CN214889337U - Concrete pump pipe fixing structure for super high-rise building construction - Google Patents
Concrete pump pipe fixing structure for super high-rise building construction Download PDFInfo
- Publication number
- CN214889337U CN214889337U CN202022690688.4U CN202022690688U CN214889337U CN 214889337 U CN214889337 U CN 214889337U CN 202022690688 U CN202022690688 U CN 202022690688U CN 214889337 U CN214889337 U CN 214889337U
- Authority
- CN
- China
- Prior art keywords
- fixed
- plate
- base station
- concrete pump
- pump pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 16
- 230000007246 mechanism Effects 0.000 claims abstract description 15
- 238000009434 installation Methods 0.000 abstract description 14
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a super high-rise building construction concrete pump pipe fixed knot constructs, including fixed base station, the upper end of fixed base station is provided with fixed establishment, fixed establishment includes fixed plate, first fixed cover and first locking plate, the upper end of fixed base station is provided with the fixed plate, the upper end of fixed plate is provided with first fixed cover, the upper end of first fixed cover is provided with first locking plate, the one end that the upper end of fixed base station is close to the fixed plate is provided with the moving mechanism, the moving mechanism includes chute board, slider, backup pad, threaded rod, carousel, turning handle, the fixed cover of second and second locking plate, the one end of the upper end fixed plate of fixed base station is provided with the chute board, the spout has been seted up to the upper end of chute board. The utility model discloses simple structure, installation fast and stable and convenient to detach, the installation time of the concrete pump pipe that has significantly reduced, better satisfying the use needs.
Description
Technical Field
The utility model relates to a fixed knot constructs technical field, specifically is a super high-rise building construction concrete pump pipe fixed knot constructs.
Background
At present, concrete pump pipes for super high-rise building construction are fixed by adopting steel frames and scaffolds as materials for fixing pump pipe supports by experience, in the super high-rise building construction, the construction of a vertical structure of a core cylinder is prior to the construction of a horizontal structure, the concrete pump pipes can be fixed only by the vertical structure which is constructed, and the force generated in concrete conveying is transmitted to the vertical structure through a pump pipe fixing frame.
At present, the pump pipe is fixed and installed by experience in super high-rise building construction, uncertainty of various factors exists in the concrete conveying process, if the concrete pump pipe falls off, a large accident is easily caused, and a large safety risk exists, so that a scheme capable of relieving the problems is urgently needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a super high-rise building construction concrete pump pipe fixed knot constructs to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete pump pipe fixing structure for super high-rise building construction comprises a fixing base station, wherein a fixing mechanism is arranged at the upper end of the fixing base station, the fixing mechanism comprises a fixing plate, a first fixing sleeve and a first locking plate, the fixing plate is arranged at the upper end of the fixing base station, the first fixing sleeve is arranged at the upper end of the fixing plate, the first locking plate is arranged at the upper end of the first fixing sleeve, a movable mechanism is arranged at one end, close to the fixing plate, of the upper end of the fixing base station, the movable mechanism comprises a sliding chute plate, a sliding block, a supporting plate, a threaded rod, a turntable, a rotating handle, a second fixing sleeve and a second locking plate, the sliding chute plate is arranged at one end of the fixing plate at the upper end of the fixing base station, a sliding chute is formed in the upper end of the sliding chute plate, the sliding block is arranged inside the sliding chute plate, the supporting plate is arranged at one end of the upper end of the sliding chute plate, and the supporting plate is provided with a threaded hole, the internal surface of the thread groove of the one end backup pad of slider is provided with the threaded rod, the one end of threaded rod is provided with the carousel, the one end edge of carousel is provided with the turning handle, the upper end of slider is provided with the fixed cover of second, the upper end of the fixed cover of second is provided with second locking plate.
Preferably, the lower end of the fixing plate is fixedly connected with one end, close to the upper end of the fixing base, and the upper end of the fixing plate is fixedly connected with the lower end of the first fixing sleeve.
Preferably, the lower end of the first locking plate is fixedly connected with the upper end of the first fixing sleeve, the lower end of the sliding groove plate is fixedly connected with the upper end of the fixing base station, and the other end of the sliding groove plate is fixedly connected with one end of the fixing plate.
Preferably, the outer surface of the sliding block is in sliding connection with the inner surface of a sliding groove of the sliding groove plate, the lower end of the supporting plate is fixedly connected with one end of the upper end of the sliding groove plate, the other end of the threaded rod is fixedly connected with one end of the sliding block, and the outer surface of the threaded rod is in threaded connection with the inner surface of a threaded hole of the supporting plate.
Preferably, the other end of the rotary table is fixedly connected with one end of the threaded rod, and one end of the rotary handle is fixedly connected with one end edge of the rotary table.
Preferably, the upper end of slider and the lower extreme fixed connection of the fixed cover of second, the lower extreme of second locking board and the upper end fixed connection of the fixed cover of second, through fixed screw locking connection between first locking board and the second locking board, threaded rod, carousel and turning handle all are provided with two sets ofly.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the device is mainly suitable for fixing the concrete pump pipe in the construction process, when in use, a preset installation position is firstly found, a fixed base station is fixedly installed at a designated position, then the concrete pump pipe is placed in a first fixing sleeve, after the concrete pump pipe is placed in the first fixing sleeve, a rotating disc is rotated by grasping a rotating handle, a threaded rod is driven by the rotation of the rotating disc to rotate and advance in a threaded hole of a supporting plate in a threaded manner, so that a sliding block is pushed to drive the second fixing sleeve and a second locking plate to move simultaneously, when the inner surface of the second fixing sleeve is attached to the outer surface of the concrete pump pipe, the second fixing sleeve is proved to move to the designated position, the rotating disc and the rotating handle stop rotating, and then the first locking plate and the second locking plate are connected, locked and fixed by using a fixing screw to prevent the concrete pump pipe from loosening, the whole installation is finished, the device is simple in structure, the installation is rapid and stable, the disassembly is convenient, and the installation time of the concrete pump pipe is greatly reduced.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a partial structure of the present invention;
FIG. 3 is a schematic view of the movable mechanism of the present invention;
fig. 4 is an enlarged schematic view of part a of the present invention.
In the figure: 1. fixing the base station; 2. a fixing mechanism; 3. a movable mechanism; 201. a fixing plate; 202. a first fixing sleeve; 203. a first locking plate; 301. a chute plate; 302. a slider; 303. a support plate; 304. a threaded rod; 305. a turntable; 306. a handle is rotated; 307. a second fixing sleeve; 308. and a second locking plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships that are relative to each other, are merely for convenience of description and to simplify the description, and do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a concrete pump pipe fixing structure for super high-rise building construction comprises a fixing base station 1, a fixing mechanism 2 is arranged at the upper end of the fixing base station 1, the fixing mechanism 2 comprises a fixing plate 201, a first fixing sleeve 202 and a first locking plate 203, the fixing plate 201 is arranged at the upper end of the fixing base station 1, the first fixing sleeve 202 is arranged at the upper end of the fixing plate 201, the first locking plate 203 is arranged at the upper end of the first fixing sleeve 202, a movable mechanism 3 is arranged at one end, close to the fixing plate 201, of the upper end of the fixing base station 1, the movable mechanism 3 comprises a chute plate 301, a sliding block 302, a supporting plate 303, a threaded rod 304, a rotary table 305, a rotary handle 306, a second fixing sleeve 307 and a second locking plate 308, the chute plate 301 is arranged at one end of the fixing plate 201 at the upper end of the fixing base station 1, a chute is arranged at the upper end of the chute plate 301, the sliding block 302 is arranged inside the chute of the chute plate 301, and the supporting plate 303 is arranged at one end of the chute plate 301, the supporting plate 303 is provided with a threaded hole, the inner surface of the threaded groove of the supporting plate 303 at one end of the sliding block 302 is provided with a threaded rod 304, one end of the threaded rod 304 is provided with a rotating disc 305, the edge of one end of the rotating disc 305 is provided with a rotating handle 306, the upper end of the sliding block 302 is provided with a second fixing sleeve 307, and the upper end of the second fixing sleeve 307 is provided with a second locking plate 308.
The lower end of the fixing plate 201 is fixedly connected with the upper end of the fixing base 1 near one end, and the upper end of the fixing plate 201 is fixedly connected with the lower end of the first fixing sleeve 202.
The lower end of the first locking plate 203 is fixedly connected with the upper end of the first fixing sleeve 202, the lower end of the sliding chute plate 301 is fixedly connected with the upper end of the fixing base 1, and the other end of the sliding chute plate 301 is fixedly connected with one end of the fixing plate 201.
The outer surface of the sliding block 302 is in sliding connection with the inner surface of the sliding groove plate 301, the lower end of the supporting plate 303 is fixedly connected with one end of the upper end of the sliding groove plate 301, the other end of the threaded rod 304 is fixedly connected with one end of the sliding block 302, and the outer surface of the threaded rod 304 is in threaded connection with the inner surface of the threaded hole of the supporting plate 303.
The other end of the rotary disc 305 is fixedly connected with one end of the threaded rod 304, and one end of the rotary handle 306 is fixedly connected with one end edge of the rotary disc 305.
The upper end of the sliding block 302 is fixedly connected with the lower end of a second fixing sleeve 307, the lower end of a second locking plate 308 is fixedly connected with the upper end of the second fixing sleeve 307, the first locking plate 203 is in locking connection with the second locking plate 308 through a fixing screw, and two groups of threaded rods 304, a rotary table 305 and a rotary handle 306 are arranged; the device is mainly suitable for fixing a concrete pump pipe in the construction process, when the device is used, a preset installation position is firstly found, a fixed base platform 1 is fixedly installed at a specified position, then the concrete pump pipe is placed in a first fixing sleeve 202, after the concrete pump pipe is placed in the first fixing sleeve 202, a rotating handle 306 is grasped to rotate a rotating disc 305, the rotating disc 305 rotates to drive a threaded rod 304 to rotate and advance in a threaded hole of a supporting plate 303 in a threaded manner, so that a sliding block 302 is pushed to drive a second fixing sleeve 307 and a second locking plate 308 to move simultaneously, when the inner surface of the second fixing sleeve 307 is attached to the outer surface of the concrete pump pipe, the second fixing sleeve 307 is proved to move to the specified position, the rotating disc 305 and the rotating handle 306 stop rotating, and then the first locking plate 203 and the second locking plate 308 are connected, locked and fixed by using fixing screws, the device has the advantages that the concrete pump pipe is prevented from loosening, the whole installation is finished, the structure is simple, the installation is rapid and stable, the disassembly is convenient, and the installation time of the concrete pump pipe is greatly reduced.
The working principle is as follows: the device is mainly suitable for fixing a concrete pump pipe in the construction process, when the device is used, a preset installation position is firstly found, a fixed base platform 1 is fixedly installed at a specified position, then the concrete pump pipe is placed in a first fixing sleeve 202, after the concrete pump pipe is placed in the first fixing sleeve 202, a rotating handle 306 is grasped to rotate a rotating disc 305, the rotating disc 305 rotates to drive a threaded rod 304 to rotate and advance in a threaded hole of a supporting plate 303 in a threaded manner, so that a sliding block 302 is pushed to drive a second fixing sleeve 307 and a second locking plate 308 to move simultaneously, when the inner surface of the second fixing sleeve 307 is attached to the outer surface of the concrete pump pipe, the second fixing sleeve 307 is proved to move to the specified position, the rotating disc 305 and the rotating handle 306 stop rotating, and then the first locking plate 203 and the second locking plate 308 are connected, locked and fixed by using fixing screws, the device has the advantages that the concrete pump pipe is prevented from loosening, the whole installation is finished, the structure is simple, the installation is rapid and stable, the disassembly is convenient, and the installation time of the concrete pump pipe is greatly reduced.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a super high-rise building construction concrete pump pipe fixed knot constructs, includes fixed base station (1), its characterized in that: the upper end of fixed base station (1) is provided with fixed establishment (2), fixed establishment (2) is including fixed plate (201), first fixed cover (202) and first locking plate (203), the upper end of fixed base station (1) is provided with fixed plate (201), the upper end of fixed plate (201) is provided with first fixed cover (202), the upper end of first fixed cover (202) is provided with first locking plate (203), the one end that the upper end of fixed base station (1) is close to fixed plate (201) is provided with movable mechanism (3), movable mechanism (3) include spout board (301), slider (302), backup pad (303), threaded rod (304), carousel (305), turning handle (306), the fixed cover of second (307) and second locking plate (308), the one end of the upper end fixed plate (201) of fixed base station (1) is provided with spout board (301), the spout has been seted up to the upper end of spout board (301), the inside slider (302) that is provided with of spout board (301), the upper end one end of spout board (301) is provided with backup pad (303), threaded hole is seted up in backup pad (303), the internal surface of the thread groove of the one end backup pad (303) of slider (302) is provided with threaded rod (304), the one end of threaded rod (304) is provided with carousel (305), the one end edge of carousel (305) is provided with turning handle (306), the upper end of slider (302) is provided with the fixed cover of second (307), the upper end of the fixed cover of second (307) is provided with second locking plate (308).
2. The super high-rise building construction concrete pump pipe fixing structure of claim 1, characterized in that: the lower extreme of fixed plate (201) is close to one end fixed connection with the upper end of fixed base station (1), the upper end of fixed plate (201) and the lower extreme fixed connection of first fixed cover (202).
3. The super high-rise building construction concrete pump pipe fixing structure of claim 1, characterized in that: the lower extreme of first jam plate (203) and the upper end fixed connection of first fixed cover (202), the lower extreme of chute board (301) and the upper end fixed connection of fixed base station (1), the other end of chute board (301) and the one end fixed connection of fixed plate (201).
4. The super high-rise building construction concrete pump pipe fixing structure of claim 1, characterized in that: the outer surface of slider (302) and the internal surface sliding connection of the spout of spout board (301), the lower extreme of backup pad (303) and the upper end one end fixed connection of spout board (301), the other end of threaded rod (304) and the one end fixed connection of slider (302), the surface of threaded rod (304) and the screw hole internal surface threaded connection of backup pad (303).
5. The super high-rise building construction concrete pump pipe fixing structure of claim 1, characterized in that: the other end of the rotary table (305) is fixedly connected with one end of the threaded rod (304), and one end of the rotary handle (306) is fixedly connected with one end edge of the rotary table (305).
6. The super high-rise building construction concrete pump pipe fixing structure of claim 1, characterized in that: the upper end of slider (302) and the lower extreme fixed connection of the fixed cover of second (307), the lower extreme of second locking board (308) and the upper end fixed connection of the fixed cover of second (307), through fixed screw locking connection between first locking board (203) and the second locking board (308), threaded rod (304), carousel (305) and turning handle (306) all are provided with two sets ofly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022690688.4U CN214889337U (en) | 2020-11-19 | 2020-11-19 | Concrete pump pipe fixing structure for super high-rise building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022690688.4U CN214889337U (en) | 2020-11-19 | 2020-11-19 | Concrete pump pipe fixing structure for super high-rise building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214889337U true CN214889337U (en) | 2021-11-26 |
Family
ID=78950764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022690688.4U Expired - Fee Related CN214889337U (en) | 2020-11-19 | 2020-11-19 | Concrete pump pipe fixing structure for super high-rise building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214889337U (en) |
-
2020
- 2020-11-19 CN CN202022690688.4U patent/CN214889337U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214889337U (en) | Concrete pump pipe fixing structure for super high-rise building construction | |
CN107780639B (en) | A kind of construction protection eminence painting support equipment | |
CN210010727U (en) | Pipe clamping device convenient for adjusting diameter of clamping opening | |
CN113063670B (en) | Detection equipment for compressive capacity of cement test block | |
CN212984717U (en) | Slant construction equipment for construction | |
CN214302882U (en) | Novel template is fixed for building engineering construction device | |
CN210032676U (en) | Civil engineering construction is with platform device of unloading | |
CN212271606U (en) | Hole reservation device for building engineering | |
CN211007566U (en) | Portable construction frame | |
CN210598376U (en) | Fastening device for equipment installation in vertical direction of electric iron tower | |
CN209927777U (en) | Road bridge crack monitoring devices | |
CN210939950U (en) | Concrete slab drilling equipment for construction site | |
CN221100341U (en) | Be used for construction concrete quality detector | |
CN211740829U (en) | Truncated cone circular mold structure for cement mortar fluidity tester | |
CN213037670U (en) | Glass supporting device for glass surface spraying production line | |
CN218157241U (en) | Strength testing device of energy-saving building material | |
CN219138383U (en) | Aluminum die pulling-on piece dismounting device | |
CN218205927U (en) | Building engineering construction formwork support structure | |
CN215847942U (en) | Magnetron sputtering cathode target tube installation device | |
CN214006635U (en) | Building structure reinforcing apparatus | |
CN220933106U (en) | Safety detection device for household appliances after sale | |
CN219549808U (en) | Narrow space pipeline support device | |
CN219882802U (en) | Concrete experiment block curing frame | |
CN216158607U (en) | Delivery pump support convenient to quick travel is fixed | |
CN218696917U (en) | Stainless steel hexagonal rod chamfering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211126 |