CN111577988A - Fixing frame of pipeline for water conservancy construction - Google Patents

Fixing frame of pipeline for water conservancy construction Download PDF

Info

Publication number
CN111577988A
CN111577988A CN202010461240.7A CN202010461240A CN111577988A CN 111577988 A CN111577988 A CN 111577988A CN 202010461240 A CN202010461240 A CN 202010461240A CN 111577988 A CN111577988 A CN 111577988A
Authority
CN
China
Prior art keywords
plate
welded
fixing
rack
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010461240.7A
Other languages
Chinese (zh)
Inventor
葛黄辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010461240.7A priority Critical patent/CN111577988A/en
Publication of CN111577988A publication Critical patent/CN111577988A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/10Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
    • F16L3/1075Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members, the two members being joined with a hinge on one side and fastened together on the other side
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • F16L3/205Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/02Energy absorbers; Noise absorbers
    • F16L55/033Noise absorbers
    • F16L55/035Noise absorbers in the form of specially adapted hangers or supports

Abstract

The invention discloses a fixing frame of a pipeline for water conservancy construction, which comprises a first supporting plate and a sleeve, wherein a first inner groove is formed in the top of the first supporting plate, a first clamping plate penetrates through the inside of the first inner groove, one end of the first clamping plate, which is far away from the first supporting plate, is hinged with a second clamping plate, and a second inner groove is formed in the inside of the second clamping plate. The applicability of the fixing frame is improved.

Description

Fixing frame of pipeline for water conservancy construction
Technical Field
The invention relates to the technical field of water conservancy construction, in particular to a fixing frame of a pipeline for water conservancy construction.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. The hydraulic engineering needs to build different types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transitional troughs, rafts, fishways and the like so as to realize the targets of the hydraulic engineering and prevent flood disasters; the irrigation and water conservancy project which prevents drought, waterlogging and serves agricultural production is also called irrigation and drainage project; hydroelectric power generation projects, which convert water energy into electrical energy, town water supply and drainage projects, which serve industrial and domestic water, and treat and remove sewage and rainwater, channel and harbor projects, which improve and create shipping conditions, often require laying of pipes during the construction of hydraulic projects in order to prevent the pipes from shifting.
The invention CN108533838A discloses a hydraulic engineering pipeline fixing device, which effectively avoids the problems of pipeline extrusion deformation and water leakage caused by misalignment in the pipeline installation and fixing process by first realizing the centering action of two pipelines and then fixing the two pipelines;
however, most of the existing pipeline fixing frames cannot be adjusted, so that the applicability of the fixing frame is reduced, and the fixing frame cannot adapt to pipelines with different calibers, and therefore one fixing frame can only support and fix the pipelines with the same calibers.
Disclosure of Invention
The invention aims to provide a fixing frame of a pipeline for water conservancy construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a fixing frame of a pipeline for water conservancy construction comprises a first supporting plate and a sleeve, wherein the first supporting plate is arranged at the top of the first supporting plate, a first clamping plate penetrates through the first inner groove, a second clamping plate is hinged to one end, far away from the first supporting plate, of the first clamping plate, a second inner groove is formed in the second clamping plate, the outer side, close to the first supporting plate, of the first clamping plate is connected to the inside of the second inner groove in a sliding mode, a second rack is welded to the outer side wall of the first clamping plate, a first fixing block is welded to the inside of the first supporting plate, a fifth fixing plate is hinged to the inside of the first fixing block, the fifth fixing plate is in a transversely telescopic nesting design, a first rack plate is slidably supported to the outer side, far away from the first fixing block, of the fifth fixing plate, and vertically penetrates through the first fixing block, a first rack is welded on the first rack plate, a first rod body is welded at one end, close to the first rack, of the fifth fixing plate, a sixth rod body is rotatably connected to the inner side wall of the first supporting plate through a first bearing, a disc is welded at the outer side of the sixth rod body, a third rod body is welded at the outer ring of the disc, a second spring is welded at the bottom of the fifth fixing plate, a second fixing plate is welded at one end, far away from the fifth fixing plate, of the second spring, and one end of the second fixing plate is welded on the inner side wall of the first supporting plate;
a second handle is welded at one end, away from the first supporting plate, of the sixth rod body, a rubber pad is bonded on the outer ring of the second handle, a protruding block is fixedly connected to the outer side wall of the rubber pad, a third rack is arranged on the side, facing the disc, of the second clamping plate body, a plurality of shifting pieces are further arranged on the outer ring of the disc, a hinge rod hinged to the disc is arranged at the bottom of the first rack plate, and the hinge position of the hinge rod and the disc and the area where the plurality of shifting pieces are located are approximately symmetrical about the circle center of the disc;
the inner side wall of the first supporting plate is connected with a threaded rod through a threaded groove and a thread, one end, close to the first supporting plate, of the threaded rod is rotatably connected with a third fixing plate through a bearing, the inner bottom wall of the first supporting plate is fixedly connected with a first sliding rail through a screw, and the outer side of the third fixing plate is connected to the inside of the first sliding rail in a sliding mode;
the welding of the bottom of first backup pad has the second backup pad, the bottom symmetric welding of second backup pad has two support columns, the welding of the bottom of support column has the third plate body, screw fixedly connected with cylinder is passed through to the bottom of third plate body, the welding of telescopic lateral wall has the switch box, screw fixedly connected with third slide rail is passed through to telescopic inside wall, one side welding that the support column is close to the third slide rail has first bracing piece, the inside of first bracing piece is rotated and is connected with the pulley, the outer lane sliding connection of pulley is in the inside of third slide rail.
The inside wall of switch box passes through screw fixed connection and has the fourth slide rail, the inside sliding connection of fourth slide rail has the baffle, the welding of the lateral wall of baffle has the first in command.
The inside of switch box is through screw fixed connection with first switch, the power output of first switch passes through the power input electric connection of wire and cylinder.
The telescopic interior diapire welded connection has the fourth spring, the interior diapire welded connection of first backup pad has first fixed plate, the lateral wall welded connection of first fixed plate has first spring, the one end that first fixed plate was kept away from to first spring welds the lateral wall of third fixed plate.
Compared with the prior art, the invention has the beneficial effects that: in the using process of the pipe fixing frame, the fixing frame can clamp and fix pipes with different calibers through the combined use of the first clamping plate, the second rack, the fifth fixing plate, the first rack, the first fixing block, the disc and the third rod body, so that the pipe fixing frame is convenient for workers to support and fix the pipes during construction, the working efficiency is improved, and the height of the fixing frame can be adjusted through the air cylinder, the third plate body, the supporting column and the second supporting plate, so that the pipe fixing frame is convenient to mount pipes at different height positions, and the applicability of the fixing frame is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the sleeve structure of the present invention;
FIG. 3 is a schematic view of a first slide rail structure according to the present invention;
FIG. 4 is a schematic diagram of the switch box structure of the present invention;
fig. 5 is a schematic front view of the present invention.
In the figure: 1. a first support plate; 2. a first spring; 3. a first fixing plate; 4. a first slide rail; 5. a first rod body; 6. a second fixing plate; 7. a second spring; 8. a third fixing plate; 9. a threaded rod; 10. a first fixed block; 11. a fifth fixing plate; 12. a first rack; 13. a second rack; 14. a first inner tank; 15. a first clamping plate; 16. a second clamping plate; 17. a second inner tank; 18. a third rod body; 19. a disc; 20. a second support plate; 21. a first support bar; 22. a pulley; 23. a switch box; 24. a third plate body; 25. a cylinder; 26. a fourth spring; 27. a sleeve; 28. a third slide rail; 29. a support pillar; 30. a fourth slide rail; 31. a first switch; 32. a first handle; 33. a baffle plate; 34. a second handle; 35. a rubber pad; 36. a raised block; 37. and a sixth rod body.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides a technical solution: a fixing frame of a pipeline for water conservancy construction comprises a first supporting plate 1 and a sleeve 27, wherein the first supporting plate 1 is arranged at the top of the first supporting plate 1, a first inner groove 14 is formed in the top of the first supporting plate 1, a first clamping plate 15 penetrates through the first inner groove 14, a second clamping plate 16 is hinged to one end, far away from the first supporting plate 1, of the first clamping plate 15, a second inner groove 17 is formed in the second clamping plate 16, the first clamping plate 15 is close to the outer side of the first supporting plate 1 and is connected to the inner side of the second inner groove 17 in a sliding mode, a second rack 13 is welded to the outer side wall of the first clamping plate 15, a first fixing block 10 is welded to the inner side of the first supporting plate 1, a fifth fixing plate 11 is hinged to the inner side of the first fixing block 10, the fifth fixing plate 11 is in a transversely telescopic nested design, and the first rack plate is supported by the sliding mode of the outer side, far away from the first fixing, the first rack plate vertically penetrates through the first fixing block 10, a first rack 12 is welded on the first rack plate, a first rod body 5 is welded at one end, close to the first rack 12, of the fifth fixing plate 11, a sixth rod body 37 is rotatably connected to the inner side wall of the first supporting plate 1 through a first bearing, a disc 19 is welded on the outer side of the sixth rod body 37, a third rod body 18 is welded on the outer ring of the disc 19, a second spring 7 is welded at the bottom of the fifth fixing plate 11, a second fixing plate 6 is welded at one end, far away from the fifth fixing plate 11, of the second spring 7, and one end of the second fixing plate 6 is welded on the inner side wall of the first supporting plate 1;
a second handle 34 is welded at one end of the sixth rod body 37, which is far away from the first support plate 1, a rubber pad 35 is bonded on the outer ring of the second handle 34, a convex block 36 is fixedly connected to the outer side wall of the rubber pad 35, a third rack is arranged on the plate body of the second clamping plate 16, which faces the disc 19, a plurality of shifting pieces are further arranged on the outer ring of the disc 19, a hinge rod hinged to the disc 19 is arranged at the bottom of the first rack plate, and the hinge position of the hinge rod and the disc 19 and the area where the plurality of shifting pieces are located are approximately symmetrical about the circle center of the disc 19;
the inner side wall of the first supporting plate 1 is connected with a threaded rod 9 through a threaded groove and a thread, one end, close to the first supporting plate 1, of the threaded rod 9 is rotatably connected with a third fixing plate 8 through a bearing, the inner bottom wall of the first supporting plate 1 is fixedly connected with a first sliding rail 4 through a screw, and the outer side of the third fixing plate 8 is connected to the inside of the first sliding rail 4 in a sliding manner;
the bottom welding of first backup pad 1 has second backup pad 20, the bottom symmetrical welding of second backup pad 20 has two support columns 29, the bottom welding of support column 29 has third plate body 24, screw fixedly connected with cylinder 25 is passed through to the bottom of third plate body 24, the lateral wall welding of sleeve 27 has switch box 23, screw fixedly connected with third slide rail 28 is passed through to the inside wall of sleeve 27, support column 29 has first bracing piece 21 near one side welding of third slide rail 28, the inside of first bracing piece 21 is rotated and is connected with pulley 22, the outer lane sliding connection of pulley 22 is in the inside of third slide rail 28.
The inside wall of switch box 23 passes through screw fixed connection and has fourth slide rail 30, the inside sliding connection of fourth slide rail 30 has baffle 33, the welding of the lateral wall of baffle 33 has first in command 32.
The switch box 23 is internally and fixedly connected with a first switch 31 through a screw, and a power output end of the first switch 31 is electrically connected with a power input end of the cylinder 25 through a wire.
Fourth spring 26 is welded to the inner bottom wall of sleeve 27, first fixed plate 3 is welded to the inner bottom wall of first backup pad 1, first spring 2 is welded to the lateral wall of first fixed plate 3, the one end that first fixed plate 3 was kept away from to first spring 2 welds the lateral wall of third fixed plate 8.
In this embodiment, specifically: inside wall of first backup pad 1 has threaded rod 9 through thread groove threaded connection, threaded rod 9 is close to the one end of first backup pad 1 and rotates through the bearing and is connected with third fixed plate 8, the first slide rail 4 of screw fixedly connected with is passed through to the inner diapire of first backup pad 1, the outside sliding connection of third fixed plate 8 is in the inside of first slide rail 4, through rotating threaded rod 9, make threaded rod 9 promote third fixed plate 8 and remove, thereby make third fixed plate 8 laminate in the bottom of the first body of rod 5, prevent that the rotation of fifth fixed plate 11 from driving first rack 12 and move down, thereby fix first grip block 15, prevent the pipeline landing.
In this embodiment, specifically: the bottom welding of first backup pad 1 has second backup pad 20, the bottom symmetrical welding of second backup pad 20 has two support columns 29, the bottom welding of support column 29 has third plate body 24, screw fixedly connected with cylinder 25 is passed through to the bottom of third plate body 24, the lateral wall welding of sleeve 27 has switch box 23, promote third plate body 24 through cylinder 25, make third plate body 24 drive support column 29 and second backup pad 20 and shift up, thereby make the whole height of mount can adjust.
In this embodiment, specifically: the inner side wall of the sleeve 27 is fixedly connected with a third slide rail 28 through a screw, a first support rod 21 is welded on one side of the support column 29 close to the third slide rail 28, a pulley 22 is rotatably connected inside the first support rod 21, an outer ring of the pulley 22 is slidably connected inside the third slide rail 28, and when the cylinder 25 pushes the third plate body 24 and the support column 29 to move upwards, the pulley 22 slides in the third slide rail 28, and the support column 29 is fixed through the first support rod 21, so that the fixed frame is prevented from collapsing.
In this embodiment, specifically: switch box 23's inside wall passes through screw fixedly connected with fourth slide rail 30, and the inside sliding connection of fourth slide rail 30 has baffle 33, and the welding of baffle 33's outside wall has first in command 32, makes baffle 33 can upwards slide through fourth slide rail 30 to make the staff can press the switch, make the inside to switch box 23 protect through baffle 33, prevent that the dust from getting into, make things convenient for staff's slide damper 33 through first in command 32.
In this embodiment, specifically: sixth rod body 37 has second handle 34 far away from the one end welding of first backup pad 1, and the outer lane bonding of second handle 34 has rubber pad 35, and the protruding piece 36 of the lateral wall fixedly connected with of rubber pad 35 makes the staff conveniently rotate sixth rod body 37 through second handle 34, through rubber pad 35 and protruding piece 36 for produce frictional force when the staff rotates second handle 34, prevent that the staff from producing when rotating second handle 34 and sideslipping.
In this embodiment, specifically: the inside of switch box 23 is connected with first switch 31 through screw fixed connection, and the power output of first switch 31 passes through wire and the power input electric connection of cylinder 25, controls the start-up and the closing of cylinder 25 through first switch 31.
In this embodiment, specifically: fourth spring 26 is welded to the inner bottom wall of sleeve 27, first fixed plate 3 is welded to the inner bottom wall of first backup pad 1, first spring 2 is welded to the lateral wall of first fixed plate 3, the one end that first fixed plate 3 was kept away from to first spring 2 welds the lateral wall of third fixed plate 8, when third plate 24 descends, extrude fourth spring 26 through third plate 24, make fourth spring 26 produce the buffer power, absorb produced vibrations of partial third plate 24 and the decline of support column 29 through the buffer power that fourth spring 26 produced, make the removal to third fixed plate 8 restrict through first fixed plate 3, make things convenient for the staff to reset third fixed plate 8 through first spring 2, the model of cylinder 25 is: SC160X 25.
When the fixing device is used, a worker puts a pipeline on the top of a first supporting plate 1, rotates a first clamping plate 15 to enable one end, close to the first supporting plate 1, of the first clamping plate 15 to enter the inside of a second inner groove 17 through a first inner groove 14, clamps and fixes the pipeline through a second rack 13 welded at one end of the first clamping plate 15 and a first rack 12 in the first supporting plate 1 in a clamping manner, when the pipeline needs to be adjusted according to the caliber of the pipeline, rotates a second handle 34 to enable the second handle 34 to drive a sixth rod body 37, drives a disc 19 to rotate through the rotation of the sixth rod body 37 to drive a third rod body 18 to rotate, pushes a fifth fixing plate 11 downwards through the rotation of the third rod body 18 to enable the first rack 12 to be far away from the second rack 13, enables the first clamping plate 15 to continue to rotate, and accordingly can be adjusted according to the caliber of the pipeline, after the regulation is accomplished, fifth fixed plate 11 extrudees second spring 7 downwards and makes second spring 7 produce elasticity, elasticity through second spring 7 makes fifth fixed plate 11 reset, through rotating threaded rod 9, make threaded rod 9 drive third fixed plate 8 and remove, thereby make the top of third fixed plate 8 laminate in the bottom of the first body of rod 5, make fifth fixed plate 11 unable rotate, improve the fixed effect of first rack 12 and second rack 13, when the height of mount is adjusted to needs, through starting cylinder 25, make promotion third plate body 24 and support column 29 rise, thereby make the mount wholly rise, it slides in the inside of third slide rail 28 to drive pulley 22 through the rising of support column 29, thereby make to support column 29 fixed, prevent that support column 29 from collapsing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a mount of pipeline for water conservancy construction, includes first backup pad (1) at top and sleeve (27) that are located first backup pad (1) bottom, its characterized in that: the top of the first supporting plate (1) is provided with a first inner groove (14), a first clamping plate (15) penetrates through the first inner groove (14), one end, far away from the first supporting plate (1), of the first clamping plate (15) is hinged with a second clamping plate (16), a second inner groove (17) is formed in the second clamping plate (16), the outer side, close to the first supporting plate (1), of the first clamping plate (15) is connected to the inside of the second inner groove (17) in a sliding mode, the outer side wall of the first clamping plate (15) is welded with a second rack (13), a first fixing block (10) is welded in the first supporting plate (1), a fifth fixing plate (11) is hinged to the inside of the first fixing block (10), the fifth fixing plate (11) is designed to be transversely telescopic in a nested mode, and the outer side, far away from the first fixing block (10), of the fifth fixing plate (11) is supported with a first rack plate in a sliding mode, the first rack plate vertically penetrates through a first fixing block (10), a first rack (12) is welded on the first rack plate, a first rod body (5) is welded at one end, close to the first rack (12), of a fifth fixing plate (11), a sixth rod body (37) is rotatably connected to the inner side wall of the first supporting plate (1) through a first bearing, a disc (19) is welded to the outer side of the sixth rod body (37), a third rod body (18) is welded to the outer ring of the disc (19), a second spring (7) is welded at the bottom of the fifth fixing plate (11), a second fixing plate (6) is welded at one end, far away from the fifth fixing plate (11), of the second spring (7), and one end of the second fixing plate (6) is welded to the inner side wall of the first supporting plate (1);
a second handle (34) is welded at one end, away from the first supporting plate (1), of the sixth rod body (37), a rubber pad (35) is bonded on the outer ring of the second handle (34), a protruding block (36) is fixedly connected to the outer side wall of the rubber pad (35), a third rack is arranged on the plate body of the second clamping plate (16) and faces towards the disc (19), a plurality of shifting pieces are further arranged on the outer ring of the disc (19), a hinge rod hinged to the disc (19) is arranged at the bottom of the first rack plate, and the hinge position of the hinge rod and the disc (19) is approximately symmetrical to the circle center of the disc (19) relative to the area where the plurality of shifting pieces are located;
the inner side wall of the first supporting plate (1) is connected with a threaded rod (9) through a threaded groove and a thread, one end, close to the first supporting plate (1), of the threaded rod (9) is rotatably connected with a third fixing plate (8) through a bearing, the inner bottom wall of the first supporting plate (1) is fixedly connected with a first sliding rail (4) through a screw, and the outer side of the third fixing plate (8) is connected to the inside of the first sliding rail (4) in a sliding mode;
the welding of the bottom of first backup pad (1) has second backup pad (20), the bottom symmetric welding of second backup pad (20) has two support columns (29), the welding of the bottom of support column (29) has third plate body (24), screw fixedly connected with cylinder (25) are passed through to the bottom of third plate body (24), the welding of the lateral wall of sleeve (27) has switch box (23), screw fixedly connected with third slide rail (28) are passed through to the inside wall of sleeve (27), one side welding that support column (29) is close to third slide rail (28) has first bracing piece (21), the internal rotation of first bracing piece (21) is connected with pulley (22), the outer lane sliding connection of pulley (22) is in the inside of third slide rail (28).
2. The fixing frame of the pipeline for water conservancy construction according to claim 1, characterized in that: the inside wall of switch box (23) passes through screw fixed connection and has fourth slide rail (30), the inside sliding connection of fourth slide rail (30) has baffle (33), the welding of the lateral wall of baffle (33) has first in command (32).
3. The fixing frame of the pipeline for water conservancy construction according to claim 2, characterized in that: the inside of switch box (23) is through screw fixed connection with first switch (31), the power output of first switch (31) passes through the wire and the power input electric connection of cylinder (25).
4. The fixing frame of the pipeline for water conservancy construction according to claim 1, characterized in that: the inner bottom wall welding of sleeve (27) has fourth spring (26), the inner bottom wall welding of first backup pad (1) has first fixed plate (3), the lateral wall welding of first fixed plate (3) has first spring (2), the one end that first fixed plate (3) were kept away from in first spring (2) welds the lateral wall of third fixed plate (8).
CN202010461240.7A 2020-05-27 2020-05-27 Fixing frame of pipeline for water conservancy construction Withdrawn CN111577988A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010461240.7A CN111577988A (en) 2020-05-27 2020-05-27 Fixing frame of pipeline for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010461240.7A CN111577988A (en) 2020-05-27 2020-05-27 Fixing frame of pipeline for water conservancy construction

Publications (1)

Publication Number Publication Date
CN111577988A true CN111577988A (en) 2020-08-25

Family

ID=72117717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010461240.7A Withdrawn CN111577988A (en) 2020-05-27 2020-05-27 Fixing frame of pipeline for water conservancy construction

Country Status (1)

Country Link
CN (1) CN111577988A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112460333A (en) * 2020-12-11 2021-03-09 张阳杰 Petroleum pipeline supporting device and using method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112460333A (en) * 2020-12-11 2021-03-09 张阳杰 Petroleum pipeline supporting device and using method
CN112460333B (en) * 2020-12-11 2023-02-10 延安地丰石油工程技术服务有限公司 Petroleum pipeline supporting device and using method

Similar Documents

Publication Publication Date Title
CN205676850U (en) A kind of shunting hydraulic pressure dam
CN205382469U (en) Formula water conservancy regulation and control gate sways
CN111577988A (en) Fixing frame of pipeline for water conservancy construction
CN103031824A (en) Hydraulic horizontal dam
CN108418516B (en) A kind of desert photovoltaic plant
CN212480372U (en) Positioning support is used in water conservancy water and electricity pipeline installation
CN212801447U (en) Hinge dam is with stagnant water structure of being convenient for maintenance
CN108199287A (en) A kind of novel desert photovoltaic plant technology
CN211231844U (en) Built-in steel pipe of embedded fixing frame for hydropower station
CN216264216U (en) Pipeline welding set for hydraulic engineering
CN212946268U (en) Elbow fitting welding clamping device for water conservancy construction
CN213921167U (en) Pipeline handling device for hydraulic engineering with high stability
CN209854681U (en) Water conservancy automatic control upset board floodgate
CN211344232U (en) Pipeline fixing device for water conservancy and hydropower
CN217914626U (en) Hydraulic engineering pipeline surface rust cleaning device
CN209760610U (en) Grouting sleeve
CN216666880U (en) Hydraulic engineering's water conservancy pipeline supports connection structure
CN214889327U (en) Support frame for water conservancy and hydropower construction
CN201411670Y (en) Sensing type self-energy-dissipating pressureless water drainage system for earth-rockfill dams
CN209798697U (en) Water transfer pump gate
CN212506804U (en) Building engineering waterproof construction
CN204878871U (en) Quick closing valve water seal valve
CN218346376U (en) City planning municipal drainage pipe
CN214246009U (en) Support positioner that municipal administration plumbing construction was used
CN210484198U (en) Low pressure heater drainage pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200825