CN214935675U - Water conservancy construction pipe laying pay-off - Google Patents

Water conservancy construction pipe laying pay-off Download PDF

Info

Publication number
CN214935675U
CN214935675U CN202121274621.0U CN202121274621U CN214935675U CN 214935675 U CN214935675 U CN 214935675U CN 202121274621 U CN202121274621 U CN 202121274621U CN 214935675 U CN214935675 U CN 214935675U
Authority
CN
China
Prior art keywords
lifting
sliding
water conservancy
sliding strip
pipe laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121274621.0U
Other languages
Chinese (zh)
Inventor
李胜
谷新容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honghe Xinsheng Construction Engineering Co ltd
Original Assignee
Honghe Xinsheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honghe Xinsheng Construction Engineering Co ltd filed Critical Honghe Xinsheng Construction Engineering Co ltd
Priority to CN202121274621.0U priority Critical patent/CN214935675U/en
Application granted granted Critical
Publication of CN214935675U publication Critical patent/CN214935675U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a water conservancy construction pipe laying pay-off, including mount, slip group and paying out machine, the mount is stainless steel rectangular frame, and is provided with paying out machine on the mount, paying out machine includes fixed station, winding group, driving motor, wire rope and lifting device, and winding group fixes through the fixed station and sets up on the mount, and the reel of winding group is connected with another reel through the hold-in range, and the reel passes through wire rope and lifting device, is provided with the material loading platform on the lifting device; the reels on the winding groups are connected with the other winding group through the rotating shaft, and one ends of the reels are connected with the driving motor through the connecting pieces; the sliding group comprises a first sliding strip, a telescopic rod and a second sliding strip. The utility model is used for solve current buried pipe mode and not only need a large amount of labours, the not high problem of work efficiency moreover.

Description

Water conservancy construction pipe laying pay-off
Technical Field
The utility model belongs to the technical field of the building energy conservation, concretely relates to water conservancy construction pipe laying pay-off.
Background
Hydraulic engineering is the surface water and the groundwater that are used for controlling and allotment nature, reaches the earth's surface water and the groundwater of harmfulness of removing the prosperity purpose and the engineering of building, in the hydraulic construction process, often need to the buried pipe handling to place the pipeline into wherein after having opened the irrigation canals and ditches, the mode of artifical transport is all adopted to current buried pipe mode, and also adopts artifical lift transport unloading at the unloading process, not only needs a large amount of labours, and work efficiency is not high moreover.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction pipe laying pay-off to solve current pipe laying mode and not only need a large amount of labours, the not high problem of work efficiency moreover.
In order to solve the technical problem, the utility model adopts the following technical scheme:
a water conservancy construction pipe laying pay-off device comprises a fixing frame, a sliding group and a pay-off mechanism, wherein the fixing frame is a stainless steel rectangular frame, the pay-off mechanism is arranged on the fixing frame, the pay-off mechanism comprises a fixing table, a winding group, a driving motor, a steel wire rope and a lifting and conveying device, the winding group is fixedly arranged on the fixing frame through the fixing table, a winding wheel of the winding group is connected with another winding wheel through a synchronous belt, the winding wheel is connected with the lifting and conveying device through the steel wire rope, and a material loading table is arranged on the lifting and conveying device; the reels on the winding groups are connected with the other winding group through the rotating shaft, and one ends of the reels are connected with the driving motor through the connecting pieces; the sliding group comprises a first sliding strip, a telescopic rod and a second sliding strip.
Furthermore, the lifting and transporting device is a rectangular platform with a placement groove arranged at the upper part, and the two ends of the lifting and transporting device are movably connected with the upper part of the lifting and transporting device through connectors and steel wire ropes and are provided with fixed belts.
Further, the upper portion of the material carrying platform is provided with an arc-shaped opening, the two ends of the material carrying platform are movably connected with the sliding grooves in the two side walls of the lifting device through sliding blocks, and the sliding grooves are provided with limiting strips.
Further, the first slide bar is connected with the second slide bar through a telescopic rod, and a limiting terminal is arranged on the telescopic rod; the bottoms of the first sliding strip and the second sliding strip are provided with fixing strips, and the fixing strips are connected with the ground surface through limiting screws.
Further, the driving motor is fixedly connected with the upper portion of the fixing frame through a motor base, and a control box and a control panel are arranged on the side portion of the fixing frame.
Furthermore, a plurality of guide wheels are arranged at the bottom of the fixing frame and are metal guide wheels, and the guide wheels are connected with guide grooves in the upper portions of the first sliding strip and the second sliding strip.
Compared with the prior art, the utility model discloses one of following beneficial effect has at least:
1. mount upper portion is provided with independent slip group, can control lower part material carrying platform through the reel and go up and down, realizes automatic unloading and improves work efficiency, and adopts a driving motor to drive when being convenient for the unloading balanced, and carries the inside resettlement groove that is provided with of fortune ware, can change material carrying platform as required, is convenient for correspond different diameter pipeline and uses, improve equipment's suitability.
2. Be provided with independent slip group, first draw runner and second draw runner are settled and are fixed at the both ends of irrigation canals and ditches, and the metal guide pulley of whole mount cooperation bottom of being convenient for slides, is convenient for with pipeline transportation to the pipe laying region, improve equipment's practicality.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a schematic view of a part of the structure of the lifting and conveying device of the present invention.
Fig. 4 is a schematic view of a part of the sliding assembly of the present invention.
In the figure: 1-a fixed frame, 2-a fixed table, 3-a reel, 4-a driving motor, 5-a motor base, 6-a rotating shaft, 7-a guide wheel, 8-a steel wire rope, 10-a lifting device, 11-a material carrying table, 12-a fixed belt, 13-a synchronous belt, 14-a first slide bar, 15-a fixed bar, 16-a telescopic rod, 17-a limit terminal and 18-a second slide bar.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the following description is taken in conjunction with the accompanying drawings
And an embodiment of the present invention will be described in further detail. It should be understood that the particulars described herein are of particular interest
The examples are provided only for explaining the present invention and are not intended to limit the present invention.
In the description of the present invention, it is to be understood that "front, rear, upper, lower, left, right", "inner,
The directions or positional relationships indicated by the outer, bottom, top, etc. are generally based on the directions or positions shown in the drawings
Relationships are merely for convenience of description and simplicity of description, and where not otherwise stated, these are
The directional terms do not indicate or imply that the referenced device or element must have a particular orientation or be in a particular direction
Bit configuration and operation, and therefore, should not be construed as limiting the scope of the present invention.
Example 1
Referring to fig. 1-4, the water conservancy construction pipe laying and paying-off device comprises a fixed frame 1, a sliding group and a paying-off mechanism, wherein the fixed frame 1 is a stainless steel rectangular frame, the paying-off mechanism is arranged on the fixed frame 1, the paying-off mechanism comprises a fixed table 2, a winding group, a driving motor 4, a steel wire rope 8 and a lifting and conveying device 10, the winding group is fixedly arranged on the fixed frame 1 through the fixed table 2, a winding wheel 3 of the winding group is connected with another winding wheel through a synchronous belt 13, the winding wheel 3 is connected with the lifting and conveying device 10 through the steel wire rope 8, and a material loading platform 11 is arranged on the lifting and conveying device 10; the reels 3 on the winding groups are connected with the other winding group through a rotating shaft 6, and one end of each reel 3 is connected with the driving motor 4 through a connecting piece; the sliding group comprises a first sliding strip 14, a telescopic rod 16 and a second sliding strip 18; among the above-mentioned scheme, mount upper portion is provided with independent slip group, can control the lower part through the reel and carry the material platform and go up and down, realizes automatic unloading and improves work efficiency, and adopts a driving motor to drive when being convenient for the unloading balanced, and carry the inside resettlement groove that is provided with of fortune ware, can change as required and carry the material platform, is convenient for correspond different diameter pipelines and uses, improve equipment's suitability.
Example 2:
in this embodiment, a carrying device 10 is further described on the basis of the existing embodiment 1, the carrying device 10 is a rectangular platform with a placement groove at the upper part, and two ends of the carrying device 10 are movably connected with a steel wire rope 8 through a connector, and a fixed belt 12 is arranged at the upper part of the carrying device 10; an arc-shaped opening is formed in the upper portion of the material carrying platform 11, two ends of the material carrying platform 11 are movably connected with sliding grooves in two side walls of the lifting device 10 through sliding blocks, and limiting strips are arranged on the sliding grooves; the upper portion of the lifting device 10 is provided with a placing groove, the material carrying table 11 can be replaced as required, the lifting device can be suitable for pipelines with different diameters, a plurality of rubber gaskets are arranged on the inner arc surface of the material carrying table 11, the anti-skidding effect is achieved, and the fixing belt 12 is used for fixing the upper portion of the pipeline and preventing sliding in the lifting process.
Example 3:
in this embodiment, a first slide bar 14 is further described on the basis of the existing embodiment 1, the first slide bar 14 is connected to a second slide bar 18 through an expansion link 16, and the expansion link 16 is provided with a limit terminal 17; the bottoms of the first sliding strip 14 and the second sliding strip 18 are provided with fixing strips 15, and the fixing strips 15 are connected with the ground surface through limiting screws; be provided with independent slip group, first draw runner and second draw runner are settled and are fixed at the both ends of irrigation canals and ditches, and the metal guide pulley of whole mount cooperation bottom of being convenient for slides, is convenient for with pipeline transportation to the pipe laying region, improve equipment's practicality.
Example 4:
in this embodiment, the first slide bar 14 is further described on the basis of the existing embodiment 1, the driving motor 4 is fixedly connected with the upper portion of the fixing frame 1 through the motor base 5, and the side portion of the fixing frame 1 is provided with a control box and a control panel; the bottom of the fixed frame 1 is provided with a plurality of guide wheels 7, the guide wheels 7 are metal guide wheels, and the guide wheels 7 are connected with guide grooves on the upper parts of the first slide bar 14 and the second slide bar 18; the control box is used for controlling the descending speed of the whole pipeline, and is convenient for operators to control and use.
The appearances of the same phrase in various places in the specification are not necessarily all referring to the same embodiment. In a further aspect of the present invention,
when a particular feature, structure, or characteristic is described in connection with any embodiment, it is submitted that it is within the purview of other ones of the embodiments
It is also within the scope of the present invention for the embodiments to achieve such features, structures, or characteristics.
Although the invention has been described herein with reference to a number of illustrative embodiments thereof, it should be understood that numerous other modifications and embodiments can be devised by those skilled in the art that will fall within the spirit and scope of the principles of this invention. More specifically, various variations and modifications are possible in the component parts and/or arrangements of the subject combination arrangement within the scope of the disclosure, the drawings and the appended claims. In addition to variations and modifications in the component parts and/or arrangements, other uses will also be apparent to those skilled in the art.

Claims (6)

1. Water conservancy construction pipe laying pay-off includes mount (1), slip group and paying out machine structure, its characterized in that: the fixing frame (1) is a stainless steel rectangular frame, a pay-off mechanism is arranged on the fixing frame (1), the pay-off mechanism comprises a fixing table (2), a winding set, a driving motor (4), a steel wire rope (8) and a lifting and conveying device (10), the winding set is fixedly arranged on the fixing frame (1) through the fixing table (2), a winding wheel (3) of the winding set is connected with another winding wheel through a synchronous belt (13), the winding wheel (3) is connected with the lifting and conveying device (10) through the steel wire rope (8), and a material loading table (11) is arranged on the lifting and conveying device (10); the winding wheel (3) on the winding set is connected with the other winding set through a rotating shaft (6), and one end of the winding wheel (3) is connected with the driving motor (4) through a connecting piece; the sliding group comprises a first sliding strip (14), a telescopic rod (16) and a second sliding strip (18).
2. The water conservancy construction pipe laying and paying off device according to claim 1, wherein: the lifting and transporting device (10) is a rectangular platform with a placement groove in the upper portion, and a fixed belt (12) is arranged on the upper portion of the lifting and transporting device (10) and movably connected with the steel wire rope (8) through connectors at two ends of the lifting and transporting device (10).
3. The water conservancy construction pipe laying and paying off device according to claim 1, wherein: the upper part of the material carrying platform (11) is provided with an arc-shaped opening, the two ends of the material carrying platform (11) are movably connected with sliding grooves in the two side walls of the lifting and conveying device (10) through sliding blocks, and the sliding grooves are provided with limiting strips.
4. The water conservancy construction pipe laying and paying off device according to claim 1, wherein: the first sliding strip (14) is connected with the second sliding strip (18) through a telescopic rod (16), and a limiting terminal (17) is arranged on the telescopic rod (16); the bottoms of the first sliding strip (14) and the second sliding strip (18) are respectively provided with a fixing strip (15), and the fixing strips (15) are connected with the ground surface through limiting screws.
5. The water conservancy construction pipe laying and paying off device according to claim 1, wherein: the driving motor (4) is fixedly connected with the upper part of the fixing frame (1) through a motor base (5), and a control box and a control panel are arranged on the side part of the fixing frame (1).
6. The water conservancy construction pipe laying and paying off device according to claim 1, wherein: the bottom of the fixing frame (1) is provided with a plurality of guide wheels (7), the guide wheels (7) are metal guide wheels, and the guide wheels (7) are connected with guide grooves in the upper portions of the first sliding strip (14) and the second sliding strip (18).
CN202121274621.0U 2021-06-08 2021-06-08 Water conservancy construction pipe laying pay-off Active CN214935675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121274621.0U CN214935675U (en) 2021-06-08 2021-06-08 Water conservancy construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121274621.0U CN214935675U (en) 2021-06-08 2021-06-08 Water conservancy construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN214935675U true CN214935675U (en) 2021-11-30

Family

ID=79052933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121274621.0U Active CN214935675U (en) 2021-06-08 2021-06-08 Water conservancy construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN214935675U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115092850A (en) * 2022-07-15 2022-09-23 国网河南省电力公司宜阳县供电公司 Well entering and lifting device for electric inspection well equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115092850A (en) * 2022-07-15 2022-09-23 国网河南省电力公司宜阳县供电公司 Well entering and lifting device for electric inspection well equipment
CN115092850B (en) * 2022-07-15 2024-01-26 国网河南省电力公司宜阳县供电公司 Well entering and lifting device for electric power inspection well equipment

Similar Documents

Publication Publication Date Title
CN214935675U (en) Water conservancy construction pipe laying pay-off
CN116706777A (en) Cable laying construction device and construction method
CN207774448U (en) A kind of electromechanics construction cable paying-off implement
CN108163634A (en) A kind of power cable laying apparatus
CN206318579U (en) Transport pipe flatcar cable automatic retraction device
CN212174127U (en) Industrial cable winding device
CN214934812U (en) Energy-saving transmission equipment cable auxiliary laying device
CN215528515U (en) Glass fiber reinforced plastic cable protection pipe with positioning structure
CN213233758U (en) Hidden culvert dredging equipment device
CN212151115U (en) Cable arrangement device for communication engineering
CN214455905U (en) Cable device of convenient transportation
CN209009838U (en) A kind of waste and old aluminum stranded conductor recycling bobbin winder device
CN210193021U (en) Quick wire drawing device for power distribution network cable
CN207497533U (en) A kind of roller-type conveyer
CN206767264U (en) A kind of cable draws auxiliary actinobacillus device
CN210514724U (en) Reducing indoor optical cable for comprehensive wiring
CN211733426U (en) Operation device convenient to carry and used for cable production
CN207551531U (en) A kind of movable type cable pay off rack
CN218332097U (en) Portable communication pipeline lead wire distributor
CN216251959U (en) Pipeline cable laying traction device
CN217251821U (en) Steel bending device
CN105712125A (en) Portable pay-off vehicle
CN213326175U (en) Full-automatic combined cable take-up and pay-off reel
CN215755694U (en) Automatic take-up device for electric power engineering
CN215452333U (en) Electric pulley for conveying cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant