the other end of the second plug head (10) penetrates through the corresponding matching hole (4) and then is fixedly connected with a second clamping block (11), the outer walls of the first clamping blocks (6) and the second clamping blocks (11) are attached to the outer wall of the corresponding pouring template (3), and the outer wall of the connecting rod (8) is connected with a nut (12) through an external thread (14) in a matched mode.
2. The detachable basket pull rod type overhanging scaffold embedded part of claim 1, wherein: mounting hole (7) have been seted up with the department that corresponds of first chock plug (5) to the outer wall of first clamp splice (6), the tip of connecting rod (8) runs through and is located mounting hole (7) behind first chock plug (5), one end fixedly connected with stopper (9) that connecting rod (8) are located mounting hole (7), the diameter of stopper (9) is greater than the diameter of connecting rod (8), stopper (9) and first clamp splice (6) swing joint.
3. The detachable basket pull rod type overhanging scaffold embedded part of claim 1, wherein: the outer wall of connecting rod (8) activity cup joints gasket (13), gasket (13) are located between nut (12) and second clamp splice (11).
4. The detachable basket pull rod type overhanging scaffold embedded part of claim 1, wherein: the end part of the connecting rod (8) is fixedly connected with a regular hexagonal prism (15).
5. The detachable basket pull rod type overhanging scaffold embedded part of claim 1, wherein: the aperture of the matching hole (4) is smaller than the outer diameter of the embedded pipe (2), and the aperture of the matching hole (4) is not smaller than the inner diameter of the embedded pipe (2).
6. The detachable basket pull rod type overhanging scaffold embedded part of claim 1, wherein: the embedded pipe (2) is bound and fixed with a steel reinforcement framework in the concrete beam (1) through an iron wire.
7. The detachable basket pull rod type overhanging scaffold embedded part of claim 1, wherein: the embedded pipe (2) is welded and fixed with a steel reinforcement framework in the concrete beam (1).
CN202121363857.1U 2021-06-19 2021-06-19 Detachable flower basket pull rod type overhanging scaffold embedded part Active CN214941092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121363857.1U CN214941092U (en) 2021-06-19 2021-06-19 Detachable flower basket pull rod type overhanging scaffold embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121363857.1U CN214941092U (en) 2021-06-19 2021-06-19 Detachable flower basket pull rod type overhanging scaffold embedded part

Publications (1)

Publication Number Publication Date
CN214941092U true CN214941092U (en) 2021-11-30

Family

ID=79048311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121363857.1U Active CN214941092U (en) 2021-06-19 2021-06-19 Detachable flower basket pull rod type overhanging scaffold embedded part

Country Status (1)

Country Link
CN (1) CN214941092U (en)

Similar Documents

Publication Publication Date Title
CN207063181U (en) A kind of diagonal brace of precast facade template and demoulding dual-purpose built-in fitting
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN214941092U (en) Detachable flower basket pull rod type overhanging scaffold embedded part
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN212224604U (en) Wall connecting assembly for connecting outer wall scaffold and wall structure
CN212428042U (en) Scaffold and building body connection fixed knot construct
CN208294057U (en) A kind of scaffold wall connecting piece and its mounting structure
CN201704954U (en) Formwork opposite-pulling device for pouring waterproof walls
CN110469014B (en) Formwork support keel connection reinforcing device for concrete pouring and disassembly-free heat preservation formwork
CN112681717A (en) Novel embedded type building external scaffold wall connecting device and construction method thereof
CN208734057U (en) A kind of wall-connecting piece
CN207794600U (en) A kind of oblique bracing means of building form
CN214575760U (en) General base of floor formwork
CN215443119U (en) ALC wallboard entrance to a cave pouring structure
CN214658822U (en) Can have enough to meet need building templates anchor clamps of use
CN206385794U (en) Wall connecting piece and connecting system thereof
CN211369499U (en) Wall connecting device for external scaffold
CN212388966U (en) External scaffold tool type wall connecting piece for cast-in-place concrete outer wall
CN203891449U (en) Wall connecting piece for wall connection of scaffold
CN212802479U (en) Shaped scaffold tie point
CN112343336A (en) Concrete wall column template positioning device and construction method thereof
CN213418453U (en) Building engineering is with linking wall spare structure
CN217812293U (en) Outer scaffold is wall spare even
CN209686843U (en) A kind of outer scaffold wall connector
CN220226196U (en) Scaffold frame even wall subassembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant