CN214935527U - Building curtain wall hoisting device - Google Patents

Building curtain wall hoisting device Download PDF

Info

Publication number
CN214935527U
CN214935527U CN202120747404.2U CN202120747404U CN214935527U CN 214935527 U CN214935527 U CN 214935527U CN 202120747404 U CN202120747404 U CN 202120747404U CN 214935527 U CN214935527 U CN 214935527U
Authority
CN
China
Prior art keywords
fixing
fixed
building curtain
base
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120747404.2U
Other languages
Chinese (zh)
Inventor
梅后敏
郑孝俊
李琦
董振
聂至波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120747404.2U priority Critical patent/CN214935527U/en
Application granted granted Critical
Publication of CN214935527U publication Critical patent/CN214935527U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building curtain overhead hoist, including the mount, base and adjustable shelf, mount and adjustable shelf link to each other, one side of adjustable shelf is connected with first cable wire fixing device, the below of mount is provided with the spiral device, be connected with the stay cord on the spiral device, stay cord and clamping device fixed connection, the base is fixed subaerial, the gyro wheel is installed to the below of base, the base top is fixed with the gag lever post, the cover has the balancing weight on the gag lever post, the one end of base is connected with two second cable wire fixing device, two second cable wire fixing device are connected with first cable wire fixing device through the cable wire. The utility model discloses an erect one can be according to building curtain handling height and the change position's double-track cable wire between ground and building roof portion, utilize the double-track cable wire to the fixed of handling curtain, can prevent the indiscriminate swing of building curtain handling in-process to keep building curtain handling in-process fixed stable, ensure building curtain and ground staff's safety.

Description

Building curtain wall hoisting device
Technical Field
The utility model belongs to the technical field of the curtain construction, in particular to building curtain overhead hoist.
Background
The building curtain wall usually refers to the non-bearing outer wall enclosure of the building, usually by panel and bearing structure composition, the main material of panel is glass, metal sheet, slabstone and ceramic plate usually, when the installation engineering outer decorative face is all the unitized curtain wall, its construction characteristics must be from the bottom up to construct gradually piece by piece layer, and the unit body installation can't utilize outer wall scaffold, and can't place in the hanging flower basket inside. Therefore, the operation is completed by applying the high-altitude lifting device of the building curtain wall, and the existing high-altitude lifting device of the building curtain wall wastes time and labor when moving the unit type curtain wall, is low in efficiency, poor in safety performance, inconvenient to operate and poor in fixing effect.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a building curtain overhead hoist to solve current curtain overhead hoist and waste time and energy, inefficiency and the poor problem of security performance.
In order to achieve the above object, the utility model provides a building curtain overhead hoist, include: the device comprises a fixed frame, a fixed frame is fixedly arranged at the top edge of a building, a movable frame is arranged above the fixed frame, the fixed frame and the movable frame are fixed in a limiting way through fixing screws, a slide rod is fixed at one side of the movable frame, two first steel cable fixing devices are connected to the slide rod in a sliding way, steel cables are respectively connected to the two first steel cable fixing devices, a wire coiling device is arranged below the fixed frame, pull ropes are connected to the wire coiling device, the steel cables and the pull ropes are respectively connected to a clamping device, the clamping device is fixedly connected with the pull ropes, the steel cables are connected with the clamping device in a sliding way, the device also comprises a base, screw cylinders are arranged at four corners of the base, fixing screws are spirally arranged inside the screw cylinders, the base is fixed on the ground through the fixing screws, four rollers are arranged below the base, a limiting rod is fixed at the central position above the base, and a balancing weight is sleeved on the limiting rod, one end of the base is connected with two second steel cable fixing devices, and the two second steel cable fixing devices are connected with the first steel cable fixing device through steel cables.
According to the utility model discloses a concrete embodiment, a plurality of fixed screws and set screw looks adaptation have been seted up to the both sides of mount.
According to the utility model discloses a concrete embodiment, the spout has been seted up to the both sides of mount, and the adjustable shelf is installed in the inside of spout.
According to the utility model discloses a concrete embodiment, the frame inside of adjustable shelf is provided with two anchor strut, and two anchor strut cross fixings are in the four corners of adjustable shelf frame.
According to the utility model discloses a concrete embodiment, the both sides of balancing weight are provided with the recess, and circular through-hole, circular through-hole's size and gag lever post looks adaptation have been seted up at the center of counter weight.
According to the utility model discloses a concrete embodiment, clamping device includes two slide drums, and two slide drums and cable wire sliding connection are fixed with flexible horizontal pole between two slide drums, install the fixed head on the flexible horizontal pole, fixed head and curtain fixed connection are provided with solid fixed ring on the flexible horizontal pole, and flexible horizontal pole passes through solid fixed ring and stay cord fixed connection.
According to the utility model discloses a concrete embodiment, the spiral device includes unable adjustment base and rotates the winding roll of being connected with unable adjustment base, and the winding roll passes through rotation axis connection to driving motor.
According to the utility model discloses a concrete embodiment, second cable wire fixing device is including the fixed lantern ring, and the outside of the fixed lantern ring is provided with the cable wire fixed head, and the inboard of the fixed lantern ring is provided with two spacing lugs, and two spacing lug symmetries set up, and lie in same axis with the fixed lantern ring, and fixed lantern ring top spiral mounting has the screw rod, and the screw rod is connected with the fixed lantern ring through splint.
Compared with the prior art, the utility model provides a pair of building curtain overhead hoist, through erect one can be according to building curtain handling height and the double-track cable wire of relocation between ground and building roof portion, through utilizing the double-track cable wire to the fixed of handling curtain, can prevent the indiscriminate swing of building curtain handling in-process to keep building curtain handling in-process fixed stable, and then can ensure building curtain and ground staff's safety, also be favorable to improving the handling speed and the anti-jamming ability of building curtain simultaneously.
Drawings
Fig. 1 is a schematic structural view of a building curtain wall hoisting device according to an embodiment of the present invention.
Fig. 2 is a top view of a building curtain wall hoisting device according to an embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a cable fixing device according to an embodiment of the present invention.
Reference numerals:
1-a fixed mount; 2-fixing the screw hole; 3-a movable frame; 4-a first cable fixing means; 5-a winding roll; 6-fixing a base; 7-a steel cord; 8-pulling a rope; 9-a slide cylinder; 10-curtain wall; 11-a building; 12-a second cable fixing means; 13-a groove; 14-a limiting rod; 15-a counterweight block; 16-a screw cylinder; 17-a fixed screw; 18-a roller; 19-a base; 20-a chute; 21-a set screw; 22-a slide bar; 23-a telescopic cross bar; 24-a fixed head; 26-reinforcing rods; 27-a screw; 28-clamping plate; 29-a limit bump; 30-cable fixing head.
Detailed Description
The present invention will be described in detail below with reference to specific embodiments in order to make the concept and idea of the present invention more clearly understood by those skilled in the art. It is to be understood that the embodiments presented herein are only a few of all embodiments that the present invention may have. Those skilled in the art who review this disclosure will readily appreciate that many modifications, variations, and alternatives to those embodiments described below, in whole or in part, are possible and are contemplated as falling within the scope of the claimed invention.
As used herein, the terms "first," "second," and the like are not intended to imply any order, quantity, or importance, but rather are used to distinguish one element from another. As used herein, the terms "a," "an," and other similar terms are not intended to mean that there is only one of the things, but rather that the pertinent description is directed to only one of the things, which may have one or more. As used herein, the terms "comprises," "comprising," and other similar words are intended to refer to logical interrelationships, and are not to be construed as referring to spatial structural relationships. For example, "a includes B" is intended to mean that logically B belongs to a, and not that spatially B is located inside a. Furthermore, the terms "comprising," "including," and other similar words are to be construed as open-ended, rather than closed-ended. For example, "a includes B" is intended to mean that B belongs to a, but B does not necessarily constitute all of a, and a may also include C, D, E and other elements.
The terms "embodiment," "present embodiment," "an embodiment," "one embodiment," and "one embodiment" herein do not mean that the pertinent description applies to only one particular embodiment, but rather that the description may apply to yet another embodiment or embodiments. It will be understood by those skilled in the art that any description made herein of one embodiment may be substituted, combined, or otherwise combined with the description made herein of another embodiment or embodiments, and that the resulting new embodiments may be readily apparent to those skilled in the art, and are within the scope of the present invention.
Example 1
Additional aspects and advantages of embodiments of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of embodiments of the invention. With reference to fig. 1-3, an embodiment of the present invention provides a building curtain wall overhead hoist, including:
the device comprises a fixed frame 1, wherein the fixed frame 1 is fixedly arranged at the top edge of a building 11, a movable frame 3 is arranged above the fixed frame 1, the fixed frame 1 and the movable frame 3 are fixed in a limiting way through a fixing screw 21, a slide rod 22 is fixed at one side of the movable frame 3, two first steel cable fixing devices 4 are connected on the slide rod 22 in a sliding way, steel cables 7 are respectively connected on the two first steel cable fixing devices 4, a winding device is arranged below the fixed frame 1 and is connected with a pull rope 8, the steel cables 7 and the pull rope 8 are respectively connected with a clamping device, wherein the clamping device is fixedly connected with the pull rope 8, the steel cables 7 are connected with the clamping device in a sliding way, the device also comprises a base 19, screw cylinders 16 are arranged at four corners of the base 19, fixing screw rods 17 are spirally arranged in the screw cylinders 16, the base 19 is fixed on the ground through the fixing screw rods 17, four idler wheels 18 are arranged below the base 19, a limiting rod 14 is fixed at the center position above the base 19, a balancing weight 15 is sleeved on the limiting rod 14, one end of the base 19 is connected with two second steel cable fixing devices 12, and the two second steel cable fixing devices 12 are connected with the first steel cable fixing device 12 through a steel cable 7. The second steel cable fixing device 12 includes a fixing sleeve ring 25, a steel cable fixing head 30 is disposed on the outer side of the fixing sleeve ring 25, two limiting convex blocks 29 are disposed on the inner side of the fixing sleeve ring 25, the two limiting convex blocks 29 are symmetrically disposed and located on the same axis with the fixing sleeve ring 25, a screw 27 is spirally mounted above the fixing sleeve ring 25, and the screw 27 is connected with the fixing sleeve ring 25 through a clamping plate 28.
Specifically, a plurality of fixing screw holes 2 are formed in two sides of the fixing frame 1, and the fixing screw holes 2 are matched with the fixing screws 21. In the process of assembling the fixed frame 1 and the movable frame 3, the position of the fixed screw hole 2 can be selected according to the actual operation environment on site, the fixed frame 1 and the movable frame 3 are fixedly connected by the fixing screw 21, the fixing screw 21 can be detached when the curtain wall is installed, and maintenance and management are facilitated.
Specifically, the fixed frame 1 is provided with sliding grooves 20 at two sides thereof, and the movable frame 3 is installed inside the sliding grooves 20. The movable frame 3 can freely move along the sliding groove 20, and the movable frame 3 is fixed in the fixing screw holes 2 at two sides of the fixed frame 1 through the fixing screws 21 after the position of the movable frame 3 is adjusted.
Specifically, two reinforcing rods 26 are arranged inside the frame of the movable frame 3, and the two reinforcing rods 26 are fixed at four corners of the frame of the movable frame 3 in a crossed manner. The reinforcing rods 26 can make the structure of the movable frame 3 more firm, increase the bearing capacity of the movable frame, and enable the stress to be more uniform, so that the curtain wall is more stable in the hoisting process.
Specifically, clamping device includes two slide drums 9, and two slide drums 9 and 7 sliding connection of cable wire are fixed with flexible horizontal pole 23 between two slide drums 9, install fixed head 24 on the flexible horizontal pole 23, and fixed head 24 and curtain 10 fixed connection are provided with solid fixed ring on the flexible horizontal pole 23, and flexible horizontal pole 23 is through solid fixed ring and stay cord 8 fixed connection. The clamping device is used for fixing the curtain wall 10 and enabling the curtain wall 10 to freely and stably move on the steel cable 7, the sliding cylinders 9 at two ends of the clamping device are sleeved on the outer side of the steel cable 7, the inner diameter of each sliding cylinder 9 is matched with the diameter of the steel cable 7, the sliding cylinders can freely slide on the steel cable 7, the length of a telescopic cross rod 23 connected between the two sliding cylinders 9 can be adjusted according to actual requirements, a fixing head 24 arranged on the telescopic cross rod 23 is used for fixing the curtain wall 10, and a fixing ring on the telescopic cross rod 23 is used for fixedly connecting the pull rope 8.
Specifically, the winding device comprises a fixed base 6 and a winding roll 5 rotatably connected with the fixed base 6, wherein the winding roll 5 is connected with a driving motor through a rotating shaft. The winding roll 5 is wound with a pull rope 8, and the winding roll 5 is driven to rotate by a driving motor, so that the pull rope 8 is wound and unwound.
Specifically, the two sides of the counterweight block 15 are provided with grooves 13, a circular through hole is formed in the center of the counterweight block 15, and the size of the circular through hole is matched with the limiting rod 14. The effect of balancing weight 15 is the fastness that increases base 19, can be according to the increase and decrease of the curtain specification free choice balancing weight 15 of handling, and the recess 13 at 15 both ends of balancing weight makes balancing weight 15 be convenient for install and dismantle.
Example 2
The embodiment of the utility model provides a building curtain overhead hoist's application method, the method is as follows:
when using the device to carry out building curtain handling, at first fix mount 1 at the roof of building, fix the spiral device on the floor under mount 1, again according to mount 1's rigidity base 19, after the two-lane cable wire 7 is fixed, adjust the position of base 19 according to the height of handling, thereby make building curtain hoist and transport just be close to building 11 when appointed height, thereby realize the adjustment to 7 intervals of two-lane cable wire through the interval between the 7 fixing device of adjustment cable wire according to the width of building curtain, then fix curtain 10 through the curtain fixed head, drive winding rod 5 through driving motor and rotate, it is safe and stable the pulling-up with curtain 10 to drive stay cord 8 through the rotation of winding rod 5.
To sum up, the utility model provides a pair of building curtain overhead hoist through erect one can be according to building curtain handling height and the double-track cable wire of relocation between ground and building roof portion, through utilizing the double-track cable wire to the fixed of handling curtain, can prevent the indiscriminate swing of building curtain handling in-process to keep building curtain handling in-process fixed stable, and then can ensure building curtain and ground staff's safety, also be favorable to improving the handling speed and the anti-jamming ability of building curtain simultaneously.
The concepts, principles and concepts of the present invention have been described above in detail in connection with specific embodiments (including examples and illustrations). It should be understood by those skilled in the art that the embodiments of the present invention may be embodied in many different forms and that various changes, modifications, substitutions and equivalents of the steps, methods, devices and components described in the above embodiments may be made by those skilled in the art after reading the present specification and should be considered as falling within the scope of the present invention. The protection scope of the present invention is subject to the claims only.

Claims (8)

1. The utility model provides a building curtain overhead hoist which characterized in that includes: the fixing frame (1), the fixing frame (1) is fixedly arranged at the top edge of a building (11), the movable frame (3) is arranged above the fixing frame (1), the fixing frame (1) and the movable frame (3) are fixed in a limiting manner through a fixing screw (21), one side of the movable frame (3) is fixed with a sliding rod (22), the sliding rod (22) is connected with two first steel cable fixing devices (4) in a sliding manner, two first steel cable fixing devices (4) are respectively connected with a steel cable (7), a winding device is arranged below the fixing frame (1), the winding device is connected with a pull rope (8), the steel cable (7) and the pull rope (8) are respectively connected with a clamping device, the clamping device is fixedly connected with the pull rope (8), and the steel cable (7) is connected with the clamping device in a sliding manner, the device still includes base (19), the four corners department of base (19) is provided with a screw section of thick bamboo (16), clamping screw (17) are installed to the inside spiral of screw section of thick bamboo (16), base (19) pass through clamping screw (17) are fixed subaerial, four gyro wheels (18) are installed to the below of base (19), the central point of the top of base (19) puts and is fixed with gag lever post (14), the cover has balancing weight (15) on gag lever post (14), the one end of base (19) is connected with two second cable wire fixing device (12), two second cable wire fixing device (12) pass through cable wire (7) with first cable wire fixing device (12) are connected.
2. The building curtain wall lifting device as claimed in claim 1, wherein a plurality of fixing screw holes (2) are formed in two sides of the fixing frame (1), and the fixing screw holes (2) are matched with the fixing screws (21).
3. The building curtain wall lifting device as claimed in claim 1, wherein sliding grooves (20) are formed in two sides of the fixed frame (1), and the movable frame (3) is mounted inside the sliding grooves (20).
4. The building curtain wall lifting device as claimed in claim 1, wherein two reinforcing rods (26) are arranged inside the frame of the movable frame (3), and the two reinforcing rods (26) are fixed at four corners of the frame of the movable frame (3) in a crossed manner.
5. The building curtain wall lifting device as claimed in claim 1, wherein grooves (13) are formed in two sides of the counterweight block (15), a circular through hole is formed in the center of the counterweight block (15), and the size of the circular through hole is matched with that of the limiting rod (14).
6. The building curtain wall lifting device as claimed in claim 1, wherein the clamping device comprises two sliding drums (9), the two sliding drums (9) are slidably connected with the steel cable (7), a telescopic cross rod (23) is fixed between the two sliding drums (9), a fixing head (24) is mounted on the telescopic cross rod (23), the fixing head (24) is fixedly connected with the curtain wall (10), a fixing ring is arranged on the telescopic cross rod (23), and the telescopic cross rod (23) is fixedly connected with the pull rope (8) through the fixing ring.
7. The building curtain wall lifting device as claimed in claim 1, wherein the wire winding device comprises a fixed base (6) and a wire winding roller (5) rotatably connected with the fixed base (6), and the wire winding roller (5) is connected to a driving motor through a rotating shaft.
8. The building curtain wall lifting device as claimed in claim 1, wherein the second steel cable fixing device (12) comprises a fixing sleeve ring (25), a steel cable fixing head (30) is arranged on the outer side of the fixing sleeve ring (25), two limiting convex blocks (29) are arranged on the inner side of the fixing sleeve ring (25), the two limiting convex blocks (29) are symmetrically arranged and are located on the same axis with the fixing sleeve ring (25), a screw rod (27) is spirally mounted above the fixing sleeve ring (25), and the screw rod (27) is connected with the fixing sleeve ring (25) through a clamping plate (28).
CN202120747404.2U 2021-04-13 2021-04-13 Building curtain wall hoisting device Expired - Fee Related CN214935527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120747404.2U CN214935527U (en) 2021-04-13 2021-04-13 Building curtain wall hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120747404.2U CN214935527U (en) 2021-04-13 2021-04-13 Building curtain wall hoisting device

Publications (1)

Publication Number Publication Date
CN214935527U true CN214935527U (en) 2021-11-30

Family

ID=79044982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120747404.2U Expired - Fee Related CN214935527U (en) 2021-04-13 2021-04-13 Building curtain wall hoisting device

Country Status (1)

Country Link
CN (1) CN214935527U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117387032A (en) * 2023-12-13 2024-01-12 上海艺嘉智慧科技集团有限公司 Curtain wall lamp installation construction device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117387032A (en) * 2023-12-13 2024-01-12 上海艺嘉智慧科技集团有限公司 Curtain wall lamp installation construction device
CN117387032B (en) * 2023-12-13 2024-02-23 上海艺嘉智慧科技集团有限公司 Curtain wall lamp installation construction device

Similar Documents

Publication Publication Date Title
CN214935527U (en) Building curtain wall hoisting device
CN106744362A (en) Small portable family expenses boom hoisting
CN210480669U (en) Auxiliary steel bar hoisting device for assembly type columns in constructional engineering
CN207469715U (en) A kind of scaffold for building for being readily transported construction material
CN209989003U (en) Assembled construction steel member hoisting accessory
CN210313191U (en) Electric single-beam suspension crane
CN210288389U (en) Anchor rod type static pressure pile device for foundation reinforcement
CN105366565B (en) High voltage transmission line tower auxiliary lifting apparatus
JP2855014B2 (en) Disassembled jib crane
CN212581394U (en) Portable small-size material transport device
CN211295989U (en) Super high-rise building shaft cable flip-chip laying device
CN108166419A (en) A kind of Campus Security environmental-protection column
CN203295074U (en) Telescopic two-dimensional full-automatic miniature cantilever crane
CN109678067B (en) A supplementary device of demolising for tower crane
CN209957264U (en) Lifting and placing composite device
CN217205489U (en) High altitude faces limit post construction equipment
CN218522163U (en) Liftable support for construction engineering construction
CN218292712U (en) But height-adjusting's scaffold frame for house construction
CN109573821A (en) A kind of hanging basket being readily transported building material
CN220317150U (en) ALC wallboard lifting machine tool
CN217627069U (en) Steel construction lifting device for assembly type building construction
CN209493230U (en) A kind of bridge crane trolley
CN216918297U (en) Prefabricated material hoist device is used in highway construction
CN210316441U (en) Scaffold for building engineering
CN212374692U (en) Eccentric segmental beam hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211130