CN214894716U - Dust measuring device for building supervision - Google Patents

Dust measuring device for building supervision Download PDF

Info

Publication number
CN214894716U
CN214894716U CN202120965097.5U CN202120965097U CN214894716U CN 214894716 U CN214894716 U CN 214894716U CN 202120965097 U CN202120965097 U CN 202120965097U CN 214894716 U CN214894716 U CN 214894716U
Authority
CN
China
Prior art keywords
plate
dust measuring
measuring device
angle frame
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120965097.5U
Other languages
Chinese (zh)
Inventor
史保通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qianzhou Rongxin Environmental Protection Technology Development Co ltd
Original Assignee
Shanghai Qianzhou Rongxin Environmental Protection Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qianzhou Rongxin Environmental Protection Technology Development Co ltd filed Critical Shanghai Qianzhou Rongxin Environmental Protection Technology Development Co ltd
Priority to CN202120965097.5U priority Critical patent/CN214894716U/en
Application granted granted Critical
Publication of CN214894716U publication Critical patent/CN214894716U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model discloses a dust measuring device is used in building supervision, comprising a base plate, the fixed plate is installed on the top of bottom plate, the top of fixed plate is provided with the threaded rod, the right angle frame is installed at the rear that the top of fixed plate is located the threaded rod, the outside sliding connection of right angle frame has the slide, the device board is installed in the outside of slide, the dust measuring apparatu is installed on the top of device board, driving motor is installed at the rear of right angle frame, first runner is installed to driving motor's power take off end. The utility model discloses a threaded rod, first runner, second runner that set up, place board and slide, can carry out the regulation of height with dust measuring instrument, can detect the air quality of co-altitude not, improved the practicality of device, through sprayer, mounting panel, gear, spliced pole, spiral post and the connecting rod that sets up, can spray the dust fall to the building place, reduce the dust on ground.

Description

Dust measuring device for building supervision
Technical Field
The utility model relates to a building detects technical field, specifically is a building is managed and is used dust measuring device.
Background
The completion of high-quality building engineering is not enough to carefully supervise building supervision, and the main work of building supervision is to supervise, check and accept whether a building meets related building standards and regulations; supervising and guiding the construction method to ensure that the project reaches the standard.
The dust measuring device for building supervision at present can measure dust on a building site when in use, but still has the following problems when in use:
when the current dust measuring device for building supervision is used, the detecting device is usually fixed at one position and cannot move when dust is measured, only one range can be detected, and the dust content in the air at different heights is different.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building is managed and is used dust measuring device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a dust measuring device for building supervision comprises a bottom plate, wherein a fixed plate is installed at the top end of the bottom plate, a threaded rod is arranged at the top end of the fixed plate, a right-angle frame is installed at the top end of the fixed plate, which is positioned at the rear end of the threaded rod, a sliding plate is slidably connected to the outer side of the right-angle frame, a device plate is installed at the outer side of the sliding plate, a dust measuring instrument is installed at the top end of the device plate, a driving motor is installed at the rear end of the right-angle frame, a first rotating wheel is installed at the power output end of the driving motor, a connecting belt is rotatably connected to the outer side of the first rotating wheel, a second rotating wheel is rotatably connected to the inner side of the other end of the connecting belt, a device box is installed at the top end of the bottom plate and positioned at the rear end of the right-angle frame, a rotating block is arranged at the outer side of the device box, a mounting plate is arranged at the top end of the device box, a water guide pipe is arranged at the outer side of the device box, the sprayer is installed to the other end of aqueduct, the support is installed on the top of mounting panel, the inside of device case is provided with the linkage plate, the connecting plate is installed on the top of linkage plate, the inside of connecting plate is rotated and is connected with the spiral post, the outside meshing of spiral post is connected with the gear, the internally mounted of gear has the spliced pole, the spliced pole is installed to the bottom of mounting panel, the connecting rod is installed to the end of spiral post, the commentaries on classics piece is installed to the other end of connecting rod, the removal wheel is installed to the bottom of bottom plate.
Preferably, the top of removal wheel is provided with the service brake piece.
Preferably, the device plate is internally provided with a threaded hole matched with the threaded rod, and the device plate is in threaded connection with the outer side of the threaded rod through the threaded hole.
Preferably, four groups of rollers are arranged on the inner side of the sliding plate, and the sliding plate is connected to the outer side of the right-angle frame in a sliding mode through the rollers.
Preferably, the inside of gear is provided with the mounting hole with spliced pole looks adaptation, and the spliced pole is installed in the inside of gear through this mounting hole.
Preferably, the connecting plate is internally provided with a connecting hole matched with the spiral column, and the spiral column is rotatably connected inside the connecting plate through the connecting hole.
Compared with the prior art, the utility model provides a building is managed and is used dust measuring device possesses following beneficial effect:
1. the utility model discloses a threaded rod, first runner, second runner that set up, place board and slide can carry out the regulation of height with dust measuring instrument, can detect the air dust of co-altitude not, have improved the practicality of device.
2. The utility model discloses a sprayer, mounting panel, gear, spliced pole, spiral post and the connecting rod that sets up can spray the dust fall to the building place, reduces the dust on ground, and the spiral post can drive gear revolve, drives the sprayer simultaneously and sprays the regulation of direction.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a schematic view of the gear structure of the present invention.
In the figure: 1. a base plate; 2. a fixing plate; 3. a threaded rod; 4. a right-angle frame; 5. a slide plate; 6. a mounting plate; 7. a dust measuring instrument; 8. a drive motor; 9. a first runner; 10. a connecting belt; 11. a second runner; 12. a device case; 13. rotating the block; 14. mounting a plate; 15. a water conduit; 16. a sprayer; 17. a support; 18. a connector tile; 19. a connecting plate; 20. a helical column; 21. a gear; 22. connecting columns; 23. a connecting rod; 24. the wheel is moved.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: a dust measuring device for building supervision comprises a bottom plate 1, a fixed plate 2 is installed at the top end of the bottom plate 1, a threaded rod 3 is arranged at the top end of the fixed plate 2, a right-angle frame 4 is installed at the top end of the fixed plate 2 and located behind the threaded rod 3, a sliding plate 5 is connected to the outer side of the right-angle frame 4 in a sliding mode, a device plate 6 is installed at the outer side of the sliding plate 5, a dust measuring instrument 7 is installed at the top end of the device plate 6, a driving motor 8 is installed behind the right-angle frame 4, a first rotating wheel 9 is installed at the power output end of the driving motor 8, a connecting belt 10 is connected to the outer side of the first rotating wheel 9 in a rotating mode, a second rotating wheel 11 is connected to the inner side of the other end of the connecting belt 10 in a rotating mode, a device box 12 is installed at the top end of the bottom plate 1 and located behind the right-angle frame 4, a rotating block 13 is arranged on the outer side of the device box 12, a mounting plate 14 is arranged at the top end of the device box 12, and a water guide pipe 15 is arranged on the outer side of the device box 12, the sprayer 16 is installed at the other end of the water guide pipe 15, the support 17 is installed at the top end of the mounting plate 14, the connecting plate 18 is arranged inside the device box 12, the connecting plate 19 is installed at the top end of the connecting plate 18, the spiral column 20 is connected to the connecting plate 19 in a rotating mode, the gear 21 is connected to the outer side of the spiral column 20 in a meshed mode, the connecting column 22 is installed inside the gear 21, the connecting column 22 is installed at the bottom of the mounting plate 14, the connecting rod 23 is installed at the end of the spiral column 20, the rotating block 13 is installed at the other end of the connecting rod 23, and the moving wheel 24 is installed at the bottom of the bottom plate 1.
In this embodiment, a foot brake piece is provided at the tip of the moving wheel 24, and the entire device can be braked while braking the moving wheel 24.
In this implementation, the inside of device board 6 is provided with the screw hole with threaded rod 3 looks adaptation, and device board 6 is in the outside of threaded rod 3 through this screw hole threaded connection, makes things convenient for device board 6 to move in the outside of threaded rod 3 and drives dust measuring instrument 7 and carry out the regulation of height.
In this embodiment, the inside of slide 5 is provided with four sets of gyro wheels, and slide 5 passes through this gyro wheel sliding connection in the outside of right-angle frame 4, makes things convenient for slide 5 to slide along with placing board 6 in the outside of right-angle frame 4 together.
In this implementation, the inside of gear 21 is provided with the mounting hole with spliced pole 22 looks adaptation, and spliced pole 22 installs in the inside of gear 21 through this mounting hole, makes things convenient for gear 21 to drive spliced pole 22 and rotate together when the pivoted, drives mounting panel 14 and rotates and make sprayer 16 can adjust the direction of spraying.
In this implementation, the inside of connecting plate 19 is provided with the connecting hole with spiral post 20 looks adaptation, and spiral post 20 rotates through this connecting hole and connects in the inside of connecting plate 19, drives spiral post 20 and rotates when conveniently rotating commentaries on classics piece 13.
The working principle is as follows: the device is moved to a working place through a moving wheel 24, the moving wheel 24 can be braked through a foot brake sheet, a driving motor 8 runs to drive a first rotating wheel 9 to rotate, the first rotating wheel 9 rotates and simultaneously drives a second rotating wheel 11 to rotate through a connecting belt 10, a rotating threaded rod 3 along with the second rotating wheel 11 rotates, a mounting plate 6 moves outside the threaded rod 3 through internal threads while the threaded rod 3 rotates, a dust measuring instrument 7 is driven to move together to adjust the height, a ground can be subjected to dust fall treatment through a connecting column 16, dust on the ground is reduced, a rotating block 13 is rotated, the rotating block 13 drives a spiral column 20 to rotate together, a rotating gear 21 of the spiral column 20 rotates together, the gear 21 drives a mounting plate 14 to rotate through a connecting column 22 which is internally mounted, the spraying machine 16 is driven to rotate along with the rotation of the mounting plate 14, and the spraying direction of the spraying machine 16 can be adjusted.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.

Claims (6)

1. The utility model provides a building is dust measuring device for supervision, includes bottom plate (1), its characterized in that: the dust measuring device is characterized in that a fixing plate (2) is installed at the top end of the bottom plate (1), a threaded rod (3) is arranged at the top end of the fixing plate (2), a right-angle frame (4) is installed at the rear end of the threaded rod (3) at the top end of the fixing plate (2), a sliding plate (5) is connected to the outer side of the right-angle frame (4) in a sliding manner, a device plate (6) is installed at the outer side of the sliding plate (5), a dust measuring instrument (7) is installed at the top end of the device plate (6), a driving motor (8) is installed at the rear end of the right-angle frame (4), a first rotating wheel (9) is installed at the power output end of the driving motor (8), a connecting belt (10) is rotatably connected to the outer side of the first rotating wheel (9), a second rotating wheel (11) is rotatably connected to the inner side of the other end of the connecting belt (10), a device box (12) is installed at the top end of the bottom plate (1) and at the rear end of the right-angle frame (4), the outside of device case (12) is provided with commentaries on classics piece (13), the top of device case (12) is provided with mounting panel (14), the outside of device case (12) is provided with aqueduct (15), sprayer (16) are installed to the other end of aqueduct (15), support (17) are installed on the top of mounting panel (14), the inside of device case (12) is provided with linkage plate (18), connecting plate (19) are installed on the top of linkage plate (18), the internal rotation of connecting plate (19) is connected with spiral post (20), the outside meshing of spiral post (20) is connected with gear (21), the internally mounted of gear (21) has spliced pole (22), spliced pole (22) is installed to the bottom of mounting panel (14), connecting rod (23) are installed to the end of spiral post (20), commentaries on classics piece (13) are installed to the other end of connecting rod (23), the bottom of the bottom plate (1) is provided with a movable wheel (24).
2. A dust measuring device for building supervision according to claim 1, characterized in that: the top end of the moving wheel (24) is provided with a foot brake sheet.
3. A dust measuring device for building supervision according to claim 1, characterized in that: the device plate (6) is internally provided with a threaded hole matched with the threaded rod (3), and the device plate (6) is in threaded connection with the outer side of the threaded rod (3) through the threaded hole.
4. A dust measuring device for building supervision according to claim 1, characterized in that: four groups of rollers are arranged on the inner side of the sliding plate (5), and the sliding plate (5) is connected to the outer side of the right-angle frame (4) in a sliding mode through the rollers.
5. A dust measuring device for building supervision according to claim 1, characterized in that: the gear (21) is internally provided with a mounting hole matched with the connecting column (22), and the connecting column (22) is mounted inside the gear (21) through the mounting hole.
6. A dust measuring device for building supervision according to claim 1, characterized in that: the connecting plate (19) is internally provided with a connecting hole matched with the spiral column (20), and the spiral column (20) is rotatably connected inside the connecting plate (19) through the connecting hole.
CN202120965097.5U 2021-05-08 2021-05-08 Dust measuring device for building supervision Expired - Fee Related CN214894716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120965097.5U CN214894716U (en) 2021-05-08 2021-05-08 Dust measuring device for building supervision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120965097.5U CN214894716U (en) 2021-05-08 2021-05-08 Dust measuring device for building supervision

Publications (1)

Publication Number Publication Date
CN214894716U true CN214894716U (en) 2021-11-26

Family

ID=78946394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120965097.5U Expired - Fee Related CN214894716U (en) 2021-05-08 2021-05-08 Dust measuring device for building supervision

Country Status (1)

Country Link
CN (1) CN214894716U (en)

Similar Documents

Publication Publication Date Title
CN211440639U (en) Building construction wall drilling machine
CN111679344B (en) Make things convenient for angle regulation's solar energy meteorological information monitoring facilities
CN209624529U (en) A kind of air pollution monitoring device
CN214894716U (en) Dust measuring device for building supervision
CN114310926B (en) Roof paying-off robot
CN211313254U (en) Integrative application equipment of application of polishing
CN216380603U (en) Mortar spraying device with quick adjustment structure
CN108413948B (en) Stay wire measuring device for building
CN212780782U (en) Total phosphorus on-line measuring device
CN215812676U (en) Movable VOC gas monitoring device for environment monitoring
CN213422261U (en) Building engineering environment monitoring device
CN212857540U (en) Steel bar cutting equipment for building engineering convenient to adjust cutting length
CN211551047U (en) Be convenient for adjust laser measuring apparatu and bear device
CN210893131U (en) Multi-functional land mapping device
CN208398783U (en) A kind of circularity detection device
CN219866975U (en) A all-round runing rest for installing sewage treatment on-line measuring equipment
CN220328251U (en) Raise dust supervision device
CN219757334U (en) Wall detection device for engineering
CN221099605U (en) Channel water depth measuring device
CN220471056U (en) Portable mapping device
CN221055726U (en) Deformation detection device for construction engineering detection
CN220436094U (en) Level meter support convenient to carry
CN216682201U (en) Roof unwrapping wire robot
CN220871753U (en) Straightness detection device hangs down
CN216390300U (en) Cable traction machine with adjustable traction height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126