CN214940132U - Pile pulling equipment for hydraulic engineering - Google Patents

Pile pulling equipment for hydraulic engineering Download PDF

Info

Publication number
CN214940132U
CN214940132U CN202120913840.2U CN202120913840U CN214940132U CN 214940132 U CN214940132 U CN 214940132U CN 202120913840 U CN202120913840 U CN 202120913840U CN 214940132 U CN214940132 U CN 214940132U
Authority
CN
China
Prior art keywords
pile pulling
hydraulic engineering
installation box
lifting
pulling equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120913840.2U
Other languages
Chinese (zh)
Inventor
戴宏斌
刘玉含
刘昊
张励
姚凯
李伟
李萍
郭宁
张民仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Beijing Engineering Corp Ltd
Original Assignee
PowerChina Beijing Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Beijing Engineering Corp Ltd filed Critical PowerChina Beijing Engineering Corp Ltd
Priority to CN202120913840.2U priority Critical patent/CN214940132U/en
Application granted granted Critical
Publication of CN214940132U publication Critical patent/CN214940132U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a hydraulic engineering is with pulling out stake equipment belongs to hydraulic engineering technical field, has solved current hydraulic engineering with pulling out stake equipment and has had the problem that pile pulling efficiency is lower and pile pulling equipment is absorbed in silt easily, and its technical essential is: including the gasbag, the gasbag symmetry is provided with four, adjacent two be linked together through the air duct between the gasbag, gasbag upper portion fixed mounting has the install bin, the inside lifting unit that is equipped with of install bin, the install bin slides on being close to the lateral wall of center department and is provided with locating component, through locating component, can carry out stable fixed to the spud pile, through lifting unit, can carry out quick extraction to the spud pile, through the gasbag that the symmetry set up, can effectually avoid the device to sink into silt in the course of the work, influence the work efficiency of device, possess stably fixed, extract fast, effectively prevent sinking and improve work efficiency's advantage.

Description

Pile pulling equipment for hydraulic engineering
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a pile pulling equipment for hydraulic engineering.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production.
Although present pile pulling equipment for hydraulic engineering can extract the spud pile, pile pulling efficiency is lower, is difficult to extract the spud pile fast, sinks into silt easily through pile pulling equipment in the course of the work, influences work efficiency, and from top to bottom, current pile pulling equipment for hydraulic engineering exists that pile pulling efficiency is lower and pile pulling equipment sinks into the shortcoming of silt easily, is difficult to obtain popularization and application.
Therefore, a pile pulling device for hydraulic engineering is needed to be provided, and the problem is solved.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model provides an aim at provides a hydraulic engineering is with pulling out stake equipment to solve the problem among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
pile pulling equipment for hydraulic engineering comprises air bags, wherein four air bags are symmetrically arranged, two adjacent air bags are communicated through air guide tubes, an installation box is fixedly installed at the upper part of each air bag, a lifting assembly is arranged in the installation box, a positioning assembly is slidably arranged on the side wall, close to the center, of the installation box, and the air bags can stably support a device and prevent the device from sinking into silt in the working process to influence the stability of the device;
the lifting assembly comprises a fixed motor, a lead screw and a lifting rod, the fixed motor is fixedly mounted at the bottom of the inner side of the mounting box, the lead screw is fixedly connected to the output end of the fixed motor, the top of the lead screw is rotatably connected with the top of the mounting box through a bearing, and the lifting rod is arranged on the outer side of the lead screw;
the locating component comprises a connecting plate, a fixed plate and a C-shaped rod, the outer end of the lifting rod is fixedly welded with the C-shaped rod, the connecting plate is wrapped inside the C-shaped rod, and the fixed plate is fixedly mounted at the outer end of the connecting plate.
As the utility model discloses further scheme, lifting unit still includes the lift screw hole, the inside lift screw hole that is equipped with of lifter, lift screw hole and lead screw thread fit are connected, and when fixed motor forward work, lead screw clockwise rotation through the lift screw hole, can realize shifting up of lifter, when fixed motor reverse work, can realize shifting down of lifter, conveniently carry out the pile pulling operation.
As a further scheme of the utility model, locating component still includes first locating hole, second locating hole and positioning bolt, C shape pole bilateral symmetry is provided with the first locating hole of a plurality of, the inside bilateral symmetry of connecting plate is equipped with the second locating hole, first locating hole and second locating hole pass through positioning bolt fixed connection, and fixed plate through the symmetry setting can carry out stable fixed to the spud pile, and through rotatory different first locating hole and the cooperation of second locating hole, can adjust the position of fixed plate, conveniently extract the spud pile of different diameters, improve the practicality that the device pulled out the pile.
As a further scheme of the utility model, the symmetry is provided with the spout on the lateral wall that the install bin is close to the fixed plate, it is provided with the slide bar to slide in the spout, slide bar and lifter horizontal welding through the sliding connection between spout and the slide bar, can improve the stability of pile pulling.
As a further proposal of the utility model, the air bag top is provided with an inflation inlet, and the inside of the air bag can be inflated through the inflation inlet.
As a further scheme of the utility model, inboard top fixed mounting of install bin has the battery, can provide the electric energy for the normal use of device.
As a further scheme of the utility model, first pole setting and second pole setting are installed respectively perpendicularly to the installation roof portion, first pole setting and second pole setting top fixedly connected with solar cell panel, the length of first pole setting is less than the length of second pole setting, through solar cell panel, can absorb the energy saving to the light energy.
To sum up, compared with the prior art, the embodiment of the utility model has the following beneficial effects:
the utility model discloses a locating component can carry out stable fixed to the spud pile, through lifting unit, can carry out quick extraction to the spud pile, and the gasbag that sets up through the symmetry can effectually avoid the device to be absorbed in silt in the course of the work, influences the work efficiency of device, possesses stable fixed, extract fast, effectively prevent sinking and improve work efficiency's effect.
To illustrate the structural features and functions of the present invention more clearly, the present invention will be described in detail with reference to the accompanying drawings and specific embodiments.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a schematic structural view of a C-shaped rod in an embodiment of the present invention.
Fig. 3 is a schematic structural view of the air duct in the embodiment of the present invention.
Fig. 4 is a schematic structural diagram of the embodiment of the present invention after improvement.
Reference numerals: 1-an air bag, 2-an inflation inlet, 3-an installation box, 4-a fixed motor, 5-a lead screw, 6-a lifting rod, 7-a connecting plate, 8-a fixed plate, 9-a sliding chute, 10-a sliding rod, 11-a C-shaped rod, 12-a first positioning hole, 13-a second positioning hole, 14-a positioning bolt, 15-an air duct, 16-a lifting threaded hole, 17-a storage battery, 18-a first upright post, 19-a second upright post and 20-a solar panel.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following detailed description is provided for the specific embodiments of the present invention.
Example 1
Referring to fig. 1-3, a pile pulling equipment for hydraulic engineering, includes gasbag 1, 1 symmetry of gasbag is provided with four, adjacent two be linked together through air duct 15 between the gasbag 1, 1 upper portion fixed mounting of gasbag has install bin 3, the inside lifting unit that is equipped with of install bin 3, it is provided with locating component to slide on the lateral wall that install bin 3 is close to center department, through gasbag 1, can carry out the outrigger to the device, avoids the device to sink into silt in the course of the work, influences the stability of device.
Lifting unit includes fixed motor 4, lead screw 5, lifter 6 and lift screw hole 16, 3 inboard bottom fixed mounting of installing bin have fixed motor 4, fixed motor 4's output fixedly connected with lead screw 5, 5 tops of lead screw are passed through the bearing rotation with 3 tops of installing bin and are connected, the 5 outsides of lead screw are equipped with lifter 6, the inside lift screw hole 16 that is equipped with of lifter 6, lift screw hole 16 is connected with 5 screw-thread fit of lead screw, and when fixed motor 4 forward work, lead screw 5 clockwise rotation can realize shifting up of lifter 6 through lift screw hole 16, and when fixed motor 4 reverse work, can realize moving down of lifter 6, conveniently carry out the pile pulling operation.
The positioning component comprises a connecting plate 7, a fixing plate 8, a C-shaped rod 11, a first positioning hole 12, a second positioning hole 13 and a positioning bolt 14, the outer end of the lifting rod 6 is fixedly welded with a C-shaped rod 11, the inside of the C-shaped rod 11 is wrapped with a connecting plate 7, a fixing plate 8 is fixedly arranged at the outer end of the connecting plate 7, a plurality of first positioning holes 12 are symmetrically arranged at two sides of the C-shaped rod 11, the two sides of the inside of the connecting plate 7 are symmetrically provided with second positioning holes 13, the first positioning holes 12 and the second positioning holes 13 are fixedly connected through positioning bolts 14, and through the symmetrically arranged fixing plates 8, the fixing pile can be stably fixed, and by rotating different first positioning holes 12 to be matched with second positioning holes 13, can adjust the position of fixed plate 8, conveniently extract the spud pile of different diameters, improve the practicality that the device pulled out the pile.
The symmetry is provided with spout 9 on the lateral wall that install bin 3 is close to fixed plate 8, it is provided with slide bar 10 to slide in the spout 9, slide bar 10 and 6 horizontal welding of lifter, through the sliding connection between spout 9 and the slide bar 10, can improve the stability of pile pulling.
Preferably, in this embodiment, an inflation port 2 is disposed above the airbag 1, and the inside of the airbag 1 can be inflated through the inflation port 2.
Preferably, in this embodiment, a storage battery 17 is fixedly mounted at the top inside the mounting box 3, so as to provide electric energy for normal use of the device.
Example 2
Referring to fig. 1 to 4, in embodiment 1, the pile pulling apparatus for hydraulic engineering includes four air bags 1, the four air bags 1 are symmetrically arranged, two adjacent air bags 1 are communicated with each other through an air duct 15, an installation box 3 is fixedly installed on the upper portion of each air bag 1, a lifting assembly is arranged inside each installation box 3, a positioning assembly is slidably arranged on a side wall of the installation box 3 close to the center, and the air bags 1 can stably support the apparatus, so that the apparatus is prevented from sinking into sludge during working and affecting the stability of the apparatus.
Different from embodiment 1, install first pole setting 18 and second pole setting 19 respectively perpendicularly in install bin 3 top, first pole setting 18 and second pole setting 19 top fixedly connected with solar cell panel 20, the length of first pole setting 18 is less than the length of second pole setting 19, through solar cell panel 20, can absorb the light energy, the energy saving.
The rest of the structure of this example is the same as example 1.
The utility model discloses a theory of operation is:
when fixed motor 4 forward work, lead screw 5 clockwise rotation, through lift screw hole 16, can realize shifting up of lifter 6, when fixed motor 4 reverse work, can realize shifting down of lifter 6, conveniently carry out the pile pulling operation, fixed plate 8 through the symmetry setting, can carry out stable fixed to the spud pile, first locating hole 12 and the cooperation of second locating hole 13 through rotatory difference, can adjust the position of fixed plate 8, conveniently extract the spud pile of different diameters, the practicality of the pile pulling of improvement device.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (7)

1. Pile pulling equipment for hydraulic engineering comprises air bags (1), and is characterized in that four air bags (1) are symmetrically arranged, two adjacent air bags (1) are communicated through air guide pipes (15), an installation box (3) is fixedly installed at the upper part of each air bag (1), a lifting assembly is arranged inside the installation box (3), and a positioning assembly is slidably arranged on the side wall, close to the center, of the installation box (3);
the lifting assembly comprises a fixed motor (4), a lead screw (5) and a lifting rod (6), the fixed motor (4) is fixedly installed at the bottom of the inner side of the installation box (3), the lead screw (5) is fixedly connected to the output end of the fixed motor (4), the top of the lead screw (5) is rotatably connected with the top of the installation box (3) through a bearing, and the lifting rod (6) is arranged on the outer side of the lead screw (5);
locating component includes connecting plate (7), fixed plate (8) and C shape pole (11), the fixed welding of outer end of lifter (6) has C shape pole (11), the inside parcel of C shape pole (11) is provided with connecting plate (7), connecting plate (7) outer end fixed mounting has fixed plate (8).
2. The pile pulling equipment for the hydraulic engineering according to claim 1, wherein the lifting assembly further comprises a lifting threaded hole (16), the lifting rod (6) is internally provided with the lifting threaded hole (16), and the lifting threaded hole (16) is in threaded fit connection with the lead screw (5).
3. The pile pulling equipment for the water conservancy project according to claim 2, wherein the positioning assembly further comprises a first positioning hole (12), a second positioning hole (13) and a positioning bolt (14), a plurality of first positioning holes (12) are symmetrically formed in two sides of the C-shaped rod (11), the second positioning hole (13) is symmetrically formed in two sides of the inside of the connecting plate (7), and the first positioning hole (12) and the second positioning hole (13) are fixedly connected through the positioning bolt (14).
4. The pile pulling equipment for the water conservancy project according to claim 3, wherein sliding grooves (9) are symmetrically formed in the side wall, close to the fixing plate (8), of the installation box (3), sliding rods (10) are arranged in the sliding grooves (9) in a sliding mode, and the sliding rods (10) are horizontally welded with the lifting rod (6).
5. Pile pulling equipment for hydraulic engineering according to claim 1, characterized in that an inflation inlet (2) is arranged above the air bag (1).
6. The pile pulling equipment for the water conservancy project according to claim 1, wherein a storage battery (17) is fixedly installed at the top of the inner side of the installation box (3).
7. The pile pulling equipment for the water conservancy project according to claim 6, wherein a first vertical rod (18) and a second vertical rod (19) are respectively vertically installed at the top of the installation box (3), a solar cell panel (20) is fixedly connected above the first vertical rod (18) and the second vertical rod (19), and the length of the first vertical rod (18) is smaller than that of the second vertical rod (19).
CN202120913840.2U 2021-04-29 2021-04-29 Pile pulling equipment for hydraulic engineering Active CN214940132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120913840.2U CN214940132U (en) 2021-04-29 2021-04-29 Pile pulling equipment for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120913840.2U CN214940132U (en) 2021-04-29 2021-04-29 Pile pulling equipment for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN214940132U true CN214940132U (en) 2021-11-30

Family

ID=79065279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120913840.2U Active CN214940132U (en) 2021-04-29 2021-04-29 Pile pulling equipment for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN214940132U (en)

Similar Documents

Publication Publication Date Title
CN206916658U (en) A kind of intelligent highway height-limiting frame
CN205676850U (en) A kind of shunting hydraulic pressure dam
CN214940132U (en) Pile pulling equipment for hydraulic engineering
CN105926004B (en) A kind of efficiently fluorine gas preparation facilities
CN210726242U (en) Remove portable photovoltaic water lift equipment
CN107342730A (en) Spiral ground pile formula adjustable photovoltaic support
CN209094820U (en) A kind of offshore wind farm tubular pole girth joint General welding platform
CN207082600U (en) Lead-acid accumulator soldering flux applying device
CN206667249U (en) A kind of civil engineering piling machine
CN206834805U (en) It is a kind of to be easy to fixed Mobile phone wireless charging device
CN212440367U (en) Domestic sewage treatment device
CN209798788U (en) Environmental protection afforestation type bank protection device is used to water
CN113694592A (en) Rainwater collection and utilization device for smart city construction
CN207339771U (en) A kind of mechanism for preventing photovoltaic module dorsulum from moving
CN221295912U (en) Photovoltaic support installation lifting tool
CN206758495U (en) A kind of enclosed cell case
CN207109731U (en) A kind of dash module of hydraulic engineering
CN207037480U (en) A kind of solar energy photovoltaic panel tracks of device
CN111577988A (en) Fixing frame of pipeline for water conservancy construction
CN206637216U (en) A kind of bracket assembly for being used to lay regeneration aggregate rinsing machine
CN209799525U (en) Extensible three-pipe communication tower
CN216851875U (en) Inverted perovskite solar cell module
CN210066674U (en) Water surface garbage fishing device for hydraulic engineering
CN214801030U (en) Integrated roof of green building for municipal landscape engineering
CN211641902U (en) Solar power generation fills electric pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant