CN214938818U CN202120402231.0U CN202120402231U CN214938818U CN 214938818 U CN214938818 U CN 214938818U CN 202120402231 U CN202120402231 U CN 202120402231U CN 214938818 U CN214938818 U CN 214938818U
Authority
CN
China
Prior art keywords
rubber strip
expansion joint
clamping
winding roller
traction unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120402231.0U
Other languages
Chinese (zh)
Inventor
李俭
韩峰
坑建秋
崔相奎
李绍杰
王建华
王卫红
田子健
霍欢欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN202120402231.0U priority Critical patent/CN214938818U/en
Application granted granted Critical
Publication of CN214938818U publication Critical patent/CN214938818U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The utility model relates to a ballastless track expansion joint construction technical field especially relates to a rubber strip installation device for expansion joint. Including the first traction unit that is equipped with first wire winding roller, the second traction unit that is equipped with second wire winding roller and at least a pair of extruded article, be equipped with first haulage rope on the first wire winding roller, be equipped with the clamping piece on the first haulage rope, the clamping piece is used for the telescopic band of the rubber strip of centre gripping under the contraction state, and the extruded article all is connected with the second haulage rope, the second haulage rope be used for with the cooperation of second wire winding roller, the extruded article with the shape phase-match of the big die cavity at expansion joint. Through the setting of above-mentioned first traction unit, second traction unit and extruded article, then can realize effectively drawing and the location to the rubber strip, can realize drawing fast to the rubber strip through setting up the clamping piece, make whole process more nimble convenient through setting up second haulage rope and second winding roller components of a whole that can function independently, effectively improved the efficiency of construction.

Description

Rubber strip installation device for expansion joint
Technical Field
The utility model relates to a ballastless track expansion joint construction technical field especially relates to a rubber strip installation device for expansion joint.
Background
In the prior art, the expansion joint generally sets up between two ballastless tracks, and two adjacent ballastless tracks all are equipped with the section bar in being close to one side each other, and one side that two section bars are close to each other all is equipped with the chamber groove, and the rubber strip generally is including the telescopic band that is located the middle part and the fixed band of setting at the telescopic band both ends, and in actual work progress, we need install between fixed band and the chamber groove. The staff can only pull rubber strip and extruded article through ordinary wire winding roller, and traction equipment is single and not systematized, and only can continue the construction of next rubber strip after the rubber strip at an expansion joint is installed completely, therefore the efficiency of construction is lower.
Disclosure of Invention
In order to solve the technical problem or at least partially solve above-mentioned technical problem, this disclosure provides a rubber strip installation device for expansion joint.
The utility model provides a rubber strip installation device for expansion joint, including the first traction unit that is equipped with first winding roller, second traction unit and at least a pair of extruded article that are equipped with second winding roller, be equipped with first haulage rope on the first winding roller, be equipped with the clamping piece on the first haulage rope, the clamping piece is used for the telescopic band of the rubber strip that the centre gripping was in under the contraction status, the extruded article all is connected with the second haulage rope, the second haulage rope be used for with the cooperation of second winding roller, the extruded article and the shape phase-match of the big die cavity at expansion joint.
Optionally, the extrusion is provided in two pairs.
Optionally, the second traction unit comprises a base, the second winding roller is arranged on the base, the second traction unit further comprises a support provided with a first fixed pulley, the base is arranged on a protection wall on one side of the expansion joint, and the support is arranged on a vertical wall on the other side of the expansion joint.
Optionally, the support includes pulley portion and presss from both sides tight fixed part, presss from both sides tight fixed part and includes the connecting piece and sets up first clamping part and the second clamping part at the connecting piece both ends, and the connecting piece is used for setting up in the gap that is formed by two adjacent vertical walls, and first clamping part and second clamping part are used for the inside and outside both sides of centre gripping respectively at vertical wall, and pulley portion accessible first clamping part is fixed at vertical wall's inboard, and first fixed pulley sets up on pulley portion.
Optionally, the pulley portion includes a pair of base plates and a connecting rod arranged between the pair of base plates, the first fixed pulley is sleeved on the connecting rod, a plurality of jacks used for fixing the connecting rod are arranged on the base plates at equal intervals along the vertical direction, and the first clamping portion is used for clamping the pair of base plates on two sides of the gap respectively.
Optionally, the connecting piece is of a rod-shaped structure, one end of the connecting piece is fixedly connected with the second clamping portion, the other end of the connecting piece is provided with threads and connected with a bolt, and the first clamping portion is provided with a through hole matched with the connecting piece.
Optionally, the bottom of base is equipped with a pair of cardboard, and the cardboard is used for the card in the both sides of protective wall.
Optionally, the first traction unit includes a fixing frame, a rotating handle, a first transmission gear, a second transmission gear and a first winding roller are arranged on the fixing frame, the rotating handle is used for driving the first transmission gear to rotate, the first transmission gear is meshed with the second transmission gear, the second transmission gear is used for driving the first winding roller to rotate, and the diameter of the first transmission gear is smaller than that of the second transmission gear.
Optionally, the bottom of the fixing frame is further provided with a second fixed pulley.
Optionally, one end of the extrusion part close to the rubber strip is provided with an extrusion wheel, and one end of the extrusion part far away from the rubber strip is provided with a rolling wheel.
Compared with the prior art, the technical scheme provided by the embodiment of the disclosure has the following advantages:
through the setting of above-mentioned first traction unit, second traction unit and extruded article, then can realize effectively drawing and the location to the rubber strip, can realize drawing fast to the rubber strip through setting up the clamping piece, make whole process more nimble convenient through setting up second haulage rope and second winding roller components of a whole that can function independently, effectively improved the efficiency of construction.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and together with the description, serve to explain the principles of the disclosure.
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present disclosure, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic drawing of a first winding roller to a rubber strip stretch band in the present disclosure;
FIG. 2 is a schematic drawing configuration of a second wire winding roller pair extrusion of the present disclosure;
FIG. 3 is a schematic view of an extrusion entering a large die cavity according to the present disclosure;
FIG. 4 is a sectional view of the bracket attached to a vertical wall according to the present disclosure;
FIG. 5 is a top view of the connection of the bracket to the vertical wall in the present disclosure.
11, a first winding roller; 12. a clamping member; 13. a fixed mount; 14. rotating the handle; 15. a first drive gear; 16. a second transmission gear; 17. a second fixed pulley; 21. a second winding roller; 22. an extrusion; 23. a base; 24. clamping a plate; 25. an extrusion wheel; 26. a rolling wheel; 31. a connecting member; 32. a first clamping portion; 33. a second clamping portion; 34. a substrate; 35. a connecting rod; 36. a first fixed pulley; 37. a jack; 38. a bolt; 41. a large cavity; 42. a small cavity; 51. a protective wall; 61. erecting a wall; 62. a gap; 71. fixing belts; 72. an extensible belt.
Detailed Description
In order that the above objects, features and advantages of the present disclosure may be more clearly understood, aspects of the present disclosure will be further described below. It should be noted that the embodiments and features of the embodiments of the present disclosure may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present disclosure, but the present disclosure may be practiced in other ways than those described herein; it is to be understood that the embodiments disclosed in the specification are only a few embodiments of the present disclosure, and not all embodiments.
Referring to fig. 1 to 3, the present disclosure provides a rubber strip installation device for an expansion joint, including a first traction unit provided with a first winding roller 11 and a second traction unit provided with a second winding roller 21, wherein a clamping member 12 is arranged on a traction rope of the first winding roller 11, the clamping member 12 is used for clamping an expansion belt 72 of a rubber strip in a contraction state, an extrusion member 22 is arranged on a traction rope of the second winding roller 21, and the extrusion member 22 is matched with a large cavity 41 of the expansion joint in shape.
In the prior art, the expansion joint is generally arranged between two ballastless tracks, two adjacent ballastless tracks are close to each other and are all provided with the section bar on one side, two section bars are close to each other and are all provided with the cavity groove on one side, and the rubber strip generally comprises a telescopic belt 72 located in the middle and fixing belts 71 arranged at two ends of the telescopic belt 72, and in the actual construction process, the fixing belts 71 and the cavity groove need to be installed.
Because the chamber groove generally includes big die cavity 41 and the small-size chamber 42 that is close to the rubber strip of keeping away from the rubber strip, so when the installation, generally pack into big die cavity 41 through manual or the mode of pulling with fixed band 71 earlier, and set up extruded article 22 in big die cavity 41, the rethread is pulled extruded article 22 along the length direction at expansion joint, thereby make extruded article 22 extrude fixed band 71, so that fixed band 71 gets into small die cavity 42 from big die cavity 41, because the shape of small die cavity 42 more is for matching with the shape of fixed band 71, therefore fixed band 71 carries out behind the small die cavity 42, the holistic water-proof effects of rubber strip is better.
In the prior art, a worker can only drag the fixing belt 71 and the extrusion part 22 through a common winding roller, the traction equipment is single and is not systematic, and the construction of the next rubber strip can be continued only after the rubber strip of one construction joint is completely installed, so that the construction efficiency is low.
In this embodiment, the system is provided with the rubber strip installation device for the expansion joint, so that the installation efficiency of the rubber strip for the expansion joint is improved.
In the actual construction process, firstly two second hauling ropes are respectively placed in the large cavities 41 of the two profiles, one end of each second hauling rope stretches out of the profile and is connected with the extrusion part 22, and the other end stretches out of the profile and is connected with the winding roller of the second hauling unit.
Then dock fixed band 71 with the large-scale chamber 41 opening of section bar respectively for the tip of fixed band 71 gets into in the large-scale chamber 41, then with clamping piece 12 centre gripping on telescopic band 72, rotate first wire winding roller 11, make first wire winding roller 11 drive first haulage rope and clamping piece 12 motion, thereby realize the traction to telescopic band 72, at the traction in-process, the fixed band 71 of rubber strip then constantly gets into in the large-scale chamber 41 of section bar.
After the fixing band 71 of the rubber strip is completely pulled into the large cavity 41, the fixing band 71 needs to be moved from the large cavity 41 to the small cavity 42, the second winding roller 21 is rotated at the moment, so that the second pulling rope and the extrusion piece 22 are driven to move, and after the extrusion piece 22 enters the large cavity 41, the fixing band 71 is correspondingly extruded into the small cavity 42, so that the final adjustment of the fixing band 71 is completed. In the traction process of the extrusion member 22, a user can simultaneously construct or separately construct two sectional materials of each expansion joint according to requirements. In order to make the operation of the extrusion member 22 more flexible, the second traction rope can be arranged separately from the second winding roller 21, and when the extrusion member 22 needs to be pulled, the second traction rope is connected with the second winding roller 21.
Through the setting of above-mentioned first traction unit, second traction unit and extruded article 22, then can realize the effective traction and the location to the rubber strip, can realize pulling fast to the rubber strip through setting up clamping piece 12, then make whole process more nimble convenient through setting up second haulage rope and the 21 components of a whole that can function independently of second winding roller, effectively improved the efficiency of construction.
In some embodiments, the extrusion member 22 has two pairs, and the embodiment further provides a method for installing the rubber strip for the expansion joint, which includes an installation device for the rubber strip for the expansion joint, and further includes the following steps:
step one, arranging a pair of second traction ropes in a large cavity 41 of a first-stage expansion joint, then installing a first traction unit and a second traction unit at the end part of the first-stage expansion joint, drawing a rubber strip into the large cavity 41 of the first-stage expansion joint through the first traction unit, and after the first traction unit finishes drawing, dismantling the first traction unit and constructing the next-stage expansion joint;
step two, firstly, an idle second traction rope is installed in the next-stage expansion joint, a first traction unit which is detached in the previous-stage expansion joint is installed, and the rubber strip is pulled through the first traction unit; the second traction unit in the previous expansion joint pulls the extrusion part 22, so that two sides of the rubber strip enter the corresponding small cavities 42, and after the second traction unit of the previous expansion joint pulls, the second traction unit is detached and installed to the current expansion joint; after the first traction unit finishes traction, the first traction unit is dismantled, and the construction of the next-stage expansion joint is carried out;
and step three, repeating the step two.
In the above method, two pairs of extrusions 22 are provided, and the method is described in more detail below.
In the first step, during the construction of the first expansion joint, a pair of second hauling ropes with extrusion parts 22 need to be installed in the profiles of the first expansion joint, because each expansion joint is provided with two profiles, and the corresponding rubber strip is also correspondingly provided with two fixing belts 71, if the fixing belts 71 are installed firstly, the extrusion parts 22 cannot be installed in the later period, so the second hauling ropes with the extrusion parts 22 are installed in the two profiles in advance. Since two pairs of extrusions 22 are provided, only one pair is used, and the remaining pair of extrusions 22 are left idle.
The expansion band 72 can be pulled by the first pulling unit, so that the fixing band 71 runs into the large cavity 41 of the corresponding profile, when the fixing band 71 reaches the design position, namely the large cavity 41, the first pulling unit is not needed for the first expansion joint, and therefore the first pulling unit can be detached, and the first pulling unit is in an idle state at the moment and can be used for construction of the second expansion joint.
In the second step, the first traction unit in the idle state may be installed at the designed position of the second expansion joint, and before the rubber strip at the second expansion joint is pulled, the second traction rope and the extrusion member 22 which are idle in the above steps need to be placed in the section bar corresponding to the second expansion joint in advance. Then can carry out the traction of second expansion joint rubber strip, simultaneously in first expansion joint, accessible second traction unit pulls extruded piece 22 to make fixed band 71 in the first expansion joint move to corresponding small-size chamber 42 in, the second traction unit that lies in the first expansion joint and the second haulage rope that has extruded piece 22 also are idle state this moment. Therefore, the second traction unit can be detached from the first expansion joint, so that the second expansion joint can be used for construction of the second expansion joint, and the extruded part 22 used for the first expansion joint can be used for construction of the third construction joint. Since the first traction unit has already finished the traction of the second expansion joint fixing band 71, the first traction unit is in an idle state at this time, and can be used for the construction of the third expansion joint.
In the third step, the second traction rope and the extrusion part 22 which are idle at the first expansion joint can be installed in the section bar of the third construction joint, then the rubber strip of the third construction joint is dragged through the first traction unit which is idle at the second expansion joint, meanwhile, the extrusion part 22 of the second expansion joint is dragged through the second traction unit, then the second traction unit is continuously dismantled for the third expansion joint, and so on, and details are not repeated herein.
In the prior art, construction of a single expansion joint is generally only possible, for example, after the fixed belt 71 is completely pulled, the extrusion part 22 is pulled, and after the extrusion part 22 is completely pulled, construction of the next expansion joint can be performed. And in this scheme, through setting up first traction unit, second traction unit and two pairs of extruded article 22 then can effectively accomplish the circulation construction at expansion joint, after first expansion joint, can realize that first traction unit and second are under construction and constantly circulate when traction unit to effectual work efficiency that has increased.
Referring to fig. 2, in some embodiments, the second traction unit includes a base 23, the second winding roller 21 is disposed on the base 23, the second traction unit further includes a bracket provided with a first fixed pulley 36, the base 23 is disposed on a protective wall 51 at one side of the expansion joint, and the bracket is disposed on a vertical wall 61 at the other side of the expansion joint.
In the above embodiment, the setting position of the second traction unit is optimized, during actual construction, the length of the expansion joint is longer, generally more than 12 meters, if the second traction unit is only arranged at one end of the expansion joint, the extrusion member 22 enters the large cavity 41 from the other end of the expansion joint, because the shape of the extrusion member 22 is matched with the large cavity 41, the extrusion member 22 needs to be manually aligned with the large cavity 41, so as to facilitate the entering of the extrusion member 22, but the initial entering position of the extrusion member 22 is far away from the second winding roller 21, so that the docking between workers is inconvenient, that is, the worker operating the second winding roller 21 does not know when the winding is performed, and cannot observe the entering condition of the extrusion member 22, thus causing inconvenience to the construction to a certain extent.
Therefore this scheme has then utilized expansion joint construction environment's self condition, sets up second wire winding roller 21 on the protective wall 51 of expansion joint one side to set up first fixed pulley 36 on the perpendicular wall 61 of expansion joint opposite side, through the diversion function of first fixed pulley 36, realized that extruded article 22's initial entering position and second wire winding roller 21 are located the purpose of homonymy, thereby effectively provide the efficiency of construction.
It should be emphasized that the first fixed pulley 36 is provided, so that the traction direction of the second traction rope to the extrusion member 22 is parallel to the expansion joint, thereby optimizing the traction effect. And because the height of protective wall 51 itself for second wire winding roller 21 can be in a higher position, the staff of being convenient for exert oneself, does not need to have too much requirement to base 23 in the direction of height promptly, thereby makes the structure of base 23 more simplified, reduces the work piece cost to a certain extent.
Referring to fig. 2, 4 and 5, in some embodiments, the bracket includes a pulley portion and a clamping fixing portion, the clamping fixing portion includes a connecting member 31 and a first clamping portion 32 and a second clamping portion 33 disposed at two ends of the connecting member 31, the connecting member 31 is disposed in a gap 62 formed by two adjacent vertical walls 61, the first clamping portion 32 and the second clamping portion 33 are respectively clamped at inner and outer sides of the vertical walls 61, the pulley portion can be fixed at an inner side of the vertical walls 61 by the first clamping portion 32, and the first fixed pulley 36 is disposed on the pulley portion.
Since the resistance received by the extrusion member 22 is large during the actual traction process, the bracket and the base 23 need to be effectively fixed, so as to ensure the smooth traction. In the above embodiment, the bracket structure is further disclosed, in an actual construction environment, the vertical walls 61 are also in a sectional type, and a gap 62 is formed between two adjacent vertical walls 61, and in this scheme, the gap 62 is effectively utilized to realize effective fixation of the bracket and the pulley portion. Above-mentioned mode has first utilized the structure of standing wall 61 itself, can effectively reduce the fixed cost of support, still can make first fixed pulley 36 be located lower position simultaneously to guarantee to pull the effect. And the structure is comparatively simple, and the main structure body is concentrated on the wall of erecting wall 61, can effectively increase space utilization efficiency, provides sufficient operating space for other constructions.
In some embodiments, the pulley portion includes a pair of base plates 34 and a connecting rod 35 disposed between the pair of base plates 34, the first fixed pulley 36 is sleeved on the connecting rod 35, a plurality of insertion holes 37 for fixing the connecting rod 35 are vertically disposed on the base plates 34 at equal intervals, and the first clamping portion 32 is used for clamping the pair of base plates 34 on two sides of the gap 62 respectively.
In the above embodiment, the arrangement of the first fixed pulley 36 is optimized, and the height of the connecting rod 35 can be effectively adjusted by arranging the insertion hole 37, so that the worker can adjust the height of the first fixed pulley 36 according to the specific construction environment, and the traction efficiency of the extrusion member 22 is improved.
The substrate 34 is clamped and fixed by the first clamping portion 32 conveniently and quickly, and no other fixing member is required. Because the base plate 34 and the first clamping portion 32 are substantially separated from each other, preferably, the base plate 34 and the first clamping portion 32 can be provided with a matching positioning member, for example, the base plate 34 is provided with a clamping strip, and the first clamping portion 32 is provided with a clamping groove, so that the base plate 34 can be ensured not to be dislocated in the fixing process of the base plate 34 and the first clamping portion 32 by the alignment of the clamping strip and the clamping groove, thereby improving the working efficiency.
Referring to fig. 4 and 5, in some embodiments, the connecting member 31 is a rod-shaped structure, one end of the connecting member 31 is fixedly connected to the second clamping portion 33, the other end of the connecting member 31 is provided with threads and is connected to a bolt 38, and the first clamping portion 32 is provided with a through hole matching with the connecting member 31.
In the above embodiment, the fixing manner of the first clamping portion 32 and the connecting member 31 is specifically disclosed, the through hole of the first clamping portion 32 is firstly sleeved on the connecting member 31, and then the bolt 38 is screwed to gradually approach the first clamping portion 32 and the second clamping portion 33, so as to achieve the fixing effect.
In some embodiments, two first fixed pulleys 36 are provided on the connecting rod 35.
In the above embodiment, the number of the first fixing pulleys 36 is optimized, and when two extrusion members 22 of one expansion joint are constructed simultaneously, two first fixing pulleys 36 may be provided, thereby ensuring smooth implementation of traction of the extrusion members 22.
Referring to fig. 2, in some embodiments, a pair of clamping boards 24 is disposed at the bottom end of the base 23, and the clamping boards 24 are used for clamping both sides of the protection wall 51.
In the above embodiment, the fixing mode of the base 23 is specifically disclosed, and by utilizing the structural characteristics of the protective wall 51 and by providing the pair of clamping plates 24, the base 23 can be effectively fixed, and the fixing device has a simple structure and is convenient and quick to install.
Referring to fig. 1, in some embodiments, the first traction unit includes a fixed frame 13, the fixed frame 13 is provided with a rotation handle 14, a first transmission gear 15, a second transmission gear 16 and a first winding roller 11, the rotation handle 14 is configured to drive the first transmission gear 15 to rotate, the first transmission gear 15 is engaged with the second transmission gear 16, the second transmission gear 16 is configured to drive the first winding roller 11 to rotate, and a diameter of the first transmission gear 15 is smaller than a diameter of the second transmission gear 16.
In the above embodiment, the structure of the fixing frame 13 is specifically disclosed, and since there is a large resistance between the fixing belt 71 of the rubber strip and the large cavity 41, the traction can be performed through gear transmission, so that the traction process is more efficient, labor-saving and stable.
Referring to fig. 1, in some embodiments, the bottom of the fixing frame 13 is further provided with a second fixed pulley 17.
In the above embodiment, the second fixed pulley 17 is arranged to redirect the first traction rope, so that the traction direction of the clamping member 12 is parallel to the expansion joint direction, thereby optimizing the traction effect
Referring to fig. 3, in some embodiments, extrusion member 22 is provided with an extrusion wheel 25 at an end thereof adjacent the rubber strip, and extrusion member 22 is provided with a rolling wheel 26 at an end thereof remote from the rubber strip.
In the above embodiment, the structure of the extrusion member 22 is specifically disclosed, and the resistance of the extrusion member 22 moving in the large-sized cavity 41 can be effectively reduced by arranging the extrusion wheel 25 and the rolling wheel 26, so that the traction effect is optimized.
It is noted that, in this document, relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The foregoing are merely exemplary embodiments of the present disclosure, which enable those skilled in the art to understand or practice the present disclosure. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the disclosure. Thus, the present disclosure is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The utility model provides a rubber strip installation device for expansion joint, its characterized in that, is including the first traction unit that is equipped with first wire winding roller (11), the second traction unit that is equipped with second wire winding roller (21) and at least a pair of extruded article (22), be equipped with first haulage rope on first wire winding roller (11), be equipped with clamping piece (12) on the first haulage rope, clamping piece (12) are used for telescopic band (72) that the centre gripping is in the rubber strip under the contraction state, extruded article (22) all are connected with the second haulage rope, the second haulage rope be used for with second wire winding roller (21) cooperation, extruded article (22) with the shape phase-match of the big die cavity (41) at expansion joint.
2. The rubber strip installation device for expansion joints according to claim 1, wherein said pressing members (22) are provided in two pairs.
3. The rubber strip installation device for expansion joints according to claim 2, wherein the second traction unit comprises a base (23), the second winding roller (21) is arranged on the base (23), the second traction unit further comprises a bracket provided with a first fixed pulley (36), the base (23) is arranged on a protective wall (51) on one side of the expansion joint, and the bracket is arranged on a vertical wall (61) on the other side of the expansion joint.
4. The rubber strip installation device for the expansion joint as claimed in claim 3, wherein the bracket comprises a pulley part and a clamping fixing part, the clamping fixing part comprises a connecting piece (31) and a first clamping part (32) and a second clamping part (33) which are arranged at two ends of the connecting piece (31), the connecting piece (31) is used for being arranged in a gap (62) formed by two adjacent vertical walls (61), the first clamping part (32) and the second clamping part (33) are respectively clamped at the inner side and the outer side of the vertical wall (61), the pulley part can be fixed at the inner side of the vertical wall (61) through the first clamping part (32), and the first fixed pulley (36) is arranged on the pulley part.
5. The rubber strip mounting device for the expansion joint as claimed in claim 4, wherein the pulley portion comprises a pair of base plates (34) and a connecting rod (35) arranged between the pair of base plates (34), the first fixed pulley (36) is sleeved on the connecting rod (35), a plurality of insertion holes (37) for fixing the connecting rod (35) are arranged on the base plates (34) along the vertical direction at equal intervals, and the first clamping portion (32) is used for clamping the pair of base plates (34) at two sides of the gap (62) respectively.
6. The rubber strip installation device for expansion joints according to claim 5, wherein the connecting member (31) is a rod-shaped structure, one end of the connecting member (31) is fixedly connected with the second clamping portion (33), the other end of the connecting member (31) is provided with threads and is connected with a bolt (38), and the first clamping portion (32) is provided with a through hole matched with the connecting member (31).
7. The rubber strip installation device for the expansion joint as claimed in claim 3, wherein a pair of clamping plates (24) is arranged at the bottom end of the base (23), and the clamping plates (24) are used for clamping at two sides of the protective wall (51).
8. The rubber strip installation device for the expansion joint according to claim 1, wherein the first traction unit comprises a fixed frame (13), the fixed frame (13) is provided with a rotating handle (14), a first transmission gear (15), a second transmission gear (16) and the first winding roller (11), the rotating handle (14) is used for driving the first transmission gear (15) to rotate, the first transmission gear (15) is meshed with the second transmission gear (16), the second transmission gear (16) is used for driving the first winding roller (11) to rotate, and the diameter of the first transmission gear (15) is smaller than that of the second transmission gear (16).
9. The rubber strip installation device for expansion joints according to claim 8, wherein the bottom of the fixed frame (13) is further provided with a second fixed pulley (17).
10. The rubber strip installation device for the expansion joint according to claim 1, wherein one end of the extrusion part (22) close to the rubber strip is provided with an extrusion wheel (25), and one end of the extrusion part (22) far away from the rubber strip is provided with a rolling wheel (26).
CN202120402231.0U 2021-02-23 2021-02-23 Rubber strip installation device for expansion joint Active CN214938818U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120402231.0U CN214938818U (en) 2021-02-23 2021-02-23 Rubber strip installation device for expansion joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120402231.0U CN214938818U (en) 2021-02-23 2021-02-23 Rubber strip installation device for expansion joint

Publications (1)

Publication Number Publication Date
CN214938818U true CN214938818U (en) 2021-11-30

Family

ID=79098541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120402231.0U Active CN214938818U (en) 2021-02-23 2021-02-23 Rubber strip installation device for expansion joint

Country Status (1)

Country Link
CN (1) CN214938818U (en)

Similar Documents

Publication Publication Date Title
CN210418812U (en) Cable winding and unwinding frame
CN214938818U (en) Rubber strip installation device for expansion joint
CN112962358A (en) Rubber strip installation device and method for expansion joint
CN116093824B (en) Cable supporting device
CN211078205U (en) Telescopic lifting frame for narrow space
CN218216379U (en) Cable laying auxiliary device for electromechanical equipment installation
CN213326050U (en) Cable erecting traction device
CN215717365U (en) Tool for mounting aluminum alloy template
CN112938320B (en) Vertical conveying mechanism for aluminum formwork building formwork
CN112390094B (en) Cable tightening device
CN211712329U (en) Miniature machine that leads is used in electric wire netting construction
CN113991538A (en) Auxiliary cable traction building device for overhead line erection
CN210105259U (en) Movable scaffold
CN208326885U (en) The actinobacillus device of wire and cable in a kind of building construction process
CN212835934U (en) Assembled removes construction canopy
CN220630284U (en) Heat preservation structure in greenhouse
CN214424053U (en) Building engineering curtain transfer device
CN219885608U (en) Hoisting platform in elevator well
CN220437765U (en) Positioning device for new energy automobile detection
CN117432223A (en) Adjusting device for installing membrane structure
CN220848650U (en) Outer protection frame of construction demolishs device
CN220190321U (en) Pipe penetrating device
CN2455143Y (en) Mosquito net stand
CN215765816U (en) Support device of solar water heater
CN218057904U (en) Cable production and processing equipment convenient to change take-up reel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant